Sunteți pe pagina 1din 2

3766 Federal Register / Vol. 70, No.

16 / Wednesday, January 26, 2005 / Notices

vehicles may not return to idle within pedal return spring failures after testing reduced slowly. Tapping or pumping
the time limits specified by S5.3. multiple samples to 10 million cycles during the accelerator pedal had little affect.
GM believes that the noncompliance the durability testing that was performed on Side taps applied to the pedal improved
is inconsequential to motor vehicle the ETC Accelerator Pedal Module for the
return time such that the pedal returned
subject vehicles.
safety for the following reasons: Condition Requires Extreme Temperatures, within 40–50 seconds. When the driver
Vehicle Controllability: A number of Pedal Assembly Warms Quickly: The root used his foot to lift up the pedal, the
conditions must occur for the noncompliance cause of the condition is an increase in idle condition was achieved within five
to occur. A return spring must be severed, the friction that may occur on some ETC seconds.
stack-up of tolerances in the ETC Pedal Accelerator Pedal Modules due to a stack-up The standard requires that a vehicle’s
Position Sensor must exist, the vehicle must of tolerances, but only when the Module is accelerator control system, with one
have soaked at an ambient temperature of subjected to extreme ambient temperatures. return spring disconnected, return to
¥30° C to ¥40° C for the Grand Prix and All tests at temperatures above those idle in cold ambient temperatures
XLR and ¥10 °C to ¥40 °C for the SXR, and extremes resulted in full compliance with the
the customer must drive the vehicle prior to FMVSS No. 124 time limits for all pedal
within three seconds. A driver who
the vehicle interior warming up. In the assemblies tested. Therefore, the ambient starts a vehicle affected by the
extremely low likelihood of all of these temperatures required for the possibility of noncompliance in these conditions and
conditions existing, the condition would the noncompliance to exist are severe. Even begins driving it soon thereafter could
occur upon the first application of the if a vehicle with a disconnected return spring be unable to control vehicle speed and
throttle pedal. The vehicle would continue to soaked under the necessary harsh conditions experience a loss of control.
be controllable by steering and braking, and for a sufficient time, the potential for the In consideration of the foregoing,
the ETC Pedal assembly would return to noncompliance to occur would exist for only NHTSA has decided that the petitioner
normal operation once the passenger a short time, because the pedal assembly has not met its burden of persuasion
compartment warmed up. would warm up quickly with activation of
that the noncompliance described is
Pedal Assembly is Protected: When the vehicle heating system.
FMVSS No. 124 was established in 1973, the Warranty Data: GM has reviewed warranty inconsequential to motor vehicle safety.
accelerator control systems of vehicles data for these 2004 vehicles, as well as Accordingly, GM’s petition is denied.
consisted of a mechanical connection complaint data. GM is unaware of any data Authority: 49 U.S.C. 30118, 30120;
between the accelerator pedal and the suggesting the subject condition is a real delegations of authority at CFR 1.50 and
engine’s carburetor. The throttle return world safety issue. 501.8.
springs required by FMVSS No. 124 were Prior NHTSA Decision: On August 3, 1998,
Issued on: January 19, 2005.
typically part of the carburetor, and subject NHTSA granted a petition for decision of
to the harsh engine environment. The inconsequential noncompliance to GM for Claude H. Harris,
requirements of S5.1 were established to 1997 Chevrolet Corvettes that failed to meet Director, Office of Vehicle Safety Compliance.
ensure that if one of those springs in that the requirements of FMVSS No. 124, with [FR Doc. 05–1433 Filed 1–25–05; 8:45 am]
