This document is an integral part of the Departments planning documents, namely, the 5-Year Strategic Plan (2010/11 2014/15), the Annual
Performance Plan (APP), the Budget Statement II (Vote 1 in Provincial Treasurys White Book) and the Premiers 2013/14 Budget and Policy
Speech. The Operational Plan seeks to demonstrate how the Department intends to achieve its results as outlined by the performance
indicators and targets in the APP. The Operational Plan identifies critical projects, the amount of resources that have been earmarked for each
of these projects and a quarterly breakdown of the key activities that will be undertaken to achieve these projects. This plan is to be read in
conjunction with the above-mentioned documents. Every effort has been made to ensure that all result areas are addressed in the Operational
Plan. The Operational Plan is laid out in accordance with the Departments four Budget Programme and is owned by all Programme and SubProgramme Managers.
Table of Contents
About this Document........................................................................................................................................................................................................................ 1
Programme 1: Administration........................................................................................................................................................................................................... 7
Sub-Programme 1.1: Office of the Deputy Director General ....................................................................................................................................................... 7
Sub-Programme 1.2: Premiers Core Staff .................................................................................................................................................................................. 9
Sub-Programme 1.3: Office of the Director General .................................................................................................................................................................. 14
Sub-Programme 1.4: Strategic and Operational Support .......................................................................................................................................................... 21
Sub-Programme 1.5: Internal Human Resource Management ................................................................................................................................................. 28
Sub-Programme 1.6: Finance and Supply Chain Management ................................................................................................................................................ 36
Programme 2: Institutional Development and Organisational Support .......................................................................................................................................... 49
Sub-Programme 2.1: Office of the Deputy Director General ..................................................................................................................................................... 49
Sub-Programme 2.2: Transversal Organisational Development and Consultancy Services .................................................................................................... 51
Sub-Programme 2.3: Information Technology Management ..................................................................................................................................................... 68
Programme 3: Policy and Governance .......................................................................................................................................................................................... 73
Sub-Programme 3.1: Office of the Deputy Director General ..................................................................................................................................................... 73
Sub-Programme 3.2: Performance Monitoring and Evaluation ................................................................................................................................................. 75
Sub-Programme 3.3: Service Delivery Intervention and Co-ordination Support ....................................................................................................................... 88
Sub-Programme 3.4: Policy Planning and Research Co-ordination .......................................................................................................................................... 92
Programme 4: Executive Support Services ................................................................................................................................................................................... 99
Sub-Programme 4.1: Office of the Deputy Director General ..................................................................................................................................................... 99
Sub-Programme 4.2: Cabinet Secretariat and Protocol Services............................................................................................................................................ 102
Sub-Programme 4.3: Provincial Communication ..................................................................................................................................................................... 103
Sub-Programme 4.4: Intergovernmental and Stakeholder Relations ...................................................................................................................................... 112
Sub-Programme 4.5: Legal Services ....................................................................................................................................................................................... 115
Signed
Ms. N. Ngcakani
Programme Manager: Administration
Date: 25 March 2013
Ms. L. Geza
Programme Manager: IDOS
Date: 25 March 2013
Mr. C. Motsilili
Programme Manager: Policy and Governance
Date: 25 March 2013
Adv. H. Smith
Acting Programme Manager: Executive Support Services
Date: 25 March 2013
Programme 1: Administration
Sub-Programme 1.1: Office of the Deputy Director General
DIRECTORATE: DDGs OFFICE
STRATEGIC OBJECTIVES
All strategic objectives applicable to Programme 1
PERFORMANCE INDICATORS
All performance indicators applicable to Programme 1
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVES
All strategic objectives applicable to Programme 1
PERFORMANCE INDICATORS
All performance indicators applicable to Programme 1
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Correspondence Administration
Correspondence Administration
Correspondence Administration
Correspondence Administration
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATOR
1.1 Percentage of petition/complaints/ to the Premier resolved as part of the Departments efforts to promote and demonstrate good and responsive governance
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATOR
1.1 Percentage of petition/complaints/ to the Premier resolved as part of the Departments efforts to promote and demonstrate good and responsive governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
10
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATOR
Number of press releases, speeches and interaction with the printed and electronic media
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
11
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATOR
Number of Parliamentary business and sittings attended, and number of Parliamentary questions responded to
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
12
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATOR
1.1 Percentage of petition/complaints/ to the Premier resolved as part of the Departments efforts to promote and demonstrate good and responsive governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
13
PROJECT NAMES
MONITORING THE IMPLEMENTATION OF THE OTP PROGRAMMES
PROVISION OF STRATEGIC SUPPORT & LEADERSHIP TO
DEPARTMENTS
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATORS
1.2 Number of management reports on implementation of OTP programmes to monitor the performance of the Department; and
1.3 Percentage of challenges from departments escalated to the Director Generals Office resolved.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Establishment of governance
/management structures, and
development of ToRs thereof, for the
OTP, e.g., Audit Committee, Risk
Management Committee, HRM
Committees, MPAT Committee, ICT
Governance Steering Committee, PMDS
Moderation Committees, Social
Committees, Audit Steering Committee,
Appeals Committee, etc.
