Chainage.
0+000 To 02+000
S.NO
Chainage
Tipe of Culvert
01 + 000
01 + 300
1 + 950
16 + 000 To 24 + 000
16+700
18+200
18+800
18+900
19+400
19+600
19+700
19+780
20+300
10
21+300
11
22+500
12
23+100
13
23+250
14
23+500
15
23+700
16
23+950
S.NO
Type of culvert
NO"S
R.R.Stone Massion
Culvert
10
MINOR BRIDGE
R.R.Stone Massion
Culvert
TOTAL NO"S
19
Clear spane
Culvert Hight
8.200
3.000
3.000
4.000
6.500
3.000
1.400
3.650
10.300
1*450
1*600
8.800
1.500
1.000
2.000
8.300
1.500
1.000
2.000
6.200
1.500
1.000
2.000
8.400
2.800
1.500
3.800
8.300
1.500
0.500
2.000
8.500
3.000
1.800
4.000
8.200
3.000
1.000
4.200
8.500
1.500
1.000
2.000
8.400
2.000
0.800
2.500
8.800
2*2.5
2.000
2*3.5
12.000
1.500
1.000
2.000
8.000
4.500
1.800
6.500
10.000
1*600
8.000
2*2.5
1.000
2*3.5
Remarks
Remarks
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Good Condition
Chainage
Type of culvert
Side
0+400
0+923
B/S
1+250
B/S
1+900
Box culvert
16+000
18+000
Box culvert
18+800
B/S
19+300
B/S
19+500
B/S
10
20+600
Box culvert
11
22+200
Box culvert
12
23+100
Box culvert
13
23+200
14
23+400
Box culvert
15
23+600
16
23+950
Box culvert
S.NO
Type of culvert
NO"S
Remarks
1
2
3
4
5
6
4
5
3
2
1
1
New
Winding
New
New
New
New
TOTAL NO"S
16
ha Site MDR-111
Culvert size Condition Remarks
1*1000
New
1*3*1.5
Winding
1*3*1.5
Winding
1*2*2
New
1*1000
New
1*2*2
New
1*3*1.5
Winding
1*3*1.5
Winding
1*3*1.5
Winding
1*2*2
New
2*3*2
New
3*8*3
New
1*1000
New
1*4.5*2.5
New
1*1000
New
2*3*2
New
S.NO
Chainage
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0+923
1+280
1+876
14+610
15+470
17+670
17+97O
18+800
18+900
19+300
19+500
19+700
19+780
20+280
20+600
22+200
23+100
23+400
23+600
23+950
R.C.C Slab
R.C.C Slab
H.P.C 450
Nill
Nill
Nill
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
R.Rmassion
H.P.C 300
R.Rmassion
H.P.C 900
H.P.C 1000
Widening
2*2Box culverts
3*8*3Box culvert
01nos
04nos
14nos
01nos
01nos
Total culverts
20nos
Widening
Widening
H.P.C 900
H.P.C 1000
H.P.C 1000
H.P.C 1000
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
Widening
3*8*3Box culvert
Widening
H.P.C 1000
Widening
Existing Length
8
6.5
9
Nill
Nill
Nill
8
8
8
8
8
8
8
8
8
8
8
8
10
8
MDR-111
Proposed Length
12
12.5
12.5
12.5
12.5
12.5
12
12
12
12
12
12
12
12
12
12
12
12
12.5
12
Remarks
Re construction
New construction
New construction
New construction
Re construction
Re construction
ITEM
UNIT
RATE
1
2
3
4
5
6
7
8
9
10
EARTH WORK
SAND FILLING
PCC(1:3:6)
PCC FOUNDATION(M-15)
SUB STRUCTURE(M-15)
FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
SUPER STRUCTURE(M-20)
WEARING COART(M-30)
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
89.9
236.1
4047.42
4402.67
4555.06
5716.75
6699.78
6639.88
5407.93
5617.00
11
CUM
2578.66
MT
65849.51
sqm
1212.00
CUM
1041.74
sqm
CUM
CUM
CUM
RMT
NOS
46.6
436.89
1132.00
49.45
100.39
311.27
CUM
648.05
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
240.08
613.62
167.23
240.08
613.62
167.23
240.08
613.62
167.23
CUM
cum
CUM
CUM
CUM
CUM
CUM
3.45
47.32
22.9
299.84
1556.02
3520.88
6122.96
12
13
14
15
16
17
18
19
20
21
Steel
25mm think salitexboard in expanision
joint
metal apall backing in the rear of well
weep hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCRC M-15 GUARD POST
(RETAINING WALL)METAL SPALL BACKING
IN THE REAR OF WELL SETINING OR WEEP
HOLE OF ABUTMENT
DISMANTLING OF CULVERTS
1
2
3
4
5
6
7
8
9
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
RIGID PAVEMENT
1
2
3
4
5
6
7
8
9
10
11
PCC (1:2:4)
RANDOM RUBBLE STONE MASONRY IN CM
1:3 IN FOUNDATION /SUB STRUCTURE
LEVELLING COURSE (1:2:4)
20MM THICK CEMENT PLASTER(1:4)
CUM
5344.9
CUM
2845.46
CUM
sqm
5344.9
145.61
2) CH-18+000 22+750KM
ESTIMATION QTY
QTY
AMOUNT
2641.39
328.9
241.53
1444.7
1120.57
232.8
156
151
16.32
21.04
237460.961
77653.29
977573.3526
6360537.349
5104263.5842
1330859.4
1045165.68
1002621.88
88257.4176
118181.68
21.11
54435.5126
97.848
6443242.85448
110
133320
437.52
455782.0848
92.6
154.51
308.91
576.68
597
440
4315.16
67503.8739
349686.12
28516.826
59932.83
136958.8
42.53
27561.5665
0.8
6.95
27.64
7.92
76.22
368.01
1.32
12.7
61.33
192.064
4264.659
4622.2372
1901.4336
46770.1164
61542.3123
316.9056
7792.974
10256.2159
0
0
1076.04
1911
441
441
441
294
588
0
3712.338
90428.52
10098.9
132229.44
686204.82
1035138.72
3600300.48
REMARKS
118.19
470
10
800
631713.731
1337366.2
53449
116488
31938619.28968
UNIT
(1:3:6)
FOUNDATION M-15
SUB-STRUCTUREM-15
M-20
FOUNDATION M-25
SUB-STRUCTURE M-25
SUPER STRUCTURE M-25
M-30
STEEL
WEEP HOLES
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
MT
RMT
S.NO
1
2
3
4
5
6
7
8
9
10
11
12
EARTH
SAND FILLING
AS PER
ESTIMATION
QTY
2641.39
328.9
241.53
1444.7
1120.57
16.32
232.8
156
151
21.04
97.848
597
13
CUM
21.11
14
sqm
110
CUM
437.52
sqm
CUM
CUM
CUM
NOS
92.6
154.51
308.91
576.68
440
CUM
42.53
CUM
CUM
CUM
CUM
CUM
CUM
0.8
6.95
27.64
7.92
76.22
368.01
15
16
17
18
19
20
21
22
23
24
25
26
27
28
DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
29
30
31
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
CUM
CUM
CUM
1.32
12.7
61.33
32
RIGID PAVEMENT
33
34
35
36
37
38
39
40
CUM
cum
CUM
CUM
CUM
CUM
CUM
CUM
1076.04
1911
441
441
441
294
588
118.19
41
CUM
470
42
43
44
CUM
sqm
RMT
10
800
0
CUM
CUM
1278.18
20853
HAWAY
GRANULAR SUB-BASE
MECHANICAL MEANS
CH-18+000 22+750KM
SITE
REQUIREMENT
QTY
EXTRA QTY'S
RATE
AMOUNT
3996.345
486.995
241.53
1444.7
1120.57
20.974
395.881
286.864
365.835
34.845
145.256
432
-1354.955
-158.095
0
0
0
-4.654
-163.081
-130.864
-214.835
-13.805
-47.408
165
89.9
236.1
4047.42
4402.67
4555.06
5407.93
5716.75
6699.78
6639.88
5617.00
65849.51
100.39
-121810.455
-37326.230
0.000
0.000
0.000
-25168.506
-932293.307
-876760.010
-1426478.620
-77542.685
-3121793.570
16564.350
30.5
-9.39
2578.66
-24213.617
110
1212.00
0.000
437.52
1041.74
0.000
130.6
0
350
650.68
440
-38
154.51
-41.09
-74
0
46.6
436.89
1132.00
49.45
311.27
-1770.800
67503.874
-46513.880
-3659.300
0.000
13.365
29.165
648.05
18900.378
0
0.8
6.95
27.64
7.92
76.22
368.01
0
0
0
0
0
0
0
240.08
613.62
167.23
240.08
613.62
167.23
0.000
0.000
0.000
0.000
0.000
0.000
0.000
REMARKS
1.32
12.7
61.33
0
0
0
1076.04
1911
441
441
441
294
588
118.19
240.08
613.62
167.23
0.000
0.000
0.000
0
0
0
0
0
0
0
0
3.45
47.32
22.9
299.84
1556.02
3520.88
6122.96
5344.9
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
470
2845.46
10
800
25
0
0
-25
0
0
-174.24
-5000
0
0
5344.9
145.61
4000
1452.42
25853
1403.4
132.36
0.000
0.000
0.000
-100000.000
0.000
0.000
-244528.416
-661800.000
0.000
-7476880.339
Tipe of culvert
AS PER
Chainage
ESTIMATION
S.NO
Chainage
1
2
3
4
18+400
18+800
18+980
19+150
1*1BOX
2*2BOX
2*2BOX
2*2BOX
CULVERT
CULVERT
CULVERT
CULVERT
1
2
3
4
0
0
18+980
19+300
19+640
2*2BOX CULVERT
19+640
6
7
8
9
10
11
19+900
21+140
21+350
22+500
21+540
19+300
2*2BOX
2*2BOX
2*2BOX
2*2BOX
2*2BOX
3*2BOX
6
7
8
9
10
11
12
19+900
20+800
20+900
21+040
21+140
0
22+280
CULVERT
CULVERT
CULVERT
CULVERT
CULVERT
CULVERT
AS PER ESTIMATION
SITE REQUIREMENT
Type of culvert
NO"S
Remarks
Type of culvert
NO"S
1*1BOX CULVERT
2*2BOX CULVERT
3*2BOX CULVERT
1
9
1
New
New
New
2
1
2
TOTAL NO"S
11
TOTAL NO"S
12
1
1
4
1
0 22+750KM
Tipe of culvert
SITE REQUIREMENT
Remarks
QTY
0
0
2*1BOX CULVERT
3*2BOX CULVERT
1.5*1.5 WIDENING
CULVERT
2*2BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
6*3BOX CULVERT
0
2*2BOX CULVERT
REMENT
Remarks
New
New
New
Winding
New
New
New
ITEM
UNIT
RATE
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
47.32
89.9
252.26
4101
4287.83
4971.89
4609.22
5463.43
CUM
5697.79
CUM
CUM
CUM
CUM
5735.17
6750.81
6702.32
5679.23
CUM
2369.6
MT
sqm
65408.35
1212
CUM
607.66
sqm
CUM
CUM
CUM
RMT
NOS
21.42
457.43
785.18
37.17
100.47
326.17
NOS
335.46
sqm
RMT
16.16
4660.22
CUM
CUM
CUM
CUM
240.08
613.62
167.24
55.95
CUM
3.45
DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART
RIGID PAVEMENT
34
35
36
37
38
39
40
41
cum
CUM
CUM
CUM
CUM
CUM
CUM
47.32
22.9
252.26
1444.77
3566.94
6189.86
5402.15
MATION QTY
QTY
AMOUNT
1800
4178.65
1238.27
450.476
1501.1
360
1036.36
21.51
85176
375660.635
312365.9902
1847402.076
6436461.613
1789880.4
4776811.2392
117518.3793
86.7
493998.393
479.42
231.59
514.9
59.71
2749555.2014
1563420.0879
3451024.568
339106.8233
113.01
267788.496
196.53
102.11
12854703.0255
123757.32
471.12
286280.7792
294.91
566.96
1142.38
1314.68
1747
338
6316.9722
259344.5128
896973.9284
48866.6556
175521.09
110245.46
10
3354.6
28.75
75
464.6
349516.5
19.96
110.69
282.82
126.5
4791.9968
67921.5978
47298.8168
7077.675
0
0
4592.5
15844.125
REMARKS
3006
1503
1503
1503
1002
2087.5
334.91
142243.92
34418.7
379146.78
2171489.31
3574073.88
12921332.75
1809234.0565
128583309
189479698
60896388.9539
ITEM
UNIT
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
MT
RMT
(1:3:6)
FOUNDATION M-15
SUB-STRUCTUREM-15
M-20
FOUNDATION M-25
SUB-STRUCTURE M-25
SUPER STRUCTURE M-25
M-30
STEEL
WEEP HOLES
150MM thick flat stone aprone embaded
300mmthink concretein(M-15)
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
Random Rubble Stone masonry work In1:3etc.