environment were to fail, the engine would respect to the requirement to return to idle BILLING CODE 4910–59–P
return to idle in a timely manner. in less than 3 seconds at ¥40 °C.
The ETC Accelerator Pedal Module in the
Additional information was requested
subject vehicles consists of the accelerator
pedal at the end of the accelerator pedal from GM. One of the factors considered DEPARTMENT OF TRANSPORTATION
lever. The lever is connected to the ETC in the prior petition grant (63 FR 41320,
Pedal Sensor shaft, and is returned to the idle August 3, 1998) was that the accelerator Research and Special Programs
position by two return springs. The ETC control system performance of the Administration
Pedal Sensor provides two redundant signals Corvettes improved after several
to the engine control module to indicate thousand application cycles of the Report on Research Activities;
accelerator pedal position. The ETC accelerator pedal. Request for Comments
Accelerator Pedal Module is located entirely However, in the present case, GM and AGENCY: Research and Special Programs
within the passenger compartment of the its pedal assembly supplier conducted
vehicle. The return springs are in a protected Administration, DOT.
area under the instrument panel, and are not
several tests of samples from the subject ACTION: Notice and Request for
subject to the harsh environment of the population attempting to demonstrate Comments.
engine compartment. this kind of improvement by cycling
Condition Requires Failed Return Spring: pedal assemblies at ambient and cold SUMMARY: The Norman Y. Mineta
The condition that is described can only temperatures, but the throttle return Research and Special Programs
occur if one of the two return springs is performance was not significantly Improvement Act of 2004 (Public Law
severed or disconnected. The springs in the improved. 108–426) will disestablish the
subject Accelerator Pedal Module, however, Six accelerator pedal assemblies were Department of Transportation’s
have extremely high reliability and are not taken from GM vehicles with up to Research and Special Programs
likely to fail in the real world. 11,553 accumulated driving miles and Administration (RSPA). In its place, two
Durability Testing: The ETC Accelerator
Pedal Module is designed for a service life of
tested on a fixture with one return new Federal agencies will be
at least 100,000 miles or 10 years working life spring disconnected at ¥40 °C and established—the Research and
for passenger car application. The Minimum higher temperatures. Checking times to Innovative Technology Administration
Typical Predicted Usage Profile of the return from 10 percent, 50 percent, and (RITA) and the Pipeline and Hazardous
Component Technical Specification states 100 percent wide-open throttle Materials Safety Administration
that the Accelerator Pedal mechanism may be positions to idle, two of the assemblies (PHMSA). These new organizations will
subject to 35,000,000 dithers / 70,000,000 returned to idle within three seconds. be effective no later than February 28,
sensor direction changes. The GM Test The four others had not fully returned 2005.
Procedure TP3750, Accelerator Pedal Lab within one minute. Section 4(g) of the Act directs the
Durability Cycling Test, that is used during The worst performer of these incoming RITA Administrator to
the development and validation of this
system, subjects these parts to 2 million
assemblies was installed in a vehicle for prepare a report to Congress, due March
cycles, an equivalent usage greater than 6 testing on a dynamometer in a cold 30, 2005, on the research activities and
lives for an automatic transmission passenger chamber. The driver accelerated to 70 priorities of the Department of
vehicle and 3 lives for a manual transmission mph and removed his foot from the Transportation. As a part of the
passenger vehicle. There were no accelerator accelerator control pedal. Vehicle speed stakeholder review process, the