Co-ordination of monthly
Management Reports
Co-ordination of monthly
Management Reports
Executive
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Oversee development and submission
of departmental compliance and
statutory plans for 2014/15 across
programmes.
Evaluate and review the OTP
Governance Structures.
Executive
Co-ordination of monthly
Management Reports
Executive
14
PROJECT NAMES
MONITORING THE IMPLEMENTATION OF THE OTP PROGRAMMES
PROVISION OF STRATEGIC SUPPORT & LEADERSHIP TO
DEPARTMENTS
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and Provincial administration
PERFORMANCE INDICATORS
1.2 Number of management reports on implementation of OTP programmes to monitor the performance of the Department; and
1.3 Percentage of challenges from departments escalated to the Director Generals Office resolved.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
identified sub-programmes.
identified sub-programmes.
identified sub-programmes.
identified sub-programmes.
15
STRATEGIC OBJECTIVE: To provide an independent, objective assurance and consulting internal audit activity designed to add value and improve departments
operations
PERFORMANCE INDICATORS
1.5 Number of audit projects completed as part of the implementation of the internal audit plan;
1.6 Number of monthly monitoring reports of the audit intervention plan to ensure that deficiencies in the internal control environment are addressed; and
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
16
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATORS
1.4 Level of implementation of the approved Risk Management Strategy to organisational integrity; and
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
17
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATORS
1.4 Level of implementation of the approved Risk Management Strategy to organisational integrity; and
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
18
PROJECT NAMES
BUDGET ALLOCATION: R1 MILLION
STRATEGIC OBJECTIVE: Effectively coordinate efforts aimed at preventing, combating fraud and corruption focusing in transforming the culture of the provincial public
service to promote professionalism and sound ethics
PERFORMANCE INDICATORS
1.7 Percentage of backlog case investigations on fraud and corruption completed;
1.8 Number of Departments coordinated and supported in the implementation of security management policies;
1.17 Number of SMS disclosing their financial interests by 30 April 2013; and
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
19
STRATEGIC OBJECTIVE: Effectively coordinate efforts aimed at preventing, combating fraud and corruption focusing in transforming the culture of the provincial public
service to promote professionalism and sound ethics
PERFORMANCE INDICATORS
1.8 Number of Departments coordinated and supported in the implementation of security management policies
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Coordination of implementation of
Security Policies in 2 (Human
Settlement) and Safety and Liaison)
departments.
Coordination of implementation of
Security Policies in 2 (Provincial
Planning and Finance and Local
Government and Traditional Affairs)
departments.
Coordination of implementation of
Security Policies in 2 (Economic
Development and Roads and Public
Works) departments.
Coordination of implementation of
Security Policies in 2 (Health and Social
Development) departments.