Plain cement concrete (1:2:4)
20mm thick cement plaster (1:4)
GRANULAR SUB-BASE
EARTH WORK EMBANKMENT
AS PER
ESTIMATION
QTY
2641.39
328.9
241.53
1444.7
1120.57
16.32
232.8
156
151
21.04
97.848
597
CUM
21.11
sqm
CUM
CUM
CUM
92.6
1220.97
2132.91
576.68
470
CUM
CUM
sqm
CUM
CUM
10
800
5920.36
20853
CH-18+000 22+750KM
SITE
REQUIREMENT
QTY
EXTRA QTY'S
RATE
AMOUNT
3145.74
477.24
269.632
874.79
950.56
16.32
332.09
273.07
324.84
29.33
136.449
554.82
504.35
148.34
28.102
-569.91
-170.01
0
99.29
117.07
173.84
8.29
38.601
-42.18
89.9
236.1
4047.42
4402.67
4555.06
5407.93
5716.75
6699.78
6639.88
5617.00
65849.51
100.39
45341.065
35023.074
113740.597
-2509125.660
-774405.751
0.000
567616.108
784343.245
1154276.739
46564.930
2541856.936
-4234.450
30.5
9.39
2578.66
24213.617
130.6
1325.66
2651.31
650.68
676.8
38
104.69
518.4
74
206.8
46.6
436.89
1132.00
49.45
2845.46
1770.800
45738.014
586828.800
3659.300
588441.128
14.4
1152
4.4
352
5344.9
145.61
23517.56
51254.72
6080
30126
159.64
9273
0
1403.4
132.36
224038.776
1227374.280
0.000
4777833.828
QTY
2094.982
Difference amount
297
Total amount
622209.654
5400043.482
REMARKS
RIGID PAVEMENT
34
35
36
37
38
39
40
41
CUM
cum
CUM
CUM
CUM
CUM
CUM
CUM
4592.5
3006
1503
1503
1503
1002
2087.5
334.91
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.45
47.32
22.9
252.26
1444.77
3566.94
6189.86
5402.15
Dharamgada TO Golua
AS PER ESTI
S.NO
ITEM
UNIT
AS PER
ESTIMATION QTY
1
2
3
4
5
6
7
8
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
1800.00
4178.65
1238.27
450.476
1501.1
360
1036.36
21.51
CUM
86.7
10
11
12
13
FOUNDATION(M-25)
SUB STRUCTURE(M-25)
SUPER STRUCTURE(M-25)
WEARING COART(M-30)
CUM
CUM
CUM
CUM
479.42
231.59
514.9
59.71
14
CUM
113.01
15
16
17
18
19
20
21
22
23
Steel
25mm think bitumen expanision joint
metal apall backing in the rear of well weep hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCRC M-15 GUARD POST
MT
sqm
CUM
sqm
CUM
CUM
CUM
RMT
NOS
196.53
102.11
471.12
294.91
566.96
1142.38
1314.68
1747
338
24
25
26
27
28
29
30
31
32
33
NOS
sqm
RMT
10
28.75
75
CUM
CUM
CUM
CUM
19.96
110.69
282.82
126.5
DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART
1800
5760.87
2406.89
450.476
1501.1
360
1036.36
21.51
86.7
479.42
231.59
514.9
59.71
EXTRA QTY'S
1800.00
3641.29
2097.9
310.87
1344.25
360
1284.692
21.51
0
-537.36
859.63
-139.606
-156.85
0
248.332
0
0
-48308.664
0
-572524.206
-672525.745
0
0
0
0
0
216850.2638
0
0
0
1144616.82104
0
86.7
342.4
129.26
460.63
59.71
0
-137.02
-102.33
-54.27
0
0
-785832.9934
-690810.3873
-363734.9064
0
0
0
0
0
0
113.01
114.26
102.11
471.12
294.91
566.96
1142.38
1314.68
1888.8
338
0
-82.27
0
0
0
0
0
0
141.8
0
0
-5381144.9545
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
14246.646
0
RATE
47.32
89.9
252.26
4101
4287.7
4971.89
4609.22
5463.43
5697.79
5735.17
6750.81
6702.32
5679.23
2369.6
65408.35
1212
607.66
21.42
457.43
785.18
37.17
100.47
326.17
10
28.75
75
0
0
0
19.96
110.69
282.82
126.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-8514881.8566
1375713.73084
-7139168.12576
335.46
16.16
4660.22
240.08
613.62
167.24
55.95
32709242.16
-39848410.28576
40.056
0
1377.02
116.916
85.783
474.346
0
470.215
0
0
0
0
10.8
0
0
2.851
0
0
0
0
0
0
268
0
0
85176
375660.635
312365.9902
1847402.076
6436266.47
1789880.4
4776811.2392
117518.3793
493998.393
1963722.208
872609.7006
3087289.6616
339106.8233
493998.393
2749555.2014
1563420.0879
3451024.568
339106.8233
267788.496
7473558.071
123757.32
286280.7792
6316.9722
259344.5128
896973.9284
48866.6556
189767.736
110245.46
267788.496
12854703.0255
123757.32
286280.7792
6316.9722
259344.5128
896973.9284
48866.6556
175521.09
110245.46
3354.6
464.6
349516.5
0
0
4791.9968
67921.5978
47298.8168
7077.675
32709242.16364
32709242.16
-39848410.28576
3354.6
464.6
349516.5
4791.9968
67921.5978
47298.8168
7077.675
39848410.2894
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Dharamga
ITEM
S.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
21
22
23
24
UNIT
CUM
CUM
CUM
CUM
CUM
CUM
CUM
CUM
Steel
25mm think bitumen expanision joint
metal apall backing in the rear of well weep
hole
PAINTING TWO COATS
PROVIDING FILTER MATERAIL
ROUGH STONE DRY PACKING
BACKFILLING
PROVIDING WEEP HOLES
RCC M-15 GUARD POST
AS PER
ESTIMATION
QTY
1800.00
4603.34
1569.34
462.74
1549.8
360
1182.11
21.51
CUM
86.7
CUM
CUM
CUM
CUM
512.26
231.59
514.9
59.71
CUM
113.01
MT
sqm
196.53
102.11
CUM
558.08
sqm
CUM
CUM
CUM
RMT
NOS
237.34
541.97
1199.28
1314.68
1747
338
25
NOS
30
26
TAR PAPER
sqm
28.75
27
RMT
75
28
RMT
50
Railling
RMT
54.68
CUM
CUM
CUM
CUM
19.96
110.69
282.82
126.5
29
30
31
32
33
DISMANTLING OF CULVERTS
A)PCC PARAPET
B)RCC M-20 DECKSLAB
C)RR STONE MASONARY
REMOVING WEARING COART
EXTRA QTY'S
RATE
0
3765.79
1057.47
341.67
1186.45
47.32
89.9
252.26
4101
4287.7
4971.89
4609.22
5463.43
2388.50
15.36
86.7
5697.79
118.91
102.33
360.51
129.26
531.38
71.29
16.48
11.58
5735.17
6750.81
6702.32
5679.23
388.8
275.79
2369.6
190.72
59.88
5.81
42.23
65408.35
1212
1162.202
604.12
607.66
538.25
2936.02
300.91
2394.05
844.02
21.42
457.43
785.18
37.17
100.47
326.17
2043.3
611.52
3302
320
703.16
1555.00
18
10
80.73
335.46
51.98
62.5
16.16
12.5
4660.22
50
4301.38
54.68
1416.91
29.46
601.69
92
459.24
9.50
491.00
0.00
332.74
0.00
9.5
491
332.74
240.08
613.62
167.24
55.95
19242776.097
-22419256.333
AMOUNT
AS PER
ESTIMATION QTY
0
338544.521
266757.3822
1401188.67
5087141.665
0
11009140.40688
0
85176.00
413840.266
395881.7084
1897696.74
6645077.46
1789880.4
5448605.0542
117518.3793
85176.00
752384.79
662639.09
3298885.41
11732219.13
1789880.40
16457745.46
33600.09
0
0
0
0
0
0
0
83918.2848
0
0
0
110454.233600001
65765.4834000001
493998.393
2937898.1842
1563420.0879
3451024.568
339106.8233
493998.39
2067586.14
872609.70
3561478.80
404872.31
0
681969.0647
690810.3873
0
0
653511.984
0
0
267788.496
12854703.0255
123757.32
921300.48
12474680.51
72574.56
0
380022.5135
51182.76
367100.77452
6445.4922
1095110.2915
662707.6236
0
156230.85
0
339122.8928
5083.8228
247913.3371
941650.6704
48866.6556
175521.09
110245.46
706223.67
11529.32
1343023.63
1604358.29
22730.20
331751.94
104374.40
0
0
0
0
26136.4572
0
5871.06
10063.8
3354.60
839.9968
0
464.6
349516.5
1304.60
291263.75
0
58252.75
215069
215069.00
0
0
2280.76
301287.42
0
18616.803
0
21543124.358
77476.6388
0
4791.9968
67921.5978
47298.8168
7077.675
0
41473457.460
77476.64
0.00
7072.76
369209.02
15386.08
25694.48
0.00
60811453.620
-19930333.102
19337996.161
17037647.900
REMARKS
0
0
2280.76
301287.42
0
18616.803
0
2300348.2605
41473457.460
Box Estimate (3 X 8000 x 3000) single cell Box Culvert (New construction)= 1nos
DETAILS OF STRUCUTRE
Width of Box Cell = a
Depth of Box Cell = b
Offset of bottom slab = c
Top slab thickness =d
Bottom slab thickness = e
Thickness of wall = f
Thickness of middle wall = g
Carriageway
Shoulder
Safety Kerb 300mm
Railling
Railling height
Length of wing wall
Length of Apron
Width of U/s Apron
Width of D/s Apron
Cut off wall Botom width
Cut off wall Top Width
Depth of Cutoff wall
Height of Wing wall
b
c
d
c
Dismantling of existing structures like culverts, bridges, retaining walls and other structures, com
concrete, wood work, steel work including T&P and scaffolding wherever necessary sorting the di
unserviceable materials and stacking the serviceable materials with all leads and lifts of 1000m as
specification and direction of the Engineer-in-charge
a
b
PCC Parapet
1
x
3
x
RCC M 20 side of Deck slab & Dirt wall
Deck slab
Bed block
Dirtwall
7.10
6
6
6
x
x
x
x
3
2
2
RR Stone Masonry
Abutment
1
8.60
8.60
Earth work in excavation of foundation of structures as per drawing and technical specification, i
shoring and bracing removal of stumps and other deleterious materials, dressing of sides and bott
earth to the extent required and utilising the remaining earth locally for road work as per claue n
direction of the Engineer-in-charge
Embankment
For Old CD
c
d
e
f
g
Box bed
Shear
Wing wall
Curtain US
U/S cross
Curtain DS
DS cross
Floor bed
U/S
D/S
Filling foundation and plinth trenches with sand as per drawing and technical specification of Mo
taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of the Engine
a
b
Box
Shear
Curtain US
U/S cross
Curtain DS
DS cross
Bed
e
f
g
1
2
2
x
x
x
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nom
in foundation and compacted by vibration including curring for 14 days
Curtain US
U/S cross
Curtain DS
DS cross
Bed
d
e
f
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm n
