Sunteți pe pagina 1din 14

TAX INVOICE

DATED: 01-10-2015
BILL NO.: RA BILL - 01

Name of work : Construction of Assam House, New Delhi


M/s SBP Commercial (P) Ltd.,
Plot No. 1, Assam House, Near Chanakya Puri Police Station,
Delhi
(Sub: RA BILL - 01 )

Dear Sir,
Please find the details of work executed along with the attached measurement sheet
Sl.No.Description of Item
1

Unit Quantity Unit PriceAmount (INR)

RA BILL - 01 as per enclosed Measurement


Nos.
Sheet

Total Basic Cost

Total Basic Amount of RA Bill 01


Service Tax @ 14% of (A)
Total Landed Cost inclusive of tax

1.000

2,524,440

2524440
2524440

(A)

2,524,440
353,422
2,877,862

In Words: INR Twenty Eight Lakhs Seventy Seven Thousand Eight Hundred Sixty Two Only

For M/s Neenv Infrastructures (P) Ltd.


Dated: 01st October 2015

ment sheet

nt (INR)

xty Two Only

RA BILL - 04 Summary Sheet of Civil Works at M/s Prayag Polymers (P) Ltd., Bhiwadi

A) RCC Shell - Terrace Floor/Mumty/Lift Machine Room


4 RCC in column - M25

988.13

cft

67.50

66698.44

4 RCC in Slab/Beam

1290.86

cft

52.50

67770.12

5 Shuttering with ply

6007.17

sqft

44.00

264315.52

26.23

MT

8775.00

230168.25

4354.90

cft

56.50

246052.01

6 Tor Steel approximate consumptio


8 Brickwork in 1:6 (230 Thk.)
9 Brick Bat Coba - Hall 1

13125.00

sqft

21.00

275625.00

Brick Bat Coba - Hall 2

13125.00

sqft

21.00

275625.00

12747.00

sqft

10.00

127470.00

10 Internal Plaster
Total Amount (A)

1553724.33

B) Exterior & Elevation Work


1 Brickwork in Face in 1:4

10606.12

sqft

27.50

291668.18

2 External Plaster

42696.85

sqft

12.00

512362.17

4 Exterior Paint - Snowcem

29600.00

sqft

2.50

5 Exterior Paint - Rustic Texture

10700.00

sqft

10.00

Total Amount (B)

74000.00
107000.00
985030.35

C) Finishing Item - After Structure


1 Kotah Stone Floor Laying - approx

69807.00

sqft

8.00

558456.00

2 MS Door Window Fabrication/Fixin

18737.80

Kg

12.00

224853.60

924.00

sqft

18.00

16632.00

15 Granite Cladding on Wall - Stairs/P

5253.13

sqft

18.00

94556.34

15 Granite on Steps/Landing/Slab

2851.48

sqft

18.00

51326.64

15 Granite on Riser

1568.48

rft

18.00

28232.64

15 Top of Wall Fixing - Granite

704.00

rft

18.00

12672.00

15 Granite - Toilet Slab

242.50

sqft

18.00

4365.00

rft

18.00

24498.00

15 Granite Cladding on Column

15 Granite - Moulding
Total Amount (C)

1361.00

1015592.22

Value of RA Bill 04 = (A+B+C)

3554346.90

All Raw Material Consumed at Site supplied by M/s Prayag Polymers (P) Ltd. free of cos

Total Basic Amount of RA Bill 4

For M/s Neenv Infrastructures Pvt. Ltd.


Dated: 27-03-2015

3,554,347

P) Ltd. free of cost

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi
Sl.No Description of Item
A
Terrace Floor
4 RCC in Column in M-25
In Grid 17 (G to A)
Pedestal - C7
Pedestal - C2
Pedestal - C3A
Pedestal - C3
In Grid 16 (D to A)
Pedestal - C9
Pedestal - C3
In Grid 15 (G to E)
Pedestal - C8
In Grid 13&14 (G to A)
Pedestal - C1
Pedestal - C4
Pedestal - C3
Pedestal - C8
Pedestal - C11
Pedestal - C4
In Grid 12 (G to A)
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 11 (G to A)
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 10 (G to A)
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 8 & 9 (G to A)
Pedestal - C2 (double set)
Pedestal - C3 (double set)
Pedestal - C3A (double set)
Pedestal - C7 (double set)
In Grid 6 & 7 (G to A)
Pedestal - C1
Pedestal - C2
Pedestal - C3

Nos.

