Documente Academic
Documente Profesional
Documente Cultură
PMC:
MARKIN
S.NOS
JOB STEPS
Prepared By:
Medium
Low
Low
Low
Medium
Low
Medium
Medium
Medium
JHA
GC :
D STATEMENT
JOB STEP CONTROL
Check for PTW
Check for all necessary PPE
Check for FTW
Materials shifting route to be specified
Check and remove of any obstruction in the route
More than 20 kgs manual lifting not allowed
Shifting and stacking at proper location and
barricading the same.
Reviewed by:
DATE:
Responsibility
Approved By :