placed in foundation and compacted by vibration including curing for 14 days
a
b
Box
Shear
1
2
2
4
4
x
x
x
x
x
28.14
5.00
5.00
c
d
e
Curtain US
U/S cross
Curtain DS
DS cross
1
2
1
2
x
x
x
x
Wing
5.00
Bottom slab
sub structure
Wall
1
2
x
x
2
2
x
x
super structure
c
Top slab
Cantliver
Extra Haunch
12
Safety Kerb
10
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for
2100 of MORT&H specifcation and direction of the Engineer-in-charge
a
Wearing coat
11
1
1
x
x
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and superstru
specifications as per section 1600 of MORT&H specifcation and direction of the Engineer-in-char
ii
iii
iv
Bed
Raft
Wall
805.730
6.150
21.330
Wing wall
2
2
1
x
x
x
5.00
5.00
5.00
x
x
x
1
2
2
x
x
x
5.00
2.75
(2.35
x
x
+
Top
Face
4 Wing wall
66.51
266.040
14
Box
12.9
W.Wall
15
3.6
W.Wall
6.0
16
a
b
wall side
Wing wall
17
2
4
Parapet
Top
Face
4
1
4
x
x
x
x
x
10.70
5.00
27.34
27.34
0.20
Providing and laying Filter material underneath pitching in slopes complete as per dra
Revet
33.60
4
4
Volume
15
493.82 x
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
493.82 x
Backfilling behind wall with excavated materials with cost of all labour T&P etc.complete as
Rcc M-30 GRADE IN RAILLING OF CULVERT AS PER APPROVED DRAWING & TECHNICAL SPECIFI
Railling
2 x 27.34
54.68mtr
Widening
1
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
p.c.c perapet
2x
4.500
4.600
0.650
0.515
Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m
5.500
4.60
Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local
a
b
c
Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment
d
e
f
Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H
the Engineer-in-charge
a
b
Abtment
Wing Walls
Below GL
Wing Inner
1x
x
4
2
x
x
2x
2x
2x
2x
x
x
x
x
2
2
2
2
x
x
x
x
1x
1x
1x
x
x
x
2
1
1
x
x
x
1
1
1
x
x
x
2
2
1
x
x
x
Wing end
Wing outre
US RIGID APPRAN
Inner
Outer
DS Rigid Apron
Outer
Belo BD
Above BD
a
b
c
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal size
Abutment
d
d
Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanic
A
a
4
4
4
3rd footing
c
d
e
f
x
x
x
2.50
4
4
4
x
x
x
3.30
3.50
3.50
1
2
1
2
x
x
x
x
Rigid apron
US Apron
DS Apron
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal si
Abutment
2.500
Dirt wall
2.500
2.500
Wing
Rigid apron
Cross wall
3.75
2
2
x
x
1.50
3.70
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mech
daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Bed block
Deck slab
Kerbs
Parapets
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysa
in-charge
a
Wearing coat
10
Providing and laying flooring complete as per drawing and technical specification laid over cement concre
crushed stone aggregates
culvert inner
us appron
DS appron
11
12.2
1
1
x
x
1.025
2.525
x
x
x
Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply sup
direction of the Engineer-in-charge
2.80
12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical
I
ii
iii
Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8
iv
13
14.070
3.260
Wing wall
Vide item- 9
Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road
2.50
14
Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m
a
b
Abt
Wing wall
15
Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb
16
2
2
x
x
x
x
(2.5+
(3.3+
4.60
4.60
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope pitching
Volume
17
4
4
15.00
270.00
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x
18
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm
Abutment
W.Wall
2
1
x
x
2
4.0
x
x
Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
p.c.c perapet
2x
4.850
4.850
0.650
0.515
Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m
6.600
4.85
Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local
a
b
c
Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment
d
e
f
Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge
a
b
Abtment
Wing Walls
Below GL
Wing Inner
Wing end
Wing outre
2x
2x
2x
2x
1x
x
4
2
x
x
x
x
x
x
2
2
2
2
x
x
x
x
US RIGID APPRAN
Inner
Outer
1x
1x
1x
x
x
x
2
1
1
x
x
x
1
1
1
x
x
x
2
2
1
x
x
x
DS Rigid Apron
Outer
Belo BD
Above BD
a
b
c
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si
Abutment
d
d
Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m
A
a
4
4
4
3rd footing
c
d
e
f
x
x
x
2.20
4
4
4
x
x
x
3.50
3.70
3.90
1
2
1
2
x
x
x
x
DS Apron
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me
Abutment
Dirt wall
2.200
2.200
Wing wall
2.200
Rigid apron
Cross wall
(3.9+4.5)1/2
2
2
x
x
1.50
3.70
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Bed block
Deck slab
Kerbs
Parapets
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a
Wearing coat
10
Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
1
1
x
x
12.2
1.025
x
x
DS appron
11
2.525
Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge
2.20
12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific
I
ii
iii
Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8
iv
13
14.720
3.260
Wing wall
Vide item- 9
Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road
2.20
14
Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m
a
b
Abt
Wing wall
15
Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb
4
4
2
2
x
x
x
x
(3.2+
(3.9+
4.60
4.60
16
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope pitching
Volume
15.00
270.00
17
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x
18
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm
Abutment
W.Wall
2
1
x
x
2
4.0
x
x
Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
p.c.c perapet
2x
4.850
4.850
0.650
0.515
Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m
6.600
4.85
Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local
a
b
c
Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment
d
e
f
Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge
a
b
Abtment
Wing Walls
Below GL
Wing Inner
1x
x
4
2
x
x
2x
2x
2x
2x
x
x
x
x
2
2
2
2
x
x
x
x
1x
1x
1x
x
x
x
2
1
1
x
x
x
1
1
1
x
x
x
2
2
1
x
x
x
Wing end
Wing outre
US RIGID APPRAN
Inner
Outer
DS Rigid Apron
Outer
Belo BD
Above BD
a
b
c
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si
Abutment
d
d
Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m
A
a
4
4
4
3rd footing
c
x
x
x
3.20
4
4
4
x
x
x
3.50
3.70
3.90
d
e
f
Curtain US
U/S cross
Curtain DS
DS cross
1
2
1
2
x
x
x
x
Rigid apron
US Apron
DS Apron
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me
Abutment
Dirt wall
Wing
Rigid apron
Cross wall
3.200
3.200
3.200
(3.9+4.5)1/2
2
2
x
x
1.50
3.70
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Bed block
Deck slab
Kerbs
Parapets
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
Wearing coat
10
Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron
11
1
1
1
x
x
x
12.2
1.025
2.525
x
x
x
Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge
2.20
12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific
I
ii
iii
Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8
iv
13
12.760
3.260
Wing wall
Vide item- 9
Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road
3.20
14
Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m
a
b
Abt
Wing wall
4
4
x
x
(2.2+
(3.9+
15
Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
Parapet
Kerb
16
2
2
x
x
4.60
4.60
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope pitching
Volume
15.00
270.00 x
17
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x
18
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm
Abutment
W.Wall
2
1
x
x
2
4.0
x
x
Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
p.c.c perapet
2x
7.200
7.200
0.650
0.515
Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m
7.200
4.85
Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local
Abutment
peiar
Wing Walls
Curtain US
U/S cross
b
c
d
e
f
Curtain DS
DS cross
Embhankment
Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge
Abtment
2
4
2
2
2x
2
2
2
x
x
x
x
2
2
2
2
x
x
x
x
1
1
1
x
x
x
2
1
1
x
x
x
1
1
1
x
x
x
2
2
1
x
x
x
peiar
b
Wing Walls
Below GL
Wing Inner
Wing end
Wing outre
x
x
x
US RIGID APPRAN
Inner
Outer
DS Rigid Apron
Outer
Belo BD
Above BD
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si
a
b
c
Abutment
pear
d
d
Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m
A
a
Wing Walls
2nd foot
3rd foot
4th foot
Curtain US
U/S cross
Curtain DS
DS cross
4
2
4
2
4
2
4
2.00
1st footing
e
f
x
x
x
x
4
4
4
3.50
3.50
3.70
3.90
1
2
1
2
x
x
x
x
Rigid apron
US Apron
DS Apron
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me
Abutment
pear
Dirt wall
Wing
