Sunteți pe pagina 1din 2

Federal Register / Vol. 70, No.

62 / Friday, April 1, 2005 / Notices 16815

‘‘eLibrary’’ link and is available for Construction of a New North-South EIS No. 050138, Draft Supplement, NIH,
review in the Commission’s Public Transportation Link to Connect the MA, National Emerging Infectious
Reference Room in Washington, DC. City of Manassas with I–66, Funding Disease Laboratories, Additional
There is an ‘‘eSubscription’’ link on the and U.S. COE Section 404 Permit, Information on Two Alternatives,
Web site that enables subscribers to Prince William, Fairfax and Loudoun Construction of National
receive email notification when a Counties, VA, Comment Period Ends: Biocontainment Laboratory,
document is added to a subscribed May 23, 2005, Contact: Ed Sundra BioSquare Research Park, Boston
docket(s). For assistance with any FERC (804) 775–3338. University Medical Center Campus,
Online service, please e-mail EIS No. 050132, Final EIS, BLM, CA, Boston, MA, Comment Period Ends:
FERCOnlineSupport@ferc.gov, or call West Mojave Plan, Habitat May 18, 2005, Contact: Valerie
(866) 208–3676 (toll free). For TTY, call Conservation Plan and Federal Land Nottingham (301) 496–7775.
(202) 502–8659. Use Plan Amendment,
Implementation, California Desert Amended Notices
Linda Mitry,
Conservation Area, Portions of San
Deputy Secretary. EIS No. 050063, Final EIS, AFS, UT,
Bernardino, Kern, Inyo, and Los
[FR Doc. E5–1468 Filed 3–31–05; 8:45 am] Angeles Counties, CA Wait Period Monticello and Blanding Municipal
BILLING CODE 6717–01–P Ends: May 2, 2005, Contact: Alan Watershed Improvement Projects,
Stein (951) 697–5382. Implementation, Manti-La Sal
EIS No. 050133, Draft EIS, AFS, OH, National Forest, Monticello Ranger
ENVIRONMENTAL PROTECTION Wayne National Forest, Proposed District, San Juan County, UT, Due:
AGENCY Revised Land and Resource March 21, 2005, Contact: Greg T.
[ER–FRL–6661–9] Management Plan, Implementation, Montgomery (435) 636–3348.
Several Counties, OH, Comment Published FR—02–18–05—Retracted
Environmental Impact Statements; Period Ends: June 30, 2005, Contact: due to noncompliance of Section
Notice of Availability Bob Gianniny (740) 753–0101. 1506.9 of the Council on
EIS No. 050134, Draft EIS, AFS, ID, UT, Environmental Quality Regulations.
Responsible Agency: Office of Federal WY, Caribou Travel Plan Revision,
Activities, General Information (202) EIS No. 050111, Draft EIS, AFS, CA,
Determine the Motorized Road and Power Fire Restoration Project, To
564–7167 or http://www.epa.gov/ Trail System, Implementation,
compliance/nepa/. Reduce Long-Term Fuel Loading for
Caribou-Targhee National Forest,
Weekly receipt of Environmental Impact the Purpose of Reducing Future
Westside, Soda Spring and
Statements filed March 21, 2005, Severity and Resistance to Control,
Montpelier Ranger Districts, Bannock,
through March 25, 2005, pursuant to Bear River, Bonneville, Caribou, Amador Ranger District, Eldorado
40 CFR 1506.9. Franklin, Oneida and Power Counties, National Forest, Amador County, CA,
ID; Box Elder and Cache Counties, UT Comment Period Ends: May 9, 2005,
EIS No.050128, Draft EIS, AFS, ID,
Porcupine East, 9 Allotment Grazing and Lincoln County, WY, Comment Contact: Patricia Ferrell (530) 642–
Analysis Project, Authorizing Period Ends: May 16, 2005, Contact: 5146. Revision of FR Notice Published
Livestock Grazing, Caribou-Targhee Deb Tiller (208) 524–7500. on 3/25/2005: Correction to CEQ
National Forest, Dubois Ranger EIS No. 050135, Draft Supplement, COE, Comment Period from March 9, 2005
District, Cenntenial Mountains, Clark FL, Herbert Hoover Dike Major to May 9, 2005.
County, ID, Comment Period Ends: Rehabilitation Evaluation Study, Dated: March 29, 2005.
May 9, 2005, Contact: Shane Q. Proposed to Reduce the Probability of Robert W. Hargrove,
Jacobson (208) 374–5422. The above a Breach of Reach One, Lake
Director, NEPA Compliance Division, Office
NOA EIS should have appeared in the Okeechobee, Martin and Palm Beach
of Federal Activities.
03/25/2005 Federal Register. The 45- Counties, FL, Comment Period Ends:
[FR Doc. 05–6490 Filed 3–31–05; 8:45 am]
Day Comment Period is Calculated May 16, 2005, Contact: Rebecca Weiss
from 03/25/2005. (904) 232–1577. BILLING CODE 6560–50–P

