Documente Academic
Documente Profesional
Documente Cultură
Knit leaves:
Using dpns and starting three stitches from one end of the chain, and
using yarn designated for the leaves, pick up 5 stitches. Turn.
2
Knit hat:
Knit all rounds in St st until hat measures 5 3/4 (6 3/4) inches from
cast-on edge.
Decrease round for size 0-3 months: (K2, k2tog) twice. (K3, k2tog)
four times. (K2, k2tog) four times. (K3, k2tog) four times. (K2, k2tog)
twice. (56 stitches)
Decrease round for size 6-9 months: (K2, k2tog, K4, k2tog) 7 times.
For remaining 9 stitches of this round: K2, k2tog, K3, k2tog (63
stitches) Break main color thread.
Beginning at the marked end of the chain, carefully release the first
leaf from the crocheted chain and place each live stitch on a dpn,
taking care that stitches are facing in the correct position. Push leaf
3
close to the right end of the dpn. Set aside. Switching to yarn
designated for leaves knit first 2 stitches of hat. Pick up leaf needle
and place it together with hat needle, leaf needle on top. Knit the first
leaf stitch and the next hat stitch together. Repeat for remaining 4 leaf
stitches and next 4 hat stitches. Knit next 2 hat stitches. Place next
leaf from crochet chain onto empty dpn and knit the leaf together with
the next 5 hat stitches as before. Continue around the hat, adding all
leaves.
4
Place remaining 5 stitches on a dpn. Work I-cord for about an inch.
Break yarn. Thread yarn tail through all stitches, and pull tight.
Stitch guide:
K knit
P purl
K2tog knit 2 together
dpn(s) double-point needle(s)
SSK slip 2 stitches, one at a time, knit the 2 stitches together,
through the back loop
SP2P slip 1 purl-wise, purl 2 together, pass the slip stitch over
the purl 2 together
St st stockinette stitch