Rigid apron
Cross wall
x
x
x
x
x
x
x
x
4
2
4
2
4
x
x
x
x
x
4
2.500
2.500
2.500
2.500
2.500
(3.9+4.5)1/2
x
2
2
x
x
1.50
3.70
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Bed block
Deck slab
Kerbs
Parapets
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a
Wearing coat
10
Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron
11
1
1
1
x
x
x
12.2
1.025
2.525
x
x
x
Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge
2.50
12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific
I
ii
iii
iv
Abtment
Vide item- 6
deck slab
Vide item- 7
Wearing coat
Vide item- 8
Wing wall
Vide item- 9
18.630
5.100
13
Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road
2.50
14
Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m
a
b
Abt
Wing wall
15
Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
4
4
Parapet
Kerb
16
2
2
x
x
x
x
(2.2+
(3.9+
7.20
7.20
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope pitching
Volume
15.00
270.00 x
17
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
270.00 x
18
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm
Abutment
W.Wall
2
1
x
x
2
4.0
x
x
Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)
Dismantling of existing structures like culvert bridges number of culvert retaining walls and othe
wherever necessary sorting the dismantling materials disposal of unserviceable meterials and stac
direction of the Engineer-in-charge
p.c.c perapet
2x
5.500
5.500
0.650
0.515
Removal of existing cement concrete wearning coat including its disposal complete a
structure and ramoval of dismantled meterial with all lifts and lead upto 100m
8.000
5.50
Earth work in excavation of foundation of structures as per drawing and technical specification, including
and bottoms backfilling the excavation earth to the extent required and utilising the remaining earth local
a
b
c
Abutment
Wing Walls
Curtain US
U/S cross
Curtain DS
DS cross
Embhankment
d
e
f
Filling foundation and plinth trenches with sand as per drawing and technical specification of MoRT&H includi
in-charge
a
b
Abtment
Wing Walls
Below GL
Wing Inner
Wing end
Wing outre
1x
x
4
2
x
x
2x
2x
2x
2x
x
x
x
x
2
2
2
2
x
x
x
x
1x
1x
1x
x
x
x
2
1
1
x
x
x
1
1
1
x
x
x
2
2
1
x
x
x
US RIGID APPRAN
Inner
Outer
DS Rigid Apron
Outer
Belo BD
Above BD
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates 40mm nominal si
a
b
c
Abutment
d
d
Wing Walls
Curtain wall US
U/S cross
Curtain DS
DS cross
plain cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size mechanically m
A
a
4
4
4
3rd footing
c
d
e
f
x
x
x
2.20
4
4
4
x
x
x
3.50
3.70
3.90
1
2
1
2
x
x
x
x
Rigid apron
US Apron
DS Apron
Plain/ Reinforced cement concrete M-15 nominal mix with crushed stone aggregates to 40mm nominal size me
Abutment
Dirt wall
Wing
Rigid apron
2.200
2.200
2.200
(3.9+4.5)1/2
2
1.50
Cross wall
3.70
Reinforced cement concrete M-25 nominal mix with crushed stone aggregates to 20mm nominal size mechanica
Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
Bed block
Deck slab
Kerbs
Parapets
Reinforced cement concrete M-30 wearing coat and compacted by vibration including curing for 14 daysas per S
a
Wearing coat
10
Providing and laying flooring complete as per drawing and technical specification laid over cement concrete bed
stone aggregates
Culvert inner
us appron
DS appron
11
1
1
1
x
x
x
12.2
1.025
2.525
x
x
x
Providing and fixing in posting of 25mm think salitex board in expanision joint for fixed end of simply supported
the Engineer-in-charge
2.20
12 Supplying fitting and HYSD bars reinforcement in foundation sub structers as per drawing and technical specific
I
ii
Abtment
Vide item- 6
deck slab
Vide item- 7
17.580
iii
Wearing coat
Vide item- 8
iv
13
3.900
Wing wall
Vide item- 9
Providing and Tar paperas bearing between cap and deck slab as per drawing and technical specification of road
2.20
14
Metal Spall backing in the rear of well steining or weep holes of abutment and deep drains including cost of all m
a
b
Abt
Wing wall
15
Painting and applying two coats of water based cement paint to unplastered concrete surface over a coat of ceme
4
4
Parapet
Kerb
16
2
2
x
x
x
x
(2.2+
(3.9+
5.50
5.50
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope pitching
Volume
15.00
330.00 x
17
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Volume
330.00 x
18
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing wall/ return wall with 100mm
Abutment
W.Wall
2
1
x
x
2
4.0
x
x
Reinforced cement concrete M15 grade Guard Post stone of standard design as per IRC:8-1980, f
Specifications for Road & Bridge works(4th Revision)
= 1nos
Ch.23+100
8000
3000
300
800
8.000
950
0.950
950
0.950
3.000
0.300
0.800
720
7000
7.000
2500
2.500
250
0.250
200
0.200
1500
5000
1.500
27940
27.940
5000
5.000
4000
4.000
700
0.700
400
0.400
1350
1.350
3565
3.565
5.000
x
0.400
nd other structures, comprising of masonry, cement
necessary sorting the dismantling materials disposal of
ds and lifts of 1000m as per clause no. 202 of MoRT&H
41.20 cum
0.50
x
x
x
0.400
8.600
8.600
8.600
1.45
x
x
x
+
+
2
4.26
6.00
0.50
0.465
1.39
1.42
0.97
1.18
2
1.39
M
x
x
x
0.600
0.300
0.400
0.60
2.30
2
4
1
1
1
1
1
1
1
1
x
x
x
x
12.00
+
2
13.10
28.14
28.14
28.14
x
x
x
13.10
0.45
0.55
x
x
x
2
4
1
x
x
x
x
x
x
x
2
1
1
2
1
1
x
x
x
x
x
x
5.1
27.94
4.10
27.94
4.10
3.10
26.44
26.44
x
x
x
x
x
x
x
x
2.95
0.9
0.90
0.90
0.90
0.90
3.50
3.50
1463.61 cum
13.10
28.14
28.14
1
2
1
2
1
1
x
x
x
x
x
x
x
x
x
28.14
0.45
0.75
27.94
4.10
27.94
3.10
26.44
26.44
x
x
x
x
x
x
x
x
x
0.150
0.150
0.150
0.90
0.90
0.90
0.90
4.28
3.28
x
x
x
x
x
x
104.90 cum
1
2
1
2
1
1
x
x
x
x
x
x
27.94
4.10
27.94
3.10
26.44
26.44
x
x
x
x
x
x
0.90
0.90
0.90
0.90
4.28
3.28
x
x
x
x
x
x
39.47 cum
x
4
x
x
12.90
28.14
x
x
(0.45
5.00
x
2.35
27.94
0.45
+
x
x
x
x
(2.350+
0.40
1.95)
0.150
0.150
0.30)
2.75
x
x
27.94
4.10
27.94
3.10
x
x
x
x
(0.700+
(0.700+
(0.700+
(0.700+
0.40)
0.40)
0.40)
0.40)
177.54 cum
(1.950+
0.50)
x
94.69 cum
x
x
27.94
x
x
0.950
0.720
360.51 cum
12.90
12.90
x
x
0.95
0.72
x
x
3.000
12.90
27.34
(0.8+0.95)1/2
12.90
0.35
0.30
0.45
3.000
129.26 cum
2
12.90
0.30
0.300
2
315.98 cum
27.34
0.450
0.30
6.15 cum
12.00
27.34
0.065
21.33 cum
x
x
(4.300+
(3.300+
4.15)
3.15)
59.32 cum
805.730
cum
120
Kg/cum
6.150
cum
80
Kg/cum
21.330
cum
75
Kg/cum
(0.40
(0.40
(3.57
+
+
+
0.50
0.40
0.50)
4
266.040
0.40)
0.40)
3.57)
=
=
=
8.00
8.00
35.70
3.57)
=
=
=
2.50
2.20
10.17
66.57
266.04 sqm
sqn
@5Kg/Sqm
100.11 Qnt
100.10 qnt
0.300
7.74 sqm
0.300
4.28 sqm
12.02 sqm
12.02 sqm
24.00 nos
24.00 sqm
10.70
5.00
x
x
0.60
0.60
x
x
2.700
3.565
77.45 cum
of all labour materials T&P etc. complete as per complete as per drawing and technical specification as per clause n
x
x
x
1.500
0.200
1.500
=
=
=
164.04 sqm
5.47 sqm
1.20 sqm
170.71 sqm
170.71 sqm
(6.43+0)1/2
x
0.15
6.43
=
3.000
74.070
cum
74.07 cum
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
148.150
cum
148.15 cum
=
611.52 cum
esign as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H Specific
40.00 nos
40.00 nos
Assistant Engineer
Assistant Executive En
etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific
0.500
0.400
0.300
0.150
0.300
0.150
0.383
0.150
s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m
cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge
4
4
1
2
1
2
4
x
x
x
x
x
x
x
2.5
3.60
3.30
0.72
3.30
2.20
5.50
x
x
x
x
x
x
x
2.85
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2
x
x
x
x
x
x
x
specification of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and d
2.50
3.60
x
x
3.60
3.60
3.13
3.70
x
x
x
1/2(0.8 +
0.885 x
1.770 x
7.000
3.085
2.470
9.300
2.85
3.13
0.60
0.80
0.10
1.10)
1/2(0.1 +
1/2(0.1 +
0.30)
0.30)
x
x
x
x
0.1
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1
x
x
0.200
0.200
x
x
x
x
0.400
0.800
1.850
1.850
x
x
x
0.600
0.600
1.050
x
x
x
0.600
0.600
1.050
9.900
1/2(0.8 +
0.50)
1.200
2.550
1/2(9.2 +
8.30)
1.350
egates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days
4
4
1
2
1
2
x
x
x
x
x
x
2.50
3.25
3.80
0.70
3.80
2.20
x
x
x
x
x
x
2.85
2.13
0.90
0.90
0.90
0.90
x
x
x
x
x
x
mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
x
4
x
x
x
2.50
2.50
2.50
x
x
x
(1.85
3.10
x
1.93
1.53
2.65
2.25
1.85
+
x
x
x
x
x
x
(1.530+
0.200
0.200
0.400
1.45)
1.93
x
x
0.20
0.40
1.13)
3.80
2.475
3.80
2.20
x
x
x
x
(0.700+
(0.700+
(0.700+
(0.700+
0.40)
0.40)
0.40)
0.40)
1.00
(2.129+
2.043)
2.49
bu
(2.129+
2.043)
gates to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days
(1.45+
1.39)
0.30
(1.39+
0.97)
1.30
.
