Documente Academic
Documente Profesional
Documente Cultură
1A
Document No
Document Title
Attachment No :
No of pages:
Rev.
Date
Originator
Checked By
Approved By
Status
Page:
1
CONTENTS
I""
1.0
OBJECTIVE
2.0
SCOPE OF APPLICATION
3.0
REFERENCE DOCUMENTS
4.0
5.0
6.0
ATTACHMENTS
ATIACHMENT 1
STATUS
ATIACHMENT 2A -
INTERFA~E
ORGANISATION
ENGINEERING PHASE
CHART
ATIACHMENT 2B -
INTERFA~E
ORGANISATION
CONSTR~CTION PHASE
CHART
ATIACHMENT 2C -
ATIACHMENT 3
ATIACHMENT 4
ATIACHMENT 5
PRESSURE
Page:
2
OBJECTIVE
To identify and define the mandatory permits and approvals required for the
in
Engineering, Procurement and Construction (EPC) of
order to ensure regulatory compliance and successful start-up and legal operation of the h.
constructed facilities.
~
2.0
SCOPE OF APPLICATION
2.1
2.2
Federal authorities may have state branches with limited functions. However, the written
approvals to be granted shall depend upon the area of jurisdiction of the particular
authority.
2.3
This procedure shall be used as a guide and should be complemented with some
discussion with the various statutory bodies as some degree of discretion may be
granted with regards to the applicable mandatory requirements.
3.0
REFERENCE DOCUMENTS
3.1
3.2
3.3
3.4
3.5
Page:
3
4.0
4.1
The coordination work for the authorities approvals is managed by a Permit Controller
whose job responsibilities are as follows :
To follow-up on the approval status from the respective authorities and engineering
disciplines.
5.0
5.1
GENERAL
The Interface Organisation charts which present the relationship between the various
Authorities, Owner and Contractor are given in Attachments 2A and 2B . The various
approvals to be obtained and the engineering discipline responsible for that approval
application is given in attachment 2C. The submission flow charts to various authorities is
given in attachment 2D.
5.2
PRE-SUBMISSION PREPARATION
All drawings and technical documentation attached to each application shall be issued
and approved by the Contractor's authorized I qualified representative. When required by
Authorities, Owner's Representative shall sign the said drawings, prior to issue to the
Authorities.
Statutory bodies generally would only accept submissions from registered Consulting
Engineers (e.g. Professional Engineers registered with the Board of Engineers, Malaysia)
for engineering submissions and from Owner for operational licenses. Please refer to
Attachment 3 for names of parties responsible for authorities submission on behalf of
Contractor's Consortium partners. Owner signatures are also required for submission to
the District Council and the Department of Environment.
The application letters to authorities shall be prepared and signed by Contractor
authorized/qualified representative.
&
5.3
Page:
4
5.4
CONFIDENTIAL INFORMATION
The following precautions shall be taken in handling OWNER Proprietary Information:
5.5
(i)
(ii)
(iii)
(iv)
The Contractor shall take the necessary precaution to ensure that only the J:...
specific information requested is released on the need-to-know basis.
~
ili
Page:
5.5.1.1
'f\
Contractor shall review and approve the vendor's design drawings and
calculations, prior for submission to DOSH.
~
The vessels shall have Third Party certification prior to submission to
DOSH. The Third Party shall be appointed by the vendor from the fourth
schedule of the Factories and Machinery Act. However, take note that
this is not a mandatory requirement but rather it is strongly
recommended for successful and prompt approval from DOSH as it has
become a common practice.
Note that DOSH normally request 1 set of all P & ID's, the actual
medium of service of all vessels and the Hazop report. The prescribed
information of the medium is to be provided with the application letter for
approval of vessels.
5.5.1.2
Page:
6
5.5.1.3
5.5.1.4
5.5.1.5
Page:
7
5.5.1.6
5.5.1.7
5.5.1.8
Page:
8
(b)
(c)
(d)
(ii)
(iii)
(iv)
(v)
vi)
(vii)
,-..,
DOSH will advise, at the time of granting exemption from hydrotest, the
type of alternative tests, if any, to be carried out. The site team shall be
advised accordingly.
5.5.1.9
5.5.1.10
5.5.1.11
Page:
9
Approval Of Incinerator
Incinerator are to be designed as per approved standard. Calculation
and drawings are to be submitted for approval. The pressure parts of
incinerator are to be registered as a pressure system.
5.5.1.12
5.5.1.13
&
la\
L!.l
b..
ili
vi)
vii)
DOSH will generally inspect the site at least once to check that adequate
safety precautions are set in-place.
5.5.1.14
If..
Page:
10
5.5.1.16
5.5.1.17
5.5.1.18
Pipelines
Pipelines, metering stations, storage facilities and dispensing facilities
for Petroleum products are under the jurisdiction of the Petroleum Act.
Pipelines must comply with the Pipeline Regulations of the Petroleum
Act. Documentation and information to be submitted for the facilities are
defined in the guidelines provided by DOSH. Refer to Attachments 5. A
reference number must be obtained from DOSH prior to submission to
DOSH.Briefly, the information to be provided are:Owner of pipeline and right of way.
Process and mechanical design of piping system including
operations and control.
Design specification and drawings .
Emergency procedures.
Corrosion Control
Construction details and procedures.
Testing procedures, (checked by OWner).
Material certificates
Page:
11
After all the above are approved, permission to install will be granted by
DOSH.
Before operation of the pipeline, certifying declaration as per the above
submission, as built drawings, emergency plans, organization charts and
records of construction are to be submitted. Operating procedures and
contact person in case of emergency shall also be provided. DOSH will
then give the permission to operate the pipeline.
5.5.1.19
5.5.1.20
1)
2)
3)
4)
5)
6)
7)
8)
9)
5.5.1.21
Page:
12
ii)
Emergency procedures
iii)
iv)
As-built drawings
v)
(""".
5.5.1.23
5.5.1.24
Page:
13
Safety Practices
DOSH representatives may visit the site to inspect safety practices.
Construction Manager is responsible to ensure that the safety at site is in
accordance with the site Safety Manual.
5.5.1.25
5.5.1.26
5.5.1.27
5.5.1.28
Hazardous Installation
Hazardous installation are defined in the Occupational Safety and Health
Act 1994. If hazardous installation as per the act is envisaged,
notification shall be submitted by the OWNER.
5.5.2
5.5.2.1
Temporary Facilities
The following shall be submitted for approval
Building plans, elevations and layout, showing fire fighting system for
temporary facilities. Note that temporary facilities must be accessible by
fire trucks.
Page:
14
5.5.2.2
5.5.2.3
Architectural Approval
All building architectural plans, elevations and sections, and layout plans
are to be submitted. These drawings should indicate all fire
fighting/protection facilities and the requirements of BOMBA. Fire
fighting/protection philosophy including a brief description of the process
system shall also be submitted.
