Federal Register / Vol. 70, No.

89 / Tuesday, May 10, 2005 / Notices 24501

DEPARTMENT OF AGRICULTURE project would be located in McDuffie, and at: Glascock County Public Library,
Warren, Hancock, Glascock and 738 Railroad Avenue, Gibson, GA
Forest Service Washington Counties, Georgia. 30810, Phone: 706–598–9837. Harlem
Meeting Information: RUS will Library, 375 North Louisville Street,
Notice of Sanders County Resource conduct a Scoping Meeting in an open Harlem, GA 30814, Phone: 706–556–
Advisory Committee Meeting house format from 1 p.m. until 3 p.m. 9795. Hancock County Library, 403 East
AGENCY: Forest Service, USDA. on Tuesday, May 24, 2005, at the Broad Street, Sparta, GA 31087, Phone:
Warthen Community Center, Warthen, 706–444–5389. Rosa M Tarbutton
ACTION: Notice of meeting. Georgia 31094. Phone: (770) 270–7741. Memorial Library, 314 South Harris
SUMMARY: Pursuant to the authorities in The Community Center is on Bethlehem Street, Sandersville, GA 31082, Phone:
the Federal Advisory Committee Act Baptist Church Road, located on State 478–552–6324. Thomson McDufffie
(Pub. L. 92–463) and under the Secure Route 102 approximately .25 miles County Library, 338 Main Street,
Rural Schools and Community Self- north of the intersection of State Route Thomson, GA 30824, Phone: 706–595–
Determination Act of 2000 (Pub. L. 106– 15. A second Scoping Meeting will be 1341. Warren County Library, 101
393) the Lolo and Kootenai National held from 5 p.m. until 7 p.m. on Warren Street, Warrenton, GA 30828,
Forests’ Sanders County Resource Tuesday, May 24, 2005. The meeting Phone: 706–465–2656.
Advisory Committee will meet on May will be held at Thomson High School, Government agencies, private
13, 2005 at 1 p.m. in Trout Creek, located at 1160 White Oak Road in organizations, and the public are invited
Montana for a business meeting. The Thomson, Georgia 30824. Phone: (706) to participate in the planning and
meeting is open to the public. 595–9393. The purpose of these two analysis of the proposed project.
DATES: May 13, 2005.
meetings are provide information and Representatives from RUS and Georgia
solicit comments. Transmission Corporation will be
ADDRESSES: The meeting will begin at
FOR FURTHER INFORMATION CONTACT: available at the scoping meetings to
Cabinet Station, 2693 Highway 200,
Stephanie Strength, Engineering and discuss RUS’ environmental review
Trout Creek, MT 59874.
Environmental Staff, Rural Utilities process, describe the project, the need
FOR FURTHER INFORMATION CONTACT: Service, Stop 1571, 1400 Independence for the project, and macro corridors
Randy Hojem, Designated Forest Official Avenue, SW., Washington, DC 20250– under consideration, and discuss the
(DFO), District Ranger, Plains Ranger 1571. Telephone: (202) 720–0468. Mrs. scope of environmental issues to be
District, (406) 826–3821. Strength’s e-mail address is considered, answer questions, and
SUPPLEMENTARY INFORMATION: Agenda stephanie.strength@usda.gov. accept oral and written comments.
topics include a field visit to view Written comments will be accepted for
SUPPLEMENTARY INFORMATION: Georgia
projects completed in the Bull River 30 days after the public scoping
Transmission Corporation proposes to
area using Title II funds. If the meeting meeting. Written comments should be
construct a 500 kilovolt transmission
time or location is changed, notice will sent to RUS at the address provided in
line between the Thomson Substation
be posted in the local newspapers, this notice.
(located on Hampton-Davis Road, 4
including the Clark Fork Valley Press, From information provided in the
miles east of Thomson, Georgia, and 2
Sanders County Ledger, Daily Interlake, alternative evaluation and site selection
miles northeast of Boneville, Georgia) to
Missoulian, and River Journal. study, input that may be provided by
the Warthen Switching Station (located
Dated: April 27, 2005. 8 miles northwest of Warthen, Georgia government agencies, private
Randy Hojem, and 1.5 miles southwest of State organizations, and the public, Georgia
Designated Federal Official, District Ranger, Highway 15 on Mill Lindsey School Transmission Corporation will prepare
Plains Ranger District. Road). It is near the Scherer-Warthen an environmental analysis to be
[FR Doc. 05–9242 Filed 5–9–05; 8:45 am] 500 kV Transmission Line and adjacent submitted to RUS for review. RUS will
BILLING CODE 3410–11–M to the Duke Energy North America’s use the environmental analysis to
Sandersville Facility, a combustion determine the significance of the
turbine generation plant. Lattice steel impacts of the project and may adopt it
DEPARTMENT OF AGRICULTURE towers ranging in height from 80- to as its environmental assessment of the
150-feet would support the conductors project. RUS’ environmental assessment
Rural Utilities Service and would require a right-of-way of 180 of the project would be available for
feet. The approximate length of the review and comment for 30 days.
Georgia Transmission Corporation; Should RUS determine, based on the
transmission line is 40 miles. It is
Notice of Intent Environmental Assessment of the
anticipated that this transmission line
AGENCY: Rural Utilities Service, USDA. would be in service in the spring of project, that the impacts of the
ACTION:Notice of intent to hold scoping 2010. construction and operation of the plant
meeting and prepare an Environmental Alternatives considered by RUS and would not have a significant
Assessment. Georgia Transmission Corporation environmental impact, it will prepare a
include: (a) No action, (b) alternative finding of no significant impact. Public
SUMMARY: Notice is hereby given that transmission improvements, and (c) notification of a finding of no significant
the Rural Utilities Service (RUS), an alternative transmission line corridors. impact would be published in the
agency delivering the U. S. Department An Electric Alternative Evaluation and Federal Register and in newspapers
of Agriculture’s Rural Development Macro Corridor Study Report, prepared with a circulation in the project area.
Utilities Programs, proposes to prepare by Georgia Transmission Corporation, Any final action by RUS related to the
an Environmental Assessment related to will be presented at the public scoping proposed project will be subject to, and
possible financing assistance to Georgia meeting. The Report is available for contingent upon, compliance with
Transmission Corporation for the public review at RUS at the address environmental review requirements as
construction of approximately 40 miles provided in this notice, at Georgia prescribed by the Council on
of 500 kilovolt transmission line. The Transmission Corporation, 2100 East Environmental Quality (CEQ) and RUS’
proposed 500-kilovolt transmission line Exchange Place, Tucker, Georgia 30084 environmental policies and procedures.