20
STRATEGIC OBJECTIVES: Provide strategic leadership and support to the department and provincial administration
PERFORMANCE INDICATORS
1.9 Organisational self-assessment conducted to provide a critical lessons to inform the Departments strategy;
1.10 Number of departmental plans approved for tabling to parliament and/or presented to the Portfolio committee to allow parliament to exercise its oversight role on the
Department; and
1.11 Number of Departmental performance reports approved for tabling to parliament and/or presented to the Provincial Treasury to allow these institutions to exercise their
oversight roles on the Department.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
21
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVES: Provide strategic leadership and support to the department and provincial administration
PERFORMANCE INDICATORS
1.9 Organisational self-assessment conducted to provide a critical lessons to inform the Departments strategy;
1.10 Number of departmental plans approved for tabling to parliament and/or presented to the Portfolio committee to allow parliament to exercise its oversight role on the
Department; and
1.11 Number of Departmental performance reports approved for tabling to parliament and/or presented to the Provincial Treasury to allow these institutions to exercise their
oversight roles on the Department.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
22
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATOR
1.12 Percentage of documents retrieved and submitted to the requester within two working days of the request being made
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
23
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATOR
1.12 Percentage of documents retrieved and submitted to the requester within two working days of the request being made
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
24
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATOR
1.12 Percentage of documents retrieved and submitted to the requester within two working days of the request being made
Summary of Planned
Quarter 1 Activities
Summary of Planned
Quarter 2 Activities
Summary of Planned
Quarter 3 Activities
Summary of Planned
Quarter 4 Activities
25
PROJECTS
BUDGET ALLOCATIONS
R3 250 000
R980 000
R4 301 000
R374 000
R911 000
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and provincial administration
PERFORMANCE INDICATOR/S: N/A
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
26
PROJECTS
ANNUAL REVIEW OF DEPARTMENTAL U-AMP;
CONTRACT MANAGEMENT (CLEANING & PLANS);
FACILITATION OF FACILITY MAINTENANCE
STRATEGIC OBJECTIVE: Provide strategic leadership and support to the department and provincial administration
PERFORMANCE INDICATOR
1.13 Review and approval of the User Asset Management Plan (U-AMP) of the Department to ensure that the Departments infrastructural needs are catered for in its
strategy
Summary of Planned
Quarter 1 Activities
Summary of Planned
Quarter 2 Activities
Summary of Planned
Quarter 3 Activities
Summary of Planned
Quarter 4 Activities
27
STRATEGIC OBJECTIVES: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014; Build a people
focused organisation; and ensure that institutions of the state are reflective of the demographics of society; and effectively coordinate and build capacity of the public sector
towards social and institutional transformation.
PERFORMANCE INDICATORS
1.15 Average number of days taken to fill a post from the date when approval was granted to fill the post;
116 Percentage of employees serving probation confirmed/or not confirmed (that is, where a review has conducted and the employee has not satisfied the obligations of
his/her duty) in the 13th month of them assuming duty in the Department;
1.25 Percentage of women in senior management position in the Department; and
1.26 Percentage of employees who are in the category of people with disability.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
28
STRATEGIC OBJECTIVES: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014; Build a people
focused organisation; and ensure that institutions of the state are reflective of the demographics of society; and effectively coordinate and build capacity of the public sector
towards social and institutional transformation.
PERFORMANCE INDICATORS
1.15 Average number of days taken to fill a post from the date when approval was granted to fill the post;
116 Percentage of employees serving probation confirmed/or not confirmed (that is, where a review has conducted and the employee has not satisfied the obligations of
his/her duty) in the 13th month of them assuming duty in the Department;
1.25 Percentage of women in senior management position in the Department; and
1.26 Percentage of employees who are in the category of people with disability.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Top Management.
29
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVES
Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014;
Build a people focused organisation; and ensure that institutions of the state are reflective of the demographics of society; and
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATORS
1.18 Number staff trained as part of the implementation of the HRD policy of the Department;
1.19 Percentage of staff awarded with bursaries successfully completing their programmes on time; and
1.22 Percentage of leave captured on PERSAL within 30 days from the date when the leave was approved.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Implementation of the Work place Skills
plan. Expenditure report on training in
line with WSP submitted to PSETA.
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Implementation of the Work place Skills
plan. Submit monitoring and evaluation
report on the HRD implementation plan
to DPSA. Expenditure report on training
in line with WSP submitted to PSETA.
30
STRATEGIC OBJECTIVES
Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014;
Build a people focused organisation; and ensure that institutions of the state are reflective of the demographics of society; and
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
1.24 Level of implementation of the Provincial Wellness Strategy as part of governments strategy to transform the public service and enhance service delivery
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
31
STRATEGIC OBJECTIVES
Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014;
Build a people focused organisation; and ensure that institutions of the state are reflective of the demographics of society; and
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
1.24 Level of implementation of the Provincial Wellness Strategy as part of governments strategy to transform the public service and enhance service delivery
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Implementation of Health and
Productivity Management.