During the architectural submission, the fire fighting/protection
philosophy shall be discussed
with BOMBA and agreed before
proceeding with the M & E submissions as per Section 5.5.2.4 below.
5.5.2.4
5.5.2.5
And
Fire
CONTRACTOR shall notify BOMBA that the plant has been constructed
as per the submitted drawings and meet all the relevant Malaysian
regulations and the Uniform Building By-Laws (UBBL).
BOMBA will then be requested to inspect that the construction of
buildings and installation of fire fighting and protection services of the
entire plant has been completed as per the submitted drawings, after
which they will test the fire protection facilities.
5.5.2.6
Witness Of Testing
Representative from BOMBA must witness the operational testing of the
fire-fighting system such as monitors, deluge, hydrants, alarm panels,
etc. BOMBA will also inspect that all buildings are built as per the
approved architectural drawings e.g. with respect to fire doors/partitions,
escape routes etc.
Page:
15
5.5.2.7
Test Records
Hydrotest and NOT records are not required to be submitted to BOMBA.
However, BOMBA requires a Professional Engineer to certify that
hydrotest has been carried out as per code.
The Professional Engineer's representative shall witness the test and
keep copies of test records for inspection. Separate test per each
section is acceptable. However, non-hydrotested joints shall be 100%
x-rayed.
5.5.2.8
5.5.3
District Council
5.5.3.1
5.5.3.2
5.5.3.3
Page:
16
5.5.3.4
5.5.3.5
5.5.3.6
5.5.3.7
Structural approval
Where architectural drawings are not applicable, structural drawings
(concrete and steel) will be submitted to MAJLIS DAERAH and their
approval shall be obtained prior to start of construction. These include
equipment shelters for process equipment, plant structures and storage
tanks and silos.
5.5.3.8
5.5.3.9
Page:
17
5.5.3.10
5.5.3.11
Commencement Of Construction
In order to commence construction, infrastructure and architectural
drawings signed by the Professional Engineer and approved by MAJLIS
DAERAH are necessary. The approval is to be obtained by
CONTRACTOR prior to issue of AFC drawings.
During construction and/or before construction commences the following
forms from the uniform building by laws shall be submitted to MAJLIS
DAERAH, Building Department:
5.5.3.12
(a)
(b)
(c)
(d)
Supervision Of Construction
The construction of the Plant must be supervised by the relevant
Professional Engineers
who
have endorsed the documentation for submission to the authorities. The
Professional Engineers are responsible to ensure that the Plant is built in
accordance with design documents which have been approved by the
authorities.
L.!..l
Page:
18
5.5.3.13
5.5.3.14
Information To Authorities
In order to keep MAJLIS DAERAH officials well informed of the activities
at site, it is recommended that a presentation is made to MAJLIS
DAERAH when a major milestone is achieved, under the coordination of
the supeiVisors of the Professional Engineer.
5.5.3.15
Completion Of Project
On completion of the project, form E which certifies that all construction
has been done as per UBBL and the approved plans, shall be submitted.
Clearance letters from other authorities are also required to be
submitted before final inspection by MAJLIS DAERAH.
5.5.3.16
Final Inspection
MAJLIS DAERAH officials will inspect that everything is in accordance
with approved plans, specifications and pre-established guidelines.
5.5.3.17
Page:
19
BOMBA
b)
c)
d)
Engineering
DAERAH).
e)
DOSH
f)
g)
h)
i)
Department of Town
Council
(MAJLIS
Page:
20
After they have inspected the plant and after approval letters have been
issued by the various authorities, MAJLIS DAERAH will issue the
Certificate of Fitness for occupation after which the Owner may take
over and occupy the plant permanently.
MAJLIS DAERAH may also issue a temporary CF which is valid for 6
months and extendible in case some minor requirements are not met.
During such period all outstanding requirements must be met and the
maximum period for extension of temporary CF will only be 12 months.
In order to obtain Operating Business License, the Owner through the !)..
contractor must obtain either temporary CF or the final CF.
ill
5.5.4
5.5.4.1
Details and layout showing entrance road to the plot shall be submitted
to JKR for approval. The drawing should show clearly the plot boundary
prior to start of the construction. It is imperative that the clearance letter
is obtained from JKR for planning approval. JKR may require to provide
speeding I no-speeding lanes, road markings and sign boards.
5.5.4.2
5.5.4.3
Excavation permits are required from JKR and MAJLIS DAERAH for any
excavation works within the JKR road reserves. Warning signs shall
also be installed at the appropriate locations.
5.5.5
5.5.5.1
APPLICATION
FOR WATER
SUPPLY
CONSTRUCTION FACILITIES (TCF)
FOR
TEMPORARY
Page:
5.5.5.2
21
5.5.5.3
5.5.5.4
Inspection
When the installation is completed, JBA will inspect whether all
installations are in accordance with approved plans, specifications and
pre-established guidelines.
Representative from JBA must be present to supervise the connection
work to public water main system. This connection work must be
performed by a contractor registered with JBA.
Before performing the connection work, the installation of the pipeline,
meter, storage tank and all ancillaries have to be completed.
5.5.5.5
5.5.5.6
5.5.6
5.5.6.1
Page:
22
5.5.7
to MAJLIS DAERAH
for issue of
(ii)
(iii)
(iv)
(v)
5.5.7.1
Commencement Of Work
ENVIRONMENTAL IMPACT ASSESSMENT - (EIA) report has to be
approved by DOE and written permission shall be obtained for
commencement of work. DOE will normally request that drainage
channels and silt traps are
in place before commencement of
construction.
5.5.7.2
5.5.7.3
Page:
23
5.5.7.5
5.5.7.6
5.5.7.7
However, they
Conditions Of Approval
Noise, water and air pollution must be controlled in accordance with
DOE's condition of approval for the EIA report.
5.5.7.8
Inspection
DOE will inspect the waste treatment plant, incinerator and fuel burning
equipment. They will also ensure that the conditions of EIA approval
has been met and monitoring facilities during operation of the plant are
in place.
5.5.7.9
5.5.7.10
Blasting Approval
Installation of blasting equipment and operation require DOE approval.
Unapproved blasting medium will not be used by contractor nor
subcontractors.
5.5.8
4-
Page:
5.5.8.1
24
5.5.8.2
5.5.8.3
5.5.9
5.5.9.1
location plan
plot plan showing location of substation
single line diagrams
installed maximum demand load and normal operating loads
date required
duration of electric supply
Form A together with the above documents shall be submitted for TNB's
approval by contractor.
If the temporary power supply
license from JBEG is required.
intake
is at 11 kV, an approval or
Page:
5.5.9.2
25
5.5.9.3
5.5.9.4
5.5.9.5
5.5.9.6
Supervision Of Installation
For large power consumer, the registered professional engineer or his
representative must supervise the installation of the wiring and
equipment. Supervision and completion certificate, Form G, shall be
submitted to (JBEG) after the electrical installation work has been
completed.
