Sunteți pe pagina 1din 4

Corrosion Damage Report

(CDR)

CDR Number:
For Mechanical, Corrosion and
Erosion damage anomalies.

GP III
07-100
Pipework

Section 1 :
Installation :-

Location :GP III

Details of System

Date Reported :-

N/A

9/25/2007

Design parameters

Gas Production - Export


Safety Critical :
P&ID No.

MC Work Order. :-

HP Gas Comp Skid - Train A

Yes
GP3008-PR-PI-0012

Component History

Pressure (bar.g)

Line / Tag No:

Temperature C

Date of last Inspection

Flow (m/s)

2"-PG-08089-C06A

Time in Service (months)

Details of Anomaly

Drawing No.
Material Type :-

316L Stainless Steel

Component OD:-

2" (50)

Key Performance Indicators

Type

Location

Anomaly Type:-

Vibration

Equipment Type:-

Anomaly Location:-

External

Component:-

Leak:-

No

Anomaly Mechanism:-

Deferment:-

No

Pitting Depth :-

N/A
N/A

Anomaly Found:

N/A

Temp. Repair (PRD)

Oil = m3

Value =

Extent:-

Gas = scfd

Value =

Min. rem. Wall thk. :-

WI = m3

Value =

Solids present:-

Other (specify in Page 2)

Pipework
Straight Pipe

Area:-

Weld
Routine Inspection
N/A

Fabric Maintenance
Coating system:-

Substrate:-

Heat Traced:-

Break down %

Substate Condition:-

Insulation Class:-

Anodes Fitted:-

Defect Area (mm2) :-

Insulation Defect:-

Section 2: Additional information not covered in Section 1 above. (Note - use Sheet 2 for sketch / photo of defect location).
Welded web support with no reinforcing pads in place at the 2" connection to 6" line. Potential for movement between the 2 lines which will
result in dynamic stress at the toes of the webs. Recommend that webs be removed and if support is required that a bolted handcuff type clamp
is fitted in place. See original JMD VRA report GP3/07/124 on page 2 for details.
Print name

J. McGhee

Job Title:

JMD Specialist

Date

27/09/2007

Section 3: Inspection Engineer:

ACTION PRIORITY:
Print name

Date

Cat 4 - within agreed date

Section 4: Integrity Management Contractor:

Recommended remedial work to be implemented by AK.

ACTION
Print name

C. Beedie

Signature

Date

Signature

Date

Signature

Date

Signature

Date

Cat 3 - > 6 months

Section 5: Maersk Integrity Engineer

Print name

Section 6: Offshore Operations


Print name

Section 7: Engineering Contractor


Print name

Section 8: Anomaly Close Out details:


CLOSED OUT:
Print name

Job Title

Date

Document Custodian : Verification Co-ordinator

No

Corrosion Damage Report


(CDR)

Continuation Sheet
2 of 2

Continuation sheet for further text, sketches etc. If not in electronic format, forward separately through internal mail system.

Document Custodian : Verification Co-ordinator

CDR Number:

GP III

07-100

Pipe Details

2"-PG-08089-C06A

WO Number
CDR Number
Location
Line Number
Material / Grade
P&ID Number
Wall Thickness
Medium
Temperature Rating
Pipe Coating
Pressure Rating

N/A
07-100
HP Gas Comp Skid - Train A
2"-PG-08089-C06A
316L Stainless Steel
Design/S

Current

Operatin 0
0
Operatin 0

Desig

Comment

Desig

Comment

Details of Defect Area

Attach drawings of pipe system, inspection reports, etc where available. Indicate any access restrictions a
proximity to other equipment.

Repair Specification
ICP approved
Nature of Defect
Current Size
Cause
Effect

Yes/No
Other (specify in Page 2)
Area
Corrosion Yes/No
External Yes/No
Perforate Yes/No
d

Depth
Erosion
Internal

Yes/No
Yes/No

Anticipated Conditions during Implementation of Repair


Pipe Temperature
Ambient
Temperature
Humidity
External
Environment
Constraints

Maximu
m
Maximu

Minimum
Minimum

Other Information
Note: This should include any remarks on previous repairs, fire protection requirements, etc

Integrity Review
Date Fitted
Inspection
Frequency
Inspection Method
Last
inspection
Date
Current WT
Life of repair

ea

ailable. Indicate any access restrictions and

Yes/No
Yes/No

mentation of Repair

requirements, etc