Sunteți pe pagina 1din 10

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.
1.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Mobilization of plant Movement of


and machineries to
machinery/
the site
contact
with
machinery
Poor access
to the
designated
working
area
Insufficient of
traffic
manageme
nt
equipment

Lifting

Consequences
Serious injuries
Fatality
Property damage

Struck by falling
objects
Struck by struck
objects
Crane overturn

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 1 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng
3
4
12

12

Risk Control
Ensure traffic management in
order with traffic controller
assistance
Ensure adequate working
clearance space
Competent machinery
operator/ driver
Apply vehicle, plant,
equipment, machinery
inspections
Good physical condition of
vehicle, plant, equipment,
machinery
Machinery must be inspected
and approved before start
work
Machinery with valid insurance
coverage
Plant & machinery shall be
equipped and comply with
all authorities and clients
requirement
Ensure Safe Working Load is

Responsibility
Project Manager
Construction
Manager
SH Officer/
Supervisor
Traffic Management
Officer /
Supervisor
Project Engineer
Site Supervisor
Machinery
operator/ supplier
Workers / helpers

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified
materials
using crane

Consequences

Serious injuries
Fatality
Property damage

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 2 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng
4

16

Incompetent
machinery
operator

2.

Delivery of work
materials to site

Movement of
machinery/
contact
with
machinery
Insufficient of
traffic
manageme
nt
equipment

Serious injuries
Fatality
Property damage

12

Struck by falling
objects

12

Risk Control
followed
Loads slung correctly
Personnel kept clear during
crane operation
Apply PTW

Responsibility

Incompetent
machinery
operator

Operators shall have valid


license/ competency
Operator shall have proper
training records
Operator shall be physically
and mentally fit to perform
works
Ensure traffic management in Project Manager
order with traffic controller Construction
assistance
Manager
Ensure adequate working
SH Officer/
clearance space
Supervisor
Traffic Management
Officer /
Ensure Safe Working is
Supervisor
followed
Site Supervisor
Loads slung correctly
Personnel kept clear during

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified
Unloading /
lifting
materials
using crane
Incompetent
machinery
operator

3.

Preliminary Survey

Movement of
vehicles /
traffic along
highway /
road

Biological
hazard
(bitten by
fauna)
Strike by

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 3 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

Struck by struck
objects
Crane overturn
Serious injuries
Fatality
Property damage

Risk Control
crane operation
Apply PTW

16

Serious injuries
Fatality

16

Serious injuries
Fatality

12

Operators shall have valid


license/ competency
Operator shall have proper
training records
Operator shall be physically
and mentally fit to perform
works
Wear high visibility vest with
reflector
Walking facing incoming traffic
flow / inside guard rail
Placement of traffic / warning
signage
Apply and obtain PTW prior to
work
Practice buddy system (min of
2 persons)
Standby emergency facility/
vehicle
Notify respective person in

Responsibility

Machinery
operator/ supplier

Incompetent
machinery
operator
Project Manager
Construction
Manager
SH Officer/
Supervisor
Traffic Management
Officer /
Supervisor
Project Engineer
Site Supervisor
Surveyor
Workers / helpers

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 4 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

lightning

4.

Excavation Works

Risk Control

Responsibility

charge (ie Project Manager)


before start work
Stop work during bad weather
Provide proper and safe rest
area

Contact with
existing
utilities/
services

Serious injuries
Fatality
Property damage

To perform mapping and


marking of utilities area
Obtain approval from utilities
provider/ owner before start
work
If necessary relocation of
utilities are carried out

Movement of
machinery/
contact
with
machinery

Serious injuries
Fatality
Property damage

12

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor
Machinery operator
Workers / helpers
Ensure traffic management in Project Manager
order with traffic controller Construction
assistance
Manager
Ensure adequate working
SH Officer/
clearance space
Supervisor
Competent machinery
Traffic Management
operator/ driver
Officer /
Apply PTW
Supervisor

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 5 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

Inadequate
machinery
for
excavation

Serious injuries
Fatality
Property damage

12

Fall of person
into
excavation
pit/ area

Injury
Fatality

12

Risk Control
Machinery must be inspected
and approved before start
work
Machinery with valid insurance
coverage
machinery shall be equipped
and comply with all
authorities and clients
requirement
Ensure machinery do not
carry out work more than its
capacity
Competent machinery
operator
Installation of safety barrier
surrounding excavation area
for depth >1.0m
Put up safety / warning
signage
Excavation shall be consider
as restricted work area

Responsibility

Project Engineer
Site Supervisor
Machinery operator
Workers / helpers

Site Supervisor
Machinery operator

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

5.