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
32
STRATEGIC OBJECTIVES
Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014;
Build a people focused organisation; and
Ensure that institutions of the state are reflective of the demographics of society; and effectively coordinate and build capacity of the public sector towards social and
institutional transformation.
PERFORMANCE INDICATORS
1.20 Number of employees with credible performance agreements by 30 April 2013 as part of the implementation of the Performance Management and Development
Policy; and
1.21 Number of employees whose performance has been reviewed and evaluated as part of the implementation of the Performance Management and Development Policy
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
33
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014.
PERFORMANCE INDICATOR
1.23 Level of implementation of the Provincial Culture Strategy to transform the public service and enhance service delivery
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Develop implementation plan for the
promotion of functionality and dress
code in OTP. 2. Awareness on
guidelines on punctuality and dress
code.
10% for the identification and
appointment of culture change agents
and 25% for the training of this group.
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
34
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.27 Percentage of grievances finalised within 30 days; and
1.28 Percentage of exit interviews conducted to employees leaving the department.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
35
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Payroll management
Payroll management
Payroll management
Payroll management
ACB recalls
ACB recalls
ACB recalls
ACB recalls
36
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Debt management
Debt management
Debt management
Debt management
Processing of Journals
Processing of Journals
Processing of Journals
Processing of Journals
37
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
38
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
39
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance;
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised; and
1.31 Financial delegations reviewed annually in accordance with the PFMA and National Treasury Regulations.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
40
STRATEGIC OBJECTIVE: Ensure sound organisational integrity inclusive of human resources, financial and SCM practices and systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.30 Percentage of approved budget spent to ensure that resources allocated to the Department are adequately utilised.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
41
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.32 Percentage of invoices /claims in good standing paid within 30 days.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
42
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.33 Number of updates/ reviews on the fixed asset register of the Department to achieve the best match of assets with service delivery objectives.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Procure assets
Procure assets
Procure assets
Procure assets
43
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.33 Number of updates/ reviews on the fixed asset register of the Department to achieve the best match of assets with service delivery objectives.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
44
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.33 Number of updates/ reviews on the fixed asset register of the Department to achieve the best match of assets with service delivery objectives.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Allocation of vehicles.
Allocation of vehicles.
Allocation of vehicles.
Allocation of vehicles.
45
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014
PERFORMANCE INDICATORS
1.29 An unqualified audit outcome with no matters of emphasis in pursuit of good corporate governance; and
1.33 Number of updates/ reviews on the fixed asset register of the Department to achieve the best match of assets with service delivery objectives.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
vehicles
vehicles
vehicles.
46
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014.
PERFORMANCE INDICATOR
1.34 Development and approval of the procurement plan of the Department as part of efforts to improve planning and budgeting.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Develop a procurement process project
plan with clear delivery dates for
identified projects
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
47
STRATEGIC OBJECTIVE: Ensure Sound Organisational Integrity Inclusive of Human Resources, Financial and SCM Practices and Systems by 2014.
PERFORMANCE INDICATOR
1.35 Percentage of bids concluded within 90 days from the date of approval to procure to the date when bid is awarded.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
48
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
49
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
50
STRATEGIC OBJECTIVES: Build a people focussed organisation; Ensure that the institution of the state are reflective of the demographics of the society; Effectively
coordinate and build the capacity of the public sector towards social and institutional transformation; and Ensure sound organisational integrity inclusive of human resource,
financial, risk and supply chain managerial practices and systems.
PERFORMANCE INDICATORS
2.1 Number of departments with credible HR Effectiveness & Capacity Assessment and developing credible improvement plans;
2.2 Number of departments with credible revised annual human resource plans by the end of June 2013;
2.3 Number of departments submitting credible six monthly and annual human resource implementation reports;
2.4 Number of departments with credible Annual Recruitment Plans (ARPs);
2.5 Percentage of provincial executive management posts filled within 6 months of them being vacant; and
2.6 Number of departments implementing credible HRM delegations.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
51
STRATEGIC OBJECTIVES: Build a people focussed organisation; Ensure that the institution of the state are reflective of the demographics of the society; Effectively
coordinate and build the capacity of the public sector towards social and institutional transformation; and Ensure sound organisational integrity inclusive of human resource,
financial, risk and supply chain managerial practices and systems.
