Sunteți pe pagina 1din 1

11232 Federal Register / Vol. 70, No.

44 / Tuesday, March 8, 2005 / Notices

Ready for Commission decision on the files comments or documents with the intervene in accordance with the
application: January 2006 Commission relating to the merits of an requirements of Rules of Practice and
issue that may affect the responsibilities Procedure, 18 CFR 385.210, .211, .214.
Linda Mitry,
of a particular resource agency, they In determining the appropriate action to
Deputy Secretary. must also serve a copy of the document take, the Commission will consider all
[FR Doc. E5–958 Filed 3–7–05; 8:45 am] on that resource agency. protests or other comments filed, but
BILLING CODE 6717–01–P k. Description of Amendment: The only those who file a motion to
licensee requests that the license be intervene in accordance with the
amended to accelerate the expiration Commission’s Rules may become a
DEPARTMENT OF ENERGY date of the license. The current party to the proceeding. Any comments,
expiration date of the license is protests, or motions to intervene must
Federal Energy Regulatory December 31, 2018. The licensee
Commission be received on or before the specified
requests the Commission to issue an comment date for the particular
Notice of Amendment of License and order accelerating the expiration date of application.
Soliciting Comments, Motions To the license to not less than 5 years and o. Filing and Service of Responsive
90 days from the date of the Documents—-Any filings must bear in
Intervene, and Protests
Commission order. The Badger-Rapide all capital letters the title
March 2, 2005. Croche Project consists of three ‘‘COMMENTS’’, ‘‘PROTEST’’, OR
Take notice that the following developments: Old Badger, New Badger, ‘‘MOTION TO INTERVENE’’, as
hydroelectric application has been filed and Rapide Croche. The Badger applicable, and the Project Number of
with the Commission and is available developments have experienced the particular application to which the
for public inspection: deterioration over the years. The 2.0- filing refers. A copy of any motion to
a. Application Type: Amendment of megawatt (MW) Old Badger powerhouse intervene must also be served upon each
license. was built in 1908. The 3.6-MW New representative of the Applicant
b. Project No.: 2677–017. Badger powerhouse was built in 1929. specified in the particular application.
c. Date Filed: January 26, 2005. The licensee intends to file an p. Agency Comments—Federal, State,
d. Applicant: City of Kaukauna, application for a new license proposing and local agencies are invited to file
Wisconsin, acting through its enterprise to rebuild the New Badger powerhouse, comments on the described application.
fund Kaukauna Utilities (KU). and to increase its installed capacity to A copy of the application may be
e. Name of Project: Badger-Rapide 7 MW, and to decommission the Old obtained by agencies directly from the
Croche. Badger powerhouse due to its advanced Applicant. If an agency does not file
f. Location: The project is located on state of deterioration. No modifications comments within the time specified for
the Fox River, in Outagamie County, would be proposed for the existing 2.4- filing comments, it will be presumed to
Wisconsin. MW Rapide Croche powerhouse. have no comments. One copy of an
g. Filed Pursuant to: Federal Power Therefore, the licensee wishes to retire agency’s comments must also be sent to
Act, 16 U.S.C. 791(a)–825(r). the existing license early and relicense the Applicant’s representative.
h. Applicant Contacts: Mike Pedersen, the project for a new powerhouse to
Generation Superintendent, Kaukauna replace the existing Old/New Badger Linda Mitry,
Utilities, 777 Island Street, P.O. Box powerhouses. If the Commission grants Deputy Secretary.
1777, Kaukauna, WI 54130–7077, (920) the request for acceleration, the [FR Doc. E5–960 Filed 3–7–05; 8:45 am]
462–0220, and Arie DeWaal, Project Commission will deem the request to be BILLING CODE 6717–01–P
Manager, Mead & Hunt, Inc., 6501 Watts a notice of intent to file an application
Road, Madison, WI 53719, (608) 273– for a new license.
6380. l. Locations of Application: A copy of DEPARTMENT OF ENERGY
i. FERC Contact: Regina Saizan, (202) the application is available for
502–8765. inspection and reproduction at the Federal Energy Regulatory
j. Deadline for Filing Comments and Commission in the Public Reference Commission
or Motions: April 18, 2005. Room, located at 888 First Street NE., [Docket Nos. RM05–7–000, AD04–13–000]
All Documents (Original and Eight Room 2A, Washington, DC 20426, or by
Copies) Should Be Filed With: Magalie calling (202) 502–8371. This filing may Potential New Wholesale Transmission
R. Salas, Secretary, Federal Energy also be viewed on the Commission’s Services; Assessing the State of Wind
Regulatory Commission, 888 First Web site at http://www.ferc.gov using Energy in Wholesale Electricity
Street, NE., Washington, DC 20426. the ‘‘eLibrary’’ link. Enter the docket Markets; Notice of Draft Agenda for
Comments, protests, and interventions number excluding the last three digits in Technical Workshop
may be filed electronically via the the docket number field to access the
Internet in lieu of paper; see 18 CFR document. For assistance, call toll-free March 2, 2005.
385.2001(a)(1)(iii) and the instructions 1–866–208–3676 or e-mail As announced in the Notice of
on the Commission’s Web site under the FERCOnlineSupport@ferc.gov. For TTY, Technical Workshop issued on February
‘‘e-Filing’’ link. The Commission call (202) 502–8659. A copy is also 1, 2005, the staffs of Bonneville Power
strongly encourages electronic filings. available for inspection and Administration (BPA) and the Western
Please include the project number (P– reproduction at the street address for Electricity Coordinating Council
2677–017) on any comments or motions KU in item h. above. (WECC) will participate with the staff of
filed. m. Individuals desiring to be included the Federal Energy Regulatory
The Commission’s Rules of Practice on the Commission’s mailing list should Commission (FERC) at a workshop on
and Procedure require all interveners so indicate by writing to the Secretary March 16–17, 2005. The workshop will
filing a document with the Commission of the Commission. be held at the Doubletree Hotel &
to serve a copy of that document on n. Comments, Protests, or Motions To Executive Meeting Center Portland-
each person in the official service list Intervene—-Anyone may submit Lloyd Center, 1000 NE. Multnomah,
for the project. Further, if an intervener comments, a protest, or a motion to Portland, Oregon 97232. The workshop

VerDate jul<14>2003 19:54 Mar 07, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\08MRN1.SGM 08MRN1

S-ar putea să vă placă și