5.5.9.7
Page:
26
5.5.9.9
5.5.9.10
5.5.9.11
Energization
The presence of a registered professional engineer or his representative
and the electrical service engineer shall be required at site during the
energization of electricity supply by CUF. The representative from
CUF needs to be present to energize the electricity supply for the first
time.
5.5.9.12
No Objective Letter
After having reviewed the above mentioned documents and drawings,
JBEG and CUF will issue a No Objection Letter for the overall
Installation/wiring to MAJLIS DAERAH.
However, permission to construct substation is obtained from MAJLIS
DAERAH.
5.5.9.13
Page:
27
5.5.9.15
Operation Of Generators
To operate any generators of capacity 100 kVA and above, approval
has to be obtained from JBEG. The necessary documents for approval
shall be submitted by Contractor for registration with JBEG.
5.5.10
5.5.10.1
5.5.10.2
5.5.10 .. 3
Design Approval for Telephone Pit, Manholes and Building trunking line.
The following documents are required :
Site & location layout indicating all the external telephone
manholes and ducting works.
Single lines schematic diagram of the telephone distribution
system.
Floor telephone trunking layout (Internal telephone system) for all
buildings.
5.5.10.4
Inspection of Manhole
When the manholes are constructed, request for inspection shall be
made to TMB who will inspect to check whether all installations are in
accordance with approved plans, specifications and pre-established
guidelines.
5.5.10.5
Page:
5.5.11
5.5.11.1
28
Contractor and vendor shall assist the Owner to apply the permit to use {"
and register all wireless equipment in the plant and submit application ~
required to obtain the necessary frequencies wave-band.
5.5.12
5.5.12.1
5.5.12.2
5.5.12.3
Inspection
After completion of construction, JPP will inspect that the sanitary
system has been constructed according to Ministry of Health (MOH)
requirements.
5.5.13
5.5.13.1
5.5.13.2
Page:
29
Hazardous Chemicals
Handling of hazardous or poisonous chemicals, if any, must be
undertaken by a person ceritified by the Ministry of Health. Only with the
availability of such a person will the license be issued to import
chemicals.
5.5.13.3
5.5.14
5.5.14.1
5.5.14.2
5.5.14.3
5.5.14.4
Operation License
During operation of the plant, the .Owner shall maintain this license for its
personnel.
Page:
5.5.14.5
30
Safety Inspection
AELB officers will inspect the safety implementation to see whether
everything is in accordance with approved plans, specifications and
pre-established guidelines which cover handling, storage and usage of
radioactive materials.
5.5.15
5.5.15.1
5.5.15.2
5.5.16
Transportation permit for over dimensional equipment.
This involves liaison with various authorities such as JKR, TMB, TNB,
MAJLIS DAERAH and Police.
It shall be done by the forwarding agent for imported equipment and by
the suppliers/vendors for local equipment.
5.5.16.1
Any of the authorities are at the liberty to visit the site at anytime to
check that the construction is proceeding in accordance with local
regulations/requirements or to investigate any complaints from third
parties. Examples are :
6.0
6.1
The relevant lead discipline engineers and the Permit Controller are responsible to
ensure that the Statutory approvals as stipulated in this procedure are well understood
and implemented properly. It is important to note that any unnecessary delay in
documentation submission and authority approvals may subsequently jeopardize the
overall project schedule and the Mechanical Completion of the constructed facilities.
Page:
31
6.2
The official distribution of this procedure shall be handled via the controlled copies list
which shall be maintained by the QA Department. The updating of this procedure is
encouraged for continuous improvement purpose provided that it is agreed by the Permit
Controller.
6.3
The status report (Attachment 1) shall be updated monthly by relevant lead discipline "'
engineers and the permit controller.
d
7.0
INTERFACE COORDINATION
Page:
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 1
STATUTORY AUTHORITIES APPROVAL STATUS REPORT
ATTACHMENT 1
PERMIT SCHEDULE
Cui.Qffllole
Pnp.llly
L
NO.
SUIJI!CT
APPLICANT
(NOTE
S
(NOTI! 1)
Z)
DRAWINGS
ISSUE DATI!
DESIGN
CALCULATIONS
ISSUI! DATI!
12..J1.1.99
12..J1.1.99
FOIUIS
TEST I
SYSTEM
RI!PORT
OWNU
SIGNATURE &
STAMP
APPLICATION
SUIIIoiSSION
DATI!
AUTHOitiTY
APPROVED
REQUIRED
DATI!
01Dec>89
01-Mor..OO
I'I!LD
REQUIRED
DATI!
01-.1111-
1.1
VENDOR
1--;~,-+----.f-----+----.f----+----l-----.f----+-----l
1.2
PnmlnVossel AppnMIJ(Firesendllnflnld)
VENDOR
f-'F:-+----+------+-----+-----+----1-----+-----+------l
1.3
VENDOR
1---;F;-t----t-----+----t----+-----t-----t----+----j
1.4
~onofRegl-ofl'nmlnV- Approwl
VENDORITPC
j--'F;--J----+-----t-----t------t----+------t----+-----f
1.5
DOSH Hylto Tosl Witness lorLocdy FobrtceledVHselul Shop Form JI<J 127
VENDOR
P
~-99
01N....SS
01-0ec-99
j--'F;--J----+-----t-----t------t----+------t----+-----t
1.8
F&S
TPC
1---~;--ll-------j-------t-----t-----j-----t------t-----+----i
1.7
F& S
TPC
P
:zG.Dec>99
01-.1....00
01-Mor..OO
f--'~::--1f-----l------+-----l------l-----+-----+----+------l
1.8
VENDORfll'C
f-C~:-f----+-----if-----f----+----+-------t----+------1
1.9
F&S
TPC
t--'~;--]f-----t-------t-----t-----l------t-----+----+------l
1.10
TPCIRBC
!---;F;-t----+------11-----,l------+----+-------t----+-----l
1.11
TPCIRBC
t--'F::--1----+-----I-----I-----+----+------t----+-----t
1.12
TPCIRBC
1---;F;-t----t-----+----t----+-----t-----t----+-----l
1.13
F&S
TPCIRBC
j--'~;--J----+-----t-----t------t----+------t----+-----t
1.14
AppnMIJiolnDI~Pipelneo
OWNERITPC
f--;F:-f----+-----1-----f----+----+------+----+------l
1.15
OWNERITPC
p
01~
01-.'IUg-00
~
1--'F;--l----+-----t-----t------t----+------t----+------t
JG.Au!l-99
01-Jen.OO
1s.Mor..OO
01-Apr..OO
:zs..u-99
:ZS..U.99
01--'-00
1s.Mor..OO
01-Apr..OO
JG.Au!l-99
30-A&Q-99
010.0.99
01-Mor..OO
2().0.0.99
20-Sep-99
:zG.Deo-99
01-.1....00
01-<>cl-99
01-.1....00
01-Mor..OO
01-0ec-99
01-Mor..OO
01..J<I.99
1~
1S.FIIIHIO
01Mor..OO
01~99
01-<>cl-99
1:>-AIIr-00
01~99
PERMIT SCHEDULE.123
JG.Au!l-99
15-.1111-00
01NOY-99
1:>-NOY-99
Page 2
REMARK
ATTACHIIENT1
PERMIT SCHEDULE
cut.otr Dll
Pnp.lly
NO.