EIS No. 050129, Final EIS, AFS, UT, EIS No. 050136, Draft EIS, AFS, CO, Dry
Duck Creek Fuels Treatment Analysis, Fork Federal Coal Lease-by-
To Reduce Fuels, Enhance Fire- Application (COC–67232), Leasing ENVIRONMENTAL PROTECTION
Tolerant Vegetation and Provide Fuel Additional Federal Coal Lands for AGENCY
Breaks, Dixie National Forest, Cedar Underground Coal Resource, Special-
City Ranger District, Kane County, Use-Permits and U.S. Army COE [ER–FRL–6662–1]
UT, Wait Period Ends: May 2, 2005, Section 404 Permit, Grand Mesa,
Contact: David Swank (435) 865– Uncompahgre and Gunnison National Environmental Impact Statements and
3700. Forests, Gunnison County, CO, Regulations; Availability of EPA
EIS No. 050130, Final EIS, AFS, WI, Comment Period Ends: May 16, 2005, Comments
Lakewood/Laona Plantation Thinning Contact: Liane Mattson (970) 844–
Project, To Implement Vegetation 6697. Availability of EPA comments
Management Activities, EIS No. 050137, Draft EIS, AFS, VT, prepared pursuant to the Environmental
Chequamegon-Nicolet National Green Mountain National Forest, Review Process (ERP), under Section
Forest, Lakewood Ranger District, Propose Revised Land and Resource 309 of the Clean Air Act and Section
Forest, Langlade and Oconto Management Plan, Implementation, 102(2)(c) of the National Environmental
Counties, WI, Wait Period Ends: May Forest Plan Revision, Addison, Policy Act as amended. Requests for
2, 2005, Contact: Anne F. Archie (715) Bennington, Rutland, Washington, copies of EPA comments can be directed
362–1300. Windham and Windsor Counties, VT, to the Office of Federal Activities at
EIS No. 050131, Draft EIS, FHW, VA, Comment Period Ends: June 30, 2005, (202) 564–7146.
Tri-County Parkway Location Study, Contact: Jay Strand (802) 767–4261.

VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\01APN1.SGM 01APN1
16816 Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices

