Sunteți pe pagina 1din 27

Thiel Christian 24.09.

2014

CIMAC NMA Norge 2014


ABB Turbocharging

CIMAC NMA Norge 2014


Agenda

ABB Group
October 2, 2014

| Slide 2

ABB Turbocharging in Norway

A200-L for two stroke engines

Engine tunings high pressure tuning method

Retrofit and upgrades 4 stroke

CIMAC NMA Norge 2014


ABB Turbocharging in Norway

ABB NO-SE-DK merged 2013

ABB Group
October 2, 2014

| Slide 3

ABB Scandinavia

Main station Oslo


39 employees

Service engineers

Service coordinators

Logistics

Reconditioning

Sales/ New building

ABB service
stations
Troms
Operative end
2014

ABB service
stations and
sales office

CIMAC NMA Norge 2014


A200-L The next 2-stroke generation

A200-L the dedicated


turbocharger for 2 stroke
engines

ABB Group / Turbocharging

ABB Group
October 2, 2014

| Slide 4

CIMAC NMA Norge 2014


A200-L The next 2-stroke generation

1995

1999

2009

2013

New generation

New generation

New generation

TPL-B

A100-L

A200-L

2000

2005

2010

2015

2011

Upgrade

A100-L37
TPL-B

A100-L

A200-L
new
new
new

ABB Group / Turbocharging

ABB Group
October 2, 2014

| Slide 5

modified

CIMAC NMA Norge 2014


The 6 key effects of A200-L

UP with pressure ratio


UP with volume flow
UP with efficiency

DOWN with first cost


DOWN with service cost
DOWN with fuel consumption

ABB Group
October 2, 2014

| Slide 6

CIMAC NMA Norge 2014


The way we made A200-L
A100-L35

The original 2009

A100-L37

-8%

Introduced 2011

A200-L

-14%

Introduced 2013

ABB Group
October 2, 2014

| Slide 7

CIMAC NMA Norge 2014


How we made the A200-L
new
new

new

ABB Group
October 2, 2014

| Slide 8

modified

CIMAC NMA Norge 2014


Illustrations for constant output

Same output

A180-L35

A275-L

-20% product cost


-25% maintenance costs

ABB Group
October 2, 2014

| Slide 9

CIMAC NMA Norge 2014


A200-L service concept

ABB Group
October 2, 2014

| Slide 10

Continuous high performance from dry-dock to dry-dock

One intermediate visual inspection of key components

Smart and compact design for easy maintenance

Optimized features

Integrated lubrication oil tank

Integrated bearing design

Improved labyrinths for minimum air blow-by and oil blow-by

Improved compressor and turbine cleaning devices

CIMAC NMA Norge 2014


A200-L referances

Large number of turbocharger

1400

A100-L units

400

A200-L units

Ask for A200-L

ABB Group
October 2, 2014

| Slide 11

CIMAC NMA Norge 2014


HPT for MAN engines

Tunings for 2- stroke engines

ABB Group
October 2, 2014

| Slide 12

New vessels optimized for real operating conditions

Slow steaming

De-ratating

Engine tunigns

CIMAC NMA Norge 2014


HPT for MAN engines

Why engine tuning and whats that?

Engine optimizing for lowest fuel consumption at a


given intended load profile of the vessel.

Optimized for high-load (90-100%)

Optimized for part-load (70-90%)

Optimized for low-load (0-70%)

Engine adjustments with shims, timing, coolers, etc.,

ABB Group
October 2, 2014

| Slide 13

Optimized ABB turbocharger specifications

CIMAC NMA Norge 2014


HPT for MAN engines
166,0

SFOC

Engine
MCR (kW)
rpm

164,0

SFOC [g/kWh]

162,0

6G60ME-C9.2
12 400
92

- 5 g/kWh
- 2,2 g/kWh

160,0

158,0

156,0
High Load Tuning
154,0
Part Load HPT
152,0
Low Load HPT
150,0

High Load Tuning


Part Load HPT
Low Load HPT

40%
164,6
161,6
159,6

45%
163,2
160,2
158,2

50%
161,8
158,8
156,8

55%
160,5
157,5
155,5

60%
159,3
156,3
154,3

65%
158,2
155,2
153,2

70%
157,4
155,2
154,7

75%
157,6
156,1
157,1

ENGINE LOAD

ABB Group
October 2, 2014

| Slide 14

80%
157,9
156,9
157,9

85%
158,5
158,7
159,2

90%
159,2
160,7
160,7

95%
160,2
161,7
161,7

100%
161,4
162,9
162,9

CIMAC NMA Norge 2014


HPT for MAN engines

ABB Group
October 2, 2014

| Slide 15

How to tune an engine for part/low load?