SUBJECT
L
f
(NOTE
APPLICANT
DRAWINGS
ISSUE DATE
2)
(NOTE1)
1.18
OWNERITPC
p
F
DESIGN
CALCULATIONS
ISSUE DATE
FORMS
TEST/
SYSTEM
REPORT
OWNER
SIGNATURE&
STAMP
APPLICATION
SUa.ss!ON
DATE
AUTHORITY
APPROVED
REQUIRED
DATE
I'II!LD
REQUIRED
DATE
01..JI>O
01~
16-Sep-00
01..JI>O
01-AIVOO
16oSefHJO
1s-Fob-OD
1!>-May.OO
01-JUn.UU
1!>-JIIIM)O
1!>-MIIM)()
01-Apr.OO
1!>-JIIIM)O
1!>-MIIM)()
01-Apr-oo
1!>-Deo-99
01-Mor.OO
01-JIII>-01
01-Apr-()1
01-Dec>OO
01-JIII>-01
01-Dtc-99
01-Mor.OO
01-Mor..01
01-Apr-()1
REMARK
1.17
OWNERITPC
p
F
A
1.18
TPC
p
F
A
1.19
TPC
1.20
TPC
p
F
A
p
F
A
1.21
OWNERITPC
1.22
TPC
1.23
TPC
p
F
A
p
F
A
p
F
30-Apr-()1
1.24
OWNERITPC
1.25
TPC
PERMIT SCHEDULE.123
p
F
A
p
F
A
Page3
3().Ap'..()1
)
ATTACHIII!NT1
PERMIT SCHEDULE
Cut.Qif c.lo
Pnp.lly
ADIJn>vedlly
,
L
NO.
SUBJECT
APPLICANT
(NOTE
DRAWINGS
ISSUE DATE
2)
(NOTE1)
~
IHIIIilifijHI kit~"!HI!H:i.J .
2.1
2.2
.u.h~ 1m . d
1!~~~.11 ~\~~L~IHim;uhmu;,;~;ij;,!!i!lll,
i.~ ~l~l.l l l~ l l ~ ~ ~ ~ ~ ~1~1 ~1 1 1 1 1 1 l l ~l l il l ~ ~ ~l ~l l~l l l~l~f!~!lililil ~l!l~l~li~l'
-loltorfcwCCIIIIIrudlonof_F_
T..,.,arory FociiUH & Silo Offtce Fn
tlgNing--
s
s
OWNERITPCIRB
TPC
DESIGN
CALCULATIONS
INUEDATI!
FORMS
TEST/
SYSTEM
REPORT
OWN!!It
SIGNATURE&
STAMP
APPLICATION
su-.oN
DATI!
AUTHORITY
APPROVI!D
REQUIRED
DATE
TPC
2.4
TPCIRBC
@!i!ii~tiliiHmii!~i~~!!iili~!i
imiii:'iii!P.ii~'ii'i~'m';i~ii
illm!!l;ill,,~!ltt"!l!i!l 1 i!!!.!
p
F
A
p
F
01MIY.!III
NA
NA
111-ADM19
26-Apr-99
29-Apr-99
1~oy-99
1:>-Moy..!lll
p
F
01..JII>.99
:z&.Apr-99
03-Moy.99
-oy.!lll
0 ......99
,....,.....
:z&.Apo-99
03-MoY-99
0&-MIY-99
01.JIJ.99
lo-AIJ!I-1111
p
F
A
2.5
2.8
Sofoly PNiosophy
TPCIRBC
p
F
1"""111'99
01..Jur>.99
1().Apr-99
NA
p
F
01oJUHXJ
01-8ep-OO
01.JIJ.OO
01-8ep-OO
01.JIJ.OO
01-8ep-OO
01.JIJ.OO
01-8ep-OO
NA
Mochlnlcel & Elec:lrlcel Ootlgn Al>l>fowl (Fire Fl~ System I Bulldngs & Field Slruc:hns) :o) Form C1, C2, C3 Fire Doors, Emorgoncy lJdll & Eldl (KeUor) SIIJI
TPCIRBC
TPCIRBC
TPCIRBC
TPCIRBC
o) Oporllllng Morul
OWNERITPC
p
F
A
p
F
A
p
F
A
p
F
01.JIJ.OO
NA
OWNERITPC
p
F
Moy.w
A
g) Emorgoncy R - Pion (Finol)
OWNERITPC
2.7
Mochlnlcel & Elec:lrlcel Construction ApprcMII (Fire Fl!ll*v System /llulldngo & Field Sllucllns)
lnsiJod!onfcwlnst.I!UIIIna
TPCIRBC
2.8
TPC
p
F
01..JII>.OO
p
F
01-Fob-00
1:>-Mor-oo
01>-JijlroiJU
01-JII-00
01-501>-00
liHiOjHIU
01.JIJ.OO
01-501>-00
""'""'-u1
01-Doc-00
01..Jo...01
OlMiy.Q1
F
A
2.9
Flnlllnsptdlcn
TPCIRBC
p
F
A
p
2.10
TPC
F
A
PERMIT SCHEDULE.123
RI!IIARK
2.3
fiELD
REQUIRED
DATI!
Page4
CoiTC*IIod
ATTACHMENT 1
PERMIT SCHEDULE
c:,..otrDito
Pnp. By
NO.
(NOT!
APPLICANT
SUBJECT
3.1
IProject Bdoftng
OWNERITPC/RB
3.2
TPC
3.3
IC:-cmeofFinon forT......-yFac:lltles
TPC
3.4
TPC
3.5
PIIng
TPC/RBC
3.6
TPC
TPCIRBC
~~-.gsandcalc:Uatlon-nlon(C-eandstool)
TPC/RBC
Roads
TPC
er.Jnage System
TPC
TPC
TPC
3.7
3.0
3.9
DRAWINGS
ISSUE DATE
2)
PERMIT SCHEDULE.123
REMARK
PageS
CarqJielod
ATTACHMENT 1
PERMIT SCHEDULE
ru.otrDillo
Pnp. By
NO.