(0.47+0.300)
x
x
x
(1.200+
0.40
0.40
0.515
0.50)
x
x
0.60
0.60
20mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14
the Engineer-in-charge
2.80
0.55
0.300
2.80
4.00
0.350
4.60
0.320
0.55
4.60
0.30
1.00
uding curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-
4.60
10.90
0.065
n laid over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with
1/2(5.100+4.800)
0.300
1/2(5.100+4.800)
1/2(5.100+4.800)
x
x
0.300
0.300
or fixed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and
0.30
er drawing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge
53.04
14.070
cum
20
Kg/cum
cum
120
Kg/cum
3.260
cum
75
Kg/cum
56.510
cum
Kg/cum
0.00
3.276MT
hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge
0.575
= 5.75
@R.
sqm
16.16 sqm
1.9)1/2
4.0)1/2
x
x
1.500
1.65
surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x
1.300
1.300
11.96 sqm
2.76 sqm
14.72 sqm
x
0.15
4.50
=
=
@R.
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
1.5
4.0
gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H
40.00 nos
20.00 nos
Assistant Engineer
Assistant Executive E
etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific
0.500
0.400
0.300
0.150
0.300
0.150
0.383
0.150
s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m
cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge
4
4
1
2
1
2
4
x
x
x
x
x
x
x
2.2
3.60
3.30
0.72
3.30
2.20
5.50
x
x
x
x
x
x
x
3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2
x
x
x
x
x
x
x
cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th
2.20
3.60
3.60
3.60
3.13
3.70
x
x
x
x
x
1/2(0.8 +
3.40
2.50
0.60
0.80
0.10
1.10)
x
x
0.150
0.150
x
x
x
x
0.400
0.800
1.850
1.850
0.885 x
1.770 x
7.000
1/2(0.1 +
1/2(0.1 +
0.30)
0.30)
0.1
x
x
x
0.600
0.600
1.050
3.085
2.470
9.300
x
x
x
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1
x
x
x
0.600
0.600
1.050
9.900
1/2(0.8 +
0.50)
1.200
2.550
1/2(9.2 +
8.30)
1.350
ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days
4
4
1
2
1
2
x
x
x
x
x
x
2.20
3.60
3.80
0.70
3.80
2.20
x
x
x
x
x
x
3.4
2.50
0.90
0.90
0.90
0.90
x
x
x
x
x
x
ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
2.20
2.20
2.20
x
x
x
x
x
x
(2.60
2.30
1.90
3.40
3.00
2.60
+
x
x
(1.900+
3.80
2.475
3.80
2.20
x
x
x
x
1.00
x
x
x
0.200
0.200
0.400
2.20)
0.40
0.40
1.50)
(0.700+
(0.700+
(0.700+
(0.700+
(2.129+
2.043)
0.40)
0.40)
0.40)
0.40)
2.49
bu
(2.129+
2.043)
s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days
(2.000+
(1.498+
1.498)
0.30
0.97)
1.75
.
(0.47+0.300)
x
x
x
(1.500+
0.40
0.40
0.450
0.50)
x
x
0.60
0.60
mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge
2.20
0.55
0.300
2.20
4.50
0.450
4.60
0.320
0.55
4.60
0.30
1.00
g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
4.60
10.90
0.065
d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)
x
x
0.300
0.300
1/2(5.100+4.800)
0.300
xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of
0.50
wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge
54.00
14.720
cum
20
Kg/cum
cum
120
Kg/cum
3.260
cum
75
Kg/cum
87.060
cum
Kg/cum
0.00
3.526MT
hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge
0.575
= 5.06
@R.
sqm
16.16 sqm
1.9)1/2
4.5)1/2
x
x
2.500
3.115
surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x
1.300
1.300
11.96 sqm
2.76 sqm
14.72 sqm
4.50
0.150
=
=
@R.
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
1.5
4.0
gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H
20.00 nos
20.00 nos
Assistant Engineer
Assistant Executive E
etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific
0.500
0.400
0.300
0.150
0.300
0.150
0.383
0.150
s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m
cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge
4
4
1
2
1
2
4
x
x
x
x
x
x
x
3.2
3.60
3.30
0.72
3.30
2.20
5.50
x
x
x
x
x
x
x
3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2
x
x
x
x
x
x
x
cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th
3.20
3.60
x
x
3.60
3.60
3.13
3.70
3.40
2.50
x
x
x
1/2(0.8 +
0.885 x
1.770 x
7.000
0.60
0.80
0.10
1.10)
1/2(0.1 +
1/2(0.1 +
0.30)
0.30)
0.1
x
x
0.150
0.150
x
x
x
x
0.400
0.800
1.850
1.850
x
x
x
0.600
0.600
1.050
3.085
2.470
9.300
x
x
x
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1
x
x
x
0.600
0.600
1.050
9.900
1/2(0.8 +
0.50)
1.200
2.550
1/2(9.2 +
8.30)
1.350
ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days
4
4
1
2
1
2
x
x
x
x
x
x
3.20
3.60
3.80
0.70
3.80
2.20
x
x
x
x
x
x
3.4
2.50
0.90
0.90
0.90
0.90
x
x
x
x
x
x
ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
x
x
x
x
3.20
3.20
3.20
x
x
x
(2.60
2.30
1.90
3.40
3.00
2.60
+
x
x
(1.900+
x
x
x
0.200
0.200
0.400
2.20)
0.40
0.40
1.50)
3.80
2.475
3.80
2.20
x
x
x
x
(0.700+
(0.700+
(0.700+
(0.700+
0.40)
0.40)
0.40)
0.40)
1.00
(2.129+
2.043)
2.49
bu
(2.129+
2.043)
s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days
(2.000+
(1.498+
1.498)
0.30
0.97)
1.75
.
(0.47+0.300)
x
x
x
(1.500+
0.40
0.40
0.450
0.50)
x
x
0.60
0.60
mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge
3.20
0.55
0.300
3.20
4.50
0.450
4.60
0.320
4.60
0.55
0.30
1.00
g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
4.60
10.90
0.065
d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)
1/2(5.100+4.800)
x
x
x
0.300
0.300
0.300
xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of
0.30
wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge
54.00
12.760
cum
20
Kg/cum
cum
120
Kg/cum
3.260
cum
75
Kg/cum
87.060
cum
Kg/cum
0.00
3.276MT
hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge
0.575
= 7.36
@R.
1.9)1/2
4.5)1/2
x
x
2.500
3.115
sqm
16.16 sqm
surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x
1.300
1.300
11.96 sqm
2.76 sqm
14.72 sqm
x
0.15
4.50
=
=
@R.
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
1.5
4.0
gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H
20.00 nos
20.00 nos
Assistant Engineer
Assistant Executive E
etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific
0.500
0.400
0.300
0.150
0.300
0.150
0.383
0.150
s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m
cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge
4
2
4
1
2
x
x
x
x
2.5
2.5
3.60
3.30
0.72
x
x
x
x
x
2.9
2.9
(3.13+5.13)1/2
0.90
0.90
x
x
x
x
x
1
2
4
x
x
x
3.30
2.20
5.50
x
x
x
0.90
0.90
(2.0+3.95)1/2
x
x
x
cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th
2.50
x
x
x
2.5
3.60
3.60
3.60
3.13
3.70
2.90
2.9
2.50
x
x
x
1/2(0.8 +
0.885 x
1.770 x
7.000
2.9
0.60
0.80
0.10
1.10)
1/2(0.1 +
1/2(0.1 +
0.30)
0.30)
0.1
x
x
x
0.150
0.15
0.150
x
x
x
x
0.400
0.800
1.850
1.850
x
x
x
0.600
0.600
1.050
3.085
2.470
9.300
x
x
x
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1
x
x
x
0.600
0.600
1.050
9.900
1/2(0.8 +
0.50)
1.200
2.550
1/2(9.2 +
8.30)
1.350
ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days
4
2
4
1
2
1
2
x
x
x
x
x
x
2.50
2.50
3.60
3.80
0.70
3.80
2.20
x
x
x
x
x
x
x
2.9
2.9
2.50
0.90
0.90
0.90
0.90
ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
x
x
x
x
x
x
x
ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
x
x
x
x
x
x
x
x
x
x
x
x
2.70
2.70
2.50
2.50
2.40
2.40
1/2(2.6 +
1/2(2.6 +
2.5
2.30
1.90
x
x
x
x
x
x
0.200
0.200
0.200
0.200
0.400
0.400
2.20) x
2.20) x
0.4
0.4
0.20
0.40
x
x
(1.900+
0.40
1.50)
3.80
2.475
3.80
2.20
x
x
x
x
(0.700+
(0.700+
(0.700+
(0.700+
0.40)
0.40)
0.40)
0.40)
1.00
(2.129+
2.043)
2.49
bu
(2.129+
2.043)
s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days
x
x
x
x
x
x
x
x
(2.000+
1.498)
(2.000+
1.498)
(1.498+
0.97)
(1.498+
0.97)
(0.47+0.300)
(1.500+
0.40
0.40
x
x
x
x
x
x
x
0.50)
0.30
0.3
1.75
1.75
0.450
0.60
0.60
mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge
2.50
0.55
0.300
2.50
4.50
0.450
7.20
0.320
0.55
7.20
0.30
1.00
g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
7.20
10.90
0.065
d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.100+4.800)
1/2(5.100+4.800)
1/2(5.100+4.800)
x
x
x
0.300
0.300
0.300
xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of
0.30
wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge
86.88
18.630
cum
20
Kg/cum
cum
120
Kg/cum
5.100
cum
75
Kg/cum
94.072
cum
Kg/cum
0.00
4.826M.T
@5Kg/Sqm
hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge
0.575
= 5.75
@R.
sqm
16.16 sqm
1.9)1/2
4.5)1/2
x
x
2.500
3.115
surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x
1.300
1.300
18.72 sqm
18.72 sqm
37.44 sqm
x
0.15
4.50
=
=
@R.
