N.O.W:
Item of Work
Qty
Unit
1084.10
m2
668.35
m2
1370.51
m2
95.53
m2
10.22
m2
42.00
m2
72.49
m2
2.60
m3
Excavation in foundation of
building, bridges etc complete : in
hard soil or soft murum
22.44
m3
7.49
m3
1.77
m3
0.768
Tonne
Rate
Amount
4.15
m3
17.85
m3
15
204.61
m2
16
77.67
m2
100
2.12
m2
3.52
m2
26.05
m2
2.6
m2
9.74
m2
1.86
m2
5.49
7.35
m3
40.38
m2
150.67
m2
18
21
23
25
21.19
0.834
tonne
2.79
m2
3.10
m3
15.48
8.99
m3
17.31
0.83
m2
12
Each
807.35
m2
532.5
m2
39 50% Available
359.5
Each
2.23
m2
4.46
m2
6370.95
m2
64.03
m2
Excavation in foundation of
44 building, bridges etc complete : in
sand, ashes or loose soil
0.76
m3
0.27
m2
1.69
m3
60.03
m2
9.29
m2
15.33
m2
50.18
m2
5.39
m2
42
46
49
52
32
Each
53
22
Each
54
Each
55
Each
260
57
Each
58
Each
Each
Each
Each
Each
Each
Each
Each
152.50
Each
Each
60
69
Each
70
Each
53.6
Each
Each
60
Each
85
Each
252
50
21
Each
17
Each
Each
16
Set
80
72
78
32
Each
14
Each
12
Each
Each
12
Each
14
Set
85
86
87
88
Total