Sunteți pe pagina 1din 1

Federal Register / Vol. 70, No.

26 / Wednesday, February 9, 2005 / Notices 6853

Any person desiring to intervene or to (PDES) filed an application for DEPARTMENT OF ENERGY
protest this filing must file in redetermination of exempt wholesale
accordance with Rules 211 and 214 of generator status pursuant to part 365 of Federal Energy Regulatory
the Commission’s Rules of Practice and the Commission’s regulations. Commission
Procedure (18 CFR 385.211 and PDES states that it operates several [Docket No. RP05–167–000]
385.214). Protests will be considered by
facilities with a capacity of 282 MW
the Commission in determining the Pine Needle LNG Company, LLC;
located in Morenci, Arizona and in
appropriate action to be taken, but will Notice of Proposed Changes in FERC
not serve to make protestants parties to Chino and Tyrone, New Mexico.
Gas Tariff
the proceeding. Any person wishing to Additionally, PDES states it has recently
become a party must file a notice of acquired a one-third undivided interest February 2, 2005.
intervention or motion to intervene, as in a 570 MW gas fired power plan Take notice that on January 28, 2005,
appropriate. Such notices, motions, or located in Deming, New Mexico. Pine Needle LNG Company, LLC (Pine
protests must be filed in accordance Any person desiring to intervene or to Needle) tendered for filing as part of its
with the provisions of § 154.210 of the protest this filing must file in FERC Gas Tariff, Original Volume No. 1,
Commission’s regulations (18 CFR accordance with Rules 211 and 214 of the following tariff sheets, to become
154.210). Anyone filing an intervention effective February 27, 2005:
the Commission’s Rules of Practice and
or protest must serve a copy of that Sixth Revised Sheet No. 40
Procedure (18 CFR 385.211 and
document on the Applicant. Anyone Second Revised Sheet No. 55
385.214). Protests will be considered by Fourth Revised Sheet No. 62
filing an intervention or protest on or the Commission in determining the Second Revised Sheet No. 83
before the intervention or protest date appropriate action to be taken, but will Second Revised Sheet No. 90
need not serve motions to intervene or not serve to make protestants parties to Pine Needle states that the purpose of
protests on persons other than the the proceeding. Any person wishing to the instant filing is to modify its tariff
Applicant. become a party must file a notice of to:(1) Clarify section 12 of the General
The Commission encourages
intervention or motion to intervene, as Terms and Conditions, Pressures; (2)
electronic submission of protests and
appropriate. Such notices, motions, or provide for the posting of any
interventions in lieu of paper using the
protests must be filed on or before the information required by Order 2004 on
‘‘eFiling’’ link at http://www.ferc.gov.
comment date. Anyone filing a motion Pine Needle’s Electronic Bulletin Board;
Persons unable to file electronically
to intervene or protest must serve a copy and (3) add a new section 31 to the
should submit an original and 14 copies
of that document on the Applicant. On General Terms and Conditions,
of the protest or intervention to the
or before the comment date, it is not Extension of Service Agreement.
Federal Energy Regulatory Commission, Any person desiring to intervene or to
888 First Street, NE., Washington, DC necessary to serve motions to intervene
or protests on persons other than the protest this filing must file in
20426. accordance with Rules 211 and 214 of
This filing is accessible on-line at Applicant.
the Commission’s Rules of Practice and
http://www.ferc.gov, using the The Commission encourages Procedure (18 CFR 385.211 and
‘‘eLibrary’’ link and is available for electronic submission of protests and 385.214). Protests will be considered by
review in the Commission’s Public interventions in lieu of paper using the the Commission in determining the
Reference Room in Washington, DC. ‘‘eFiling’’ link at http://www.ferc.gov. appropriate action to be taken, but will
There is an ‘‘eSubscription’’ link on the Persons unable to file electronically not serve to make protestants parties to
web site that enables subscribers to
should submit an original and 14 copies the proceeding. Any person wishing to
receive e-mail notification when a
of the protest or intervention to the become a party must file a notice of
document is added to a subscribed
Federal Energy Regulatory Commission, intervention or motion to intervene, as
docket(s). For assistance with any FERC
888 First Street, NE., Washington, DC appropriate. Such notices, motions, or
Online service, please e-mail
20426. protests must be filed in accordance
FERCOnlineSupport@ferc.gov, or call
with the provisions of Section 154.210
(866) 208–3676 (toll free). For TTY, call This filing is accessible on-line at
of the Commission’s regulations (18 CFR
(202) 502–8659. http://www.ferc.gov, using the
154.210). Anyone filing an intervention
‘‘eLibrary’’ link and is available for or protest must serve a copy of that
Magalie R. Salas,
review in the Commission’s Public document on the Applicant. Anyone
Secretary.
Reference Room in Washington, DC. filing an intervention or protest on or
[FR Doc. E5–520 Filed 2–8–05; 8:45 am]
There is an ‘‘eSubscription’’ link on the before the intervention or protest date
BILLING CODE 6717–01–P
web site that enables subscribers to need not serve motions to intervene or
receive e-mail notification when a protests on persons other than the
DEPARTMENT OF ENERGY document is added to a subscribed Applicant.
docket(s). For assistance with any FERC The Commission encourages
Federal Energy Regulatory Online service, please e-mail electronic submission of protests and
Commission FERCOnlineSupport@ferc.gov, or call interventions in lieu of paper using the
(866) 208–3676 (toll free). For TTY, call ‘‘eFiling’’ link at http://www.ferc.gov.
[Docket No. EG05–36–000]
(202) 502–8659. Persons unable to file electronically
Phelps Dodge Energy Services; Notice Comment Date: 5 p.m. Eastern Time should submit an original and 14 copies
of Application for Commission on February 22, 2005. of the protest or intervention to the
Redetermination of Exempt Wholesale Federal Energy Regulatory Commission,
Generator Status Magalie R. Salas, 888 First Street, NE., Washington, DC
Secretary. 20426.
February 2, 2005.
[FR Doc. E5–519 Filed 2–8–05; 8:45 am] This filing is accessible on-line at
Take notice that on January 31, 2005, http://www.ferc.gov, using the
BILLING CODE 6717–01–P
Phelps Dodge Energy Services, LLC ‘‘eLibrary’’ link and is available for

VerDate jul<14>2003 16:49 Feb 08, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\09FEN1.SGM 09FEN1

S-ar putea să vă placă și