25816 Federal Register / Vol. 70, No.

93 / Monday, May 16, 2005 / Notices

under this program by the deadline date LLC (collectively, Allegheny) pursuant DEPARTMENT OF ENERGY
in this notice. Eligible applicants that to section 206 of the Federal Power Act,
submitted their applications in a timely 16 U.S.C. 824e (2000), and Rule 206 of Federal Energy Regulatory
manner for the Star Schools program FY the Commission’s Rules of Practice and Commission
2005 competition to the Department on Procedure, 18 CFR 385.206 (2004),
[Docket No. ER01–545–006, et al.]
or prior to the competition’s original alleging that Allegheny has violated the
deadline date of May 9, 2005, are not interconnection requirements of both Duke Energy Lee, LLC, et al. Electric
required to re-submit their applications the Commission and PJM Rate and Corporate Filings
or re-apply in order to be considered for Interconnection, L.L.C. (PJM). Longview
FY 2005 awards under this program. We has requested Fast Track Processing of May 10, 2005.
encourage eligible applicants to submit the complaint pursuant to 18 CFR The following filings have been made
their applications as soon as possible to 385.206(h) (2004). with the Commission. The filings are
avoid any problems with filing Longview certifies that a copy of the listed in ascending order within each
electronic applications on the last day. complaint was served on the contacts docket classification.
The deadline for submission of for Monongahela Power Company,
Allegheny Energy Supply Company, 1. Duke Energy Lee, LLC
applications will not be extended any
further. LLC, and PJM, as listed on the [Docket No. ER01–545–006]
Electronic Access to This Document: Commission’s list of Corporate Officials, Take notice that, on May 3, 2005,
You may view this document, as well as and on the Public Service Commission Duke Energy Lee, LLC (Duke Lee)
all other documents of this Department of West Virginia. submitted for filing revisions to its
published in the Federal Register, in Any person desiring to intervene or to market-based rate tariff, designated as
text or Adobe Portable Document protest this filing must file in FERC Electric Tariff, Original Volume
Format (PDF) on the Internet at the accordance with Rules 211 and 214 of No. 1, to include the change in status
following site: http://www.ed.gov/news/ the Commission’s Rules of Practice and reporting requirements adopted in
fedregister. Procedure (18 CFR 385.211 and Reporting Requirement for Changes in
To use PDF you must have Adobe 385.214). Protests will be considered by Status For Public Utilities With Market-
Acrobat Reader, which is available free the Commission in determining the Based Rate Authority, Order No. 652,
at this site. If you have questions about appropriate action to be taken, but will 110 FERC ¶ 61,097 (2005).
using PDF, call the U.S. Government not serve to make protestants parties to Duke Lee states that copies of the
Printing Office (GPO), toll free, at 1– the proceeding. Any person wishing to filing were served upon the parties on
888–293–6498; or in the Washington, become a party must file a notice of the official service list in the Docket No.
DC, area at (202) 512–1530. intervention or motion to intervene, as ER01–545–000.
appropriate. The Respondent’s answer Comment Date: 5 p.m. eastern time on
Note: The official version of this document and all interventions, or protests must
is the document published in the Federal May 24, 2005.
Register. Free Internet access to the official be filed on or before the comment date.
edition of the Federal Register and the Code The Respondent’s answer, motions to 2. Hermiston Power Partnership, Zion
of Federal Regulations is available on GPO intervene, and protest must be served on Energy LLC, Auburndale Peaker Energy
Access at: http://www.gpoaccess.gov/nara/ the Complainants. Center L.L.C.
index.html. The Commission encourages [Docket Nos. ER02–1257–002, ER02–1319–
electronic submission of protests and 002, and ER02–1633–002]
Dated: May 11, 2005. interventions in lieu of paper using the
Nina Shokraii Rees, Take notice that on May 3, 2005,
‘‘eFiling’’ link at http://www.ferc.gov.
Assistant Deputy Secretary for Innovation and Hermiston Power Partnership; Zion
Persons unable to file electronically
Improvement. Energy LLC; and Auburndale Peaker
should submit an original and 14 copies
[FR Doc. 05–9728 Filed 5–13–05; 8:45 am] Energy Center L.L.C. submitted a joint
of the protest or intervention to the
triennial updated market power analysis
BILLING CODE 4000–01–P Federal Energy Regulatory Commission,
and revised market-based rate schedules
888 First Street, NE., Washington, DC
to incorporate: (1) the reporting
20426.
This filing is accessible on-line at requirements adopted by the
DEPARTMENT OF ENERGY
http://www.ferc.gov, using the Commission in Order No. 652,
Federal Energy Regulatory ‘‘eLibrary’’ link and is available for Reporting Requirements for Changes in
Commission review in the Commission’s Public Status for Public Utilities with Market-
Reference Room in Washington, DC. Based Rate Authority, 110 FERC
[Docket No. EL05–108–000] ¶ 61,097 (2005), and (2) the required
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to affiliates sales language pursuant to
Longview Power, LLC, Complainant, v.
receive e-mail notification when a Aquila, Inc., 101 FERC ¶ 61,331 (2002).
Monongahela Power Company, Doing
document is added to a subscribed Comment Date: 5 p.m. eastern time on
Business as Allegheny Power, and
docket(s). For assistance with any FERC May 24, 2005.
Allegheny Energy Supply Company,
LLC, Respondents; Notice of Online service, please e-mail 3. Midwest Independent Transmission
Complaint and Request for Fast Track FERCOnlineSupport@ferc.gov, or call System Operator, Inc. PJM
Processing (866) 208–3676 (toll free). For TTY, call Interconnection, L.L.C.
(202) 502–8659.
May 10, 2005. [Docket No. ER04–375–021]
Comment Date: 5 p.m. eastern time on
Take notice that on May 9, 2005, May 31, 2005. Take notice that on May 2, 2005 as
Longview Power, LLC (Longview) filed amended on May 4, 2005, the Midwest
a formal complaint against Linda Mitry, Independent Transmission System
Monongahela Power Company, doing Deputy Secretary. Operator, Inc. (Midwest ISO) and PJM
business as Allegheny Power, and [FR Doc. E5–2435 Filed 5–13–05; 8:45 am] Interconnection, L.L.C. (PJM), submitted
Allegheny Energy Supply Company, BILLING CODE 6717–01–P revisions to the Joint Operating

VerDate jul<14>2003 16:37 May 13, 2005 Jkt 205001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\16MYN1.SGM 16MYN1