SUBJECT
IAPPLICANT
(NOTE
2)
(NOTE1)
3.10
TPCIRBC
TPCIRBC
TPCIRBC
TPCIRBC
TPCIRBC
TPC
DRAWINGS
ISSUE DATE
TPC
PERMIT SCHEDULE.123
PageS
DESIGN
CALCULATIONS
ISSUE DATE
fOIUIS
TEST/
SYSTEM
REPORT
OWN Ell
SIGNATUllE
STAMP
APPLICATION
SUIIIIISSION
DATE
AUTHOIIITY
APPROVED
REQUIRED
DATE
FIELD
REQUIRED
DATE
RI!IIAIIK
ATTACHMENT 1
I"ERMIT SCHEDULE
CUI.otrDote
Pnp.ly
SUBJECT
NO.
L
f
I
IAPPliCANT
(NOTE
2)
(NOTE11
TPC
TPC
TPCIRBC
TPC
TPC
SUBCONTRACTOR/
5.6
I
I
5.7
5.5
DESIGN
CALCULAllONS
ISSUE DATE
FORMS
TEST/
OWN lit
APPIJCAllON
sYSTEM
SIGNATURE&
SUBIISSION
REPORT
STAMP
DATE
AUTHOIUTY
APPROVED
REQUIRED
DATE
FIELD
RIQtnRID
DATE
RI!IIAitK
TPC
TPC
6.3
!Inspection
TPC
6.4
TPC
PERMIT SCHEDULE.123
DRAWINGS
ISSUE DATI
01F.01
Page7
)
ATTACHMENT 1
PERMIT SCHEDULE
Clll.otf Dale
Pnp.By
NO.
(NOTE
APPLICANT
SUIJICT
OWNERITPCIRB
OWNERITPC
with Erwlrormonlln1>oc1Assessmenl~ons
OWNERITPC
7.4
TPC
7.5
OWNERITPC
7.6
OWNERITPC
7. 7
OWNERITPC
OWNERITPC
F&S
OWNERITPC
TPC
8.1
I Project Briefing
OWNERITPC
8.2
TPC
8.3
TPC
PERMIT SCHEDULE.123
DRAWINGS
ltEIIARK
ISSUE DATE
2)
I F I
C........od
F I
TBA
--
C........od
PageS
ATTACIIMI!NT 1
PERMIT SCHEDULE
CUI.otr Dille
Pnp. By
NO.
,L I
SUBJECT
(NOTE
APPLICANT
DRAWINGS
ISSUE DATE
2)
(NOTE1)
DESIGN
CALCULATIONS
ISSUE DATI
FORMS
TEST/
OWNER
SYSTI!II
SIGNATURE&
STAMP
REPORT
AUTHORITY
APPROVED
REQutR!O
DATE
APPLICATION
SUBiaSION
DATE
fiELD
REIIAIIK
REQUIRED
DATI!
TPC
I
9.5
ISitoTottRoport~
TPCIRBC
TPCIRBC
SUBCONTRACTOR
SUBCONTRACTOR
SUBCONTRACTOR
9.6
9.7
OWNERITPCI
SUBCONTRACTC
9.8
Rogl-onofSibtlatlon
OWNERITPCI
SUBCONTRACTOR
9.11
SUBCONTRACTOR
OWNERITPCI
I F I
OWNERITPCI
I F I
Hold
Hold
Hold
Hold
SUBCONTRACTC
9.12
Slbmlnlon of Borong G.
~lion
OWNERITPCI
F I
I F I
SUBCONTI
9.13
9.14
PERMIT SCHEDULE.123
s
I
OWNERJTPCI
TPC
Page9
ATTACHIII!NT1
PERMIT SCHEDULE
Cut-Oil' Dolo
Pnp. By
APPLICANT
SUBJI!CT
NO.
(NOTI!
21
DRAWINGS
ISSUI!DATI!
s
s
OWNER/fPC
TPC
TPC
TPC
TPC
ltfT......... fPennoneotF-.
10.3
I0~ Appravll far Ceble PI!, Mllllhole, BUidr1l Tnndng l.N & Eldemol wlrtng
TPC
TPC
TPC
11.2
PERMIT SCHEDULE.123
Page 10
lti!IIAitK
ATTACHMI!NT 1
PERMIT SCHEDULE
CW.otfDito
Prop. By
(NOTE
APPUCAIIT
SUIJI!CT
NO.
21
OWNERITPC
TPC
JPP
TPC
TPC
TPC
TPC
TPC
DRAWINGS
ISSUI!DATE
12.3
PERMIT SCHEDULE.123
Page 11
REMARK
ATTACHMENT1
PERMIT SCHEDULE
cut.Qff o.t
Prop. By
NO.
SUBJECT
,L IAPPLICANT
(NOTE
2)
(NOTE1)
15.4 ITrud<Welghlscele
PERMIT SCHEDULE.123
DRAWINGS
ISSUE DATE
OWNERITPC
DESIGN
CALCULATIONS
ISSUE DATE
FORMS
TEST/
SYSTEM
ltEPORT
OWHEit
SIGNATURE&
STAMP
APPLICATION
SUBIISSION
DATE
AUTHORITY
APPROVED
REQUIRED
DATE
PII!LD
REQUIRED
DATE
REMARK
TOYelffY
Page 12
)
ATTACHMENT 1
PERMIT SCHEDULE
c:ut.QifDIIe
Pnp.ly
L
NO.
SUBJECT
f
I
IAPPLICANT2)
(NOTE1)
19.1 IApplcattanForEla:lseU..,..
19.2 ICUstodyProcllctMovemenlllloplpelnH
(NOTE
DRAWINGS
ISSUE DATE
I c:ALC:ULATIONI
DI!IIGN
ISSUE DATE
FORMS
TUT/
IYIT!M
REPORT
OWNER
SIGNATURE&
STAMP
APPLICATION
IUBIUSION
DATE
DATE
I'I!LD
REQUIIIED
REIIAitK
DATE
TBA
OWNER
TBA
NOTE2:
NOTE3:
L- LOCAL
TBA- To Be A<Msed
I-STATE
F-FEDERAL
VENDOR
SUBCONTRACTOR
PERMIT SCHEDULE.123
REQUIIIED
OWNERITPC
TPC:IRB
NOTE1:
AUTHORITY
APPROVED
Page 13
ATTACHMENT 2
INTERFACE ORGANISATION CHART & DISCIPLINE RESPONSIBILITY
(REFER SECTION 5.1)
Page:
1
")
ATTACHMENT 2 A
BOMBA
DISTRICT
COUNCR. (MDK)
JKR
JBA
JPS(DIO)
DOE
DCA
JPP
TNBICUF
JBEG
TMB
SIJRliHANJAYA
TELEKOMUMSAII
DAN MULTIMEDIA
MALAYSIA
DOH
AELB
SIRJM
CHEMISTRY
DePARTMENT
JABATAN
PERANCANG
PERMIT CONTROLLER
)
ATTACHMENf28
lOMBA
DISTRICT
COUNCIL (MDK)
JKR
JBA
JPS(DID)
DOE
JPP
TNM:IIF
JII!Q
TMI
~YA
TILEKOIIUNIIIA8I
DAN IIUL'IIMEDIA
IIALAYIIIA
DDII
AI!LI
CHEIIIITRY
DEPARTIII!NT
.lAllATAN P!RANCANO
li I
j !i
;~
Iii
I ~~
I
~
II
I
' '
gi
I!
