PROJECT:

PMC:

MARKIN
S.NOS

JOB STEPS

Materials arrangement &


Shifting.

Arrangement of hand /electric


portable tools

Arrangement of hand /electric


portable tools

Marking /Setting out plan

Fixing of GI partition system by


cutting into required size

Fixing of Ply & Gypsum

Work completion - Cleaning and


clearing area from waste
materials

Prepared By:

SAFE WORK METHOD STATAEMENT

MARKING & PARTITION - SAFE WORK METH


JOB STEP HAZZARDS

Back pain, Fall during shifting of


the materials .Slip,Trip

Injury cause of hitting and


mishandling of hand tools. Electric
shock due to loose connectivity.

Injury cause of hitting and


mishandling of hand tools. Electric
shock due to loose connectivity.

Marking on floor - No impact of


hazard

Marking on ceiling - Injury due to


fall from ladder
Breathing problem due to inhaling
of dust

Cutting injury and hitting and


scraches on body by sharp edge

Finger cut injury by manual


tools.Finger cutting injury for
sharp edges.injury due to from fall
from ladder. falling due to
mishandling the materials.

Injury due to slip/trip, injury of


finger cutting during segregation
of waste pieces

SAFE WORK METHOD STATAEMENT & JHA

G & PARTITION - SAFE WORK METHOD STATEMENT


RISK CLASS

Medium

Low

Low

Low

Medium
Low

Medium

Medium

Medium

JHA
GC :

D STATEMENT
JOB STEP CONTROL
Check for PTW
Check for all necessary PPE
Check for FTW
Materials shifting route to be specified
Check and remove of any obstruction in the route
More than 20 kgs manual lifting not allowed
Shifting and stacking at proper location and
barricading the same.

Check for necessary PPE

All hand tools to be fitted and connected properly


& tighty.

Electric portable machine like drilling and hammer


machine to be checked and certify by electrician
with tagging by qualified Electrician
Machine to be connected with joint free cable with
3 pin socket.
Check for necessary PPE

Instructed to use double harness safety belt more


than the height of 1.8 meter
Check for Ladder locking system of castor wheel
Before cleaning and brooming the are water to be
spread to settle the dust
Nose mask with proper ventillation to the area
provided.

Check for necessary PPE


Work in progress signages to placed prior to start
the work with soft barricading the location
Only authorised workers allowed at work location
Machine shall be inspected and tagged prior to
use.
Only trained workmen shall be allowed to use
Power tools
Use 'A' type ladder Or scaffolding & same to be
inspected and tagged prior to use. One person
should hold the 'A' type ladder while working on
platform.
Proper handing and lifting of ply and gypsum with
proper support.

Check for PPE


Stacking waste pieces at identified debris yard.
Proper house keeping of the area.
Closing the PTW as compliance of assignment in
safe work methods and procedures.

Reviewed by:

DATE:

Responsibility

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

cherry hill - Eng/safety team

Approved By :

S-ar putea să vă placă și