VerDate jul<14>2003 16:17 May 09, 2005 Jkt 205001 PO 00000 Frm 00004 Fmt 4703 Sfmt 4703 E:\FR\FM\10MYN1.SGM 10MYN1
24502 Federal Register / Vol. 70, No. 89 / Tuesday, May 10, 2005 / Notices

Dated: May 4, 2005. invited interested parties to comment on On March 15, 2005, the Petitioners,
Glendon D. Deal, our preliminary determination, BioLab Inc.,3 and the two Mandatory
Director, Engineering and Environmental amended preliminary determination, Respondents submitted case briefs.
Staff, Water and Environmental Programs, and preliminary critical circumstances On March 17, BioLab requested a one-
Rural Utilities Service. determination. Based on our analysis of day extension to submit rebuttal briefs
[FR Doc. 05–9241 Filed 5–9–05; 8:45 am] the comments we received, we have until March 22, 2005. The Department
BILLING CODE 3410–15–P made changes to our calculations for the granted the request, and received the
two Mandatory Respondents. As a result rebuttal briefs from parties on March 22,
of those changes, the rate assigned to the 2005. On March 24, 2005, the
DEPARTMENT OF COMMERCE Section A Respondents has also Department convened a public hearing
changed. in accordance with 19 CFR
International Trade Administration 351.310(d)(l). Representatives for the
Case History two Mandatory Respondents, the
[A–570–898]
The Department published its Petitioners, and BioLab were in
Notice of Final Determination of Sales preliminary determination in this attendance. On March 29, 2005, Jiheng
at Less Than Fair Value: Chlorinated investigation on December 16, 2004. See submitted its revised rebuttal brief.
Isocyanurates From the People’s Notice of Preliminary Determination of On April 11, 2005, the Department
Republic of China Sales at Less Than Fair Value and published the Preliminary Critical
Postponement of Final Determination: Circumstances Determination. On April
AGENCY: Import Administration, Chlorinated Isocyanurates from the 14, 2005, the Petitioners submitted a
International Trade Administration, People’s Republic of China, 69 FR 75293 case brief on the Department’s
Department of Commerce. (December 16, 2004) (‘‘Preliminary Preliminary Critical Circumstances
DATES: Effective Date: May 10, 2005. Determination’’). On February 24, 2005, Determination.
FOR FURTHER INFORMATION CONTACT: the Department published an amended Mandatory Respondents
Cindy Lai Robinson or Brian C. Smith, preliminary determination. See Notice
AD/CVD Operations, Office 9, Import On December 10, 2004, Jiheng and
of Amended Preliminary Antidumping
Administration, International Trade Nanning submitted sales reconciliation
Duty Determination of Sales at Less
Administration, U.S. Department of documentation. Jiheng also submitted
Than Fair Value: Chlorinated
Commerce, 14th Street and Constitution its response to a question addressed in
Isocyanurates from the People’s
Avenue NW., Washington, DC 20230; the Department’s November 12, 2004,
Republic of China, 70 FR 9035
telephone: (202) 482–3797 or (202) 482– letter concerning its reported sulfuric
(February 24, 2005) (‘‘Amended
1766, respectively. acid data. On December 17, 2004, the
Preliminary Determination’’). On April
Department sent a supplemental
Final Determination 11, 2005, the Department published its questionnaire for sales and cost
partial affirmative preliminary critical reconciliations to Jiheng and Nanning.
We determine that chlorinated circumstances determination. See
isocyanurates from the People’s On December 21, 2004, the Department
Partial Affirmative Preliminary sent another supplemental