I r !I li!
e
IIi
n:1
!II!
~
'lr
;;;;
IP
-r;
I
rE
I<
u n
~ il
i
I
~~~
z~
IP
i~
~s
~
I
..~
"'~
~~
;II
1:li
;~
~e
~~
!~
!il
!
I!
"'
II II
u
II
. II
~l
I
iI
II
qQtlll
;~~i
I!
lj
If
II
I
~I'
..
.. ill
I!
,..c:
.....
iS
"'3
"'Ill
S!
IS
....
c:
..,z
Page:
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT2D
THE SUBMISSION FLOW CHARTS
j:2..)
OBTAIN PREVIOUS
REGISTRATION NUMBER
FROM FACTORY OWNER
AND FILL IN THE FORM
JKJ 105
EXTENSION
NO
FURNISH FURTHER
INFORMATION QUIERIEO
BY 00.5\\
~YES
NO
I YES
"
VENDOR TO ARRANGE
WITH DOSH FOR
THE INSPECTION & APPROVAL
EXTENSION
UPON COMPLETION
BUT PRIOR COMMISSIONING,
FILL UP JKJ 106
&RELEVANT
FURNISH FURTHER
INFORMATION
QUIRED BY OOS\-\
YES
BOMBA COMMENT
YES
NO
NO
NO
MAKE CORRECTION
DISTRICT COUNCIL
NO
<8>
~
AMENDBUILDINGPLABNASPERMOK
YES
NO
1-------------_..,.---------------.
NO
RECTIFY AS PER COMMENT AND
REQUEST FOR INSPECTION
/_________COM:==M=E=NT~ANO~~RE~SU~BMIT~~---------------J
~--------~~rV~MOK~~----J
NO
NO
REVISED AS PE
COMMENT
NO
AMMENDAS
PERJBA
COMMENT
NO
AMMENDAS
PERJBA
YES
COMMENT
NO
AMEND AS
PER JPS COMMEN
NO
RECTIFY AS
PER JPS COMMENTS
CLIENT TO SUBMIT
STUDY ON EIA TO DOE
YES
NO
YES
NO
REVISED/AMEND
ASPER DOE
COMMENT & RESUBMIT
NO
UPON COMPLETION
ARRANGE WITH DOE'S
OFFICER FOR INSPECTION
NO
NO
NO
RECTIFY AS
PER DCA COMMENTS
NO
AMEND AS PER
JPPCOMMENTS
NO
RECTIFY AS PER JPP
COMMENTS
NO
FURNISH FURTHER
INFO AS REQUESTED
ASSIST. CLIENT
TO APPEAL
TOTNB/CUF
AGREED
GG
NON
COMPLY
COMPLY
ADVICE CLIENT
TO PROVIDE BG OF
RM 20,000 TO TNBt
HELP CLIENT
ON LEASING AGREEMENT
A1
SUBMIT AlB : /
FROM TO TNB/c
C1
1 1
I
A3
YES
FURNISH FURTHER
INFO AS REQUIRED
NO
REVISE
SETTING VALUE
ARRANGE SITE
TEST ON ELECTRICAL
INSTALLATION
FAIL
PASS
YES
COMPLY ANY
COMMENT FROM
TNB.
STANDY
CONTINUOUS
NO
FIRNISH FURTHER
INFORMATION AS REQUESTED
YES
FAIL
FURNISH FURTHER
INFORMATION AS REQUIRED
NO
FURNISH FURTHER
INFORMATION/MODIFICATION
AS REQUIRED BY TMB
YES
NO
YES
ADVISE/ASSIST CLEINT TO
SUBMIT OFFICIAL APPLICATION
FOR TELEPHONE LINES
j
f_
NO
NO
AMMEND AS PER
CHEMISTRY DEPT.
YES
NO
YES
RECTIFY AS PER
CHEMISTRY DEPARTMENT
COMMENTS
NO
AMMENO AS PER
JPBD COMMENTS
NO
RECTIFY AS PER
JPBO COMMENTS
YES
Page:
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 3
AUTHORITIES SUBMISSION RESPONSIBILITIES
Page:
Page:
STATUTORY AUTHORITIES APPROVAL PROCEDURE
ATTACHMENT 4
GUIDELINES FOR SUBMISSION OF PRESSURE VESSEL DOCUMENTATION TO DOSH
(REFER SECTION 5.5.1.1)
Page:
2
ATTACHMENT 4
GUIDELINES FOR SUBMISSION OF PRESSURE VESSEL DOCUMENTATION TO DOSH
DEPARTMENT OF OCCUPATIONAL SAFETY AND HEALTH (DOSH)
APPROVAL OF PRESSURE VESSEL
Pressure vessels that are to be utilized in Malaysia have to comply with the Factories and
Machinery Act, Pressure Vessel Regulations. For overseas manufactured vessels design,
manufacturing and inspection records are to be submitted to DOSH for approval and
rehydrotested at site and witnessed by DOSH.
We summarize below the essence of DOSH requirements and attached herewith the regulations
and schedules.
AAA-GENERAL
1.
Pressure vessels means every vessel that is operated above and/or below atmospheric pressure
including package equipment components. Piping components and atmospheric Storage Tanks
are excluded.
2.
All the pressure vessels (reactors, towers, heat exchangers, vessels, filters, etc). are subject to
DOSH approval. This includes calculation, drawings, inspection and testing documentation. This
is applicable for vessels locally fabricated and/or imported.
3.
Design code to be used shall be one of those listed on the third schedule of Factories and
Machinery (Pressure Vessel) regulation (attached) and the materials to be employed shall be as
per listed materials in the relevant codes. Equivalent materials can be employed with the
exception that when A.D. Merkblatter code is chosen, Din material are to be utilized.
4.
5.
The units of measurement are Kilopascal or bar for the pressure and millimeters for length I
thickness.
6.
Approval for design from DOSH will normally be approximately two to three months after
submission of application. However DOSH would consider a request to expedite if reasons are
made known.
7.
Vessels fabricated locally are to be fabricated by a fabricator with a manufacturing license from
DOSH. Any vendor can be chosen from abroad provided that the vessels have Third Party
certification. Third Party is to be chosen from the fourth schedule of the Pressure Vessel
Regulations.
8.
PQR for locally fabricated vessels are to be witnessed by DOSH and for imported vessels, any
Third Party (chosen from the fourth schedule) witness is acceptable. WPQ witnessed by Third
Party is acceptable.
