Federal Register / Vol. 70, No.

51 / Thursday, March 17, 2005 / Notices 13017

Board members whose terms expire may BLS–Z, Building 624, Pleasanton Road, differ materially in their compatibility
be made by individuals, firms or Fort Bliss, TX 79916–6812. with the Army’s mission or their
associations. Nominations will: FOR FURTHER INFORMATION CONTACT: John environmental effects; therefore, the
(1) State the region to be represented. F. Barrera, (915) 568–3908. Army selected Site 3 because it is
(2) State whether the nominee is SUPPLEMENTARY INFORMATION: The EPWU’s preferred site due to its
representing carriers, shippers or both. desalination plant is needed to provide proximity to roads and utilities, as well
(3) Provide information on the an additional reliable source of potable as to EPWU’s water distribution system.
nominee’s personal qualifications. water for the City of El Paso and Fort All practicable means of avoiding or
(4) Include the commercial operations Bliss. Currently, both EPWU and Fort minimizing environmental harm have
of the carrier and/or shipper with whom Bliss pump fresh groundwater from the been adopted through site selection and
the nominee is affiliated. This Hueco Bolson Aquifer. Ongoing mitigation measures. The desalination
commercial operations information will withdrawals of fresh groundwater from plant site does not contain sensitive
show the actual or estimated ton-miles the bolson exceed the aquifer’s recharge cultural or biological resources, and a
of each commodity carried or shipped rate. Pumping of fresh groundwater by desalination plant is compatible with
on the inland waterways system in a EPWU, the Army, Ciudad Juarez, and near-by land uses. Mitigation measures
recent year (or years) using the others has resulted in declining to be implemented by EPWU to further
waterway regions and commodity groundwater levels in the bolson. reduce the potential for adverse
categories previously listed. Brackish groundwater is intruding into environmental impact include the
Nominations received in response to the aquifer’s freshwater area and has the following:
Federal Register notice published on potential to affect existing water wells 1. Using dust suppression measures
January 14, 2004 (69 FR 2122) have been on Fort Bliss and in other areas of El during ground disturbance to prevent
retained for consideration. Paso. The desalination plant will treat erosion and wind-blown dust.
Renomination is not required but may brackish (salty) water from the Hueco 2. Installing pressure monitors in the
be desirable. Bolson Aquifer to provide potable water concentrate pipeline to detect leaks or
e. Deadline for Nominations. All for use by the city and Fort Bliss. catastrophic failures and developing an
nominations must be received at the The FEIS addressed the potential emergency action plan to minimize the
address shown above no later than April environmental effects of the proposed release of concentrate during an
22, 2005. project and analyzed seven alternatives accident or equipment failure.
in detail; six action alternatives and the 3. Designing the access road to the
Brenda S. Bowen,
No Action Alternative. The six action desalination plant site to minimize
Army Federal Register Liaison Officer.
alternatives comprised alternative impact to traffic flow on Montana
[FR Doc. 05–5327 Filed 3–16–05; 8:45 am] combinations of three candidate sites for Avenue.
BILLING CODE 3710–92–M the desalination plant itself—Sites 1, 2, 4. Establishing a procedure for EPWU
and 3—and two alternatives for to coordinate access to the injection
disposing of the concentrate, deep-well wells and concentrate pipelines with
DEPARTMENT OF DEFENSE
injection and evaporation ponds. The Fort Bliss to ensure required
Department of the Army Army has decided to grant an easement maintenance can be performed with
to EPWU to implement Alternative 3, minimal interference with the Army’s
Record of Decision for the Proposed consisting of desalination plant Site 3, mission at Fort Bliss.
Leasing of Lands at Fort Bliss, Texas an undeveloped site near Montana These mitigation measures will be
for the Proposed Siting, Construction, Avenue east of El Paso International included as conditions of the easement
and Operation by the City of El Paso Airport, and disposal of the concentrate to be granted by the Army to EPWU.
of a Brackish Water Desalination Plant through deep-well injection at a location
Hugh M. Exton, Jr.,
and Support Facilities in the northeast corner of the South
Training Areas of Fort Bliss near the Director, SWRO, Installation Management
AGENCY: Department of the Army, DoD. Agency.
Texas-New Mexico border.
ACTION: Notice. In reaching this decision, the Army [FR Doc. 05–5326 Filed 3–16–05; 8:45 am]
considered its own needs for a reliable BILLING CODE 3710–08–M
SUMMARY: The Department of the Army source of potable water, compatibility
announces the execution of a Record of with its training mission, and the
Decision (ROD) to grant an easement to environmental consequences associated DEPARTMENT OF DEFENSE
the City of El Paso, El Paso Water with each alternative. The Army
Utilities (EPWU), for land in the South Department of the Army
decided not to select the No Action
Training Areas of Fort Bliss for Alternative because it fails to address Board of Visitors, United States
construction and operation of a the issues of declining freshwater Military Academy (USMA)
desalination plant and support facilities, supplies and impending brackish
including wells, pipelines, and disposal groundwater intrusion on Fort Bliss AGENCY: Department of the Army, DoD.
sites for the residual brine, referred to as wells. Among the action alternatives, ACTION: Notice of open meeting.
concentrate, resulting from the the Army selected deep-well injection
desalination process. The ROD was as the preferred concentrate disposal SUMMARY: In accordance with section
signed on March 7, 2005, pursuant to method because it is the preferred 10(a)(2) of the Federal Advisory
the completion of a Final Environmental method of EPWU and, with the Committee Act (Pub. L. 92–463),
Impact Statement (FEIS) dated protection provided by the Texas announcement is made of the following
December 2004. Commission on Environmental Quality meeting:
ADDRESSES: To obtain copies of the permitting process, appears to have less Name of Committee: Board of
ROD, contact John F. Barrera (915) 568– potential for adverse environmental Visitors, United States Military
3908 or write to: Fort Bliss Directorate impacts than the evaporation ponds. Academy.
of the Environment, ATTN: IMSW– The three desalination plant sites do not Date: Wednesday, April 13, 2005.