Quantity

1.000
2.000
2.000
1.000

1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000

6.000
12.000
12.000
6.000

3.000
1.000

1.500
1.000

1.500
1.500

4.000
4.000

27.000
6.000

2.000

1.000

1.500

4.000

12.000

2.000
1.000
1.000
1.000
3.000
1.000

1.000
1.000
1.000
1.000
1.500
1.000

1.000
1.500
1.500
1.500
1.500
1.500

10.000
10.000
10.000
10.000
4.000
4.000

20.000
15.000
15.000
15.000
27.000
6.000

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

6.000
6.000
9.000
18.000
9.000

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

6.000
6.000
9.000
18.000
9.000

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

6.000
6.000
9.000
18.000
9.000

4.000
2.000
4.000
2.000

1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500

10.000
10.000
10.000
10.000

60.000
30.000
60.000
30.000

1.000
1.000
1.000

1.000
1.000
1.000

1.000
1.500
1.500

10.000
4.000
10.000

10.000
6.000
15.000

Unit

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi
Pedestal - C4A
Pedestal - C8
Pedestal - C9
Pedestal - C10
Pedestal - C11
Pedestal - C10
In Grid 5 (G to A)
Pedestal - C2
Pedestal - C4
Pedestal - C6
Pedestal - C9
Pedestal - C10
In Grid 3 & 4 (G to A)
Pedestal - C4
Pedestal - C5
Pedestal - C6
Pedestal - C9
Pedestal - C12
In Grid 2 (G to A)
Pedestal - C13
Pedestal - C14
Pedestal - C15
Pedestal - C15
Pedestal - C16
In Grid 1 (G to A)
Pedestal - C13
Pedestal - C15
5

RCC in Slab/Beam in M-25


In Beam
Mumty near Grid 6-7
Beam B-12
do
Beam B-11
Beam B-7
Beam B-23
Beam B-21
Beam B-20
Mumty near Grid 13-15
Beam B-13
Beam
Beam
Beam
Beam
Beam
Beam

B-11
B-9
B-8
B-27
B-25
B-21

1.000
1.000
1.000
1.000
1.000
1.000

1.000
1.000
1.500
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500
1.500

10.000
10.000
4.000
10.000
4.000
4.000

15.000
15.000
9.000
22.500
9.000
9.000

1.000
1.000
1.000
3.000
1.000

1.000
1.000
1.000
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

6.000
6.000
6.000
27.000
9.000

1.000
1.000
3.000
3.000
1.000

1.000
1.000
1.000
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
15.500
15.500
4.000
15.500

6.000
23.250
69.750
27.000
34.875

2.000
1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
15.500
15.500

18.000
9.000
9.000
34.875
34.875

5.000
1.000

1.500
1.500

1.500
1.500

4.000
4.000

45.000
9.000
988.125

2.000
1.000
1.000
1.000
1.000
1.000
1.000

14.750
6.250
6.250
22.000
20.500
20.000
19.000

1.000
0.750
0.750
1.000
0.750
1.000
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000

59.000
9.375
9.375
44.000
30.750
40.000
38.000

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

11.000
8.000
8.000
11.500
9.000
21.000
19.500
19.750

1.000
0.750
0.750
0.750
1.000
1.000
0.750
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000

22.000
12.000
12.000
17.250
18.000
42.000
29.250
39.500

cft

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi
Mumty near Grid 2-4
Beam B-16
Beam B-18
Beam B-19
Beam B-1
Beam B-3
Beam B-4
In Slab
Mumty near Grid 6-7
do
do
Chajja
Mumty near Grid 13-15
do
do
Chajja
Mumty near Grid 2-4
do
do
Chajja
7

Shuttering
In Grid 17 (G to A)
Pedestal - C7
Pedestal - C2
Pedestal - C3A
Pedestal - C3
In Grid 16 (D to A)
Pedestal - C9
Pedestal - C3
In Grid 15 (G to E)
Pedestal - C8
In Grid 13&14 (G to A)
Pedestal - C1
Pedestal - C4
Pedestal - C3
Pedestal - C8
Pedestal - C11
Pedestal - C4
In Grid 12 (G to A)
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 11 (G to A)

