Dharamgada TO Goluamundha Site MDR

Chainage.

0+000 To 02+000

S.NO

Chainage

Tipe of Culvert

01 + 000

R.C.C Slab culvert

01 + 300

R.C.C Slab culvert

1 + 950

Home pipe culvert

Dharamgada TO Goluamundha Site MDR


Chainage.

16 + 000 To 24 + 000

16+700

Home pipe culvert

18+200

R.R.Stone Massion Culvert

18+800

R.R.Stone Massion Culvert

18+900

R.R.Stone Massion Culvert

19+400

R.R.Stone Massion Culvert

19+600

R.R.Stone Massion Culvert

19+700

R.R.Stone Massion Culvert

19+780

R.R.Stone Massion Culvert

20+300

R.R.Stone Massion Culvert

10

21+300

R.R.Stone Massion Culvert

11

22+500

MINOR BRIDGE R.R.Stone


Massion Culvert

12

23+100

MINOR BRIDGE R.R.Stone


Massion Culvert

13

23+250

R.C.C SLAB CULVERT

14

23+500

R.R.Stone Massion Culvert

15

23+700

16

23+950

Home pipe culvert


MINOR BRIDGE R.R.Stone
Massion Culvert

S.NO

Type of culvert

NO"S

Home pipe culvert

R.C.C SLAB CULVERT

R.R.Stone Massion
Culvert

10

MINOR BRIDGE
R.R.Stone Massion
Culvert

TOTAL NO"S

19

mundha Site MDR-111


Culvert length

Clear spane

Culvert Hight

Total Slab Length

8.200

3.000

3.000

4.000

6.500

3.000

1.400

3.650

10.300

1*450

mundha Site MDR-111


12.500

1*600

8.800

1.500

1.000

2.000

8.300

1.500

1.000

2.000

6.200

1.500

1.000

2.000

8.400

2.800

1.500

3.800

8.300

1.500

0.500

2.000

8.500

3.000

1.800

4.000

8.200

3.000

1.000

4.200

8.500

1.500

1.000

2.000

8.400

2.000

0.800

2.500

8.800

2*2.5

2.000

2*3.5

12.000

1.500

1.000

2.000

8.000

4.500

1.800

6.500

10.000

1*600

8.000

2*2.5

1.000

2*3.5

Remarks

Remarks
Good Condition
Good Condition
Good Condition

Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition

Dharamgada TO Goluamundha Site MD


S.NO

Chainage

Type of culvert

Side

0+400

Home pipe culvert

0+923

R.C.C Slab culvert

B/S

1+250

R.C.C Slab culvert

B/S

1+900

Box culvert

16+000

Home pipe culvert

18+000

Box culvert

18+800

R.C.C Slab culvert

B/S

19+300

R.C.C Slab culvert

B/S

19+500

R.C.C Slab culvert

B/S

10

20+600

Box culvert

11

22+200

Box culvert

12

23+100

Box culvert

13

23+200

Home pipe culvert

14

23+400

Box culvert

15

23+600

Home pipe culvert

16

23+950

Box culvert

S.NO

Type of culvert

NO"S

Remarks

1
2
3
4
5
6

Home pipe culvert


R.C.Slab culvert
2*2Box culvert
2*3*2 Box culvert
3*8*3 Box culvert
1*4.5*2.5 Box culvert

4
5
3
2
1
1

New
Winding
New
New
New
New

TOTAL NO"S

16

ha Site MDR-111
Culvert size Condition Remarks
1*1000

New

1*3*1.5

Winding

1*3*1.5

Winding

1*2*2

New

1*1000

New

1*2*2

New

1*3*1.5

Winding

1*3*1.5

Winding

1*3*1.5

Winding

1*2*2

New

2*3*2

New

3*8*3

New

1*1000

New

1*4.5*2.5

New

1*1000

New

2*3*2

New

Dharamgada TO Goluamundha Site MDR-111


Tipe of culvert
Existing
Proposed

S.NO

Chainage

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

0+923
1+280
1+876
14+610
15+470
17+670
17+97O
18+800
18+900
19+300
19+500
19+700
19+780
20+280
20+600
22+200
23+100
23+400
23+600
23+950

R.C.C Slab
R.C.C Slab
H.P.C 450
Nill
Nill
Nill
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
H.P.C 300
R.Rmassion

H.P.C 900
H.P.C 1000
Widening
2*2Box culverts
3*8*3Box culvert

01nos
04nos
14nos
01nos
01nos

Total culverts

20nos

Widening
Widening
H.P.C 900
H.P.C 1000
H.P.C 1000
H.P.C 1000
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
3*8*3Box culvert
Widening
H.P.C 1000
Widening

Existing Length
8
6.5
9
Nill
Nill
Nill
8
8
8
8
8
8
8
8
8
8
8
8
10
8

MDR-111
Proposed Length
12
12.5
12.5
12.5
12.5
12.5
12
12
12
12
12
12
12
12
12
12
12
12
12.5
12

Remarks

Re construction
New construction
New construction
New construction

Re construction
Re construction

B.D.ROAD (SH-52) CH-18+000


AS PER ESTIMATION Q
S.NO

ITEM

UNIT

RATE

1
2
3
4
5
6
7
8
9
10

EARTH WORK
SAND FILLING
PCC(1:3:6)
PCC FOUNDATION(M-15)
SUB STRUCTURE(M-15)
FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
SUPER STRUCTURE(M-20)
WEARING COART(M-30)

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM

89.9
236.1
4047.42
4402.67
4555.06
5716.75
6699.78
6639.88
5407.93
5617.00

11

150MM thick flat stone aprone embaded


300mmthink concretein(M-15)

CUM

2578.66

MT

65849.51

sqm

1212.00

CUM

1041.74

sqm
CUM
CUM
CUM
RMT
NOS

46.6
436.89
1132.00
49.45
100.39
311.27

CUM

648.05

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM

240.08
613.62
167.23
240.08
613.62
167.23
240.08
613.62
167.23

CUM
cum
CUM
CUM
CUM
CUM
CUM

3.45
47.32
22.9
299.84
1556.02
3520.88
6122.96

12
13
14
15
16
17
18
19
20
21

Steel
25mm think salitexboard in expanision
joint
metal apall backing in the rear of well
weep hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCRC M-15 GUARD POST
(RETAINING WALL)METAL SPALL BACKING
IN THE REAR OF WELL SETINING OR WEEP
HOLE OF ABUTMENT

DISMANTLING OF CULVERTS
1
2
3
4
5
6
7
8
9

A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY

RIGID PAVEMENT
1
2
3
4
5
6
7

SCCARIFYING THE EXISTING


EARTH WORK IN HARD SOIL
LOOSENING
SAND FILLING
GRANULAR SUB-BASE
DLC
PQC

8
9
10
11

PCC (1:2:4)
RANDOM RUBBLE STONE MASONRY IN CM
1:3 IN FOUNDATION /SUB STRUCTURE
LEVELLING COURSE (1:2:4)
20MM THICK CEMENT PLASTER(1:4)

CUM

5344.9

CUM

2845.46

CUM
sqm

5344.9
145.61

2) CH-18+000 22+750KM
ESTIMATION QTY
QTY

AMOUNT

2641.39
328.9
241.53
1444.7
1120.57
232.8
156
151
16.32
21.04

237460.961
77653.29
977573.3526
6360537.349
5104263.5842
1330859.4
1045165.68
1002621.88
88257.4176
118181.68

21.11

54435.5126

97.848

6443242.85448

110

133320

437.52

455782.0848

92.6
154.51
308.91
576.68
597
440

4315.16
67503.8739
349686.12
28516.826
59932.83
136958.8

42.53

27561.5665

0.8
6.95
27.64
7.92
76.22
368.01
1.32
12.7
61.33

192.064
4264.659
4622.2372
1901.4336
46770.1164
61542.3123
316.9056
7792.974
10256.2159
0
0

1076.04
1911
441
441
441
294
588

0
3712.338
90428.52
10098.9
132229.44
686204.82
1035138.72
3600300.48

REMARKS

118.19
470
10
800

631713.731
1337366.2
53449
116488
31938619.28968

B.D.ROAD (SH-52) CH-18+


ITEM

UNIT

(1:3:6)
FOUNDATION M-15
SUB-STRUCTUREM-15
M-20
FOUNDATION M-25
SUB-STRUCTURE M-25
SUPER STRUCTURE M-25
M-30
STEEL
WEEP HOLES

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
MT
RMT

S.NO
1
2
3
4
5
6
7
8
9
10
11
12

EARTH
SAND FILLING

AS PER
ESTIMATION
QTY
2641.39
328.9
241.53
1444.7
1120.57
16.32
232.8
156
151
21.04
97.848
597

13

150MM thick flat stone aprone embaded


300mmthink concretein(M-15)

CUM

21.11

14

25mm think salitexboard in expanision joint

sqm

110

CUM

437.52

sqm
CUM
CUM
CUM
NOS

92.6
154.51
308.91
576.68
440

CUM

42.53

CUM
CUM
CUM
CUM
CUM
CUM

0.8
6.95
27.64
7.92
76.22
368.01

15
16
17
18
19
20
21
22
23
24
25
26
27
28

metal apall backing in the rear of well weep


hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
RCRC M-15 GUARD POST
(RETAINING WALL)METAL SPALL BACKING IN
THE REAR OF WELL SETINING OR WEEP HOLE
OF ABUTMENT

DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY

29
30
31

A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY

CUM
CUM
CUM

1.32
12.7
61.33

32

RIGID PAVEMENT

33
34
35
36
37
38
39
40

SCCARIFYING THE EXISTING


EARTH WORK IN HARD SOIL
LOOSENING
SAND FILLING
GRANULAR SUB-BASE
DLC
PQC
PCC (1:2:4)

CUM
cum
CUM
CUM
CUM
CUM
CUM
CUM

1076.04
1911
441
441
441
294
588
118.19

41

RANDOM RUBBLE STONE MASONRY IN CM 1:3


IN FOUNDATION /SUB STRUCTURE

CUM

470

42
43
44

LEVELLING COURSE (1:2:4)


20MM THICK CEMENT PLASTER(1:4)
R.C.C PIPE NP3
1*700 DIA

CUM
sqm
RMT

10
800
0

CUM
CUM

1278.18
20853

HAWAY
GRANULAR SUB-BASE
MECHANICAL MEANS

CH-18+000 22+750KM
SITE
REQUIREMENT
QTY

EXTRA QTY'S

RATE

AMOUNT

3996.345
486.995
241.53
1444.7
1120.57
20.974
395.881
286.864
365.835
34.845
145.256
432

-1354.955
-158.095
0
0
0
-4.654
-163.081
-130.864
-214.835
-13.805
-47.408
165

89.9
236.1
4047.42
4402.67
4555.06
5407.93
5716.75
6699.78
6639.88
5617.00
65849.51
100.39

-121810.455
-37326.230
0.000
0.000
0.000
-25168.506
-932293.307
-876760.010
-1426478.620
-77542.685
-3121793.570
16564.350

30.5

-9.39

2578.66

-24213.617

110

1212.00

0.000

437.52

1041.74

0.000

130.6
0
350
650.68
440

-38
154.51
-41.09
-74
0

46.6
436.89
1132.00
49.45
311.27

-1770.800
67503.874
-46513.880
-3659.300
0.000

13.365

29.165

648.05

18900.378

0
0.8
6.95
27.64
7.92
76.22
368.01

0
0
0
0
0
0
0

240.08
613.62
167.23
240.08
613.62
167.23

0.000
0.000
0.000
0.000
0.000
0.000
0.000

REMARKS

1.32
12.7
61.33

0
0
0

1076.04
1911
441
441
441
294
588
118.19

240.08
613.62
167.23

0.000
0.000
0.000

0
0
0
0
0
0
0
0

3.45
47.32
22.9
299.84
1556.02
3520.88
6122.96
5344.9

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

470

2845.46

10
800
25

0
0
-25
0
0
-174.24
-5000
0
0

5344.9
145.61
4000

1452.42
25853

1403.4
132.36

0.000
0.000
0.000
-100000.000
0.000
0.000
-244528.416
-661800.000
0.000
-7476880.339