Page:
BBB- DRAWINGS
1.
2.
A space is to be provided on the drawings for DOSH stamp of approval. This space shall be a
white block 90 x 120 mm, above the title block and shall be visible when the drawing is folded.
3.
The information that are to be shown on the drawings are indicated on Page 9.
In particular the following points are important :
-
All the information and details shall be on the drawings e.g. the welding details.
DOSH does not accept information on the documents (e.g. welding key form).
The welding details shall make reference to the figure of the code (e.g. UW16.1.c), to
the applicable WPS and to the AWS classification of the welds metal.
The location of nozzles for safety valve and pressure gauge shall be identified.
The construction drawing shall contain the reference to the other applicable drawings.
The third party chosen shall be one of those listed on the fourth schedule of FMD regulation.
2.
Malaysian vendor shall have DOSH manufacturing licence for pressure vessels.
(ii)
Third party Certification is not strictly required by the regulation but it is strongly recommended
by DOSH to submit (for their approval) drawing and calculation already approved and stamped
by Third Party : e.g. speeds - up DOSH approval. It is a common practice to follow this
procedure.
(iii)
Page:
(ii)
No limitation for the selection of the vendors providing that the vessels, have a third party
certification as explained below.
(iii)
Third party involvement and certificate is required for all imported vessel.
(iv)
All the documentation including welding documentation, material test certificates, N.D.T
reports, dimensional reports, etc. shall be stamped and signed by third party.
It is requested to include on the dossier the in-plant check list employed internally by the
vendor to follow closely the fabrication and all the dimensional reports including the
intermediate reports.
(v)
It is not required for third party to witness the mechanical test of Raw Materials in the
mill unless required by code, but it is required that all the component employed for
the pressure parts are clearly stamped by third party near to the heat number. Third
party to decide if witness of the marking transfer is necessary.
But all
Page:
l"'
1.
Each letter has the name and the telephone number of the person to be contacted.
2.
3.
4.
5.
6.
7.
Each detail drawing of component and welding is noted with corresponding reference on plan.
8.
Each document which is to be submitted to DOSH must be written in a language that is easily
understood and be translated to English, if necessary.
9.
Each change or addition of information to the plan that has already been submitted must have
revision (status).
EEE -VARIOUS
,......
1.
2.
3.
4.
5.
6.
Normally the vessels are registered by DOSH. This means that during the service they are
subject to periodical inspection by DOSH. For items not critical and/or small items included in
the packages the exemption from the registration can be requested. DOSH will decide on case
by case basis.
Page:
6
THIRD SCHEDULE
DESIGN CODES
Regulation 7 (2) (iii)
1.
2.
British Standard No 1500- Fusion-welded Pressure Vessels for the Chemical and Allied Trades.
3.
4.
5.
6.
7.
8.
9.
British Standard No. 1515 - Pt. 1 - Fusion-welded Pressure Vessels (Advances Design and
Construction for use in the Chemical, Petroleum and Allied Industries).
10.
11.
12.
Standards Association of Australia Code No. B-55- Cast Iron Steam Jacketed Pans.
13.
14.
Section VIII (unfired Pressure Vessels) of the Boiler and Unfired Pressure Vessels Code of the
American Society of Mechanical Engineers.
15.
Rules for the Construction of Steel Boilers and other Pressure Vessels of the Associated Offices
Technical Committee, Manchesters, England.
16.
17.
Page:
7
19.
(b)
(c)
(d)
(e)
(f)
(g)
20.
21.
22.
Page:
8
Three copies of design drawing of appropriate scale and size, complete with the followings
i)
ii)
iii)
iv)
v)
Main dimensions
Welding details
Services of Nozzles & Orientation of Nozzles
Material specifications
Data such as 'design pressure' design temperature', working pressure', working
temperature, test pressure, design code, working media, volume, corrosion allowance,
welding factor, flange rating and others.
vi) Detail drawing of component and weld, on which is noted with reference I configuration.
vii) Other necessary informations
,.....
b)
Location of safety features such as pressure gage and safety valve (Please submit P & ID if
the safety features are not installed on the vessels.
D
D
D
c)
d)
Material certificate
e)
Manufacturer Data Report which details size and dimension of the pressure retaining
components, design pressure, design code, material certificates, welding procedures and report,
in-plant check list, non-destractive/destructive test if any), hydrostatic test, manufacturer 's
serial
number and others.
f)
Design, fabrication, inspection and testing of this vessel shall be in accordance with the latest
edition of the code recognized by this Department.
g)
Each document submitted must be written in a language that can be understood. Please
translate, if necessary.
h)
Items (a},(c),(d) and (e) must be checked and endorsed by inspecting authorities
recognised by this department.
Further informations with regards to the above and other can be referred to factory and
Machinery Regulations 1990 (Steam Boilers and Unfired Pressure Vessels) and Factory
and machinery Act 1967.
D
D
b)
Reference letter No :
c)
Application date :
d)
e)
f)
g)
Model Of available)
h)
Serial No:
i)
Drawing No:
j)
k)
Volume:
I)
m)
n)
Test pressure :
o)
Medium:
p)
q)
r)
Page:
9
Page:
10
DESIGN DRAWING
a)
b)
c)
List of material for major component, including gasket and bolt and nut.
d)
e)
f)
g)
h)
Joint Efficiency
i)
Service of nozzles
j)
Orientation of nozzles
k)
Flange size/table
I)
Medium
m)
Capacity {volume)
n)
Corrosion allowance
o)
p)
Proper Scale
q)
r)
s)
Page:
11
FOURTH SCHEDULE
INSPECTION AUTHORITIES
(Regulation 7 (2) (iv))
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
The London Guarantee and Accident Co. Ltd., New York, U.S.A.
16.
17.
18.
The General Accident Fire and Life Assurance Corporation Ltd., England
19.
20.
21.
22.
The Hartford Steam Boiler Inspection and Insurance Company, Conn:, U.S.A
24.
25.
26.
27.
28.
29.
30.
Chief Inspector of Boilers, Dept. of Labour and Industry, South Australia, Adelaide.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
Page:
12
45.
46.
47.
48.
Page:
13
Provided that the end user of the steam boiler or unfired pressure vessel is any one of
the Shell group of Companies or Companies associated with Shell in Malaysia.
!"""
49.
50.
51.
52.
53.
Germanischer Lloyds
54.
55.
Shanghai, Boiler & pressure Vessel Inspection Institute, Shanghai, Peoples Republic of China
Page:
14
are in
accordance with
(being a code named in the Second/Third Schedule to the aforementioned Regulations) for a design
pressure of ..................... pounds per square inch. The workmanship is good.
All materials used in the construction, in respect of chemical composition, quality, process of
manufacture, number and nature of tests, inspections and manufacturer's certificate, comply
with the provision of the above mentioned code. (1}
On completion the Steam Boiler/Unfired Pressure Vessel was tested hydrostatically to
................................................ pounds per square inch for a period of ............................. minutes in my
presence on ............................ .