exhaust gas bypass (EGB)

engine control tuning (ECT) for electronic engines only

variable turbine geometry (VT)

High Pressure Tuning (HPT)

CIMAC NMA Norge 2014


HPT for MAN engines

The concept:

Increased scavenging air


pressure at SMCR (+0.4
0.5 bar) (two-stroke Miller
timing)

Results in higher
scavenging air pressure at
part and low-load, equal to
EGB/VT tuning

Scavenging air
pressure

ABB Group
October 2, 2014

| Slide 16

CIMAC NMA Norge 2014


HPT for MAN engines
4,75
4,5
4,25

Scav. air pressure bara

4
3,75
3,5

ABB HPT
MDT-L High Load

Pscav. = + 0.5

3,25

MDT-L Low load VT

3
2,75
2,5
2,25
40%

50%

60%

70%
80%
Engine Load

90%

Similar pressure ratio as with VT tuning


ABB Group
October 2, 2014

| Slide 17

100%

110%

Standard Cycle

HPT Cycle
Exhaust
Exhaust

Log

pC

pC

BDC

PO

PO

EVO

pmax

BDC

p
pmax

EVO

Log

Scavenge Pressure

Intake

ABB Group
September 20, 2013 | Slide 5

Intake

EVC

Log V

TDC

EVC

TDC

Scavenge Pressure
Log V

CIMAC NMA Norge 2014


HPT for MAN engines

Benefits of HPT:

Equal or better SFOC compared to VT or EGB

VTG/ EGB not needed

ABB Group
October 2, 2014

| Slide 19

No investment

No maintenance

No breakdown

Combined with all A200-L

High charge pressure

High volume flow

Dual rating possible (part load + low load)

Available on MAN electronic engines (ME) and exhaust


valve control

29 engines delivered with HPT

CIMAC NMA Norge 2014


Upgrades on 4 stroke engines

Upgrades and Retrofit

ABB Group
October 2, 2014

| Slide 20

CIMAC NMA Norge 2014


Upgrade projects: Power station in Kohinoor, Pakistan

VTR564

8 x Wrtsil 18V46A
with 2 x VTR564-P
Upgrade to TPL76-C34 with higher
efficiency
No changes on the engine

TPL76-C

Improvement
Fuel consumption
Turbo efficiency

- 2.0 %
+ 5.4 %-Pkt.

Speed margin

+ 6.0 %

Turbine inlet temperature

- 18.0 C

CIMAC NMA Norge 2014


Upgrade projects: Cruise liner Freedom of the Seas

First marine application!

6 x Wrtsil 12V46 with 2 x TPL73-A30

Upgrade to newer turbocharger generation compressor


stage

New recertification issued by DNV

CIMAC NMA Norge 2014


Upgrade projects: Cruise liner Freedom of the Seas

CV30 CV32

Improvement
Fuel consumption
Turbo efficiency

- 3 g/kWh (-1,65%)

+ 3.5 %-Pkt.

Speed margin

+7,2 %

Turbine inlet temperature

-24 C

Fuel savings > 0,65 MUSD / year

CIMAC NMA Norge 2014


Retrofit projects: Power plant of GENOR in Guatemala

NA457

TPL71-C

4 x Wrtsil 18V38A-2
with 2 x NA457

Retrofit from Napier to ABB TPL71-C;


introduction of Miller timing

Fuel consumption

Fuel savings of 2% could be


guaranteed (actual: 3.5%)

Speed margin

+6%

Payback time < 1.5 years

Turbine inlet temperature

- 14 C

Fuel savings > 1.4 MUSD / year

NOx reduction

- 13 %

Improvement
Turbo efficiency

- 3.5%
(ca. + 3 %)

CIMAC NMA Norge 2014


Updrade: Bergen engines

ABB Group
October 2, 2014

| Slide 25

Bergen B32:40L9P with 4500 kW

Equipped with TPL69-A

IMO I

Upgraded with TPL67-C and new camshaft

Miller cycle + IMO II

Higher engine efficiency and lower fuel consumption

Upgrade in combination with replacement of main


components

CIMAC NMA Norge 2014

Questions?