B.D.ROAD (SH-52) CH-18+000 22+750KM


S.NO

Tipe of culvert
AS PER
Chainage
ESTIMATION

S.NO

Chainage

1
2
3
4

18+400
18+800
18+980
19+150

1*1BOX
2*2BOX
2*2BOX
2*2BOX

CULVERT
CULVERT
CULVERT
CULVERT

1
2
3
4

0
0
18+980
19+300

19+640

2*2BOX CULVERT

19+640

6
7
8
9
10
11

19+900
21+140
21+350
22+500
21+540
19+300

2*2BOX
2*2BOX
2*2BOX
2*2BOX
2*2BOX
3*2BOX

6
7
8
9
10
11
12

19+900
20+800
20+900
21+040
21+140
0
22+280

CULVERT
CULVERT
CULVERT
CULVERT
CULVERT
CULVERT

AS PER ESTIMATION

SITE REQUIREMENT

Type of culvert

NO"S

Remarks

Type of culvert

NO"S

1*1BOX CULVERT
2*2BOX CULVERT
3*2BOX CULVERT

1
9
1

New
New
New

2
1
2

TOTAL NO"S

11

Home pipe culvert


1*1BOX CULVERT
2*2Box culvert
1.5*1.5 WIDENING
CULVERT
3*2 Box culvert
6*3 Box culvert
2*1 Box culvert

TOTAL NO"S

12

1
1
4
1

0 22+750KM
Tipe of culvert
SITE REQUIREMENT
Remarks
QTY
0
0
2*1BOX CULVERT
3*2BOX CULVERT
1.5*1.5 WIDENING
CULVERT
2*2BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
0
2*2BOX CULVERT

REMENT
Remarks
New
New
New
Winding
New
New
New

Dharamgada TO Goluamundha Site


AS PER ESTIMATION QTY
S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

ITEM

UNIT

RATE

EARTH WORK (DRAIN EXCAVATION)


EARTH WORK
SAND FILLING
PCC(1:3:6)
PCC FOUNDATION(M-15)
SUB STRUCTURE(M-15) (DRAIN WALL)
SUB STRUCTURE(M-15)
SUPER STRUCTURE(M-20)
DRAIN COVER SLAB(M-20)WITH SIKN
RAINFORCE CEMENT
FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
WEARING COART(M-30)
150MM thick flat stone aprone embaded
300mmthink concretein(M-15)
Steel
25mm think bitumen expanision joint
metal apall backing in the rear of well
weep hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCRC M-15 GUARD POST

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM

47.32
89.9
252.26
4101
4287.83
4971.89
4609.22
5463.43

CUM

5697.79

CUM
CUM
CUM
CUM

5735.17
6750.81
6702.32
5679.23

CUM

2369.6

MT
sqm

65408.35
1212

CUM

607.66

sqm
CUM
CUM
CUM
RMT
NOS

21.42
457.43
785.18
37.17
100.47
326.17

DRAINAGE SPOUTS COMPLETE AS PER


DRAWING
TAR PAPER
RCC PIPE NP3

NOS

335.46

sqm
RMT

16.16
4660.22

CUM
CUM
CUM
CUM

240.08
613.62
167.24
55.95

CUM

3.45

DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART

RIGID PAVEMENT
34

SCCARIFYING THE EXISTING

35
36
37
38
39
40
41

EARTH WORK IN HARD SOIL


LOOSENING
SAND FILLING
GRANULAR SUB-BASE
DLC
PQC
PCC (1:2:4)

cum
CUM
CUM
CUM
CUM
CUM
CUM

47.32
22.9
252.26
1444.77
3566.94
6189.86
5402.15

mundha Site MDR-111

MATION QTY
QTY

AMOUNT

1800
4178.65
1238.27
450.476
1501.1
360
1036.36
21.51

85176
375660.635
312365.9902
1847402.076
6436461.613
1789880.4
4776811.2392
117518.3793

86.7

493998.393

479.42
231.59
514.9
59.71

2749555.2014
1563420.0879
3451024.568
339106.8233

113.01

267788.496

196.53
102.11

12854703.0255
123757.32

471.12

286280.7792

294.91
566.96
1142.38
1314.68
1747
338

6316.9722
259344.5128
896973.9284
48866.6556
175521.09
110245.46

10

3354.6

28.75
75

464.6
349516.5

19.96
110.69
282.82
126.5

4791.9968
67921.5978
47298.8168
7077.675
0
0

4592.5

15844.125

REMARKS

3006
1503
1503
1503
1002
2087.5
334.91

142243.92
34418.7
379146.78
2171489.31
3574073.88
12921332.75
1809234.0565
128583309
189479698

60896388.9539

B.D.ROAD (SH-52) CH-18+


S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
22
23

ITEM

UNIT

EARTH work (EXCHAVITION)


SAND FILLING

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
MT
RMT

(1:3:6)
FOUNDATION M-15
SUB-STRUCTUREM-15
M-20
FOUNDATION M-25
SUB-STRUCTURE M-25
SUPER STRUCTURE M-25
M-30
STEEL
WEEP HOLES
150MM thick flat stone aprone embaded
300mmthink concretein(M-15)
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
Random Rubble Stone masonry work In1:3etc.
Plain cement concrete (1:2:4)
20mm thick cement plaster (1:4)
GRANULAR SUB-BASE
EARTH WORK EMBANKMENT

AS PER
ESTIMATION
QTY
2641.39
328.9
241.53
1444.7
1120.57
16.32
232.8
156
151
21.04
97.848
597

CUM

21.11

sqm
CUM
CUM
CUM

92.6
1220.97
2132.91
576.68
470

CUM
CUM

sqm
CUM
CUM

10
800

5920.36
20853

Different amount for M-15 grade concrete (repiasement of 40MM to 20 MM )

CH-18+000 22+750KM
SITE
REQUIREMENT
QTY

EXTRA QTY'S

RATE

AMOUNT

3145.74
477.24
269.632
874.79
950.56
16.32
332.09
273.07
324.84
29.33
136.449
554.82

504.35
148.34
28.102
-569.91
-170.01
0
99.29
117.07
173.84
8.29
38.601
-42.18

89.9
236.1
4047.42
4402.67
4555.06
5407.93
5716.75
6699.78
6639.88
5617.00
65849.51
100.39

45341.065
35023.074
113740.597
-2509125.660
-774405.751
0.000
567616.108
784343.245
1154276.739
46564.930
2541856.936
-4234.450

30.5

9.39

2578.66

24213.617

130.6
1325.66
2651.31
650.68
676.8

38
104.69
518.4
74
206.8

46.6
436.89
1132.00
49.45
2845.46

1770.800
45738.014
586828.800
3659.300
588441.128

14.4
1152

4.4
352

5344.9
145.61

23517.56
51254.72

6080
30126

159.64
9273
0

1403.4
132.36

224038.776
1227374.280
0.000

4777833.828
QTY
2094.982

Difference amount
297
Total amount

622209.654
5400043.482

REMARKS

RIGID PAVEMENT
34
35
36
37
38
39
40
41

SCCARIFYING THE EXISTING


EARTH WORK IN HARD SOIL
LOOSENING
SAND FILLING
GRANULAR SUB-BASE
DLC
PQC
PCC (1:2:4)

CUM
cum
CUM
CUM
CUM
CUM
CUM
CUM

4592.5
3006
1503
1503
1503
1002
2087.5
334.91

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

3.45
47.32
22.9
252.26
1444.77
3566.94
6189.86
5402.15

Dharamgada TO Golua

AS PER ESTI
S.NO

ITEM

UNIT

AS PER
ESTIMATION QTY

1
2
3
4
5
6
7
8

EARTH WORK (DRAIN EXCAVATION)


EARTH WORK
SAND FILLING
PCC(1:3:6)
PCC FOUNDATION(M-15)
SUB STRUCTURE(M-15) (DRAIN WALL)
SUB STRUCTURE(M-15)
SUPER STRUCTURE(M-20)

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM

1800.00
4178.65
1238.27
450.476
1501.1
360
1036.36
21.51

DRAIN COVER SLAB(M-20)WITH SIKN RAINFORCE


CEMENT

CUM

86.7

10
11
12
13

FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
WEARING COART(M-30)

CUM
CUM
CUM
CUM

479.42
231.59
514.9
59.71

14

150MM thick flat stone aprone embaded 300mmthink


concretein(M-15)

CUM

113.01

15
16
17
18
19
20
21
22
23

Steel
25mm think bitumen expanision joint
metal apall backing in the rear of well weep hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCRC M-15 GUARD POST

MT
sqm
CUM
sqm
CUM
CUM
CUM
RMT
NOS

196.53
102.11
471.12
294.91
566.96
1142.38
1314.68
1747
338

24
25
26
27
28
29
30
31
32
33

DRAINAGE SPOUTS COMPLETE AS PER DRAWING


TAR PAPER
RCC PIPE NP3

NOS
sqm
RMT

10
28.75
75

CUM
CUM
CUM
CUM

19.96
110.69
282.82
126.5

DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART

1800
5760.87
2406.89
450.476
1501.1
360
1036.36
21.51
86.7
479.42
231.59
514.9
59.71

amgada TO Goluamundha Site MDR-111


AS PER ESTIMATION QTY
SITE REQUIREMENT
QTY

EXTRA QTY'S

1800.00
3641.29
2097.9
310.87
1344.25
360
1284.692
21.51

0
-537.36
859.63
-139.606
-156.85
0
248.332
0

0
-48308.664
0
-572524.206
-672525.745
0
0
0

0
0
216850.2638
0
0
0
1144616.82104
0

86.7
342.4
129.26
460.63
59.71

0
-137.02
-102.33
-54.27
0

0
-785832.9934
-690810.3873
-363734.9064
0

0
0
0
0
0

113.01
114.26
102.11
471.12
294.91
566.96
1142.38
1314.68
1888.8
338

0
-82.27
0
0
0
0
0
0
141.8
0

0
-5381144.9545
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
14246.646
0

RATE
47.32
89.9
252.26
4101
4287.7
4971.89
4609.22
5463.43
5697.79
5735.17
6750.81
6702.32
5679.23
2369.6
65408.35
1212
607.66
21.42
457.43
785.18
37.17
100.47
326.17

10
28.75
75

0
0
0

19.96
110.69
282.82
126.5
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0

-8514881.8566

1375713.73084

-7139168.12576

335.46
16.16
4660.22

240.08
613.62
167.24
55.95

32709242.16

-39848410.28576

40.056

0
1377.02
116.916
85.783
474.346
0
470.215
0
0
0
0
10.8
0

0
2.851
0
0
0
0
0
0
268
0
0

SITE REQUIREMENT AS PER ESTIMATION


AMOUNT
QTY AMOUNT
REMARKS
85176
327351.971
529216.254
1274877.87
5763740.725
1789880.4
5921428.06024
117518.3793

85176
375660.635
312365.9902
1847402.076
6436266.47
1789880.4
4776811.2392
117518.3793

493998.393
1963722.208
872609.7006
3087289.6616
339106.8233

493998.393
2749555.2014
1563420.0879
3451024.568
339106.8233

267788.496
7473558.071
123757.32
286280.7792
6316.9722
259344.5128
896973.9284
48866.6556
189767.736
110245.46

267788.496
12854703.0255
123757.32
286280.7792
6316.9722
259344.5128
896973.9284
48866.6556
175521.09
110245.46

3354.6
464.6
349516.5
0
0
4791.9968
67921.5978
47298.8168
7077.675
32709242.16364

32709242.16

-39848410.28576

3354.6
464.6
349516.5

4791.9968
67921.5978
47298.8168
7077.675
39848410.2894

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Dharamga

ITEM

S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
21
22
23
24

UNIT

EARTH WORK drain


EARTH WORK
SAND FILLING
PCC(1:3:6)
PCC FOUNDATION(M-15)
SUB STRUCTURE(M-15) (DRAIN WALL)
SUB STRUCTURE(M-15)
SUPER STRUCTURE(M-20)
DRAIN COVER SLAB(M-20)WITH SIKN
RAINFORCE CEMENT
FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
WEARING COART(M-30)
150MM thick flat stone aprone embaded
300mmthink concretein(M-15)

CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM

Steel
25mm think bitumen expanision joint
metal apall backing in the rear of well weep
hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCC M-15 GUARD POST

AS PER
ESTIMATION
QTY
1800.00
4603.34
1569.34
462.74
1549.8
360
1182.11
21.51

CUM

86.7

CUM
CUM
CUM
CUM

512.26
231.59
514.9
59.71

CUM

113.01

MT
sqm

196.53
102.11

CUM

558.08

sqm
CUM
CUM
CUM
RMT
NOS

237.34
541.97
1199.28
1314.68
1747
338

25

DRAINAGE SPOUTS COMPLETE AS PER


DRAWING

NOS

30

26

TAR PAPER

sqm

28.75

27

RCC PIPE NP3

RMT

75

28

RCC PIPE NP4

RMT

50

Railling

RMT

54.68

CUM
CUM
CUM
CUM

19.96
110.69
282.82
126.5

29
30
31
32
33

DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART

ramgada TO Goluamundha Site MDR-111


SITE
REQUIREMENT
QTY
1800.00
8369.13
2626.81
804.41
2736.25
360
3570.614
6.15

EXTRA QTY'S

RATE

0
3765.79
1057.47
341.67
1186.45

47.32
89.9
252.26
4101
4287.7
4971.89
4609.22
5463.43

2388.50
15.36

86.7

5697.79
118.91
102.33

360.51
129.26
531.38
71.29

16.48
11.58

5735.17
6750.81
6702.32
5679.23

388.8

275.79

2369.6

190.72
59.88

5.81
42.23

65408.35
1212

1162.202

604.12

607.66

538.25
2936.02

300.91
2394.05
844.02

21.42
457.43
785.18
37.17
100.47
326.17

2043.3
611.52

3302
320

703.16

1555.00
18

10
80.73

335.46
51.98

62.5

16.16

12.5

4660.22

50

4301.38

54.68

1416.91

29.46
601.69
92
459.24

9.50
491.00
0.00
332.74
0.00

9.5
491
332.74

240.08
613.62
167.24
55.95

19242776.097

-22419256.333

AMOUNT

AS PER
ESTIMATION QTY

0
338544.521
266757.3822
1401188.67
5087141.665
0
11009140.40688
0

85176.00
413840.266
395881.7084
1897696.74
6645077.46
1789880.4
5448605.0542
117518.3793

85176.00
752384.79
662639.09
3298885.41
11732219.13
1789880.40
16457745.46
33600.09

0
0
0
0
0
0
0
83918.2848

0
0
0
110454.233600001
65765.4834000001

493998.393
2937898.1842
1563420.0879
3451024.568
339106.8233

493998.39
2067586.14
872609.70
3561478.80
404872.31

0
681969.0647
690810.3873
0
0

653511.984
0
0

267788.496
12854703.0255
123757.32

921300.48
12474680.51
72574.56

0
380022.5135
51182.76

367100.77452
6445.4922
1095110.2915
662707.6236
0
156230.85
0

339122.8928
5083.8228
247913.3371
941650.6704
48866.6556
175521.09
110245.46

706223.67
11529.32
1343023.63
1604358.29
22730.20
331751.94
104374.40

0
0
0
0
26136.4572
0
5871.06

10063.8

3354.60

839.9968
0

464.6
349516.5

1304.60
291263.75

0
58252.75

215069

215069.00

0
0
2280.76
301287.42
0
18616.803
0
21543124.358

77476.6388
0
4791.9968
67921.5978
47298.8168
7077.675
0
41473457.460

77476.64
0.00
7072.76
369209.02
15386.08
25694.48
0.00
60811453.620

-19930333.102

19337996.161

17037647.900

REMARKS

0
0
2280.76
301287.42
0
18616.803
0
2300348.2605

41473457.460

Box Estimate (3 X 8000 x 3000) single cell Box Culvert (New construction)= 1nos
DETAILS OF STRUCUTRE
Width of Box Cell = a
Depth of Box Cell = b
Offset of bottom slab = c
Top slab thickness =d
Bottom slab thickness = e
Thickness of wall = f
Thickness of middle wall = g
Carriageway
Shoulder
Safety Kerb 300mm
Railling
Railling height
Length of wing wall
Length of Apron
Width of U/s Apron
Width of D/s Apron
Cut off wall Botom width
Cut off wall Top Width
Depth of Cutoff wall
Height of Wing wall

Length of foundation 7m CW+ (Shoulder x 2 ) + (Parapet x 2)+(Safety Kerbx 2) +100+100 of-fset

b
c
d
c

Width of foundation (a+ (c x 2)+(f x 2)+100+100 offset


Depth of foundation= d+b+e+300 (PCC & Sand)
Bottom slab a+(f x 2) +(c x 2 )
Top Slab a+(f x 2)

Dismantling of Granular courses of flexible pavements and disposal of dismantled materials up to


serviceable and unserviceable materials separately

Road crust for new constn


1 nos
x
28.14
x
3.66
Dismantling of existing structures like culverts, bridges, retaining walls and other structures, com
concrete, wood work, steel work including T&P and scaffolding wherever necessary sorting the di
unserviceable materials and stacking the serviceable materials with all leads and lifts of 1000m as
specification and direction of the Engineer-in-charge

Dismantling of existing structures like culverts, bridges, retaining walls and other structures, com
concrete, wood work, steel work including T&P and scaffolding wherever necessary sorting the di
unserviceable materials and stacking the serviceable materials with all leads and lifts of 1000m as
specification and direction of the Engineer-in-charge

a
b

PCC Parapet
1
x
3
x
RCC M 20 side of Deck slab & Dirt wall
Deck slab
Bed block
Dirtwall

7.10
6
6
6

x
x
x
x

3
2
2

RR Stone Masonry
Abutment
1

8.60

8.60

Earth work in excavation of foundation of structures as per drawing and technical specification, i
shoring and bracing removal of stumps and other deleterious materials, dressing of sides and bott
earth to the extent required and utilising the remaining earth locally for road work as per claue n
direction of the Engineer-in-charge

Embankment
For Old CD

c
d
e
f
g

Box bed
Shear

Wing wall
Curtain US
U/S cross
Curtain DS
DS cross
Floor bed

U/S
D/S

Quantity for 1 Nos


4

Filling foundation and plinth trenches with sand as per drawing and technical specification of Mo
taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of the Engine

a
b

Box
Shear

Curtain US
U/S cross
Curtain DS
DS cross
Bed

e
f
g

1
2
2

x
x
x

Quantity for 1 Nos


5

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nom
in foundation and compacted by vibration including curring for 14 days

Curtain US
U/S cross
Curtain DS
DS cross
Bed

d
e
f

Quantity for 1 Nos


6

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm n
placed in foundation and compacted by vibration including curing for 14 days

a
b

Box
Shear

1
2
2

Wing Walls 1st foot


2nd foot
3rd foot

4
4

x
x
x

x
x
28.14
5.00
5.00

c
d
e

Curtain US
U/S cross
Curtain DS
DS cross

1
2
1
2

x
x
x
x

Quantity for 1 Nos


Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm
placed in sub-structure and compacted by vibration including curing fo

Wing

5.00

Quantity for 1 Nos


Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal
foundation and compacted by vibration including curing for 14 daysas per Section No.1000 and 2
direction of the Engineer-in-charge

Bottom slab

sub structure
Wall

1
2

x
x

2
2

x
x

super structure
c

Top slab

Cantliver

Extra Haunch

12

Quantity for 1 Nos


Reinforced cement concrete M-20 nominal mix in Super-structure with crushed stone aggregates
mixed placed in foundation and compacted by vibration including curing for 14 daysas per Sectio
specifcation and direction of the Engineer-in-charge

Safety Kerb

10

Quantity for 1 Nos


Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for
2100 of MORT&H specifcation and direction of the Engineer-in-charge

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for
2100 of MORT&H specifcation and direction of the Engineer-in-charge
a

Wearing coat

11

Quantity for 1 Nos


Providing and laying flooring complete as per drawing and technical specification laid over cemen
Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed stone aggregates
U/S
D/S

1
1

x
x

Quantity for 1 Nos


13

Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and superstru
specifications as per section 1600 of MORT&H specifcation and direction of the Engineer-in-char

Box & Wing wall


Vide item- 6
Parapet & Kerb
Vide item- 7
Wearing coat
Vide item- 8

ii
iii
iv

Bed
Raft
Wall

805.730

6.150

21.330
Wing wall
2
2
1

x
x
x

5.00
5.00
5.00

x
x
x

1
2
2

x
x
x

5.00
2.75
(2.35

x
x
+

Top
Face

4 Wing wall

66.51

266.040

14

Quantity for 1 Nos


Providing and fixing in position of 25mm thick Salitex board in expansion joint for fixed ends of s
exceeding 10m to cater for a horizontal movement upto 20mm covered with sealant complete as p
specification as per clause no.2605 of MoRT&H specification and direction of the EIC

Box

12.9

W.Wall

15

3.6

Quantity for 1 Nos


Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return w

W.Wall

6.0

16

Quantity for 1 Nos


Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains includ

a
b

wall side
Wing wall

17

Quantity for 1 Nos


Painting two coats with approved shade using Enamel paint with cost of all labour materials
MoRT&H specification and direction of the EIC

2
4

Parapet
Top
Face

4
1
4

x
x

x
x
x

10.70
5.00

27.34
27.34
0.20

Quantity for 1 Nos


18

Providing and laying Filter material underneath pitching in slopes complete as per dra
Revet

33.60
4

4
Volume

15
493.82 x

Quantity for 1 Nos


19

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P

Volume

493.82 x

Quantity for 1 Nos


20

Backfilling behind wall with excavated materials with cost of all labour T&P etc.complete as

2/3rd Qnty of item no.1 above


21

Quantity for 1 Nos


Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980
Road & Bridge works(4th Revision)

Quantity for 1 Nos


22

Rcc M-30 GRADE IN RAILLING OF CULVERT AS PER APPROVED DRAWING & TECHNICAL SPECIFI

Railling
2 x 27.34

54.68mtr

Widening
1

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

p.c.c perapet
2x

4.500

R.C.C M 20 side of deck slab & dirt


2.000

4.600

0.650

0.515

Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m

5.500

4.60

Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local

a
b
c

Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment

d
e
f

Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H
the Engineer-in-charge

a
b

Abtment
Wing Walls
Below GL
Wing Inner

1x
x

4
2

x
x

2x
2x
2x
2x

x
x
x
x

2
2
2
2

x
x
x
x

1x
1x
1x

x
x
x

2
1
1

x
x
x

1
1
1

x
x
x

2
2
1

x
x
x

Wing end
Wing outre
US RIGID APPRAN

Inner
Outer
DS Rigid Apron

Outer
Belo BD

Above BD

a
b
c

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal size

Abutment

d
d

Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanic

A
a

Below bed level


1st footing
2nd footing

4
4
4

3rd footing
c

d
e
f

Wing Walls 1st footing


2nd foot
3rd foot
4th foot
Curtain US
U/S cross
Curtain DS
DS cross

x
x
x

2.50

4
4
4

x
x
x

3.30
3.50
3.50
1
2
1
2

x
x
x
x

Rigid apron
US Apron

DS Apron

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal si

Abutment

2.500

Dirt wall

2.500

2.500

Wing

Rigid apron
Cross wall

3.75
2
2

x
x

1.50
3.70

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mech
daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Bed block

Deck slab

Kerbs

Parapets

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysa
in-charge
a

Wearing coat

10

Providing and laying flooring complete as per drawing and technical specification laid over cement concre
crushed stone aggregates

culvert inner
us appron
DS appron

11

12.2

1
1

x
x

1.025
2.525

x
x
x

Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply sup
direction of the Engineer-in-charge

2.80

12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical

I
ii
iii

Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8

iv

13

14.070

3.260

Wing wall
Vide item- 9

Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road

2.50

14

Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m

a
b

Abt
Wing wall

15

Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb

16

2
2

x
x

x
x

(2.5+
(3.3+

4.60
4.60

Providing and laying Filter material underneath pitching in slopes complete as per drawing