PERFORMANCE INDICATORS
2.1 Number of departments with credible HR Effectiveness & Capacity Assessment and developing credible improvement plans;
2.2 Number of departments with credible revised annual human resource plans by the end of June 2013;
2.3 Number of departments submitting credible six monthly and annual human resource implementation reports;
2.4 Number of departments with credible Annual Recruitment Plans (ARPs);
2.5 Percentage of provincial executive management posts filled within 6 months of them being vacant; and
2.6 Number of departments implementing credible HRM delegations.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
52
STRATEGIC OBJECTIVES: Build a people focussed organisation; Ensure that the institution of the state are reflective of the demographics of the society; Effectively
coordinate and build the capacity of the public sector towards social and institutional transformation; and Ensure sound organisational integrity inclusive of human resource,
financial, risk and supply chain managerial practices and systems.
PERFORMANCE INDICATORS
2.1 Number of departments with credible HR Effectiveness & Capacity Assessment and developing credible improvement plans;
2.2 Number of departments with credible revised annual human resource plans by the end of June 2013;
2.3 Number of departments submitting credible six monthly and annual human resource implementation reports;
2.4 Number of departments with credible Annual Recruitment Plans (ARPs);
2.5 Percentage of provincial executive management posts filled within 6 months of them being vacant; and
2.6 Number of departments implementing credible HRM delegations.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
53
STRATEGIC OBJECTIVE
Build a people focussed organisation
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATORS
2.9 Number of departments implementing employee wellness programmes; and
2.10 Number of departments implementing Policy and Procedure on Incapacity Leave and Ill-health Retirement (PILIR) Framework effectively.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Conduct employee wellness audit in 7
departments
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Analyse data and compile annual report.
Facilitate Planning sessions with 13
departments for 2014/15
Analyse data and compile report and
conduct one on one session with
departments
54
STRATEGIC OBJECTIVE
Build a people focussed organisation
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATORS
2.9 Number of departments implementing employee wellness programmes; and
2.10 Number of departments implementing Policy and Procedure on Incapacity Leave and Ill-health Retirement (PILIR) Framework effectively.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
55
STRATEGIC OBJECTIVES
Build a people focussed organisation
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
2.11 Number of departments implementing employment relations strategies.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
IDLRF held.
IDLRF held.
IDLRF held.
IDLRF held.
56
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
STRATEGIC OBJECTIVES
Build a people focussed organisation
Effectively coordinate and build capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATORS
2.7 Number of departments with credible HoDs performance agreements by 31 May 2013; and
2.8 Number of departments conducting credible performance reviews and evaluations for their Heads of Departments.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
57
PROJECT NAMES
BUDGET ALLOCATION
TRANSVERSAL TRAINING
LEADERSHIP DEVELOPMENT
WOMEN IN LEADERSHIP
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATORS
2.18 Number of middle and senior managers trained through the leadership development programme;
2.19 Number of women participating in the Women in Leadership Development Programme; and
2.20 Number of public servants trained in specific key areas in line with the Public Sector Transformation Strategy.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
TRANSVERSAL TRAINING
Train at least 150 officials on key areas
in line with the Public Sector
transformation Strategy (Financial and
Business Management, Human
Resource Management, Organisational
Development, Communication,
Compulsory Induction Training, ICT)
LEADERSHIP DEVELOPMENT
58
PROJECT NAMES
BUDGET ALLOCATION
TRANSVERSAL TRAINING
LEADERSHIP DEVELOPMENT
WOMEN IN LEADERSHIP
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATORS
2.18 Number of middle and senior managers trained through the leadership development programme;
2.19 Number of women participating in the Women in Leadership Development Programme; and
2.20 Number of public servants trained in specific key areas in line with the Public Sector Transformation Strategy.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
WOMEN IN LEADERSHIP
Finalise Concept And Develop
Programme
59
SKILLS DEVELOPMENT
FINANCIAL ASSISTANCE
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATORS
2.20 Number of public servants trained in specific key areas in line with the Public Sector Transformation Strategy; and
2.21 Number of unemployed young people trained in specific skill areas as part of the strategic skills development initiative
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
SKILLS DEVELOPMENT
Support Government Departments to
develop HRD Implementation Plans in
line with the PSDS
FINANCIAL ASSISTANCE
60
STRATEGIC OBJECTIVE
Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATORS
2.12 Number of departments with approved organizational Structures for the current Medium Term Strategic Framework; and
2.13 Number of departments with credible human resource planning, recruitment and selection and leave management business processes.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
61
STRATEGIC OBJECTIVE
Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
Ensure sound organisational integrity inclusive of human resource, financial, risk and supply chain managerial practices and systems
PERFORMANCE INDICATORS
2.12 Number of departments with approved organizational Structures for the current Medium Term Strategic Framework; and
2.13 Number of departments with credible human resource planning, recruitment and selection and leave management business processes.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
62
Ensure implementation of
recommendations and follow through
STRATEGIC OBJECTIVES
