standard structural bearings: A Series
Description:

Bearings in this series are designed to support loads of up to 2000kN(200 tonnes) at bearing surface temperatures of up to 150
C. For temperatures between 150 C and 250 C the bearings must be derated.
Translation in the plane of movement is maintained at a low frictional resistance by the use of mating surfaces, polished
stainless steel and PTFE.
Designs incorporating alternate bearing material can be used in applications where vibration or heat is a problem. Designers
should raise these applications with our technical staff.

Bearing Selection & Part No.

Example 1.

Required attachment

- Threaded holes in
top and base plates.
Required load capacity
- 1500kN
Dimension A
- 275mm
Required Movements X
- 25mm
Y - 12,5mm
Part No. AH 150/275/50/25

Example 2.

Bearing same as for example I but constrained in Y direction.


Part No. AH 150/275/50/C

Greater Movements:-

Can be provided on request

Material Specifications:-

Top plate base plate & studs


Bearing plate
Bearing Material
Standard finish

- Mild Steel
- Stainless steel
- PTFE or other on special applications
- Primer

All d im e n s io n s a re in m illim e tre s

L O AD

P ART No .S UF F IX *

P ART
NUM BER
/10/125/*
/10/95/*
/20/160/*
/20/125/*
/30/185/*
/30/145/*
/40/210/*
/40/160/*
/50/230/*
/50/175/*
/60/250/*
/60/185/*
/70/265/*
/70/195/*
/80/280/*
/80/210/*
/90/290/*
/90/215/*
/100/305/*
/100/230/*
/110/320/*
/110/240/*
/120/330/*
/120/250/*
/130/345/*
/130/255/*
/140/355/*
/140/265/*
/150/370/*
/150/275/*
/175/395/*
/175/290/*
/200/420/*
/200/315/*

M O V EM ENT
KN
100
100
200
200
300
300
400
400
500
500
600
600
700
700
800
800
900
900
1000
1000
1100
1100
1200
1200
1300
1300
1400
1400
1500
1500
1750
1750
2000
2000

A
125
95
160
125
185
145
210
160
230
175
250
185
265
195
280
210
290
215
305
230
320
240
330
250
345
255
355
265
370
275
395
290
420
315

B
125
155
160
210
185
245
210
280
215
295
235
320
250
340
265
365
275
380
290
405
305
425
315
445
330
455
340
475
355
480
380
525
405
565

F
85
55
120
85
135
95
160
110
155
100
175
110
190
120
180
110
190
115
205
130
195
115
205
125
220
130
205
115
220
125
245
140
270
165

G
85
115
120
170
135
195
160
230
155
235
175
260
190
280
180
280
190
295
205
320
195
315
205
335
220
345
205
340
220
345
245
390
270
430

C
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55
55

25/C
25/25
X = 12.5
Y= 12.5 Y= 1.5
E
K
D
145 145 180
175 115 210
180 180 215
230 145 265
205 205 240
270 165 305
230 230 265
300 180 335
250 250 285
330 195 365
270 270 305
360 210 390
285 285 320
375 220 410
300 300 335
400 230 435
315 315 350
415 235 450
325 325 360
440 250 475
340 340 375
460 260 495
350 350 385
480 270 515
365 365 400
490 275 525
375 375 410
510 285 545
390 390 425
515 295 550
415 415 450
560 310 595
440 440 475
600 330 635

50/25
50/C
X = 25
Y= 12.5 Y= 1.5
E
K
D
145 170 180
175 140 210
180 205 215
230 170 265
205 230 240
270 190 305
230 255 265
300 205 335
250 275 285
330 220 365
270 295 305
360 235 390
285 310 320
375 245 410
300 325 335
400 255 435
315 340 350
415 260 450
325 350 360
440 275 475
340 365 375
460 285 495
350 375 385
480 295 515
365 390 400
490 300 525
375 400 410
510 310 545
390 415 425
515 320 550
415 440 450
560 335 595
440 465 475
600 355 635

75/25
75/C
X = 37.5
Y= 12.5 Y= 1.5
E
K
D
145 195 180
175 165 210
180 230 215
230 195 265
205 255 240
270 215 305
230 280 265
300 230 335
250 300 285
330 245 365
270 320 305
360 260 390
285 335 320
375 265 410
300 350 335
400 280 435
315 360 350
415 285 450
325 375 360
440 300 475
340 390 375
460 310 495
350 400 385
480 320 515
365 415 400
490 325 525
375 425 410
510 335 545
390 440 425
515 345 550
415 465 450
560 360 595
440 490 475
600 380 635

50/50
X = 25
Y= 25
E
D
170 170
200 140
205 205
255 170
230 230
295 190
255 255
325 205
275 275
355 220
295 295
385 235
310 310
400 245
325 325
425 255
335 340
440 260
350 350
465 275
365 365
485 285
375 375
505 295
390 390
515 300
400 400
535 310
415 415
540 320
440 440
585 335
465 465
625 355

Check list for the installation of bearings

DO
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Handle carefully and where necessary with adequate craneage


Store in a clean dry place.
Ensure that bearings are installed in the correct location and orientation.
Ensure that bearings are installed on a flat rigid bed before the design loads are applied.
Ensure that fixings are uniformly tightened.
Complete any site coatings and make good any corrosion protection damaged during handling and installation.
Protect the working surfaces during the placement of in-situ concrete.
Keep the bearings and surrounding areas clean.
Remove any temporary transit clamps etc. before the bearings are required to operate.
Take special care to support top plates when casting in-situ concrete.

DO NOT
1.
2.
3.
4.
5.

Dismantle bearings on site.


Leave bearings uncovered.
Install any bearings showing signs of damage.
Attempt to modify without approval.
Install without qualified supervision.

Honel Structural Products (Pty) Ltd.


Physical Address:
Unit 16, 8 Reed Place
Maxmead
Pinetown
Postal Address:
18 Padfield Road
Pinetown
3610
Phone:+27 31 701 1355
Fax:+27 31 701 1356
Cell:+27 83 630 21 26
Web Site: www.honel.co.za
E-mail: sales@honel.co.za

S-ar putea să vă placă și