1.000
1.000
1.000
1.000
1.000
1.000
1.000

17.500
18.000
17.500
12.375
9.000
9.000
22.375

1.000
0.750
0.750
0.750
0.750
0.750
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000

35.000
27.000
26.250
18.563
13.500
13.500
44.750

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

6.250
6.250
14.750
24.542
11.500
8.000
8.000
22.500
12.875
9.000
9.000
25.375

13.000
8.000
21.750
1.500
21.500
12.500
8.250
1.500
18.750
9.250
9.000
1.500

0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500
0.500

40.625
25.000
160.406
18.406
123.625
50.000
33.000
16.875
120.703
41.625
40.500
19.031
###

1.000
2.000
2.000
1.000

1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000

20.000
40.000
40.000
20.000

3.000
1.000

1.500
1.000

1.500
1.500

4.000
4.000

72.000
20.000

2.000

1.000

1.500

4.000

40.000

2.000
1.000
1.000
1.000
3.000
1.000

1.000
1.000
1.000
1.000
1.500
1.000

1.000
1.500
1.500
1.500
1.500
1.500

10.000
10.000
10.000
10.000
4.000
4.000

80.000
50.000
50.000
50.000
72.000
20.000

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

20.000
20.000
24.000
48.000
24.000

cft

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 10 (G to A)
Pedestal - C2
Pedestal - C4A
Pedestal - C9
Pedestal - C10
Pedestal - C11
In Grid 8 & 9 (G to A)
Pedestal - C2 (double set)
Pedestal - C3 (double set)
Pedestal - C3A (double set)
Pedestal - C7 (double set)
In Grid 6 & 7 (G to A)
Pedestal - C1
Pedestal - C2
Pedestal - C3
Pedestal - C4A
Pedestal - C8
Pedestal - C9
Pedestal - C10
Pedestal - C11
Pedestal - C10
In Grid 5 (G to A)
Pedestal - C2
Pedestal - C4
Pedestal - C6
Pedestal - C9
Pedestal - C10
In Grid 3 & 4 (G to A)
Pedestal - C4
Pedestal - C5
Pedestal - C6
Pedestal - C9
Pedestal - C12
In Grid 2 (G to A)
Pedestal - C13
Pedestal - C14
Pedestal - C15
Pedestal - C15
Pedestal - C16
In Grid 1 (G to A)
Pedestal - C13
Pedestal - C15

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

20.000
20.000
24.000
48.000
24.000

1.000
1.000
1.000
2.000
1.000

1.000
1.000
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

20.000
20.000
24.000
48.000
24.000

4.000
2.000
4.000
2.000

1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500

10.000
10.000
10.000
10.000

200.000
100.000
200.000
100.000

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

1.000
1.000
1.000
1.000
1.000
1.500
1.500
1.500
1.500

1.000
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500

10.000
4.000
10.000
10.000
10.000
4.000
10.000
4.000
4.000

40.000
20.000
50.000
50.000
50.000
24.000
60.000
24.000
24.000

1.000
1.000
1.000
3.000
1.000

1.000
1.000
1.000
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
4.000
4.000

20.000
20.000
20.000
72.000
24.000

1.000
1.000
3.000
3.000
1.000

1.000
1.000
1.000
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
15.500
15.500
4.000
15.500

20.000
77.500
232.500
72.000
93.000

2.000
1.000
1.000
1.000
1.000

1.500
1.500
1.500
1.500
1.500

1.500
1.500
1.500
1.500
1.500

4.000
4.000
4.000
15.500
15.500

48.000
24.000
24.000
93.000
93.000

5.000
1.000

1.500
1.500

1.500
1.500

4.000
4.000

120.000
24.000

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi
In Beam
Mumty near Grid 6-7
Beam B-12
do
Beam B-11
Beam B-7
Beam B-23
Beam B-21
Beam B-20
Mumty near Grid 13-15
Beam B-13
Beam B-11
Beam B-9
Beam B-8
Beam B-27
Beam B-25
Beam B-21
Mumty near Grid 2-4
Beam B-16
Beam B-18
Beam B-19
Beam B-1
Beam B-3
Beam B-4
In Slab
Mumty near Grid 6-7
do
do
Chajja
Mumty near Grid 13-15
do
do
Chajja
Mumty near Grid 2-4
do
do
Chajja
8

