Documente Academic
Documente Profesional
Documente Cultură
Succesfull offers
for for O&M of
Marafiq IWPP
followed by
Shuqaiq IWPP
2005
Bowarege achieves
PCOD
2007
2006
Shuaibah Expansion
IWP is added to the
O&M portfolio
2009
2011
2010
2008
Successfully bid for
O&M of Rabigh IPP
NOMAC Oman
assumes
operation of
Barka 1 IWPP
2012
NOMAC Today
A formidable competitor in the Power and Water O&M Sector
Project Cost
(in MUSD)
Contracted Power
(in MW)
Contracted
Water (in 000
m3/day)
Contract Type
PCOD
Shuaibah IWPP
2,450
900
880
20 YR
1Q 2010
Shuqaiq IWPP
1,831
850
212
20 YR
2Q 2011
Marafiq Jubail
IWPP
3,359
2,744
800
20 YR
4Q 2010
Shuaibah
Expansion IWP
233
150
20 YR
4Q 2009
Rabigh IPP
2,506
1,204
20 YR
2Q 2013
Bowarege
99
52
3 YR
2Q 2008
Barka 1 IWPP
415
442
91
15 YR
1Q 2003
Qurayyah IPP
2,846
3,927
20 YR
2Q 2014
180
60
20 YR
2Q 2014
13,919
10,127
2,216
Project Name
Karadzhalovo IPP
Total
2004
2017-2018
Karadzhalovo PV IPP
Location
Karadzhalovo, Bulgaria
Offtaker
Natsionalna Elektricheska
Kompania (National Electric
Company)
Power
60 MWp
Configuration
Project Cost
Commercial
Operational Date
Q1 2012
Acquisition Date
July 2012
ACWA Power
Share
42%
PPA-BOO 20 years
Operator
SunE NOMAC
Location
Offtaker
Power
Configuration
Project Cost
Commercial
Operational Date
Q2 2015 (forecast)
PPA-BOOT 25 years
Operator
NOMAC,
with
EPC
Contractor oversight for the
first
3
years
after
construction
Location
Offtaker
Power
50 MW (net)
Configuration
Project Cost
Commercial
Operational Date
Q3 2015 (forecast)
PPA-BOO 20 years
Operator
NOMAC (vide a
management contract with
the O&M Co.)
140
120
Will double
120
100
10
9.0
85
80
11.0
Doubled
7.0
5.5
60
4
43
40
20
21
2
0
0
2000
2010
2020
2030
2000
2010
2020
2030
viable
technology
includes
12
photovoltaic
and
Technology
Differences
Forecast
51.5GW
44.3GW
35.7GW
28.7GW 30.4GW
18.2GW
6.6GW 7.7GW
2.8GW
2007
2008
2009
2010
2011
Western Europe
Eastern Europe
China
India
Source: Bloomberg New Energy Finance
2012
2013
Japan
Rest of World
2014
USA
2015
A DNI
higher
KWh/m2/year
than
2,400
50 % of maximum load
25,000 MW
3100
3000
Production time - PV
2900
2800
2700
2600
2500
2400
0:30
1:00
1:30
2:00
2:30
3:00
3:30
4:00
4:30
5:00
5:30
6:00
6:30
7:00
7:30
8:00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
23:00
23:30
2300
1.6
4000
1.4
3500
2500
2000
1500
1000
Barrel / day
3000
1.2
1
0.8
0.6
0.4
500
0.2
Major overhauls
Services
Training
Environmental Health and safety
Optimum solution is the one which delivers the lowest power and water tariff to
the off taker
Introduction of solar power results in a parading shift in the power and water
generation industry in the KSA
Thank You
for Your
Attention
25