Slope pitching
Volume

17

4
4

15.00
270.00

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x

18

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm

Abutment
W.Wall

2
1

x
x

2
4.0

x
x

Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

p.c.c perapet
2x

4.850

R.C.C M 20 side of deck slab & dirt


2

4.850

0.650

0.515

Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m

6.600

4.85

Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local

a
b
c

Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment

d
e
f

Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge

a
b

Abtment
Wing Walls
Below GL
Wing Inner

Wing end
Wing outre

2x
2x
2x
2x

1x
x

4
2

x
x

x
x
x
x

2
2
2
2

x
x
x
x

US RIGID APPRAN

Inner
Outer

1x
1x
1x

x
x
x

2
1
1

x
x
x

1
1
1

x
x
x

2
2
1

x
x
x

DS Rigid Apron

Outer
Belo BD
Above BD

a
b
c

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si

Abutment

d
d

Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m

A
a

Below bed level


1st footing
2nd footing

4
4
4

3rd footing
c

d
e
f

Wing Walls 1st footing


2nd foot
3rd foot
4th foot
Curtain US
U/S cross
Curtain DS
DS cross
Rigid apron
US Apron

x
x
x

2.20

4
4
4

x
x
x

3.50
3.70
3.90
1
2
1
2

x
x
x
x

DS Apron

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me

Abutment

Dirt wall

2.200

2.200

Wing wall

2.200

Rigid apron
Cross wall

(3.9+4.5)1/2
2
2

x
x

1.50
3.70

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Bed block

Deck slab

Kerbs

Parapets

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a

Wearing coat

10

Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron

1
1

x
x

12.2
1.025

x
x

DS appron

11

2.525

Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge

2.20

12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific

I
ii
iii

Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8

iv

13

14.720

3.260

Wing wall
Vide item- 9

Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road

2.20

14

Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m

a
b

Abt
Wing wall

15

Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb

4
4

2
2

x
x

x
x

(3.2+
(3.9+

4.60
4.60

16

Providing and laying Filter material underneath pitching in slopes complete as per drawing

Slope pitching
Volume

15.00
270.00

17

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x

18

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm

Abutment
W.Wall

2
1

x
x

2
4.0

x
x

Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

p.c.c perapet
2x

4.850

R.C.C M 20 side of deck slab & dirt


2

4.850

0.650

0.515

Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m

6.600

4.85

Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local

a
b
c

Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment

d
e
f

Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge

a
b

Abtment
Wing Walls
Below GL
Wing Inner

1x
x

4
2

x
x

2x
2x
2x
2x

x
x
x
x

2
2
2
2

x
x
x
x

1x
1x
1x

x
x
x

2
1
1

x
x
x

1
1
1

x
x
x

2
2
1

x
x
x

Wing end
Wing outre
US RIGID APPRAN

Inner
Outer
DS Rigid Apron

Outer
Belo BD
Above BD

a
b
c

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si

Abutment

d
d

Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m

A
a

Below bed level


1st footing
2nd footing

4
4
4

3rd footing
c

Wing Walls 1st footing


2nd foot
3rd foot
4th foot

x
x
x

3.20

4
4
4

x
x
x

3.50
3.70
3.90

d
e
f

Curtain US
U/S cross
Curtain DS
DS cross

1
2
1
2

x
x
x
x

Rigid apron
US Apron

DS Apron

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me

Abutment

Dirt wall
Wing
Rigid apron
Cross wall

3.200

3.200

3.200

(3.9+4.5)1/2
2
2

x
x

1.50
3.70

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Bed block

Deck slab

Kerbs

Parapets

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S

Wearing coat

10

Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron

11

1
1
1

x
x
x

12.2
1.025
2.525

x
x
x

Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge

2.20

12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific

I
ii
iii

Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8

iv

13

12.760

3.260

Wing wall
Vide item- 9

Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road

3.20

14

Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m

a
b

Abt
Wing wall

4
4

x
x

(2.2+
(3.9+

15

Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb

16

2
2

x
x

4.60
4.60

Providing and laying Filter material underneath pitching in slopes complete as per drawing

Slope pitching
Volume

15.00
270.00 x

17

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x

18

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm

Abutment
W.Wall

2
1

x
x

2
4.0

x
x

Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

p.c.c perapet
2x

7.200

R.C.C M 20 side of deck slab & dirt


2

7.200

0.650

0.515

Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m

7.200

4.85

Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local

Abutment
peiar
Wing Walls
Curtain US
U/S cross

b
c

d
e
f

Curtain DS
DS cross
Embhankment

Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge

Abtment
2

4
2
2

2x
2
2
2

x
x
x
x

2
2
2
2

x
x
x
x

1
1
1

x
x
x

2
1
1

x
x
x

1
1
1

x
x
x

2
2
1

x
x
x

peiar
b

Wing Walls
Below GL
Wing Inner
Wing end
Wing outre

x
x
x

US RIGID APPRAN

Inner
Outer
DS Rigid Apron

Outer
Belo BD
Above BD

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si

a
b
c

Abutment
pear

d
d

Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m

A
a

Below bed level


1st footing
pear
2nd footing
pear
3rd footing
pear
4th footing
pear

Wing Walls

2nd foot
3rd foot
4th foot
Curtain US
U/S cross
Curtain DS
DS cross

4
2
4
2
4
2
4
2.00

1st footing

e
f

x
x
x
x

4
4
4

3.50
3.50
3.70
3.90
1
2
1
2

x
x
x
x

Rigid apron
US Apron

DS Apron

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me

Abutment
pear

Dirt wall
Wing
Rigid apron
Cross wall

x
x
x
x
x
x
x
x

4
2
4
2
4

x
x
x
x
x
4

2.500
2.500
2.500
2.500
2.500
(3.9+4.5)1/2

x
2
2

x
x

1.50
3.70

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Bed block

Deck slab

Kerbs

Parapets

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a

Wearing coat

10

Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron

11

1
1
1

x
x
x

12.2
1.025
2.525

x
x
x

Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge

2.50

12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific

I
ii
iii

iv

Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8
Wing wall
Vide item- 9

18.630

5.100

13

Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road

2.50

14

Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m

a
b

Abt
Wing wall

15

Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme

4
4

Parapet
Kerb

16

2
2

x
x

x
x

(2.2+
(3.9+

7.20
7.20

Providing and laying Filter material underneath pitching in slopes complete as per drawing

Slope pitching
Volume

15.00
270.00 x

17

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x

18

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm

Abutment
W.Wall

2
1

x
x

2
4.0

x
x

Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)

Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge

p.c.c perapet
2x

5.500

R.C.C M 20 side of deck slab & dirt


2

5.500

0.650

0.515

Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m

8.000

5.50

Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local

a
b
c

Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment

d
e
f

Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge

a
b

Abtment
Wing Walls
Below GL
Wing Inner
Wing end
Wing outre

1x
x

4
2

x
x

2x
2x
2x
2x

x
x
x
x

2
2
2
2

x
x
x
x

1x
1x
1x

x
x
x

2
1
1

x
x
x

1
1
1

x
x
x

2
2
1

x
x
x

US RIGID APPRAN

Inner
Outer
DS Rigid Apron

Outer
Belo BD
Above BD

Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si

a
b
c

Abutment

d
d

Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross

plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m

A
a

Below bed level


1st footing
2nd footing

4
4
4

3rd footing
c

d
e
f

Wing Walls 1st footing


2nd foot
3rd foot
4th foot
Curtain US
U/S cross
Curtain DS
DS cross

x
x
x

2.20

4
4
4

x
x
x

3.50
3.70
3.90
1
2
1
2

x
x
x
x

Rigid apron
US Apron

DS Apron

Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me

Abutment

Dirt wall
Wing
Rigid apron

2.200

2.200

2.200

(3.9+4.5)1/2
2

1.50

Cross wall

3.70

Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

Bed block

Deck slab

Kerbs

Parapets

Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a

Wearing coat

10

Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron

11

1
1
1

x
x
x

12.2
1.025
2.525

x
x
x

Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge

2.20

12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific

I
ii

Abtment
Vide item- 6
deck slab
Vide item- 7

17.580

iii

Wearing coat
Vide item- 8

iv

13

3.900

Wing wall
Vide item- 9

Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road

2.20

14

Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m

a
b

Abt
Wing wall

15

Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme

4
4

Parapet
Kerb

16

2
2

x
x

x
x

(2.2+
(3.9+

5.50
5.50

Providing and laying Filter material underneath pitching in slopes complete as per drawing

Slope pitching
Volume

15.00
330.00 x

17

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
330.00 x

18

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm

Abutment
W.Wall

2
1

x
x

2
4.0

x
x

Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)

= 1nos
Ch.23+100
8000
3000
300
800

8.000

950

0.950

950

0.950

3.000
0.300
0.800

720
7000

7.000

2500

2.500

250

0.250

200

0.200

1500
5000

1.500

27940

27.940

5000

5.000

4000

4.000

700

0.700

400

0.400

1350

1.350

3565

3.565

5.000

rbx 2) +100+100 of-fset

mantled materials up to a lead of 1000 metres, stacking

x
0.400
nd other structures, comprising of masonry, cement
necessary sorting the dismantling materials disposal of
ds and lifts of 1000m as per clause no. 202 of MoRT&H

41.20 cum

0.50

x
x
x

0.400

8.600
8.600
8.600

1.45

x
x
x

+
+
2

4.26

6.00
0.50
0.465

1.39
1.42
0.97
1.18

2
1.39

M
x
x
x

0.600
0.300
0.400

0.60

2.30

technical specification, including setting out construction of


ressing of sides and bottoms backfilling the excavation
oad work as per claue no.304 of MoRT&H specification and

2
4
1
1
1
1
1
1
1
1

x
x
x
x

12.00

+
2

13.10

28.14
28.14
28.14

x
x
x

13.10
0.45
0.55

x
x
x
2

4
1
x
x
x
x
x
x

x
2
1
1
2
1
1

x
x
x
x
x
x

5.1
27.94
4.10
27.94
4.10
3.10
26.44
26.44

x
x
x
x
x
x
x
x

2.95
0.9
0.90
0.90
0.90
0.90
3.50
3.50

1463.61 cum

nical specification of MoRT&H including cost, conveyance


d direction of the Engineer-in-charge

13.10
28.14
28.14
1
2
1
2
1
1

x
x
x
x
x
x
x
x
x

28.14
0.45
0.75
27.94
4.10
27.94
3.10
26.44
26.44

x
x
x
x
x
x
x
x
x

0.150
0.150
0.150
0.90
0.90
0.90
0.90
4.28
3.28

x
x
x
x
x
x

104.90 cum

e aggregates 40mm nominal size mechanically mixed placed

1
2
1
2
1
1

x
x
x
x
x
x

27.94
4.10
27.94
3.10
26.44
26.44

x
x
x
x
x
x

0.90
0.90
0.90
0.90
4.28
3.28

x
x
x
x
x
x
39.47 cum

e aggregates to 40mm nominal size mechanically mixed


days

x
4
x
x

12.90
28.14

x
x
(0.45
5.00

x
2.35

27.94
0.45
+

x
x
x

x
(2.350+

0.40
1.95)

0.150
0.150
0.30)
2.75

x
x

27.94
4.10
27.94
3.10

x
x
x
x

(0.700+
(0.700+
(0.700+
(0.700+

0.40)
0.40)
0.40)
0.40)
177.54 cum

one aggregates to 40mm nominal size mechanically mixed


ation including curing for 14 days

(1.950+

0.50)

x
94.69 cum

gates to 20mm nominal size mechanically mixed placed in


r Section No.1000 and 2100 of MORT&H specifcation and
12.90
27.94

x
x

27.94

x
x

0.950
0.720
360.51 cum

12.90
12.90

x
x

0.95
0.72

x
x

3.000

12.90

27.34

(0.8+0.95)1/2

12.90

0.35

0.30

0.45

3.000
129.26 cum

2
12.90

0.30

0.300

2
315.98 cum

rushed stone aggregates to 40mm nominal size mechanically


for 14 daysas per Section No.1000 and 2100 of MORT&H

27.34

0.450

on including curing for 14 daysas per Section No.1000 and

0.30

6.15 cum

12.00

27.34

0.065
21.33 cum

ification laid over cement concrete bedding (150mm thick


tone aggregates
26.54
26.54

x
x

(4.300+
(3.300+

4.15)
3.15)
59.32 cum

structure and superstructures as per drawing and technical


of the Engineer-in-charge

805.730

cum

120

Kg/cum

6.150

cum

80

Kg/cum

21.330

cum

75

Kg/cum

(0.40
(0.40
(3.57

+
+
+

0.50
0.40
0.50)
4
266.040

0.40)
0.40)
3.57)