Build a people focussed organisation; and
Effectively coordinate and build the capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
2.14 Number of departments implementing culture change strategies
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Feedback to departments on the DI
Analysis and findings
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Monitor and support implementation of
Departmental Culture Change Quick
Win Projects that are aligned to
Departmental Programmes
63
STRATEGIC OBJECTIVES
Build a people focussed organisation; and
Effectively coordinate and build the capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
2.14 Number of departments implementing culture change strategies
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Preparations for the Public Service
Month
APSD Activities held on 23 June
2013 (Part of EXCO Outreach)
Preparation for the EXCO outreach
Report on progress on 2012 HoD
Deployments, feedback and followup
HoD Deployments to Service
Delivery Sites
Public Servants Policy and Culture
Change Sessions
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Logistics
Feed -back to Ikhwezi
Feedback to Elliotdale
Preparation for the EXCO outreach
64
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Monitor the implementation of the
PSM recommendation
Annual report on the PSM 2013/14
Public Service Month Concept for
2014 developed
Monitor implementation of EXCO
Outreach Resolutions in respect of HoD
Deployments
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
2.15 Integrated organizational performance assessment framework and tool developed.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Research and development on the
integration of organizational
performance diagnostic tools done:
Research on integrated hybrid
organizational assessment tools
done
Benchmarking of hybrid tools and
organizational maturity models
Integrated model for organizational
performance assessment and
reporting developed
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
65
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Development of a web-based
organizational diagnostic tool done:
Blue print for a web- based tool
done
User needs analysis done
Web-based tool piloted to users
Web-based toll signed off
Organizational Performance
Assessment Policy Updated:
Organizational Assessment policy
revision workshop conducted
Revised policy communicated to all
stakeholders
Updated policy approved by EXCO
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation.
PERFORMANCE INDICATOR
2.16 Number of departments implementing revised Service Delivery Improvement Plans
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
66
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.17 Number of departments implementing Innovation and Knowledge Management strategies.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
67
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.22 Number of departments implementing ICT Governance in accordance with the Provincial Framework.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
68
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.23 Level of compliance of SITA with the Service Level Agreements
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Submission of
Renewal/Termination/Amendment of
reviewed SLAs for approval
69
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.23 Level of implementation of the Provincial ICT Infrastructure Plan
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
70
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.25 Level of implementation of spatial referencing of government information through Geographical Information System (GIS)
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
71
STRATEGIC OBJECTIVE: Effectively coordinate and build the capacity of the public sector towards social and institutional transformation
PERFORMANCE INDICATOR
2.26 Level of implementation of phase two of the IT Disaster Recovery Plan for Office of the Premier
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Performance Assessment and
Procurement of hardware for the DRP
solution
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
72
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Development of procedure manuals to
restore services and testing of Disaster
Recovery Solution
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
73
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
financial year
Correspondence Administration
Correspondence Administration
Correspondence Administration
Correspondence Administration
74
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.1 Number of departments submitting credible quarterly performance reports
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
75
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.1 Number of departments submitting credible quarterly performance reports
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Development of an Assessment
Framework for analysing the quality of
departmental Frameworks for managing
performance information
Development of an Assessment
Framework for analysing the quality of
departmental Frameworks for managing
performance information
Development of an Assessment
Framework for analysing the quality of
departmental Frameworks for managing
performance information
76
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.1 Number of departments submitting credible quarterly performance reports
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
77
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.1 Number of departments submitting credible quarterly performance reports
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
78
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Launch of the system
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
79
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.2 Number of provincial performance oversight reports processed
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Verification of information
Verification of information
Verification of information
80
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.3 Number of evaluations/impact assessment conducted to evaluate the impact of government policies and programmes on the lives of people in the province
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
81
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