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
1.5
4.0
gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H
20.00 nos
20.00 nos
Assistant Engineer
Assistant Executive E
etaining walls and other structurs comprising of masonry cement concrete wood work steel work including T&P and sca
eable meterials and stacking the serviceabials with all leads and lifts of 1000m as per clause no. 202 of MORT&H specific
0.500
0.400
0.300
0.150
0.300
0.150
0.383
0.150
s disposal complete as per technical specification without causing any detrimental effect to any part of th
lead upto 100m
cal specification, including setting out construction of shoring and bracing removal of stumps and other deleterious materials, dress
the remaining earth locally for road work as per claue no.304 of MoRT&H specification and direction of the Engineer-in-charge
4
4
1
2
1
2
4
x
x
x
x
x
x
x
2.2
3.60
3.30
0.72
3.30
2.20
5.50
x
x
x
x
x
x
x
3.4
(3.13+5.13)1/2
0.90
0.90
0.90
0.90
(2.0+3.95)1/2
x
x
x
x
x
x
x
cation of MoRT&H including cost, conveyance taxes of all materials as per clause no. 304.3.7 MORT&H specifcation and direction of th
2.20
3.60
x
x
3.60
3.60
3.13
3.70
3.40
2.50
x
x
x
1/2(0.8 +
0.885 x
1.770 x
7.000
0.60
0.80
0.10
1.10)
1/2(0.1 +
1/2(0.1 +
0.30)
0.30)
0.1
x
x
0.150
0.150
x
x
x
x
0.400
0.800
1.850
1.850
x
x
x
0.600
0.600
1.050
3.085
2.470
9.300
x
x
x
1/2(0.1 + 0.30)
1/2(0.1 + 0.30)
0.1
x
x
x
0.600
0.600
1.050
9.900
1/2(0.8 +
0.50)
1.200
2.550
1/2(9.2 +
8.30)
1.350
ggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring for 14 days
4
4
1
2
1
2
x
x
x
x
x
x
2.20
3.60
3.80
0.70
3.80
2.20
x
x
x
x
x
x
3.4
2.50
0.90
0.90
0.90
0.90
x
x
x
x
x
x
ominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days
2.20
2.20
2.20
x
x
x
x
x
x
(2.60
2.30
1.90
3.40
3.00
2.60
+
x
x
(1.900+
x
x
x
0.200
0.200
0.400
2.20)
0.40
0.40
1.50)
3.80
2.475
3.80
2.20
x
x
x
x
(0.700+
(0.700+
(0.700+
(0.700+
0.40)
0.40)
0.40)
0.40)
1.00
(2.129+
2.043)
2.49
bu
(2.129+
2.043)
s to 40mm nominal size mechanically mixed placed in sub-structure and compacted by vibration including curing for 14 days
(2.000+
(1.498+
1.498)
0.30
0.97)
1.75
.
(0.47+0.300)
x
x
(1.500+
0.40
0.50)
x
0.60
0.450
0.40
0.60
mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 daysas per
n-charge
2.20
0.55
0.300
2.20
5.50
0.450
5.50
0.320
0.55
5.50
0.30
1.00
g curing for 14 daysas per Section No.1000 and 2100 of MORT&H specifcation and direction of the Engineer-in-charge
5.50
10.90
0.065
d over cement concrete bedding (150mm thick Flat Stone aprons embaded 300mm thick concrete in M-15 with crushed
1/2(5.500+5.200)
1/2(5.500+5.200)
1/2(5.500+5.200)
x
x
x
0.300
0.300
0.300
xed end of simply supported complete as per drawing and technical specification of MORT&H specifcation and direction of
0.50
wing and technical specifications as per section 1600 of MORT &H specifications and direction of the Engineer-in-charge
65.43
17.580
cum
20
Kg/cum
cum
120
Kg/cum
3.900
cum
75
Kg/cum
87.070
cum
Kg/cum
0.00
4.146MT
hnical specification of road and bridge work (4th revison) of monistry and direction of the Engineer in charge
0.575
= 5.06
@R.
sqm
16.16 sqm
1.9)1/2
4.5)1/2
x
x
2.500
3.115
surface over a coat of cement wash after cleaning the surface of dirt dust oil grease efflorescence and applying paint @ Ltr for 2 sqm
x
x
1.300
1.300
14.30 sqm
14.30 sqm
28.60 sqm
x
0.15
5.50
=
=
@R.
materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
0.30
1.5
4.0
gn as per IRC:8-1980, fixing in position including painting and printing etc as per Clause 804 of MoRT&H
20.00 nos
20.00 nos
Assistant Engineer
Assistant Executive E
um
Re Construction=
13.10M
28.14M
5.05M
27.94M
27.34M
4.26 cum
@R.
0.600
0.300
0.400
557.28 cum
15.48 cum
19.20 cum
591.96 cum
@R.
21.980 cum
70.020 cum
92.00 cum
10.50
5.12
1.250
0.450
0.450
2.95
0.9
0.90
0.90
0.90
0.90
3.50
3.50
@R.
674.69
=
=
=
x
x
x
x
x
x
x
x
1.35
1.65
1.65
1.65
1.65
1.65
0.60
0.60
460.79
11.40
13.98
81.24
41.4909
12.177
41.491
6.089
9.207
55.524
55.524
1463.61
um
89.90 /cum
@R.
=
=
=
0.15
0.15
0.15
0.15
0.15
0.15
um
0.15
0.15
0.15
0.15
0.15
0.15
3.772 cum
1.107 cum
3.772 cum
0.837 cum
16.974 cum
13.008 cum
39.470 cum
@R.
um
0.450
0.40
0.40
55.30 cum
3.80 cum
6.33 cum
3.772 cum
1.107 cum
3.772 cum
0.837 cum
16.974 cum
13.008 cum
104.90 cum
@R.
=
=
=
=
=
=
54.06 cum
3.80 cum
9.50 cum
22.000 cum
18.800 cum
17.200 cum
x
x
x
x
1.35
1.35
1.35
1.35
20.745 cum
6.089 cum
20.745 cum
4.604 cum
177.54 cum
@R.
um
3.865
94.690 cum
94.69 cum
@R.
um
um
=
um
0.30
um
0.20
0.250
cum
73.53 cum
55.73
@R.
cum
308.60 cum
0.41 cum
6.97 cum
315.98 cum
@R.
um
+
2
342.40 cum
18.105
@R.
6.150 cum
=
6.15 cum
@R.
=
=
21.33 cum
21.33 cum
um
@R.
x
x
um
Qnt
nt
0.30
0.30
33.640 cum
25.680 cum
59.320 cum
@R.
96687.60 Kg
492.00 Kg
1599.75 Kg
8.00 sqm
8.00 sqm
35.70 sqm
2.50 sqm
2.20 sqm
10.17 sqm
66.57 sqm
1330.20 Kg
100109.55 kg
@R.
qm
@R.
qm
@R.
=
=
um
34.67 cum
42.78 cum
77.450 cum
@R.
@R.
qm
@R.
108.02 sqm
385.8
sqm
um
um
@R.
493.82 sqm
@R.
@R.
611.52 cum
um
@R.
os
@R.
1416.91
Executive Engineer
9 Nos
1.80
@R.
240.08 /cum
0.41
0.12
0.12
0.65
@R.
613.62 /cum
25.3
55.95 /cum
@R.
2
1.85
2.05
1.70
1.70
1.70
1.70
1.30
52.73 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
278.76 cum
89.90 /cum
@R.
=
=
5.700
9.014
cum
cum
=
=
=
=
3.46
9.216
2.32
26.01
cum
cum
cum
cum
=
=
=
0.212
0.156
cum
0.212 cum
cum
=
=
=
0.740
0.592
0.976
cum
cum
cum
15.444
cum
60.243
cum
134.29 cum
252.26 /cum
@R.
curring for 14 days
0.15
0.15
0.15
0.15
0.15
0.15
4.28 cum
4.154 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
10.238 cum
4101.24 /cum
@R.
r 14 days
=
=
=
=
0.400
5.30 cum
4.50 cum
7.40 cum
6.60 cum
9.573 cum
5.100 cum
8.568 cum
7.450 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum
0.40
0.40
x
x
x
x
1.05
1.05
1.05
1.05
0.15
0.310
cum
0.15
0.781
cum
65.37 cum
4287.43 /cum
@R.
4.26
cum
2.03
15.34
cum
1.98
cum
25.820
cum
=
=
0.76
1.776
49.94
@R.
cum
4609.22 /cum
1.85 cum
7.84 cum
1.62 cum
2.76 cum
14.07
6702.32 /cum
@R.
3.26
5679.23 /cum
@R.
18.12 cum
=
=
1.529 cum
3.757 cum
23.40 cum
2369.60 /cum
@R.
3.36
sqm
@R.
he Engineer-in-charge
1060.80 Kg
1688.40
Kg
244.50
Kg
282.55
Kg
3276.25 kg
0.00
65408.35
@R.
=
=
13.200
24.09
37.29
/sqm
/sqm
cum
21.42
@R.
270.00
40.50
40.50
@R.
cum
cum
cum
457.43
81.00
cum
MT
/sqm
cum
@R.
81.00
=
=
cum
6
16
22
@R.
nos
nos
nos
785.18
@R.
326.17
@R.
Executive Engineer
1 Nos
1.80
@R.
240.08 /cum
0.44
0.12
0.12
0.68
613.62 /cum
@R.
32.01
55.95 /cum
@R.
2
1.85
2.05
1.70
1.70
1.70
1.70
1.30
55.35 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
281.39 cum
89.90 /cum
@R.
=
=
4.488
5.400
cum
cum
=
=
=
=
3.46
9.216
2.32
26.01
cum
cum
cum
cum
=
=
=
0.212
0.156
cum
0.212 cum
cum
=
=
=
0.740
0.592
0.976
cum
cum
cum
15.444
cum
60.243
cum
129.46 cum
252.26 /cum
@R.
0.15
0.15
0.15
0.15
0.15
0.15
4.49 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
11.697 cum
4101.24 /cum
@R.
=
=
=
=
0.400
0.40
x
x
x
x
0.15
5.98 cum
5.28 cum
9.15
8.45 cum
cum
12.880 cum
11.248
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum
1.05
1.05
1.05
1.05
0.310
cum
cum
cum
0.15
0.781
cum
74.48 cum
4287.43 /cum
@R.
g for 14 days
3.115
4.62
cum
19.00
cum
1.52
cum
52.332
cum
=
=
0.76
1.776
80.01
cum
4609.22 /cum
@R.
1.45 cum
8.91 cum
1.62 cum
2.76 cum
14.74
6702.32 /cum
@R.
=
@R.
=
=
3.26
5679.23 /cum
18.12 cum
1.529 cum
3.757 cum
23.403 cum
2369.60 /cum
@R.
4.40
sqm
@R.
in-charge
1080.00 Kg
1766.40
Kg
244.50
Kg
435.30
Kg
3526.20 kg
0.00
65408.35
@R.
=
=
25.500
52.332
77.832
/sqm
/sqm
cum
@R.
MT
21.42
/sqm
@R.
270.00
40.50
40.50
@R.
cum
cum
cum
457.43
81.00
81.00
cum
cum
=
=
6
16
22
cum
@R.
nos
nos
nos
@R.
@R.
Executive Engineer
785.18
1 Nos
326.17
1.80
@R.
240.08 /cum
0.44
0.12
0.12
0.68
@R.
613.62 /cum
32.01
@R.
55.95 /cum
2
1.85
2.05
1.70
1.70
1.70
1.70
1.30
80.51 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
306.55 cum
@R.
89.90 /cum
=
=
6.528
5.400
cum
cum
=
=
=
=
3.46
9.216
2.32
26.01
cum
cum
cum
cum
=
=
=
0.212
0.156
cum
0.212 cum
cum
=
=
=
0.740
0.592
0.976
cum
cum
cum
15.444
cum
60.243
cum
131.50 cum
252.26 /cum
@R.
0.15
0.15
0.15
0.15
0.15
0.15
6.53 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
13.737 cum
4101.24 /cum
@R.