=
=
=

8.00
8.00
35.70

3.57)

=
=
=

2.50
2.20
10.17
66.57

266.04 sqm
sqn

@5Kg/Sqm
100.11 Qnt
100.10 qnt

joint for fixed ends of simply supported spans not


th sealant complete as per drawing and technical
n of the EIC

0.300

7.74 sqm

0.300

4.28 sqm
12.02 sqm
12.02 sqm

ment, wing wall/ return wall with 100mm dia AC pipe

24.00 nos
24.00 sqm

and deep drains including cost of all materials etc complete

10.70
5.00

x
x

0.60
0.60

x
x

2.700
3.565
77.45 cum

of all labour materials T&P etc. complete as per complete as per drawing and technical specification as per clause n

x
x
x

1.500
0.200
1.500

=
=
=

164.04 sqm
5.47 sqm
1.20 sqm
170.71 sqm
170.71 sqm

complete as per drawing and Technical specification 15.5 2504


x

(6.43+0)1/2

x
0.15

6.43
=

3.000

74.070

cum
74.07 cum

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials

0.30

148.150

ur T&P etc.complete as per specification and direction of the Engineer-in-charge

cum
148.15 cum

=
611.52 cum

esign as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H Specific

40.00 nos
40.00 nos

G & TECHNICAL SPECIFICATION AND AS PER SECTION 1500, 1700 &2200

Assistant Engineer

Assistant Executive En

Widening of existing (3.000 x 1.500M) Span R.C.C Slab culvert at KM 18/000,18/

etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific

0.500

0.400

0.300

0.150

0.300

0.150

0.383

0.150

s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m

cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge

4
4
1
2
1
2
4

x
x
x
x
x
x
x

2.5
3.60
3.30
0.72
3.30
2.20
5.50

x
x
x
x
x
x
x

2.85
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2

x
x
x
x
x
x
x

specification of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and d

2.50
3.60

x
x

3.60
3.60
3.13
3.70

x
x
x
1/2(0.8 +

0.885 x
1.770 x
7.000
3.085
2.470
9.300

2.85
3.13
0.60
0.80
0.10
1.10)

1/2(0.1 +
1/2(0.1 +

0.30)
0.30)

x
x
x
x

0.1
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1

x
x

0.200
0.200

x
x
x
x

0.400
0.800
1.850
1.850

x
x
x

0.600
0.600
1.050

x
x
x

0.600
0.600
1.050

9.900

1/2(0.8 +

0.50)

1.200

2.550

1/2(9.2 +

8.30)

1.350

egates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days

4
4
1
2
1
2

x
x
x
x
x
x

2.50
3.25
3.80
0.70
3.80
2.20

x
x
x
x
x
x

2.85
2.13
0.90
0.90
0.90
0.90

x
x
x
x
x
x

mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

x
4
x
x
x

2.50
2.50
2.50

x
x
x
(1.85
3.10

x
1.93
1.53

2.65
2.25
1.85
+

x
x
x
x

x
x
(1.530+

0.200
0.200
0.400
1.45)
1.93

x
x

0.20
0.40
1.13)

3.80
2.475
3.80
2.20

x
x
x
x

(0.700+
(0.700+
(0.700+
(0.700+

0.40)
0.40)
0.40)
0.40)

1.00

(2.129+

2.043)

2.49

bu

(2.129+

2.043)

gates to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days

(1.45+

1.39)

0.30

(1.39+

0.97)

1.30
.

(0.47+0.300)

x
x
x

(1.200+
0.40
0.40

0.515

0.50)
x
x

0.60
0.60

20mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14
the Engineer-in-charge

2.80

0.55

0.300

2.80

4.00

0.350

4.60

0.320

0.55

4.60

0.30

1.00

uding curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-

4.60

10.90

0.065

n laid over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with
1/2(5.100+4.800)

0.300

1/2(5.100+4.800)
1/2(5.100+4.800)

x
x

0.300
0.300

or fixed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and

0.30

er drawing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge

53.04

14.070

cum

20

Kg/cum

cum

120

Kg/cum

3.260

cum

75

Kg/cum

56.510

cum

Kg/cum
0.00
3.276MT

hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge

0.575

= 5.75
@R.

sqm
16.16 sqm

rains including cost of all materials etc complete

1.9)1/2
4.0)1/2

x
x

1.500
1.65

surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x

1.300
1.300

11.96 sqm
2.76 sqm
14.72 sqm

mplete as per drawing and Technical specification 15.5 2504

x
0.15

4.50

=
=
@R.

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30

wall/ return wall with 100mm dia AC pipe

1.5
4.0

gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H

40.00 nos
20.00 nos

Assistant Engineer

Assistant Executive E

Widening of existing (3.500 x 2.500M) Span R.C.C S

etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific

0.500

0.400

0.300

0.150

0.300

0.150

0.383

0.150

s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m

cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge

4
4
1
2
1
2
4

x
x
x
x
x
x
x

2.2
3.60
3.30
0.72
3.30
2.20
5.50

x
x
x
x
x
x
x

3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2

x
x
x
x
x
x
x

cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th

2.20
3.60
3.60
3.60
3.13
3.70

x
x
x
x
x
1/2(0.8 +

3.40
2.50
0.60
0.80
0.10
1.10)

x
x

0.150
0.150

x
x
x
x

0.400
0.800
1.850
1.850

0.885 x
1.770 x
7.000

1/2(0.1 +
1/2(0.1 +

0.30)
0.30)

0.1

x
x
x

0.600
0.600
1.050

3.085
2.470
9.300

x
x
x

1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1

x
x
x

0.600
0.600
1.050

9.900

1/2(0.8 +

0.50)

1.200

2.550

1/2(9.2 +

8.30)

1.350

ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days

4
4
1
2
1
2

x
x
x
x
x
x

2.20
3.60
3.80
0.70
3.80
2.20

x
x
x
x
x
x

3.4
2.50
0.90
0.90
0.90
0.90

x
x
x
x
x
x

ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

2.20
2.20
2.20

x
x
x

x
x
x
(2.60
2.30
1.90

3.40
3.00
2.60
+
x
x
(1.900+

3.80
2.475
3.80
2.20

x
x
x
x

1.00

x
x
x

0.200
0.200
0.400
2.20)

0.40
0.40
1.50)
(0.700+
(0.700+
(0.700+
(0.700+

(2.129+

2.043)

0.40)
0.40)
0.40)
0.40)

2.49

bu

(2.129+

2.043)

s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days

(2.000+
(1.498+

1.498)

0.30

0.97)

1.75
.

(0.47+0.300)

x
x
x

(1.500+
0.40
0.40

0.450

0.50)
x
x

0.60
0.60

mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge

2.20

0.55

0.300

2.20

4.50

0.450

4.60

0.320

0.55

4.60

0.30

1.00

g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
4.60

10.90

0.065

d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)

x
x

0.300
0.300

1/2(5.100+4.800)

0.300

xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of

0.50

wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge

54.00

14.720

cum

20

Kg/cum

cum

120

Kg/cum

3.260

cum

75

Kg/cum

87.060

cum

Kg/cum
0.00
3.526MT

hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge

0.575

= 5.06
@R.

sqm
16.16 sqm

rains including cost of all materials etc complete

1.9)1/2
4.5)1/2

x
x

2.500
3.115

surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x

1.300
1.300

11.96 sqm
2.76 sqm
14.72 sqm

mplete as per drawing and Technical specification 15.5 2504

4.50
0.150

=
=
@R.

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30

wall/ return wall with 100mm dia AC pipe

1.5
4.0

gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H

20.00 nos
20.00 nos

Assistant Engineer

Assistant Executive E

Widening of existing (3.500 x 2.500M) Span R.C.C S

etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific

0.500

0.400

0.300

0.150

0.300

0.150

0.383

0.150

s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m

cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge

4
4
1
2
1
2
4

x
x
x
x
x
x
x

3.2
3.60
3.30
0.72
3.30
2.20
5.50

x
x
x
x
x
x
x

3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2

x
x
x
x
x
x
x

cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th

3.20
3.60

x
x

3.60
3.60
3.13
3.70

3.40
2.50

x
x
x
1/2(0.8 +

0.885 x
1.770 x
7.000

0.60
0.80
0.10
1.10)

1/2(0.1 +
1/2(0.1 +

0.30)
0.30)

0.1

x
x

0.150
0.150

x
x
x
x

0.400
0.800
1.850
1.850

x
x
x

0.600
0.600
1.050

3.085
2.470
9.300

x
x
x

1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1

x
x
x

0.600
0.600
1.050

9.900

1/2(0.8 +

0.50)

1.200

2.550

1/2(9.2 +

8.30)

1.350

ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days

4
4
1
2
1
2

x
x
x
x
x
x

3.20
3.60
3.80
0.70
3.80
2.20

x
x
x
x
x
x

3.4
2.50
0.90
0.90
0.90
0.90

x
x
x
x
x
x

ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

x
x
x
x

3.20
3.20
3.20

x
x
x
(2.60
2.30
1.90

3.40
3.00
2.60
+
x
x
(1.900+

x
x
x

0.200
0.200
0.400
2.20)

0.40
0.40
1.50)

3.80
2.475
3.80
2.20

x
x
x
x

(0.700+
(0.700+
(0.700+
(0.700+

0.40)
0.40)
0.40)
0.40)

1.00

(2.129+

2.043)

2.49

bu

(2.129+

2.043)

s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days

(2.000+
(1.498+

1.498)

0.30

0.97)

1.75
.

(0.47+0.300)

x
x
x

(1.500+
0.40
0.40

0.450

0.50)
x
x

0.60
0.60

mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge

3.20

0.55

0.300

3.20

4.50

0.450

4.60

0.320

4.60

0.55
0.30

1.00

g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge

4.60

10.90

0.065

d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)
1/2(5.100+4.800)

x
x
x

0.300
0.300
0.300

xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of

0.30

wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge

54.00

12.760

cum

20

Kg/cum

cum

120

Kg/cum

3.260

cum

75

Kg/cum

87.060

cum

Kg/cum
0.00
3.276MT

hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge

0.575

= 7.36
@R.

rains including cost of all materials etc complete

1.9)1/2
4.5)1/2

x
x

2.500
3.115

sqm
16.16 sqm

surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x

1.300
1.300

11.96 sqm
2.76 sqm
14.72 sqm

mplete as per drawing and Technical specification 15.5 2504

x
0.15

4.50

=
=
@R.

