A) earthquake
B) wildcat strike
C) tornado
D) flooding caused by a hurricane
Points Earned: 1.0/1.0
Correct Answer(s): B
3. The scope definition of the BCP should include all of the following EXCEPT
:
A) prioritizing critical business processes.
Feedback: See page bottom of page 127 and the top of page 128.
B) calculating the value and cost of continuing important business processes.
C) assessing the cost to the business if critical services are disrupted.
D) performing a dry run of emergency fire and medical evacuation procedures.
Feedback: See page bottom of page 127 and the top of page 128.Points Earned: 0.
0/1.0
Correct Answer(s): D
8. The BIA prioritizes systems for recovery and ____________ are at the top o
f the list.
A) Less critical systems
B) Mission-required systems
C) Mission-critical systems
D) Nice to have systems
Points Earned: 1.0/1.0
Correct Answer(s): C
10. Using multiple centers as a recovery site has what main disadvantage?
A) Services may be shared between in-house and out-side services.
B) Processing is shared by multiple sites.
C) Multiple center offer redundant processing.
D) Multiple centers are more difficult to administer than other types.
Feedback: See page 131.
Feedback: See page 131.Points Earned: 1.0/1.0
Correct Answer(s): D
11. What is the prime priority of disaster recovery?
A) protecting hardware
Feedback: See page 124 (Mid-page).
B) personnel safety
C) transaction processing
D) protecting software
Feedback: See page 124 (Mid-page).Points Earned: 0.0/1.0
Correct Answer(s): B