Republic of China (‘‘PRC’’) is being, or Determination of Critical
is likely to be, sold in the United States questionnaire to Jiheng addressing
Circumstances: Chlorinated certain deficiencies in its November 23,
at less than fair value (‘‘LTFV’’) as Isocyanurates from the People’s
provided in section 735 of Tariff Act of 2004, submission. On December 22,
Republic of China, 70 FR 18362 (April 2004, Arch Chemicals, an interested
1930, as amended (‘‘the Act’’). The 11, 2005) (‘‘Preliminary Critical
estimated margins of sales at LTFV are party in this proceeding, submitted a
Circumstances Determination’’). copy of its July 30, 2004, rebuttal scope
shown in the ‘‘Final Determination Since the publication of the
Margins’’ section of this notice. comments, ‘‘Respondent’s Reply to
Preliminary Determination, the Petitioners’ Scope Comments,’’ which
SUMMARY: On December 16, 2004, the following events have occurred. The are applicable to the dual PRC and
Department of Commerce Department conducted verification of Spain antidumping proceedings:
(‘‘Department’’) published its the two Mandatory Respondents: Jiheng Antidumping Duty Investigation of
preliminary determination and on January 17 through 21, 2005; Chlorinated Isocyanurates from People’s
postponement of the final determination Nanning on January 24 through 28, Republic of China and Spain, Case Nos.
in this case. On February 24, 2005, the 2005; and a Section A Respondent: A–570–898 and A–469–814.
Department published an amended Sinochem Hebei on January 27 and 28, On December 20, 2004, Jiheng and
preliminary determination in this case. 2005. See ‘‘Verification’’ Section below Nanning submitted ministerial error
On April 11, 2005, the Department for additional information. allegations.
published its partial affirmative On January 13, 2005, Clearon On January 4, 2005, Jiheng submitted
preliminary critical circumstances Corporation and Occidental Chemical its response to the Department’s
determination in this case. Corporation (the ‘‘Petitioners’’), Jiheng, December 21, 2004, supplemental
This investigation covers two and Arch Chemicals, Inc. (‘‘Arch’’), an questionnaire. On January 5 and 12,
exporters of chlorinated isocyanurates importer of subject merchandise, 2005, Jiheng and Nanning submitted
that are Mandatory Respondents 1 and requested that the Department convene their responses to the Department’s
five Section A Respondents.2 We a hearing in this proceeding. On March December 17, 2004, sales and cost
4, 2005, the Department informed all reconciliations questionnaire,
1 Hebei Jiheng Chemical Co., Ltd. (‘‘Jiheng’’) and
interested parties of the hearing date respectively.
Nanning Chemical Industry Co., Ltd. (‘‘Nanning’’).
2 Liaocheng Huaao Chemical Industry Co., Ltd.
and location. On January 10, 2005, Jiheng submitted
(‘‘Huaao’’); Shanghai Tian Yuan International On February 24, 2005, the Department a revised sales listing and factors of
Trading Co., Ltd., (‘‘Tian Yuan’’); Changzhou Clean published the Amended Preliminary
Chemical Co., Ltd. (‘‘Clean Chemical’’); Sinochem Determination. 3 On January 27, 2005, BioLab, Inc. (BioLab), a

Hebei Import & Export Corporation (‘‘Sinochem U.S. producer of chlorinated isocyanurates,
Hebei’’); and Sinochem Shanghai Import & Export
On March 4, 2005, the petitioners submitted a letter of appearance as an interested
Corporation (‘‘Sinochem Shanghai’’). filed a critical circumstances allegation. party.

VerDate jul<14>2003 16:17 May 09, 2005 Jkt 205001 PO 00000 Frm 00005 Fmt 4703 Sfmt 4703 E:\FR\FM\10MYN1.SGM 10MYN1

S-ar putea să vă placă și