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30

wall/ return wall with 100mm dia AC pipe

1.5
4.0

gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H

20.00 nos
20.00 nos

Assistant Engineer

Assistant Executive E

Widening of existing (3.500 x 2.500M) Span R.C.C Slab culvert at

etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific

0.500

0.400

0.300

0.150

0.300

0.150

0.383

0.150

s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m

cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge

4
2
4
1
2

x
x
x
x

2.5
2.5
3.60
3.30
0.72

x
x
x
x
x

2.9
2.9
(3.13+5.13)1/2
0.90
0.90

x
x
x
x
x

1
2
4

x
x
x

3.30
2.20
5.50

x
x
x

0.90
0.90
(2.0+3.95)1/2

x
x
x

cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th

2.50

x
x
x

2.5
3.60
3.60
3.60
3.13
3.70

2.90
2.9
2.50

x
x
x
1/2(0.8 +

0.885 x
1.770 x
7.000

2.9

0.60
0.80
0.10
1.10)

1/2(0.1 +
1/2(0.1 +

0.30)
0.30)

0.1

x
x
x

0.150
0.15
0.150

x
x
x
x

0.400
0.800
1.850
1.850

x
x
x

0.600
0.600
1.050

3.085
2.470
9.300

x
x
x

1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1

x
x
x

0.600
0.600
1.050

9.900

1/2(0.8 +

0.50)

1.200

2.550

1/2(9.2 +

8.30)

1.350

ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days

4
2
4
1
2
1
2

x
x
x
x
x
x

2.50
2.50
3.60
3.80
0.70
3.80
2.20

x
x
x
x
x
x
x

2.9
2.9
2.50
0.90
0.90
0.90
0.90

ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

x
x
x
x
x
x
x

ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

x
x
x
x
x
x
x
x

x
x
x
x

2.70
2.70
2.50
2.50
2.40
2.40
1/2(2.6 +
1/2(2.6 +

2.5
2.30
1.90

x
x
x
x
x
x

0.200
0.200
0.200
0.200
0.400
0.400
2.20) x
2.20) x

0.4
0.4

0.20
0.40

x
x
(1.900+

0.40
1.50)

3.80
2.475
3.80
2.20

x
x
x
x

(0.700+
(0.700+
(0.700+
(0.700+

0.40)
0.40)
0.40)
0.40)

1.00

(2.129+

2.043)

2.49

bu

(2.129+

2.043)

s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days

x
x
x
x
x
x
x
x

(2.000+
1.498)
(2.000+
1.498)
(1.498+
0.97)
(1.498+
0.97)
(0.47+0.300)
(1.500+
0.40
0.40

x
x

x
x
x
x
x
0.50)

0.30
0.3
1.75
1.75
0.450

0.60
0.60

mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge

2.50

0.55

0.300

2.50

4.50

0.450

7.20

0.320

0.55

7.20

0.30

1.00

g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
7.20

10.90

0.065

d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)
1/2(5.100+4.800)

x
x
x

0.300
0.300
0.300

xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of

0.30

wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge

86.88

18.630

cum

20

Kg/cum

cum

120

Kg/cum

5.100

cum

75

Kg/cum

94.072

cum

Kg/cum
0.00

4.826M.T

@5Kg/Sqm

hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge

0.575

= 5.75
@R.

sqm
16.16 sqm

rains including cost of all materials etc complete

1.9)1/2
4.5)1/2

x
x

2.500
3.115

surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x

1.300
1.300

18.72 sqm
18.72 sqm
37.44 sqm

mplete as per drawing and Technical specification 15.5 2504

x
0.15

4.50

=
=
@R.

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30

wall/ return wall with 100mm dia AC pipe

1.5
4.0

gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H

20.00 nos
20.00 nos

Assistant Engineer

Assistant Executive E

Widening of existing (4.500 x 2.000M) Span R.C.C Sl

etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific

0.500

0.400

0.300

0.150

0.300

0.150

0.383

0.150

s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m

cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge

4
4
1
2
1
2
4

x
x
x
x
x
x
x

2.2
3.60
3.30
0.72
3.30
2.20
5.50

x
x
x
x
x
x
x

3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2

x
x
x
x
x
x
x

cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th

2.20
3.60

x
x

3.60
3.60
3.13
3.70

3.40
2.50

x
x
x
1/2(0.8 +

0.885 x
1.770 x
7.000

0.60
0.80
0.10
1.10)

1/2(0.1 +
1/2(0.1 +

0.30)
0.30)

0.1

x
x

0.150
0.150

x
x
x
x

0.400
0.800
1.850
1.850

x
x
x

0.600
0.600
1.050

3.085
2.470
9.300

x
x
x

1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1

x
x
x

0.600
0.600
1.050

9.900

1/2(0.8 +

0.50)

1.200

2.550

1/2(9.2 +

8.30)

1.350

ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days

4
4
1
2
1
2

x
x
x
x
x
x

2.20
3.60
3.80
0.70
3.80
2.20

x
x
x
x
x
x

3.4
2.50
0.90
0.90
0.90
0.90

x
x
x
x
x
x

ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days

2.20
2.20
2.20

x
x
x

x
x
x
(2.60
2.30
1.90

3.40
3.00
2.60
+
x
x
(1.900+

x
x
x

0.200
0.200
0.400
2.20)

0.40
0.40
1.50)

3.80
2.475
3.80
2.20

x
x
x
x

(0.700+
(0.700+
(0.700+
(0.700+

0.40)
0.40)
0.40)
0.40)

1.00

(2.129+

2.043)

2.49

bu

(2.129+

2.043)

s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days

(2.000+
(1.498+

1.498)

0.30

0.97)

1.75
.

(0.47+0.300)

x
x

(1.500+
0.40

0.50)
x

0.60

0.450

0.40

0.60

mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge

2.20

0.55

0.300

2.20

5.50

0.450

5.50

0.320

0.55

5.50

0.30

1.00

g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
5.50

10.90

0.065

d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.500+5.200)
1/2(5.500+5.200)
1/2(5.500+5.200)

x
x
x

0.300
0.300
0.300

xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of

0.50

wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge

65.43

17.580

cum

20

Kg/cum

cum

120

Kg/cum

3.900

cum

75

Kg/cum

87.070

cum

Kg/cum
0.00
4.146MT

hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge

0.575

= 5.06
@R.

sqm
16.16 sqm

rains including cost of all materials etc complete

1.9)1/2
4.5)1/2

x
x

2.500
3.115

surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x

1.300
1.300

14.30 sqm
14.30 sqm
28.60 sqm

mplete as per drawing and Technical specification 15.5 2504

x
0.15

5.50

=
=
@R.

materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30

wall/ return wall with 100mm dia AC pipe

1.5
4.0

gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H

20.00 nos
20.00 nos

Assistant Engineer

Assistant Executive E

um

Re Construction=

13.10M
28.14M
5.05M
27.94M
27.34M

4.26 cum

@R.

0.600
0.300
0.400

557.28 cum
15.48 cum
19.20 cum
591.96 cum

@R.

21.980 cum
70.020 cum
92.00 cum

10.50

5.12

1.250
0.450
0.450
2.95
0.9
0.90
0.90
0.90
0.90
3.50
3.50

@R.

674.69

=
=
=
x
x
x
x
x
x
x
x

1.35
1.65
1.65
1.65
1.65
1.65
0.60
0.60

460.79
11.40
13.98
81.24
41.4909
12.177
41.491
6.089
9.207
55.524
55.524
1463.61

um

89.90 /cum

@R.

=
=
=
0.15
0.15
0.15
0.15
0.15
0.15

um

0.15
0.15
0.15
0.15
0.15
0.15

3.772 cum
1.107 cum
3.772 cum
0.837 cum
16.974 cum
13.008 cum
39.470 cum
@R.

um

0.450
0.40
0.40

55.30 cum
3.80 cum
6.33 cum
3.772 cum
1.107 cum
3.772 cum
0.837 cum
16.974 cum
13.008 cum
104.90 cum
@R.

=
=
=
=
=
=

54.06 cum
3.80 cum
9.50 cum
22.000 cum
18.800 cum
17.200 cum

x
x
x
x

1.35
1.35
1.35
1.35

20.745 cum
6.089 cum
20.745 cum
4.604 cum
177.54 cum
@R.

um

3.865

94.690 cum
94.69 cum
@R.

um

um
=

um

0.30

um

0.20
0.250

cum

73.53 cum
55.73
@R.

cum

308.60 cum

0.41 cum

6.97 cum

315.98 cum
@R.

um

+
2

342.40 cum
18.105
@R.

6.150 cum
=

6.15 cum
@R.

=
=

21.33 cum
21.33 cum

um

@R.

x
x

um

Qnt
nt

0.30
0.30

33.640 cum
25.680 cum
59.320 cum
@R.

96687.60 Kg
492.00 Kg
1599.75 Kg
8.00 sqm
8.00 sqm
35.70 sqm
2.50 sqm
2.20 sqm
10.17 sqm
66.57 sqm
1330.20 Kg
100109.55 kg
@R.

qm

@R.

qm

@R.

=
=

um

34.67 cum
42.78 cum
77.450 cum
@R.

fication as per clause no.2605 of

@R.

qm

@R.

108.02 sqm
385.8

sqm

um

um

@R.

493.82 sqm
@R.
@R.

611.52 cum

um

@R.

4 of MoRT&H Specifications for

os

@R.

Assistant Executive Engineer

1416.91

Executive Engineer

at KM 18/000,18/800,18/900,19/300,19/500,19/600,19/700,20/200 &20/500 = 9nos

including T&P and scaffolding


02 of MORT&H specification and

9 Nos

1.80
@R.

240.08 /cum

0.41
0.12
0.12

0.65
@R.

613.62 /cum

ffect to any part of the bridge

25.3
55.95 /cum

@R.

leterious materials, dressing of sides


he Engineer-in-charge

2
1.85
2.05
1.70
1.70
1.70
1.70
1.30

52.73 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
278.76 cum
89.90 /cum

@R.

RT&H specifcation and direction of

=
=

5.700
9.014

cum
cum

=
=
=
=

3.46
9.216
2.32
26.01

cum
cum
cum
cum

=
=
=

0.212
0.156

cum
0.212 cum
cum

=
=
=

0.740
0.592
0.976

cum
cum
cum

15.444

cum

60.243

cum
134.29 cum

252.26 /cum

@R.
curring for 14 days

0.15
0.15
0.15
0.15
0.15
0.15

4.28 cum
4.154 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
10.238 cum
4101.24 /cum

@R.

r 14 days

=
=
=
=

0.400

5.30 cum
4.50 cum
7.40 cum
6.60 cum
9.573 cum
5.100 cum
8.568 cum
7.450 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum

0.40

0.40
x
x
x
x

1.05
1.05
1.05
1.05

0.15

0.310

cum

0.15

0.781

cum
65.37 cum

4287.43 /cum

@R.

uding curing for 14 days

4.26

cum

2.03

15.34

cum

1.98

cum

25.820

cum

=
=

0.76
1.776
49.94

@R.

cum
4609.22 /cum

1.85 cum

7.84 cum

1.62 cum

2.76 cum
14.07
6702.32 /cum

@R.

3.26
5679.23 /cum

@R.

18.12 cum

=
=

1.529 cum
3.757 cum
23.40 cum
2369.60 /cum

@R.

3.36

sqm

@R.

he Engineer-in-charge

1060.80 Kg

1688.40

Kg

244.50

Kg

282.55

Kg
3276.25 kg

0.00
65408.35

@R.

=
=

13.200
24.09
37.29

/sqm
/sqm
cum

int @ Ltr for 2 sqm

21.42

@R.

270.00
40.50
40.50
@R.

cum
cum
cum
457.43

81.00

cum

MT

/sqm

cum

@R.

81.00

=
=

cum

6
16
22

@R.

nos
nos
nos

785.18

@R.

326.17

@R.

QTY For 9 NO CULVERT

Assistant Executive Engineer

Executive Engineer

00M) Span R.C.C Slab culvert at KM 0/900 = 1no

including T&P and scaffolding


02 of MORT&H specification and

1 Nos

1.80
@R.

240.08 /cum

0.44
0.12
0.12

0.68
613.62 /cum

@R.

ffect to any part of the bridge

32.01
55.95 /cum

@R.

leterious materials, dressing of sides


he Engineer-in-charge

2
1.85
2.05
1.70
1.70
1.70
1.70
1.30

55.35 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
281.39 cum
89.90 /cum

@R.

ifcation and direction of the Engineer-

=
=

4.488
5.400

cum
cum

=
=
=
=

3.46
9.216
2.32
26.01

cum
cum
cum
cum

=
=
=

0.212
0.156

cum
0.212 cum
cum

=
=
=

0.740
0.592
0.976

cum
cum
cum

15.444

cum

60.243

cum
129.46 cum

252.26 /cum

@R.

rring for 14 days

0.15
0.15
0.15
0.15
0.15
0.15

4.49 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
11.697 cum
4101.24 /cum

@R.