82
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.3 Number of evaluations/impact assessment conducted to evaluate the impact of government policies and programmes on the lives of people in the province
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
83
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.3 Number of evaluations/impact assessment conducted to evaluate the impact of government policies and programmes on the lives of people in the province
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
84
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.11 Number of departments conducting effective management performance assessments
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
85
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.12 Number of monitoring reports on the provincial management oversight plan (FOSAD plan)
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
86
STRATEGIC OBJECTIVE: Provincial monitoring, reporting and evaluation framework fully implemented
PERFORMANCE INDICATOR
3.13 Number of monitoring reports on frontline service delivery
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Formulation of a concept document and
the Annual FSD Plan 2013/14
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
87
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Project identification
Project assessments
Stakeholder management
Stakeholder management
Reporting
Progress reporting
Progress reporting
Progress reporting
Progress reporting
88
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Site inspections
Site inspections
Site inspections
Site inspections
89
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Quarterly reporting
Quarterly reporting
Quarterly reporting
Quarterly reporting
90
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
91
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the Province
PERFORMANCE INDICATOR
3.6 Level of functionality of the government cluster system
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Analysis of APPs
Reporting
Reporting
Reporting
Reporting
92
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the Province
PERFORMANCE INDICATOR
3.7 Number departments with credible APPs that are aligned to the Provincial priorities
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Analysis of APPs
Reporting
Reporting
93
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the Province
PERFORMANCE INDICATOR
3.8 Number of Departments with approved Infrastructure Delivery Plans
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
94
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the Province
PERFORMANCE INDICATOR
3.9 Level of readiness to implement the National Development Plan in the Province
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
95
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the Province
PERFORMANCE INDICATOR
3.10 Youth Development Strategy Approved
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Project scoping
Consultation of stakeholders
96
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the province
PERFORMANCE INDICATOR
Number of provincial policy research programmes conducted
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Reporting
Reporting
Reporting
97
STRATEGIC OBJECTIVE: To lead the coordination of policy, planning and research in the province
PERFORMANCE INDICATOR
3.15 Quarterly Review of ECSECC performance
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Management of SLA
98
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
99
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
requests from DDG and Sub-branches,
include SATMA, Ex-mine Workers PSC
and/or any other intervention deemed
necessary for DDGs Office.
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Correspondence Administration,
acknowledgements and responses
Correspondence Administration,
acknowledgements and responses
Correspondence Administration,
acknowledgements and responses
Correspondence Administration,
acknowledgements and responses
Coordinate/Facilitate/Monitor
functionality of Branch Monitoring
Committees:
Coordinate/Facilitate/Monitor
functionality of Branch Monitoring
Committees:
100
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
Training Committee
PMDS Programme Committee
Monitor risk management indicators and
performance of Sub-branches
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Training Committee
PMDS Programme Committee
Monitor risk management indicators and
performance of Sub-branches
101
STRATEGIC OBJECTIVE: Lead and manage the provision of Executive support to the Premier, Executive Structures and Provincial Government
PERFORMANCE INDICATOR
4.1 Number of reports on secretariat and protocol services rendered to executive structures
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
102
STRATEGIC OBJECTIVE: Enhance the Image of the provincial government and EC province
PERMANCE INDICATOR
4.2 Percentage of people rating the Provincial government and EC province positively
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Implementation of plan
Implementation of plan
103
STRATEGIC OBJECTIVE: Enhance the Image of the provincial government and EC province
PERMANCE INDICATOR
4.2 Percentage of people rating the Provincial government and EC province positively
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Billboard campaign
campaign
104
STRATEGIC OBJECTIVE: Enhance the Image of the Provincial government and EC Province
PERFORMANCE INDICATOR
4.3 Percentage of net positive media representation of the provincial government in the media domain
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
A service provider/partnership is
developed with research institutions or
higher learning institution for the
development if issue management
framework
105
STRATEGIC OBJECTIVE: Enhance the Image of the Provincial government and EC Province
PERFORMANCE INDICATOR
4.3 Percentage of net positive media representation of the provincial government in the media domain
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
maximising generation and
dissemination of good news on ECPA.
Appointment of a service provider to
execute good news generation
Execution of a Public Relations
Campaign to profile the 20 years of
Freedom reporting period. Commission
writers/experts to draft pieces; and
Negotiate with print media owners to
avail leader page space.