It showed no sign of weakness and found tight and sound in every respect at that pressure. It was
stamped by me as follows :
ATTACHMENT 5
CHECKLIST FOR APPLYING PERMISSION FROM DOSH FOR PIPING INSTALLATION
Page:
1
1.
2.
3.
4.
5.
Letter of Award
i. From Owner to Main Contractor
ii. From Main Contractor to sub-contractor
6.
7.
8.
9.
10. List of equipment (please refer to Attachment PTI (pipe) para 4.8)
11. Specifications of design :
List of applicable code
Specification of the material (medium) to be used
iii. Specification of pipe's material/material certificate
iv. Data schedule of pipe's design
v. Calculation for :
a. Internal pressure
b. Wall thickness
c. Pressure drop
d. Bending
e. Lower in
f. Crossing - road/river/railway/drain/culvert
vi. Detail of Safety control equipments and functions
i.
ii.
Page:
2
Page:
3
14. Procedure :
i. Quality Control
ii. Construction
iii. Hydrostatic test
iv. Commissioning
15. Safety & Health Plan
Note : Please thick on each item (above) if the documents are inside the application file. This checklist
must be filed together with the application to DOSH.
Page:
1.
Bagi memohon kebenaran memasang sesuatu projek, pihak pemohon hendaklah membuat
permohonan secara bertulis kepada JKKP bagi mendapatkan nombor pendaftaran (JKKP/KSM-HK
300/.....) dengan menyatakan tajuk projek dengan sejelas yang mungkin.
2.
Sebarang urusan dengan Jabatan ini (surat-surat, dokumen-dokumen prosedur, sijil-sijil ujian dan
lain-lain) hendaklah dinyatakan nombor pendaftaran di atas. Sebarang urusan tanpa disertakan
nombor pendaftaran tidak akan dilayan.
3.
Nota: i.
Sekiranya pemunya memohon melalui wakilnya; satu sural serah kuasa {nyatakan
kuasa-kuasa yang diberi) kepada wakil hendaklah dikemukakan oleh pemunya kepada
Jabatan ini.
ii.
4.
Page:
5
4.3 Satu salinan surat setuju terima (Letter of Award) dari pemunya kepada Kontraktor Utama serta dari
kontraktor utama kepada sub-kontraktor Oika ada).
4.4 Nama dan alamat pemunya tanah 'right of way'/jeti/'support structure'. Nyatakan pihak yang
bertanggungjawab mengenai penyelenggaraannya.
4.5 Jadual pelaksanaan aktiviti-aktiviti projek.
4.6 Pelan Laluan Talian Paip dan Gambarajah Talian Aliran (yang telah disahkan/diluluskan oleh
pemunya/perunding termasuk :
a.
b.
c.
d.
e.
f.
g.
h.
i.
Bil.
Pelan kunci dan pelan lokasi. Bagi pelan lokasi, plan plot dan pelan tapak, jika terdapat talian
paip sedia ada hendaklah ditunjukkan (samada sambungan atau yang berhampiran}. Sila
nyatakan nombor rujukan Jabatan terdahulu (JKKP/KSM-HK300/....}bagi talian paip yang sedia
ada.
Pelan index untuk route & profile drawing.
Detail AFC route & profile drawing.
Approved for Construction for Engineering Drawing.
Schematic Piping & Instrumentations Diagrams - untuk keseluruhan talian paip.
Piping fabrication/welding detail.
Pipe supporting element (structural attachments and fixtures) detail.
Vaults and crossing detail- road, railway, river, drain, culvert.
Pressure vessel (filter, scraper trap, pig launcher dan receiver ) - KELULUSAN rekabentuk
yang berasingan bagi setiap model perlu diperolehi. Senaraikan dalam jadual kesemua
Pengandung Tekanan Tak Berapi yang terdapat dalam sistem talian paip tersebut.
Jenis
Pengandung
Lokasi
Pengandung
Kod
Rekabentuk
Nama dan
Alamat
Pembuat
Nama dan
Alamat
Pemohon
No.
Model
Tekanan
Rekabentuk
Tekanan
Ujlan
Tekanan
Operas!
j.
k.
Lukisan-lukisan lain yang perlukan dan berkaitan. Kesemua lukisan hendaklah disemak dan
ditandatangani (disahkan) oleh pemunya yang bertauliah sebelum diserah ke Jabatan
Keselamatan dan Kesihatan Pekerjaan (JKKP) untuk permohonan kelulusan.
b. Pipe Material Certificate serta Spesifikasi fizikal dan bahan-bahan kimia yang digunakan seperti
gas, petroleum dan petroleum product dan petrochemicals.
c.
Keterangan lengkap mengenai operasi sistem talian paip berdasarkan 'schematic piping and
instrument diagram'. Nyatakan alat-alat kawalan/keselamatan yang ada. Jelaskan ciri-cirinya.
e.
Butiran pengiraan tegasan talian paip desebabkan oleh lain-lain daya dalam keadaan seperti :
i.
ii.
iii.
iv.
v.
f.
Page:
6
g. Senaraikan semua Welding Procedure Specification (WPS) dan nama pengimpal serta
bilangannya yang akan digunakan untuk satu-satu projek tersebut. Semua WPS, Procedure
Qualification Record, Welding Qualification Test dan Welding Repair Procedure hendaklah
disaksikan dan disahkan oleh pihak JKKP. Sambungan kimpalan yang dilakukan mestilah
dikenakan Ujian Tanpa Musnah (NOT) serta disemak dan disahkan oleh badan Pemeriksa yang
diiktiraf oleh Jabatan ini. Pemunya hendaklah menyertakan satu surat pengesahan dari badan
Pemeriksa yang berkenaan sepert contoh surat yang disertakan. Bagi Welding Qualiffication
Test yang melebihi 6 bulan dari tarikh ia diluluskan, borang BP1 yang ditandatangani oleh
pegawai JKKP hendaklah disertakan.
h. Corrosion control - onshore/offshore pipelines, internal/external coatings, buried pipelines,
cathodic protection, etc.
i.
i.
ii.
iii.
iv.
j.
Sila isikan data-data rekabentuk seperti di bawah yang berkaitan dengan projek yang hendak
dilaksanakan.
Page:
7
Jenis
Talian
Paip
Bil.
Klas
Lokasi
Jenis
Pembinaan
Garispusat
NPS
Ketebalan Dinding
(m)
Nominal I Minimum
B.
Bil.
Panjang
Tekanan
Rekabentuk
(pslg)
Jenis
Talian Paip
No.
Tafian
Dari
Hingga
Garispusat
NPS
Anggaran
PanJ8ng (m)
Ketebalan
Medium
Tekanan
Rekabentuk (pslg)