=
=
=
=

0.400

0.40
x
x
x
x

0.15

5.98 cum
5.28 cum
9.15
8.45 cum
cum
12.880 cum
11.248
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum

1.05
1.05
1.05
1.05

0.310

cum

cum

cum

0.15

0.781

cum
74.48 cum

4287.43 /cum

@R.

g for 14 days

3.115

4.62

cum

19.00

cum

1.52

cum

52.332

cum

=
=

0.76
1.776
80.01

cum
4609.22 /cum

@R.

1.45 cum

8.91 cum

1.62 cum

2.76 cum
14.74
6702.32 /cum

@R.

=
@R.

=
=

3.26
5679.23 /cum

18.12 cum
1.529 cum

3.757 cum
23.403 cum
2369.60 /cum

@R.

4.40

sqm
@R.

in-charge

1080.00 Kg

1766.40

Kg

244.50

Kg

435.30

Kg
3526.20 kg

0.00
65408.35

@R.

=
=

25.500
52.332
77.832

/sqm
/sqm
cum

int @ Ltr for 2 sqm

@R.

MT

21.42

/sqm

@R.

270.00
40.50
40.50
@R.

cum
cum
cum
457.43

81.00
81.00

cum
cum

=
=

6
16
22

cum

@R.

nos
nos
nos

@R.

@R.

Assistant Executive Engineer

Executive Engineer

00M) Span R.C.C Slab culvert at KM 1/300 = 1no

including T&P and scaffolding


02 of MORT&H specification and

785.18

1 Nos

326.17

1.80
@R.

240.08 /cum

0.44
0.12
0.12

0.68
@R.

613.62 /cum

ffect to any part of the bridge

32.01
@R.

55.95 /cum

leterious materials, dressing of sides


he Engineer-in-charge

2
1.85
2.05
1.70
1.70
1.70
1.70
1.30

ifcation and direction of the Engineer-

80.51 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
306.55 cum
@R.

89.90 /cum

=
=

6.528
5.400

cum
cum

=
=
=
=

3.46
9.216
2.32
26.01

cum
cum
cum
cum

=
=
=

0.212
0.156

cum
0.212 cum
cum

=
=
=

0.740
0.592
0.976

cum
cum
cum

15.444

cum

60.243

cum
131.50 cum

252.26 /cum

@R.

rring for 14 days

0.15
0.15
0.15
0.15
0.15
0.15

6.53 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
13.737 cum
4101.24 /cum

@R.

=
=
=
=

0.400

0.40

8.70 cum
7.68 cum
13.31
12.29 cum
cum
12.880 cum
11.248
10.610 cum

cum

cum

x
x
x
x

1.05
1.05
1.05
1.05

2.195 cum
2.859 cum
2.195 cum
2.541 cum

0.15

0.310

cum

0.15

0.781

cum
87.60 cum

4287.43 /cum

@R.

g for 14 days

3.115

6.72

cum

27.64

cum

2.22

cum

52.332

cum

=
=

0.76
1.776
91.44
4609.22 /cum

@R.

@R.

cum

2.11 cum

12.96 cum

1.62 cum

2.76 cum
19.45
6702.32 /cum

3.26
5679.23 /cum

@R.

=
=
=

18.12 cum
1.529 cum
3.757 cum
23.403 cum
2369.60 /cum

@R.

2.64

sqm
@R.

in-charge

1080.00 Kg

1531.20

Kg

244.50

Kg

435.30

Kg
3291.00 kg

0.00
65408.35

@R.

=
=

20.500
52.332

/sqm
/sqm

MT

72.832

cum

@R.

int @ Ltr for 2 sqm

21.42

@R.

270.00
40.50
40.50
@R.

cum
cum
cum
457.43

81.00
81.00

cum
cum

=
=

6
16
22

/sqm

cum

@R.

nos
nos
nos

@R.

@R.

Assistant Executive Engineer

785.18

Executive Engineer

326.17

C.C Slab culvert at KM 22/200&23/950 two span culvert = 2nos

including T&P and scaffolding


02 of MORT&H specification and

2 Nos

1.80
@R.

240.08 /cum

0.65
0.12
0.12

0.89
@R.

613.62 /cum

ffect to any part of the bridge

34.92
@R.

55.95 /cum

leterious materials, dressing of sides


he Engineer-in-charge

1.85
1.85
2.05
1.70
1.70

107.30 cum
26.83 cum
121.92 cum
5.049 cum
2.203 cum

1.70
1.70
1.30

5.049 cum
6.732 cum
85.09 cum
360.16 cum
89.90 /cum

@R.

ifcation and direction of the Engineer-

cum

0.000
2.18
5.400

=
=
=
=

3.46
9.216
2.32
26.01

cum
cum
cum
cum

=
=
=

0.212
0.156

cum
0.212 cum
cum

=
=
=

0.740
0.592
0.976

cum
cum
cum

15.444

cum

60.243

cum

cum
cum

127.15 cum
@R.

252.26 /cum

rring for 14 days

0.15
0.15
0.15
0.15
0.15
0.15
0.15

4.35 cum
2.18 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
13.734 cum
@R.

4101.24 /cum

5.40 cum
2.70 cum
5.00 cum
2.50 cum
9.60 cum
4.80 cum
9.60 cum
4.80 cum

=
=
=

0.40
x
x
x
x

=
=
=
=

7.00 cum
12.880 cum
11.248 cum
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum

1.05
1.05
1.05
1.05

0.15

0.310

cum

0.15

0.781

cum
97.02 cum

4287.43 /cum

@R.

g for 14 days

=
=

5.25
2.62
21.60
10.80
2.22
52.332

cum
cum
cum
cum
cum
cum

=
=

0.76
1.776

cum
cum

97.35

cum

3.115

@R.

4609.22 /cum

1.65 cum

10.13 cum

2.53 cum

4.32 cum
18.63
6702.32 /cum

@R.

5.10
5679.23 /cum

@R.

=
=
=

18.12 cum
1.529 cum
3.757 cum
23.40 cum
2369.60 /cum

@R.

3.00

sqm
@R.

in-charge

1737.60 Kg

0.00

2235.60

Kg

382.50

Kg

470.36

Kg
4826.06 kg

65408.35

@R.

=
=

20.500
52.332
72.832

MT

/sqm
/sqm
cum

@R.

int @ Ltr for 2 sqm

21.42

@R.

=
=

270.00
40.50
40.50
@R.

cum
cum
cum
457.43

81.00
81.00

cum
cum

6
16
22

/sqm

cum

@R.

nos
nos
nos

785.18

@R.

@R.

326.17

For 2 NOS CULVERT

Assistant Executive Engineer

Executive Engineer

00M) Span R.C.C Slab culvert at KM 23/400 = 1no

including T&P and scaffolding


02 of MORT&H specification and

1 Nos

1.80
@R.

240.08 /cum

0.50
0.12
0.12

0.74
@R.

613.62 /cum

ffect to any part of the bridge

44

55.95 /cum

@R.

leterious materials, dressing of sides


he Engineer-in-charge

2
1.85
2.05
1.70
1.70
1.70
1.70
1.30

55.35 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
281.39 cum
89.90 /cum

@R.

ifcation and direction of the Engineer-

rring for 14 days

=
=

4.488
5.400

cum
cum

=
=
=
=

3.46
9.216
2.32
26.01

cum
cum
cum
cum

=
=
=

0.212
0.156

cum
0.212 cum
cum

=
=
=

0.740
0.592
0.976

cum
cum
cum

15.444

cum

60.243

cum
129.46 cum

@R.

252.26 /cum

0.15
0.15
0.15
0.15
0.15
0.15

4.49 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
11.697 cum
4101.24 /cum

@R.

=
=
=
=

0.400

0.40
x
x
x
x

5.98 cum
5.28 cum
9.15
8.45 cum
cum
12.880 cum
11.248
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum

1.05
1.05
1.05
1.05

cum

cum

0.15

0.310

cum

0.15

0.781

cum
74.48 cum

4287.43 /cum

@R.

g for 14 days

3.115

6.72

cum

27.64

cum

2.22

cum

52.332

cum

0.76

1.776
91.44

cum
4609.22 /cum

@R.

1.45 cum

10.89 cum

1.94 cum

3.30 cum
17.58
6702.32 /cum

@R.

3.90
5679.23 /cum

@R.

=
=
=

19.58 cum
1.65 cum
4.05 cum
25.28 cum
2369.60 /cum

@R.

4.40

sqm
@R.

in-charge

1308.60 Kg

2109.60

Kg

292.50

Kg

435.35

Kg
4146.05 kg

0.00
65408.35

@R.

=
=

20.500
52.332
72.832

MT

/sqm
/sqm
cum

@R.

int @ Ltr for 2 sqm

21.42

@R.

=
=

330.00
49.50
49.50
@R.

cum
cum
cum
457.43

99.00
99.00

cum
cum

6
16

/sqm

cum

@R.

nos
nos

785.18

22

nos

@R.

@R.

Assistant Executive Engineer

Executive Engineer

326.17

1 nos

13.10M
28.14M
5.05M
27.94M
27.34M

cum

cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum

240.08 /cum

1022.74

613.62 /cum

363238.50

167.24 /cum

15386.08

131578.54

252.26 /cum

26462.07

4047.42 /cum

159751.67

m
m
m
m
m
m
m
m
m
m

m
m
m
m
m
m
m

m
m
m
m
m
m

m
m
m
m
m
4287.43 /cum

761190.32

4609.22 /cum

436447.04

5735.17 /cum

2067586.14

6750.81 /cum

872609.70

6702.32 /cum

2117799.07

5463.43 /cum

33600.09

m
m

m
cum

m
cum

5617.00 /cum

119810.61

2369.60 /cum

140564.67

65408.35 /Qnt

6547375.84

m
m
m

g
g

1212.00 /sqm

14568.24

100.47 /nos

2411.28

607.66 /cum

47063.27

46.60 /sqm

7955.09

457.43 /cum

33881.84

785.18 /cum

116324.42

m
m
m

1416.91

37.17 /cum

22730.20

326.17 /each

13046.80

77476.63
14052404.00

00 = 9nos

cum
R

432.14

cum
cum
cum
cum
R

398.85

cum
R

1415.54

25060.79

m
m
m
m
m
m
m
m

m
m

m
m
m
m

m
m
m

m
m
m

33876.00

41988.50

280271.98

m
m
m
m
m
m
m

m
m
m
m
m
m
m
m
m
m
m
m

230175.23

94282.88

18509.18

55455.75

m
m
m
um

1212

sqm

4072.32

607.66/cum

214277.75

92.92

22659.64

315.30

18525.92

785.18

/cum

100.47

/each

TY For 9 NO CULVERT

63599.58

2210.34

R
R

6523.40
1114144.00

10027295.97

cum
R

432.14

cum
cum
cum
cum
R

415.11

1790.96

25296.96

cum

m
m
m
m
m
m
m
m

m
m

m
m
m
m

m
m
m

m
m
m

32657.58

47972.20

m
m
m
m
m
m
m

m
m
cum

m
m
m
cum

m
m
m
m
m

cum

cum

319326.18

368779.08

98800.24

18509.18

m
m

m
m
um

1212

sqm

55455.75

5332.80

607.66/cum

214277.75

81.77

22659.64

315.30

785.18

/cum

100.47

/each

18525.92

63599.58

2210.34

6523.40

1302961.89

cum
R

432.14

cum
cum
cum
cum
R

415.11

1790.96

27558.85

cum

m
m
m
m
m
m
m
m

m
m

m
m
m
m

m
m
m

m
m
m

33172.19

56338.73

m
m
m
m
m
m
m

m
m
cum

m
m
m

cum

m
m
m
m

cum
cum

375577.26

421476.30

130368.17

m
m
m
m
um

1212

sqm

18509.18

55455.75

3199.68

214277.75

118.94

607.66/cum

785.18

/cum

100.47

/each

22659.64

315.30

18525.92

63599.58

2210.34

6523.40

1452525.18

m
m
m
m
m

cum
R

432.14

cum
cum
cum
cum
R

544.89

1953.77

cum

m
m
m
m

32378.65

32074.86

56326.43

m
cum

m
m
m
m

m
m
m

m
m
m

m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m

m
m
m
m
m
m
m
m

415956.28

448693.74

m
m
m
m
um

1212

sqm

124860.20

28970.89

55455.75

3636.00

607.66/cum

785.18

/cum

100.47

/each

315660.70

92.92

22659.64

801.96

18525.92

63599.58

2210.34

6523.40

For 2 NOS CULVERT

1631358.06

3262716.13

cum
R

432.14

cum
cum
cum
cum
R

cum

451.01

2461.80

25296.96

32657.58

m
m
m
m
m
m
m
m

m
m

m
m
m
m

m
m
m

m
m
m

m
m
m
m
m
m
m

47972.20

319326.18

m
m
cum

m
m
m
cum

m
m
m
m
m

cum
cum

421476.30

117813.38

22130.54

59898.75

5332.80

m
m
m
m
um

1212

sqm

607.66/cum

785.18

/cum

271183.02

81.77

22659.64

612.61

22642.79

77732.82

100.47

/each

2210.34

6523.4

1458896.03

Detailed estimate for " Construction of Concrete Retaining wall

19010

19160

22950

23070

Earth work in excavation for foundation of structures as per drawing and technical spe
approved materials all kinds of soil as per clause no.304 of MoRT&H specification a