Summary of Rating Definitions protect the environment, or the EPA Summary: EPA has environmental
reviewer has identified new reasonably concerns about the proposed project
Environmental Impact of the Action
available alternatives that are within the related to upland forest habitat losses,
LO—Lack of Objections spectrum of alternatives analyzed in the forest fragmentation, and potential for
The EPA review has not identified draft EIS, which could reduce the stream sedimentation. EPA also
any potential environmental impacts environmental impacts of the action. recommends additional analysis of the
requiring substantive changes to the The identified additional information, cumulative impacts related to forest
proposal. The review may have data, analyses, or discussion should be fragmentation be included in the FEIS.
disclosed opportunities for application included in the final EIS. ERP No. D–FRC–G03024–TX Rating
of mitigation measures that could be EC2, Vista del Sol Liquefied Natural Gas
Category 3—Inadequate (LNG) Terminal Project, Construct,
accomplished with no more than minor
changes to the proposal. EPA does not believe that the draft Install and Operate an LNG Terminal
EIS adequately assesses potentially and Natural Gas Pipeline Facilities,
EC—Environmental Concerns significant environmental impacts of the Vista del Sol LNG Terminal LP and
The EPA review has identified action, or the EPA reviewer has Vista del Sol Pipeline LP, TX.
environmental impacts that should be identified new, reasonably available Summary: EPA identified
avoided in order to fully protect the alternatives that are outside of the environmental concerns that may
environment. Corrective measures may spectrum of alternatives analyzed in the require changes to the preferred
require changes to the preferred draft EIS, which should be analyzed in alternative and mitigation measures to
alternative or application of mitigation order to reduce the potentially reduce environmental impact. EPA
measures that can reduce the significant environmental impacts. EPA requested additional information to be
environmental impact. EPA would like believes that the identified additional included in the FEIS, including
to work with the lead agency to reduce information, data, analyses, or information regarding wetland impacts,
these impacts. discussions are of such a magnitude that mitigation, contaminant testing and the
they should have full public review at suitability of dredged material for
EO—Environmental Objections a draft stage. EPA does not believe that beneficial use.
The EPA review has identified the draft EIS is adequate for the Final EISs
significant environmental impacts that purposes of the NEPA and/or Section
309 review, and thus should be formally ERP No. F–FAA–K51039–CA, Los
must be avoided in order to provide
revised and made available for public Angeles International Airport Proposed
adequate protection for the
comment in a supplemental or revised Master Plan Improvements, Alternative
environment. Corrective measures may
draft EIS. On the basis of the potential D Selected, Enhanced Safety and
require substantial changes to the
significant impacts involved, this Security Plan, Los Angeles County, CA.
preferred alternative or consideration of
proposal could be a candidate for Summary: EPA continues to express
some other project alternative
referral to the CEQ. environmental concerns about potential
(including the no action alternative or a
effects to air quality, and requested
new alternative). EPA intends to work Draft EISs additional mitigation measures to
with the lead agency to reduce these
ERP No. D–COE–C32036–NY Rating reduce airport-related emissions of
impacts.
EC2, Hudson River at Athens, New York particulate matter and air toxic. ERP No.
EO—Environmentally Unsatisfactory Navigation Project, Design and FS–BIA–A65165–00 Programmatic
The EPA review has identified Construction of a Spur Navigation EIS—Navajo Nation 10–Year Forest
adverse environmental impacts that are Channel, Hudson River, New York City, Management Plan, Selected Preferred
of sufficient magnitude that they are NY. Alternative Four, Chuska Mountain and
unsatisfactory from the standpoint of Defiance Plateau Area, AZ and NM.
Summary: EPA expressed concerns Summary: EPA has continuing
public health or welfare or about the project’s economic viability, concerns regarding cumulative impacts
environmental quality. EPA intends to the scope of the project’s dredging and to water quality and riparian habitat
work with the lead agency to reduce sediment disposal, the impacts to water from existing impaired conditions,
these impacts. If the potentially quality, fish and wildlife species and including exceedances of Navajo Nation
unsatisfactory impacts are not corrected habitat, and the indirect and cumulative Water Quality Standards.
at the final EIS stage, this proposal will impacts, and requested that additional
be recommended for referral to the CEQ. information, especially Habitat Dated: March 29, 2005.
Impairment Test results, be presented in Robert W. Hargrove,
Adequacy of the Impact Statement
the Final EIS to address these issues. Director, NEPA Compliance Division, Office
Category 1—Adequate ERP No. D–COE–E11055–NC Rating of Federal Activities.
LO, Fort Bragg Headquarters for XVIII [FR Doc. 05–6491 Filed 3–31–05; 8:45 am]
EPA believes the draft EIS adequately
sets forth the environmental impact(s) of Airborne Corps and Army Special BILLING CODE 6560–50–P

the preferred alternative and those of Operations Command, To Fully


the alternatives reasonably available to Integrate the Overhill Tract Training
Program, Cumberland and Harnett ENVIONMENTAL PROTECTION
the project or action. No further analysis
Counties, NC. AGENCY
or data collection is necessary, but the
reviewer may suggest the addition of Summary: EPA has no objections to [OPP–2005–0090; FRL–7707–5]
clarifying language or information. the proposed project. ERP No. D–FHW–
F40428–OH Rating EC2, OH–823, EFED Exposure Modeling Work Group;
Category 2—Insufficient Information Portsmouth Bypass Project, Notice of Public Meeting
The draft EIS does not contain Transportation Improvements, Funding AGENCY: Environmental Protection
sufficient information for EPA to fully and U.S. Army COE Section 404 Permit, Agency (EPA).
assess environmental impacts that Appalachian Development Highway,
ACTION: Notice.
should be avoided in order to fully Scioto County, OH.

VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\01APN1.SGM 01APN1