=
=
=
=
0.400
0.40
8.70 cum
7.68 cum
13.31
12.29 cum
cum
12.880 cum
11.248
10.610 cum
cum
cum
x
x
x
x
1.05
1.05
1.05
1.05
2.195 cum
2.859 cum
2.195 cum
2.541 cum
0.15
0.310
cum
0.15
0.781
cum
87.60 cum
4287.43 /cum
@R.
g for 14 days
3.115
6.72
cum
27.64
cum
2.22
cum
52.332
cum
=
=
0.76
1.776
91.44
4609.22 /cum
@R.
@R.
cum
2.11 cum
12.96 cum
1.62 cum
2.76 cum
19.45
6702.32 /cum
3.26
5679.23 /cum
@R.
=
=
=
18.12 cum
1.529 cum
3.757 cum
23.403 cum
2369.60 /cum
@R.
2.64
sqm
@R.
in-charge
1080.00 Kg
1531.20
Kg
244.50
Kg
435.30
Kg
3291.00 kg
0.00
65408.35
@R.
=
=
20.500
52.332
/sqm
/sqm
MT
72.832
cum
@R.
21.42
@R.
270.00
40.50
40.50
@R.
cum
cum
cum
457.43
81.00
81.00
cum
cum
=
=
6
16
22
/sqm
cum
@R.
nos
nos
nos
@R.
@R.
785.18
Executive Engineer
326.17
2 Nos
1.80
@R.
240.08 /cum
0.65
0.12
0.12
0.89
@R.
613.62 /cum
34.92
@R.
55.95 /cum
1.85
1.85
2.05
1.70
1.70
107.30 cum
26.83 cum
121.92 cum
5.049 cum
2.203 cum
1.70
1.70
1.30
5.049 cum
6.732 cum
85.09 cum
360.16 cum
89.90 /cum
@R.
cum
0.000
2.18
5.400
=
=
=
=
3.46
9.216
2.32
26.01
cum
cum
cum
cum
=
=
=
0.212
0.156
cum
0.212 cum
cum
=
=
=
0.740
0.592
0.976
cum
cum
cum
15.444
cum
60.243
cum
cum
cum
127.15 cum
@R.
252.26 /cum
0.15
0.15
0.15
0.15
0.15
0.15
0.15
4.35 cum
2.18 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
13.734 cum
@R.
4101.24 /cum
5.40 cum
2.70 cum
5.00 cum
2.50 cum
9.60 cum
4.80 cum
9.60 cum
4.80 cum
=
=
=
0.40
x
x
x
x
=
=
=
=
7.00 cum
12.880 cum
11.248 cum
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum
1.05
1.05
1.05
1.05
0.15
0.310
cum
0.15
0.781
cum
97.02 cum
4287.43 /cum
@R.
g for 14 days
=
=
5.25
2.62
21.60
10.80
2.22
52.332
cum
cum
cum
cum
cum
cum
=
=
0.76
1.776
cum
cum
97.35
cum
3.115
@R.
4609.22 /cum
1.65 cum
10.13 cum
2.53 cum
4.32 cum
18.63
6702.32 /cum
@R.
5.10
5679.23 /cum
@R.
=
=
=
18.12 cum
1.529 cum
3.757 cum
23.40 cum
2369.60 /cum
@R.
3.00
sqm
@R.
in-charge
1737.60 Kg
0.00
2235.60
Kg
382.50
Kg
470.36
Kg
4826.06 kg
65408.35
@R.
=
=
20.500
52.332
72.832
MT
/sqm
/sqm
cum
@R.
21.42
@R.
=
=
270.00
40.50
40.50
@R.
cum
cum
cum
457.43
81.00
81.00
cum
cum
6
16
22
/sqm
cum
@R.
nos
nos
nos
785.18
@R.
@R.
326.17
Executive Engineer
1 Nos
1.80
@R.
240.08 /cum
0.50
0.12
0.12
0.74
@R.
613.62 /cum
44
55.95 /cum
@R.
2
1.85
2.05
1.70
1.70
1.70
1.70
1.30
55.35 cum
121.92 cum
5.049 cum
2.203 cum
5.049 cum
6.732 cum
85.09 cum
281.39 cum
89.90 /cum
@R.
=
=
4.488
5.400
cum
cum
=
=
=
=
3.46
9.216
2.32
26.01
cum
cum
cum
cum
=
=
=
0.212
0.156
cum
0.212 cum
cum
=
=
=
0.740
0.592
0.976
cum
cum
cum
15.444
cum
60.243
cum
129.46 cum
@R.
252.26 /cum
0.15
0.15
0.15
0.15
0.15
0.15
4.49 cum
5.400 cum
0.513 cum
0.189 cum
0.513 cum
0.594 cum
11.697 cum
4101.24 /cum
@R.
=
=
=
=
0.400
0.40
x
x
x
x
5.98 cum
5.28 cum
9.15
8.45 cum
cum
12.880 cum
11.248
10.610 cum
2.195 cum
2.859 cum
2.195 cum
2.541 cum
1.05
1.05
1.05
1.05
cum
cum
0.15
0.310
cum
0.15
0.781
cum
74.48 cum
4287.43 /cum
@R.
g for 14 days
3.115
6.72
cum
27.64
cum
2.22
cum
52.332
cum
0.76
1.776
91.44
cum
4609.22 /cum
@R.
1.45 cum
10.89 cum
1.94 cum
3.30 cum
17.58
6702.32 /cum
@R.
3.90
5679.23 /cum
@R.
=
=
=
19.58 cum
1.65 cum
4.05 cum
25.28 cum
2369.60 /cum
@R.
4.40
sqm
@R.
in-charge
1308.60 Kg
2109.60
Kg
292.50
Kg
435.35
Kg
4146.05 kg
0.00
65408.35
@R.
=
=
20.500
52.332
72.832
MT
/sqm
/sqm
cum
@R.
21.42
@R.
=
=
330.00
49.50
49.50
@R.
cum
cum
cum
457.43
99.00
99.00
cum
cum
6
16
/sqm
cum
@R.
nos
nos
785.18
22
nos
@R.
@R.
Executive Engineer
326.17
1 nos
13.10M
28.14M
5.05M
27.94M
27.34M
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
cum
240.08 /cum
1022.74
613.62 /cum
363238.50
167.24 /cum
15386.08
131578.54
252.26 /cum
26462.07
4047.42 /cum
159751.67
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
4287.43 /cum
761190.32
4609.22 /cum
436447.04
5735.17 /cum
2067586.14
6750.81 /cum
872609.70
6702.32 /cum
2117799.07
5463.43 /cum
33600.09
m
m
m
cum
m
cum
5617.00 /cum
119810.61
2369.60 /cum
140564.67
65408.35 /Qnt
6547375.84
m
m
m
g
g
1212.00 /sqm
14568.24
100.47 /nos
2411.28
607.66 /cum
47063.27
46.60 /sqm
7955.09
457.43 /cum
33881.84
785.18 /cum
116324.42
m
m
m
1416.91
37.17 /cum
22730.20
326.17 /each
13046.80
77476.63
14052404.00
00 = 9nos
cum
R
432.14
cum
cum
cum
cum
R
398.85
cum
R
1415.54
25060.79
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
33876.00
41988.50
280271.98
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
230175.23
94282.88
18509.18
55455.75
m
m
m
um
1212
sqm
4072.32
607.66/cum
214277.75
92.92
22659.64
315.30
18525.92
785.18
/cum
100.47
/each
TY For 9 NO CULVERT
63599.58
2210.34
R
R
6523.40
1114144.00
10027295.97
cum
R
432.14
cum
cum
cum
cum
R
415.11
1790.96
25296.96
cum
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
32657.58
47972.20
m
m
m
m
m
m
m
m
m
cum
m
m
m
cum
m
m
m
m
m
cum
cum
319326.18
368779.08
98800.24
18509.18
m
m
m
m
um
1212
sqm
55455.75
5332.80
607.66/cum
214277.75
81.77
22659.64
315.30
785.18
/cum
100.47
/each
18525.92
63599.58
2210.34
6523.40
1302961.89
cum
R
432.14
cum
cum
cum
cum
R
415.11
1790.96
27558.85
cum
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
33172.19
56338.73
m
m
m
m
m
m
m
m
m
cum
m
m
m
cum
m
m
m
m
cum
cum
375577.26
421476.30
130368.17
m
m
m
m
um
1212
sqm
18509.18
55455.75
3199.68
214277.75
118.94
607.66/cum
785.18
/cum
100.47
/each
22659.64
315.30
18525.92
63599.58
2210.34
6523.40
1452525.18
m
m
m
m
m
cum
R
432.14
cum
cum
cum
cum
R
544.89
1953.77
cum
m
m
m
m
32378.65
32074.86
56326.43
m
cum
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
415956.28
448693.74
m
m
m
m
um
1212
sqm
124860.20
28970.89
55455.75
3636.00
607.66/cum
785.18
/cum
100.47
/each
315660.70
92.92
22659.64
801.96
18525.92
63599.58
2210.34
6523.40
1631358.06
3262716.13
cum
R
432.14
cum
cum
cum
cum
R
cum
451.01
2461.80
25296.96
32657.58
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
47972.20
319326.18
m
m
cum
m
m
m
cum
m
m
m
m
m
cum
cum
421476.30
117813.38
22130.54
59898.75
5332.80
m
m
m
m
um
1212
sqm
607.66/cum
785.18
/cum
271183.02
81.77
22659.64
612.61
22642.79
77732.82
100.47
/each
2210.34
6523.4
1458896.03
19010
19160
22950
23070
Earth work in excavation for foundation of structures as per drawing and technical spe
approved materials all kinds of soil as per clause no.304 of MoRT&H specification a
1
x
270.00
Filling foundation and plinth with coarsed river sand as per direction of department inc
1
x
270.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates
1
x
270.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge
Foundation
1
1
x
X
270.00
270.00
Sub-structure
1
270.00
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o
1
x
270.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and
Both side
Top
Surface area of Return wall
Totalarea =
or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr
270.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Area as above
Volum
10
675
Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard
270
1.5
18660
19400
20520
20880
21420
21660
21960
22380
18760
19450
20635
21130
21560
21745
22010
22440
Total length
Earth work in excavation for foundation of structures as per drawing and technical spe
1
x
850.00
Filling foundation and plinth with coarsed river sand as per direction of department inc
1
x
850.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates
a
b
Bed concrete
1
x
850.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge
UPTO GL
1
850.00
Above GL
1
850.00
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o
1
x
850.00
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr
850
0.45
22200
22380
22210
22305
23020
23070
Earth work in excavation for foundation of structures as per drawing and technical spe
1
x
325.00
Filling foundation and plinth with coarsed river sand as per direction of department inc
1
x
325.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates
1
x
325.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge
Foundation
1
1
b
Sub-structure
1
x
x
325.00
325.00
325.00
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o
1
x
325.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and
Both side
Top
Surface area of Return wall
Totalarea =
or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr
325.00
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Area as above
Volum
10
812.5
Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard
243.18
1.5
23140
1
23190
Earth work in excavation for foundation of structures as per drawing and technical spe
approved materials all kinds of soil as per clause no.304 of MoRT&H specification a
1
x
100.00
Filling foundation and plinth with coarsed river sand as per direction of department inc
1
x
100.00
Plain cement concrete 1:3:6 Nominal mix in foundation with crushed stone aggregates
a
b
1
x
100.00
Plain cement concrete M-15 nominal mix in Foundation with crushed stone aggreg
MORT&H specifcation and direction of the Engineer-in-charge
Foundation
1
Above GL
1
100.00
100.00
Providing weep holes in masonry/ Plain reinforced cement concrete abutment, wing
technical specification as per clause no.2706 of MoRT&H specification and direction o
1
x
100.00