Coordinate government efforts of
building good government media
relations. Convene a Seminar to
observe the World Press day jointly with
the media sector (03 May 2013)
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
106
STRATEGIC OBJECTIVE: Enhance the Image of the Provincial government and EC Province
PERFORMANCE INDICATOR
4.3 Percentage of net positive media representation of the provincial government in the media domain
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
nd
rd
107
th
STRATEGIC OBJECTIVE: Enhance the Image of the Provincial government and EC Province
PERFORMANCE INDICATOR
4.3 Percentage of net positive media representation of the provincial government in the media domain
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Strengthen cooperation with community
radio, print and TV media sector.
Organise and convene a community
media round table
Execution of the manual for maximizing
media liaison support for the EXCO
outreach programme: 80% increase of
profile of EXCO Outreach programme
Develop and Execute media liaison plan
during SOPA, Budget speech and Policy
speeches.
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Execute documentaries reflecting
progress 20 years of Freedom.
108
STRATEGIC OBJECTIVE: Enhance the Image of the Provincial government and EC Province
PERFORMANCE INDICATOR
4.3 Percentage of net positive media representation of the provincial government in the media domain
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
province.
109
STRATEGIC OBJECTIVE : Enhance the image of Provincial Government and the Eastern Cape
PERFORMANCE INDICATOR
4.4 Percentage of resolved public enquiries as registered and tracked on the Presidential Hotline
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
110
STRATEGIC OBJECTIVE : Enhance the image of Provincial Government and the Eastern Cape
PERFORMANCE INDICATOR
4.4 Percentage of resolved public enquiries as registered and tracked on the Presidential Hotline
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
communities
Participate and responding to customer
care queries during International,
National and Provincial Mandates: To
attend the institutionalised days and
document the issues raised and
analysed them.
111
STRATEGIC OBJECTIVES
Strengthen Executive and IGR Structures of Provincial Government; and
Improve mechanisms for effective engagement with civil society
PERFORMANCE INDICATORS
4.5 Number of reports on participation of all provincial government departments in the development of Integrated Development Plans at local government level to improve
integrated planning and effectiveness in implementation of government programmes; and
4.6 Number of EXCO Outreach Programme organised to strengthen public participation and public engagements with stakeholders on service delivery commitments and
progress towards attaining coherence in service delivery.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Convene PCF
Convene PCF
Convene PCF
Convene PCF
112
BUDGET: R1.477m
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
113
BUDGET: R2.19m
STRATEGIC OBJECTIVE: Improve mechanisms for effective engagement with civil society
PERFORMANCE INDICATOR
4.8 Number of engagement platforms facilitated for communities and stakeholders to participate in government programmes
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
Planning and preparations for
Community and Stakeholder
engagement during EXCO outreach
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
114
PROJECT NAMES
BUDGET ALLOCATION: R207 000
MANAGEMENT OF PAIA
LEGAL MANAGEMENT
STRATEGIC OBJECTIVE: Enhance compliance with the Constitution and other prescripts
PERFORMANCE INDICATORS
4.9 Percentage of adverse court judgements against Provincial Government; and
4.10 Percentage of requests for legal advice and opinions provided.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Approval of guide
115
PROJECT NAMES
BUDGET ALLOCATION: R207 000
MANAGEMENT OF PAIA
LEGAL MANAGEMENT
STRATEGIC OBJECTIVE: Enhance compliance with the Constitution and other prescripts
PERFORMANCE INDICATORS
4.9 Percentage of adverse court judgements against Provincial Government; and
4.10 Percentage of requests for legal advice and opinions provided.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
contracts on request
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
contracts on request
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
contracts on request
116
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
contracts on request
STRATEGIC OBJECTIVE: Enhance compliance with the Constitution and other prescripts
PERFORMANCE INDICATORS
4.9 Percentage of adverse court judgements against Provincial Government; and
4.10 Percentage of requests for legal advice and opinions provided.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
Roll-out of plan
Roll-out of plan
117
STRATEGIC OBJECTIVE: Enhance compliance with the Constitution and other prescripts
PERFORMANCE INDICATORS
4.9 Percentage of adverse court judgements against Provincial Government;
4.10 Percentage of requests for legal advice and opinions provided; and
4.11 Percentage of Bills developed.
SUMMARY OF PLANNED
QUARTER 1 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 2 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 3 ACTIVITIES
SUMMARY OF PLANNED
QUARTER 4 ACTIVITIES
118