ACHIEVEMENTS
Above 3 million people in 39 districts (compared to 30 in 2012) are more
resilient due to local DRR interventions Over 820,000 people (of which 385,000 female) directly benefitted by 249
new schemes (safe drinking water, embankments, cyclone shelters, sanitation,
resilient habitat, etc.);
More than 80,000 people (25,000 female) benefited from short term
employment generated by LDRRF scheme implementation;
245,744 families received livelihood support (e.g. cash for work, training,
adaptive cropping, irrigation facilities, skill based training, etc.);
Construction of 153 km long embankment, saving more than 40,000 hec of
cultivable land;
Reduced water collection time of 36,000 women installation of 300 DTW &
200 RWH;
30,000 women & children benefited from construction of 5,000 hygienic
toilets
Comprehensive Disaster Management Programme (CDMP II)
Ministry of Disaster Management & Relief
LDRRF GOVERNANCE
LDRRF Technical Committee
CDMP Project Manager is the Chair & other Members include, representatives
from DDM, UNDP, Technical Expert & LFMS as Member Secretary.
LDRRF Approval Committee
CDMP NPD is the Chair & other members include: DG, DDM, Deputy ChiefMoDMR, ACD, UNDP, civil society representative & LFMS as Member
Secretary.
LDRRF Project Progress Review Committee
On request of CDMP, the then MoFDM through a notification 19 Sept. 2011
formed a 7 member committee with Joint Secretary (DM) as Chair. On 21 Nov
2013, MoDMR have reformed the Committee with Addl. Secretary (Admin) as
Chair with Addl. Secretary (DM), JS (DM), JS (Relief), Director (KABIKHA) of DDM,
Dy. Chief & Sr. Ast. Chief of MoDMR, representatives from UNDP & CDMP.
Identifying
vulnerable
Upazilas
Identifying
most
vulnerable
Unions
Contracts
Signed
Technical
Review and
Approval
Implementati
on cycle
begins
CRA, CRA
revisit or
FTRA
Project
Proposal
Development
(Site Engineers, PIO,
Endorsed by UNO)
LDRRF AT A GLANCE
PRINCIPLES
STATUS AS ON November 13
Covered 39 districts, 90
exemplary
Risks as the cornerstone of
interventions
Covering all the targeted districts
Empowering the local
administration
Pursuing quality and
accountability
Timely and systematic
DETAILS OF PROJECTS
Intervention
Killa Construction/Reconstruction
Embankment Construction/ Reconstruction
Water supply pipeline
Excavation of Pond
Canal re-excavation
Sanitary Latrine
Tube-Well
Rain Water Harvester
Pond Sand filter (PSF)
Pond excavation/re-excavation
Brick Flat Soling (BFS)
Herring Bond Road (HBR)
Cyclone Shelter re-construction
Tree plantation
Parameter Quantity
Earth
Volume
Earth
Volume
Length
No.
No.
No.
No.
No.
No.
No.
Length
Length
No.
No.
m3
No.
85
3,225,632
m3
Length
153
198
54
21
5,134
415
261
75
164
5,004
1,050
6
81,716
km
Indeginious people
No.
Parameter Quantity
196,060
Beneficiaries(Total)
Unit
1,848,444
Unit
km
Urban Schemes
m
Interventions
m
Strom Sewer
Unit
Progress(%)
6.1km
90
672m
50
Construction of DRH
260
75
DRH at Gopalgonj
Construction of U-Drain
Construction of drainage
DRH Gopalgonj
DRH Gazipara
DRH Gopalgonj
DRH Bainpara
DRH Bainpara
Re-excavation of canal
Water dispenser
Vegetation at Killah
Hygienic Toilet
VISITORS AT FIELD
WAY FORWARD
Strengthen local community/ authority to
sustain LDRRF supported activities;
Thank you
Website: www.cdmp.org.bd