Supplying fitting and fixing HYSD bars reinforcement in foundation, substructure and
Both side
Top
Surface area of Return wall
Totalarea =
or Say
Metal Spall backing in the rear of well steining or weep holes of abutment and deep dr
100.00
8
Providing and laying Filter material underneath pitching in slopes complete as per drawing
Slope
Rough stone dry packing in approns and revetments with cost of all materials, labour, T&P
Area as above
Volum
10
400
Supplying and fixing 15 cm dia 1.0 mtr long guard post of RCC (1:2:3) using 75kg of steel per cum for each guard
160
1.5
19160
150.000
23070
120.00
270.00
per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
04 of MoRT&H specification and direction of the EIC
x
1.90
x
1.45
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M
0
x
1.90
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring
0
x
1.90
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge
x
x (
1.70
1.50
x
1.33
)x
x (
1.33
0.50
)x
ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC
0
x
1
no
x
1.25
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an
1
1
x
x
2
1
x
x
270
270
1.500
5.00
4.850
holes of abutment and deep drains including cost of all materials etc complete
MT
x
0.45
x
0.45
omplete as per drawing and Technical specification 15.5 2504
270.0
+
2
970.00 sqm
x
x
0.3
2.50
all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
675
0.300
of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water
1.5
m/
INTERVAL
0
0
5
0
0
5
0
0
1
1
1
1
1
1
1
1
=
100.000
mtr
X
=
50.000
mtr
X
=
115.000
mtr
X
=
250.000
mtr
X
=
140.000
mtr
X
=
85.000
mtr
X
=
50.000
mtr
X
=
60.000
mtr
=
850.00
mtr
per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
0
x
1.10
x
0.800
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M
0
x
1.10
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring
0
x
1.10
x
0.150
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge
0.90
0.70
+
2
0.70
+
0.40
x
2
ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC
0
x
1 no
x
holes of abutment and deep drains including cost of all materials etc complete
0.900
holes of abutment and deep drains including cost of all materials etc complete
0.3
22380
180.00
22305
95.00
23070
50.00
325.00
per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
x
1.90
x
1.05
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M
0
x
1.90
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring
0
x
1.90
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge
x
x (
1.70
1.50
x
1.33
)x
x (
1.33
0.50
)x
ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC
0
x
2
no
x
1.00
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an
1
1
x
x
2
1
x
x
325
325
1.500
6.050
holes of abutment and deep drains including cost of all materials etc complete
x
0.45
x
0.30
omplete as per drawing and Technical specification 15.5 2504
325.0
+
2
1157.50 sqm
x
x
5.00
MT
2.50
all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
812.5
0.300
of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water
1.5
m/
INTERVAL
Assistan
23190
100.00
100.00
per drawing and technical specifications, including setting out construction of shoring and bracing, removal of stumps and other deleteriou
04 of MoRT&H specification and direction of the EIC
x
1.40
x
1.45
=
per direction of department including cost, conveyance, royalty and taxes of all materials as per clause 304.2 as per clause no.304 3.7 of M
0
x
1.4
x
0.15
with crushed stone aggregates 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curring
0
x
1.4
x
0.15
on with crushed stone aggregates to 40mm nominal size mechanically mixed placed in Sub-structure and compacted by vibration inclu
-charge
x (
1.2
1.03
)x
x (
1.03
0.50
)x
ment concrete abutment, wing wall/ return wall with 100mm dia AC pipe extending through the full width at the structure with slope of
H specification and direction of the EIC
0
x
1
no
x
0.75
n foundation, substructure and superstructures as per drawing and technical specifications as per section 1600 of MORT&H specifcation an
1
1
x
x
2
2
x
x
100
100
1.200
+
2
346.38 sqm
2.750
holes of abutment and deep drains including cost of all materials etc complete
x
x
0.45
5.00
MT
0.3
160.0
2.50
all materials, labour, T&P etc. complete. Including cost conveyance taxes of all materials
400
0.300
of steel per cum for each guard post with 12mm size HGCB chips including cost of reinforcement & materials centering shuttering & water
1.5
m/
INTERVAL
PART-C
mtr
R/S
120.00
mtr
R/S
270.00
mtr
of stumps and other deleterious materials dressing of sides and bottom and backfilling with
743.85 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge
=
by vibration including curring for 14 days
76.95 cum
=
76.95 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of
0.25
0.50
=
=
114.75 cum
212.25 cum
339.75 cum
2.50
617.63 cum
at the structure with slope of IV:20 H towards drainage face complete as per drawing and
m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge
1.50
0.50
0.500
1
337.50 mtr
2.500
/Kg/sqm
4850.00
16.40 cum
675.00
=
=
750
202.50
ls
218.0
@R
nos
Assistant Engineer
Executive Engineer
mtr
R/S
mtr
R/S
mtr
L/S
mtr
R/S
mtr
L/S
mtr
L/S
mtr
L/S
mtr
L/S
mtr
of stumps and other deleterious materials dressing of sides and bottom and backfilling.
748.00 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charg
=
by vibration including curring for 14 days
140.25 cum
=
140.25 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of
0.5
340.00 cum
467.50
467.50
at the structure with slope of IV:20 H towards drainage face complete as per drawing and
765
cum
cum
cum
114.75 cum
114.75 cum
Junior Engineer
Assistant Engineer
Executive Engineer
PART-C
mtr
L/S
95.00
mtr
R/S
50.00
mtr
L/S
325.00
mtr
of stumps and other deleterious materials dressing of sides and bottom and backfilling.
648.38 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge
=
92.63
by vibration including curring for 14 days
cum
=
92.63 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of
0.25
0.50
=
=
138.13 cum
229.94 cum
385.05
2.50
743.44 cum
at the structure with slope of IV:20 H towards drainage face complete as per drawing and
m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge
1.50
0.50
0.500
1
650.00 mtr
2.000
/Kg/sqm
5787.50
43.88 cum
812.50
=
=
400
243.75
ls
330.0
nos
@R
Assistant Engineer
Executive Engineer
PART-C
Retaining wall 2.0mtr section
100.00
mtr
100.00
mtr
B/S
of stumps and other deleterious materials dressing of sides and bottom and backfilling with
203.00 cum
as per clause no.304 3.7 of MORT&H specifcation and direction of the Engineer-in-charge
=
by vibration including curring for 14 days
21.00 cum
=
21.00 cum
compacted by vibration including curing for 14 daysas per Section No.1000 and 2100 of
0.50
60.00 cum
1.50
114.38 cum
at the structure with slope of IV:20 H towards drainage face complete as per drawing and
m
=
0 of MORT&H specifcation and direction of the Engineer-in-charge
1.20
0.50
0.500
0.85
75.00 mtr
1.500
/Kg/sqm
1731.90
13.50 cum
400.00
=
=
400
120.00
ls
116.0
@R
nos
Assistant Engineer
Executive Engineer
tion
@R
@R
89.90 /cum
252.26
@R
/cum
4101.00 /cum
um
um
um
@R
4287.43
um
@R
4609.22
@R
100.47 /Mtr
=
=
=
=
=
or
4850.00 Kg
@R
65408.35
@R
675.00
607.66 /cum
sqm
@R
457.43 /cum
@R
785.18 /cum
750
202.50
@R
Executive Engineer
326.17 /Each
@Rs.
@Rs.
252.26
@R
um
cum
cum
@R
89.90 /cum
/cum
4101.00 /cum
@Rs.
4287.43
@Rs.
4609.22
100.47 mtr
@R
607.66 cum
Executive Engineer
ction
@R
@R
@R
89.90 /cum
252.26
/cum
4101.00 /cum
um
um
um
@R
4287.43
@R
4609.22
@R
100.47 /Mtr
=
=
=
=
=
or
5787.50 Kg
@R
65408.35
@R
812.50
607.66 /cum
sqm
@R
457.43 /cum
@R
785.18 /cum
400
243.75
@R
326.17 /Each
cutive Engineer
ction
@R
@R
89.90 /cum
252.26
@R
/cum
4101.00 /cum
um
@R
4287.43
um
@R
4609.22
@R
100.47 /Mtr
=
=
=
=
=
or
1731.90 Kg
@R
65408.35
@R
400.00
607.66 /cum
sqm
@R
457.43 /cum
@R
785.18 /cum
400
120.00
@R
Executive Engineer
326.17 /Each
31
/cum
1456654.34
/cum
2846792.55
810.00 sqm
135.00 sqm
25.00 sqm
970.00 sqm
48.50 qntl
317230.50
um
308765.25
158998.95
R
R
71105.06
5137513.70
um
57
/cum
1457726.20
/cum
2154810.35
R
R
6
4436915.01
379875.63
/cum
1650874.92
/cum
3426678.52
65305.50
395720.52
975.00 sqm
162.50 sqm
20.00 sqm
1157.50 sqm
57.88 qntl
/Qnt
um
371661.88
191387.63
R
R
107636.10
6134410.25
/cum
25
/cum
52
240.00 sqm
100.00 sqm
6.38 sqm
346.38 sqm
17.32 qntl
17
um
182972.00
94221.60
37835.72
1127563.89
66872.12
19411.41
315571.95
1456654.34
2846792.55
33908.63
317230.50
9967.14
308765.25
158998.95
71105.06
5137513.70
67245.20
35379.47
575165.25
1457726.20
2154810.35
76859.55
69728.99
4436915.01
58289.36
23365.58
379875.63
1650874.92
3426678.52
65305.50
395720.52
26664.12
371661.88
191387.63
107636.10
6134410.25
18249.70
5297.46
86121.00
257245.80
527202.58
7535.25
179872.96
8203.41
182972.00
94221.60
37835.72
1127563.89
1X6X3 RC
GUARD POST
5000
WING WALL
RCCM-25
BOX DIMENSIONS
a
6.000
WALL
3.000
720
c
d
e
f
0.720
0.720
0.400
0.755
400
RCCM-20PARAPET
GURRD POST
5000
7440
SLAB
755
WALL
720
RAFT M-2720
P.C.C M-15
SAND FILLIN
8240
400
URRD POST
WING WALL