Kick-off meeting
September, 2012
HUAWEI TECHNOLOGIES CO., LTD.
Contents
1
Project Objective
Project Schedule
Responsibility Matrix
Page 2
Project Scope
5 sites
5 sites
Service Migration
according to RFP)
Local Training Service
5 days / 12 attendance
6 days/ 4 attendance
2 years
Customer Support
plus (year 1)
HUAWEI TECHNOLOGIES CO.,
HISILICON SEMICONDUCTOR
LTD.
Page 3
Steering Board
PMO
Carlos Benavides
Monthly meeting
Steering the
project
Approving the
results
CTO
office
Weekly meeting
Defining and dividing
the work
Monitoring
Planning the weekly
meetings
Topic meeting
Technical
Logistic
Finance
Logistic Dept
Finance
Page 4
-Sign FAC
Migration *
Arrival Date at
Lima.
Training Dates
Brasil Training 5 Nov
Local Training 13 Dec
Page 5
Page 6
Provisto por
EL
Huawei CLIENTE
Partida
1.1
1.2
1.3
Garantizar o obtener permisos, accesos, llaves, y accesos logsticos para visitar la estacin requerida.
Solicitar y obtener permisos a los encargados de las estaciones y a instituciones terceras, como
instituciones privadas o pblicas, gobierno, gobierno local, etc.
1.4
Convocar a todas las partes involucradas o a sus representantes para las visitas.
1.5
Visita de inspeccin
Proveer informacin necesaria el cual es requerido por Huawei para ser usada en los documentos de
ingeniera, diseos, etc.
Preparar el diseo de red y documentos de ingeniera, los cuales describen el trabajo a hacer realizado por
Huawei en cada sitio.
Revisar y aprobar el diseo de red y documentos de ingeniera, los cuales describen el trabajo a hacer
realizado por Huawei en cada sitio.
1.6
1.7
1.8
1.9
Realizar las adecuaciones de obra civil de ser necesarios para proveer espacio, energa y aterramiento.
1.10
1.11
1.12
X
X
X
X
X
X
X
X
1.14
1.15
1.16
1.17
1.13
X
X
Page 7
Provisto por
EL
Huawei CLIENTE
Partida
1 Equipo
1.1 Equipos DWDM/U2000
X
X
2 Cable de energa
2.1 Cables de energa para los equipos DWDM/U2000
Page 8
Page 9
Open Issues
Q&A
Page 10