Job sequence /
Steps

Laying of bedding
materials

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

Failure of
excavate
slope

Engulfment
hazard
Topple of
machinery

Movement of
machinery/
contact
with
machinery

Serious injuries
Fatality

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 6 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng
4
4
16

12

Risk Control
Ensure safe degree of slope
cutting/ platform
Deep excavation shall provide
temporary work ie shoring
Safe distance from machinery
to excavated area
Excavated earth to be pile
minimum of 3m from the
slope
Machinery shall be sit on top
of steel plate when perform
works at weak GROUND
To properly level the ground
before machinery start
excavation works
Ensure traffic management in
order with traffic controller
assistance
Ensure adequate working
clearance space
Competent machinery
operator
Apply PTW
Machinery must be inspected

Responsibility
Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor
Machinery operator
Workers / helpers

Project Manager
Construction
Manager
SH Officer/
Supervisor
Traffic Management
Officer /
Supervisor
Project Engineer

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 7 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

Risk Control

Inadequate
machinery
for
excavation

Serious injuries
Fatality
Property damage

Fall of person
into
excavation
pit/ area

Injury
Fatality

12

12

and approved before start


work
Machinery with valid insurance
coverage
machinery shall be equipped
and comply with all
authorities and clients
requirement
Ensure machinery do not
carry out work more than its
capacity
Competent machinery
operator

Installation of safety barrier


surrounding excavation area
for depth >1.0m
Put up safety / warning
signage
Excavation shall be consider
as restricted work area

Responsibility
Site Supervisor
Machinery operator
Workers / helpers

Site Supervisor
Machinery operator

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.
6.

Job sequence /
Steps
Installation of UDrain

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

Lifting
materials
using crane

Struck by falling
objects
Struck by struck
objects

Movement of
machinery/
contact
with
machinery

Serious injuries
Fatality

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 8 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng
3
4
12

12

Risk Control
Ensure Safe Working Load is
followed
Loads slung correctly
Personnel kept clear during
crane operation

Responsibility

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor
Machinery operator
Ensure traffic management in Project Manager
order with traffic controller Construction
assistance
Manager
Ensure adequate working
SH Officer/
clearance space
Supervisor
Competent machinery
Traffic Management
operator
Officer /
Apply PTW
Supervisor
Machinery must be inspected Project Engineer
and approved before start
Site Supervisor
work
Machinery operator
Machinery with valid insurance Workers / helpers
coverage
machinery shall be equipped
and comply with all
authorities and clients

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 9 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

Risk Control

Responsibility

requirement

7.

Backfilling

Fall of person
into
excavation
pit/ area

Injury
Fatality

12

Installation of safety barrier


surrounding excavation area
for depth >1.0m
Put up safety / warning
signage
Excavation shall be consider
as restricted work area

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor

Movement of
machinery/
contact
with
machinery

Serious injuries
Fatality

12

Ensure traffic management in


order with traffic controller
assistance
Ensure adequate working
clearance space
Competent machinery
operator
Apply PTW
Machinery must be inspected

Project Manager
Construction
Manager
SH Officer/
Supervisor
Traffic Management
Officer /
Supervisor
Project Engineer

PROJECT: TEMPORARY WORKS CAMP & INFRASTRUCTURE WORKS, RAPID

JOB SAFETY ANALYSIS


PROJECT: TEMPORARY
WORKS CAMP &
INFRASTRUCTURE WORKS,
RAPID
LOCATION : Package 20Ai

No.

Job sequence /
Steps

ACTIVITY : Construction of U-Drain

DATE :

Probable
Hazards
Identified

Consequences

PREPARED BY : Chung May Lynn

REV. NO : 00

REVIEWED BY :

PAGES : 10 of 10

APPROVED BY:

Risk
Assessment
P
S
Rati
ng

Risk Control

Fall of person
into
excavation
pit/ area

Injury
Fatality

12

and approved before start


work
Machinery with valid insurance
coverage
machinery shall be equipped
and comply with all
authorities and clients
requirement
Installation of safety barrier
surrounding excavation area
for depth >1.0m
Put up safety / warning
signage
Excavation shall be consider
as restricted work area

Responsibility
Site Supervisor
Machinery operator
Workers / helpers

Project Manager
Construction
Manager
SH Officer/
Supervisor
Project Engineer
Site Supervisor

S-ar putea să vă placă și