VerDate jul<14>2003 19:33 Jan 25, 2005 Jkt 205001 PO 00000 Frm 00097 Fmt 4703 Sfmt 4703 E:\FR\FM\26JAN1.SGM 26JAN1
Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices 3767

Department of Transportation is In developing the report, the RITA Issued in Washington, DC on January 14,
soliciting comments from Federal, state, Administrator must also: 2005.
private sector, and not-for-profit • Solicit input from a wide range of Thomas Marchessault,
institutions on the topics outlined stakeholders; Acting Associate Administrator, Office of
below. Innovation, Research and Education,
• Take into account how the research Research and Special Programs
ADDRESSES: Please submit all comments and development activities of other Administration.
electronically to Federal, state, private sector, and not- [FR Doc. 05–1226 Filed 1–25–05; 8:45 am]
RitaReport@rspa.dot.gov or fax to (202) for-profit institutions contribute to the BILLING CODE 4910–60–P
366–3671. The deadline for comments is achievement of the desired purposes;
February 15, 2005. and
FOR FURTHER INFORMATION CONTACT: • Address methods to avoid DEPARTMENT OF TRANSPORTATION
Thomas Marchessault, RSPA, by unnecessary duplication of efforts in
telephone at (202) 366–4434 or Fax: achieving such purposes. Surface Transportation Board
(202) 366–3671. As a part of the stakeholder review [STB Finance Docket No. 33388 (Sub–No.
SUPPLEMENTARY INFORMATION: RITA is a process, the Department of 95)] 1
new Department of Transportation Transportation is soliciting comments
(DOT) organization dedicated to from Federal, state, private sector, and CSX Corporation and CSX
advancing the DOT’s priorities for not-for-profit institutions on these Transportation, Inc., Norfolk Southern
transportation innovation, research, and Corporation and Norfolk Southern
topics. The Department is using a
education. RITA will integrate the Railway Company—Control and
variety of venues to solicit comments by
existing intermodal research and Operating Leases/Agreements—
stakeholders. This Federal Register
development functions of the RSPA Conrail Inc. and Consolidated Rail
Notice is one method for receiving
Office of Innovation, Research, and Corporation [Petition to Approve
comment. In particular, the Department
Education and the Secretary’s Office of Settlement Agreement and Exempt
encourages comments on the following
Intermodalism. Embraced Transactions]
topics:
In addition, RITA also will AGENCY: Surface Transportation Board,
incorporate the Volpe National Identification of Priorities
DOT.
Transportation Systems Center in • How do we establish DOT ACTION: Notice of Board action with
Cambridge, Massachusetts; the transportation research priorities in an regard to settlement agreement and 6
Transportation Safety Institute in environment of limited resources? related exemptions.
Oklahoma City; and the Bureau of
Transportation Statistics in its entirety. • How do we balance research on SUMMARY: Under 49 U.S.C. 11327, the
long-term, high-risk and high-impact Board finds that a settlement agreement
Report to Congress advances versus research with that was entered into by Norfolk
On November 30, 2004, President immediate transportation safety and Southern Corporation and Norfolk
Bush signed the Norman Y. Mineta mobility returns? Southern Railway Company
Research and Special Programs Research Duplication (collectively, NS) and Wheeling & Lake
Improvement Act (Public Law 108–426). Erie Railway Company (W&LE), when
Section 4(g) of the Act directs the RITA • How do we identify and avoid implemented, will satisfy certain
Administrator to prepare a report on the unnecessary duplication in conditions imposed in CSX Corp. et
research activities of the Department of transportation-related technology al.—Control—Conrail Inc. et al., 3 S.T.B.
Transportation, for delivery to the research? 196 (1998). Under 49 U.S.C. 10502 the
Committee on Transportation and • How do we share information and Board grants the exemption authority
Infrastructure, the Committee on learn about opportunities to benefit sought by NS and W&LE pursuant to the
Science of the House of Representatives, from others’ research? settlement agreement.
and the Committee on Commerce, The Settlement Agreement includes 7
Science, and Transportation of the The Role of Stakeholders elements.
Senate. This report is due March 30, • What on-going communications Element #1 provides that W&LE will
2005, 120 days after enactment. methods or processes might be be granted overhead trackage rights,
The report shall include the following established with stakeholders outside of
information: the DOT to receive their advice and
1 This notice embraces: STB Finance Docket No.

• A summary of the mission and recommendations?


33388 (Sub-No. 96), Wheeling & Lake Erie Railway
Co.—Trackage Rights Exemption—Norfolk
strategic goals of the new RITA
Administration; • What information resources can Southern Railway Co. Between Bellevue and
Toledo, OH; STB Finance Docket No. 33388 (Sub-
• A prioritized list of the research and RITA utilize or create to leverage private No. 97), Wheeling & Lake Erie Railway Co.—
development activities that the sector advances into the DOT missions Trackage Rights Exemption—Norfolk Southern
Department intends to pursue over the and goals? Railway Co. in Cleveland, OH; STB Finance Docket
No. 33388 (Sub-No. 98), Norfolk Southern Railway
next five (5) years; We encourage your ideas on these Co.—Trackage Rights Exemption—Wheeling & Lake
• A description of the primary topics, and on other related topics you Erie Railway Co. Between Clairton, PA and
purposes for conducting such R&D may identify. The development of RITA, Bellevue, OH; STB Finance Docket No. 33388 (Sub-
activities such as reducing traffic its roles, direction, and responsibilities, No. 99), Wheeling & Lake Erie Railway Co.—
Petition for Exemption—Purchase of the Toledo
congestion, improving mobility, and will be a methodical process of growth. Pivot Bridge—Norfolk Southern Railway Co.; STB
promoting safety; It may not be possible to incorporate Finance Docket No. 32516 (Sub-No. 1), Wheeling &
• An estimate of the funding levels many of the ideas we receive in our Lake Erie Railway Co.—Lease and Operation
needed to implement such R&D Congressional report. However, all ideas Exemption—Norfolk and Western Railway Co.’s
Dock at Huron, OH; and STB Finance Docket No.
activities for the current fiscal year; and and concerns identified will be 32525 (Sub-No. 1), Wheeling & Lake Erie Railway
• Additional information the RITA considered for integration into our Co.—Trackage Rights Exemption—Norfolk and
Administrator considers appropriate. planning endeavors. Western Railway.

VerDate jul<14>2003 19:33 Jan 25, 2005 Jkt 205001 PO 00000 Frm 00098 Fmt 4703 Sfmt 4703 E:\FR\FM\26JAN1.SGM 26JAN1

S-ar putea să vă placă și