1
x
270.00
Filling foundation and plinth with coarsed river sand as per direction of department inc

1
x
270.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates

1
x
270.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge

Foundation
1
1

x
X

270.00
270.00

Sub-structure
1

270.00

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o

1
x
270.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and

Both side
Top
Surface area of Return wall

Totalarea =

or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr

270.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P

Area as above
Volum
10

675

Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard

270

1.5

Construction of toe wall

18660
19400
20520
20880
21420
21660
21960
22380

18760
19450
20635
21130
21560
21745
22010
22440

Total length
Earth work in excavation for foundation of structures as per drawing and technical spe

1
x
850.00
Filling foundation and plinth with coarsed river sand as per direction of department inc

1
x
850.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates

a
b

Bed concrete
1
x
850.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge

UPTO GL
1

850.00

Above GL
1

850.00

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o

1
x
850.00
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr

Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr

850

0.45

Detailed estimate for " Construction of Concrete Retaining wall

22200

22380

22210

22305

23020

23070

Earth work in excavation for foundation of structures as per drawing and technical spe

1
x
325.00
Filling foundation and plinth with coarsed river sand as per direction of department inc

1
x
325.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates

1
x
325.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge

Foundation

1
1
b

Sub-structure
1

x
x

325.00
325.00

325.00

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o

1
x
325.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and

Both side
Top
Surface area of Return wall

Totalarea =

or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr

325.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P

Area as above
Volum
10

812.5

Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard

243.18

1.5

Detailed estimate for " Construction of Concrete Retaining wall

23140
1

23190

Earth work in excavation for foundation of structures as per drawing and technical spe
approved materials all kinds of soil as per clause no.304 of MoRT&H specification a

1
x
100.00
Filling foundation and plinth with coarsed river sand as per direction of department inc

1
x
100.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates

a
b

1
x
100.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge

Foundation
1
Above GL
1

100.00

100.00

Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o

1
x
100.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and

Both side
Top
Surface area of Return wall

Totalarea =

or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr

100.00
8

Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope

Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P

Area as above
Volum
10

400

Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard

160

1.5

rete Retaining wall

19160

150.000

23070

120.00

270.00

per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
04 of MoRT&H specification and direction of the EIC

x
1.90
x
1.45
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M

0
x
1.90
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring

0
x
1.90
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge

x
x (

1.70
1.50

x
1.33

)x

x (

1.33

0.50

)x

ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC

0
x
1
no
x
1.25
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an

1
1

x
x

2
1

x
x

270
270
1.500

5.00

4.850
holes of abutment and deep drains including cost of all materials etc complete

MT

x
0.45
x
0.45
omplete as per drawing and Technical specification 15.5 2504

270.0

+
2

970.00 sqm

x
x

0.3

2.50

all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials

675

0.300

of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water

1.5

m/

INTERVAL

0
0
5
0
0
5
0
0

1
1
1
1
1
1
1
1

=
100.000
mtr
X
=
50.000
mtr
X
=
115.000
mtr
X
=
250.000
mtr
X
=
140.000
mtr
X
=
85.000
mtr
X
=
50.000
mtr
X
=
60.000
mtr
=
850.00
mtr
per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou

0
x
1.10
x
0.800
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M

0
x
1.10
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring

0
x
1.10
x
0.150
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge

0.90

0.70

+
2

0.70

+
0.40
x
2
ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC

0
x
1 no
x
holes of abutment and deep drains including cost of all materials etc complete

0.900

holes of abutment and deep drains including cost of all materials etc complete

0.3

rete Retaining wall

22380

180.00

22305

95.00

23070

50.00

325.00

per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou

x
1.90
x
1.05
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M

0
x
1.90
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring

0
x
1.90
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge

x
x (

1.70
1.50

x
1.33

)x

x (

1.33

0.50

)x

ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC

0
x
2
no
x
1.00
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an

1
1

x
x

2
1

x
x

325
325
1.500

6.050
holes of abutment and deep drains including cost of all materials etc complete

x
0.45
x
0.30
omplete as per drawing and Technical specification 15.5 2504
325.0

+
2

1157.50 sqm

x
x

5.00

MT

2.50

all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials

812.5

0.300

of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water

1.5

m/

INTERVAL

Assistan

rete Retaining wall

23190

100.00

100.00

per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
04 of MoRT&H specification and direction of the EIC

x
1.40
x
1.45
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M

0
x
1.4
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring

0
x
1.4
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge

x (

1.2

1.03

)x

x (

1.03

0.50

)x

ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC

0
x
1
no
x
0.75
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an

1
1

x
x

2
2

x
x

100
100
1.200

+
2

346.38 sqm

2.750
holes of abutment and deep drains including cost of all materials etc complete

x
x

0.45

5.00

MT

0.3

omplete as per drawing and Technical specification 15.5 2504


x

160.0

2.50

all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials

400

0.300

of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water

1.5

m/

INTERVAL

PART-C

Retaining wall 3mtr section


150.000

mtr

R/S

120.00

mtr

R/S

270.00

mtr

of stumps and other deleterious materials dressing of sides and bottom and backfilling with

743.85 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge

=
by vibration including curring for 14 days

76.95 cum

=
76.95 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of

0.25
0.50

=
=

114.75 cum
212.25 cum
339.75 cum

2.50

617.63 cum

at the structure with slope of IV:20 H towards drainage face complete as per drawing and

m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge

1.50
0.50
0.500
1

337.50 mtr

2.500

/Kg/sqm

4850.00

16.40 cum

675.00

=
=

750
202.50

ls

ls centering shuttering & watering & curing etc. Complet

218.0

@R

nos

Assistant Engineer

Assistant Executive Engineer

Executive Engineer

mtr
R/S
mtr
R/S
mtr
L/S
mtr
R/S
mtr
L/S
mtr
L/S
mtr
L/S
mtr
L/S
mtr
of stumps and other deleterious materials dressing of sides and bottom and backfilling.

748.00 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charg

=
by vibration including curring for 14 days

140.25 cum

=
140.25 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of

0.5

340.00 cum

467.50
467.50

at the structure with slope of IV:20 H towards drainage face complete as per drawing and

765

cum

cum
cum

114.75 cum

114.75 cum

Junior Engineer

Assistant Engineer

Executive Engineer

PART-C

Retaining wall 2.5mtr section


180.00

mtr

L/S

95.00

mtr

R/S

50.00

mtr

L/S

325.00

mtr

of stumps and other deleterious materials dressing of sides and bottom and backfilling.

648.38 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge

=
92.63
by vibration including curring for 14 days

cum

=
92.63 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of

0.25
0.50

=
=

138.13 cum
229.94 cum
385.05

2.50

743.44 cum

at the structure with slope of IV:20 H towards drainage face complete as per drawing and

m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge

1.50
0.50
0.500
1

650.00 mtr

2.000

/Kg/sqm

5787.50

43.88 cum

812.50

=
=

400
243.75

ls

ls centering shuttering & watering & curing etc. Complet

330.0

nos

@R

Assistant Engineer

Assistant Executive Engineer

Executive Engineer

PART-C
Retaining wall 2.0mtr section
100.00

mtr

100.00

mtr

B/S

of stumps and other deleterious materials dressing of sides and bottom and backfilling with

203.00 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge

=
by vibration including curring for 14 days

21.00 cum

=
21.00 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of

0.50

60.00 cum

1.50

114.38 cum

at the structure with slope of IV:20 H towards drainage face complete as per drawing and

m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge

1.20
0.50
0.500
0.85

75.00 mtr

1.500

/Kg/sqm

1731.90

13.50 cum

400.00

=
=

400
120.00

ls

ls centering shuttering & watering & curing etc. Complet

116.0

@R

nos

Assistant Engineer

Assistant Executive Engineer

Executive Engineer

tion

@R

@R

89.90 /cum

252.26

@R

/cum

4101.00 /cum

um
um
um

@R

4287.43

um

@R

4609.22

@R

100.47 /Mtr

=
=
=
=
=

or

4850.00 Kg

@R

65408.35

@R

675.00

607.66 /cum

sqm
@R

457.43 /cum

@R

785.18 /cum

750
202.50

@R

Executive Engineer

326.17 /Each

@Rs.

@Rs.

252.26

@R

um

cum
cum

@R

89.90 /cum

/cum

4101.00 /cum

@Rs.

4287.43

@Rs.

4609.22

100.47 mtr

@R

607.66 cum

Executive Engineer

ction

@R

@R

@R

89.90 /cum

252.26

/cum

4101.00 /cum

um
um

um

@R

4287.43

@R

4609.22

@R

100.47 /Mtr

=
=
=
=
=

or

5787.50 Kg

@R

65408.35

@R

812.50

607.66 /cum

sqm
@R

457.43 /cum

@R

785.18 /cum

400
243.75

@R

326.17 /Each

cutive Engineer

ction

@R

@R

89.90 /cum

252.26

@R

/cum

4101.00 /cum

um

@R

4287.43

um

@R

4609.22

@R

100.47 /Mtr

=
=
=
=
=

or

1731.90 Kg

@R

65408.35

@R

400.00

607.66 /cum

sqm
@R

457.43 /cum

@R

785.18 /cum

400
120.00

@R

Executive Engineer

326.17 /Each

31

/cum

1456654.34

/cum

2846792.55

810.00 sqm
135.00 sqm
25.00 sqm
970.00 sqm
48.50 qntl

317230.50

um

308765.25

158998.95

R
R

71105.06
5137513.70

um

57

/cum

1457726.20

/cum

2154810.35

R
R

6
4436915.01

379875.63

/cum

1650874.92

/cum

3426678.52

65305.50

395720.52

975.00 sqm
162.50 sqm
20.00 sqm
1157.50 sqm
57.88 qntl

/Qnt

um

371661.88

191387.63

R
R

107636.10
6134410.25

/cum

25

/cum

52

240.00 sqm
100.00 sqm
6.38 sqm
346.38 sqm
17.32 qntl

17

um

182972.00

94221.60

37835.72

1127563.89

66872.12

19411.41

315571.95

1456654.34
2846792.55

33908.63

317230.50

9967.14

308765.25

158998.95

71105.06
5137513.70

67245.20

35379.47

575165.25

1457726.20

2154810.35

76859.55

69728.99
4436915.01

58289.36

23365.58

379875.63

1650874.92
3426678.52

65305.50

395720.52

26664.12

371661.88

191387.63

107636.10
6134410.25

18249.70

5297.46

86121.00

257245.80
527202.58

7535.25

179872.96

8203.41

182972.00

94221.60

37835.72

1127563.89

1X6X3 RC

GUARD POST
5000

WING WALL

RCCM-25

BOX DIMENSIONS
a

6.000

WALL

3.000

720

c
d
e
f

0.720
0.720
0.400
0.755

400

1X6X3 RCC BOX CULVERT

RCCM-20PARAPET

GURRD POST
5000

7440
SLAB
755

WALL
720

RAFT M-2720
P.C.C M-15
SAND FILLIN
8240

400

URRD POST

WING WALL