2.000
1.000
1.000
1.000
1.000
1.000
1.000

14.750
6.250
6.250
22.000
20.500
20.000
19.000

1.000
0.750
0.750
1.000
0.750
1.000
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000

143.075
28.750
27.813
106.700
94.300
94.000
92.150

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

11.000
8.000
8.000
11.500
9.000
21.000
19.500
19.750

1.000
0.750
0.750
0.750
1.000
1.000
0.750
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000
2.000

53.350
36.800
35.600
52.900
43.650
101.850
86.775
95.788

1.000
1.000
1.000
1.000
1.000
1.000
1.000

17.500
18.000
17.500
12.375
9.000
9.000
22.375

1.000
0.750
0.750
0.750
0.750
0.750
1.000

2.000
2.000
2.000
2.000
2.000
2.000
2.000

84.875
80.100
80.500
56.925
41.400
40.050
108.519

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

6.250
6.250
14.750
24.542
11.500
8.000
8.000
22.500
12.875
9.000
9.000
25.375

13.000
8.000
21.750
1.500
21.500
12.500
8.250
1.500
18.750
9.250
9.000
1.500

Brickwork - 230 Thk. In 1:6


In Super Structure
In Grid 17 (A-G)
1.000 96.000
In Grid 9&8 (A-G)
2.000 96.000
In Grid A(17-4)
1.000 182.584
In Grid G(17-2)
1.000 202.459
Mumty - Grid 6&7
2.000 20.500

0.750
0.750
0.750
0.750
0.750

0.500

0.500

0.500

4.000
4.000
4.000
4.000
10.500

81.250
50.000
320.813
50.583
247.250
100.000
66.000
46.500
241.406
83.250
81.000
52.250
###

288.000
576.000
547.752
607.377
322.875

sqft

BILL OF QUANTITIES FOR TERRACE FLOOR - Prayag Polymers (P) Ltd.,


Bhiwadi

Mumty - Grid 13&15


Mumty near Grid 2-4

Deduct Mumty Doors

2.000
2.000
2.000
1.000
1.000
3.000
1.000
4.000

For M/s Neenv Infrastructures (P) Ltd.


Dated: 27-03-2015

22.000
21.000
20.000
13.000
9.000
17.500
22.330
5.000

0.750
0.750
0.750
0.750
0.750
0.750
0.750
0.750

10.500
10.500
10.500
15.500
15.500
15.500
15.500
7.000

346.500
330.750
315.000
151.125
104.625
610.313
259.586
-105.000
###

cft

BILL OF QUANTITIES FOR EXTERIOR ELEVATION - Prayag Polymers (P)


Ltd., Bhiwadi
Sl.No Description of Item
A
Exterior & Elevation
East Side - Brickwork
Box - U Type
Edge of Box
Box - E Type
Edge of Box
Front Top of U
Front Top of E
South Side - Brickwork
Box - U Type
Edge of Box
Box - E Type
Edge of Box
Front Top of U
Front Top of E
Mumty Near South East
Less Area at 00 Level
Less Area at 00 Level
Mumty Near South East
Less Area at 00 Level
Less Area at 00 Level
Box - Single Type
Edge of Box
North Side - Brickwork
Box - U Type
Edge of Box
Box - I Type
Edge of Box
Front Top of U
Mumty Near North West
Less Area at 00 Level

East Side - Plaster


Full Length of Building
Edge of U Box
Edge of E Box
Front Top of U

Nos.

Quantity

4.000
8.000
3.000
6.000
2.000
1.000

2.250
1.000
2.500
1.000
24.000
23.000

45.160
45.160
45.160
45.160
5.500
7.500

406.440
361.280
338.700
270.960
264.000
172.500

8.000
###
3.000
6.000
4.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
2.000

2.250
1.000
2.500
1.000
25.000
24.000
22.160
7.250
3.000
24.083
7.500
3.000
2.250
1.000

45.160
45.160
45.160
45.160
5.500
7.500
60.490
52.660
52.660
60.490
52.660
52.660
52.660
52.660

812.880
722.560
338.700
270.960
550.000
180.000
1340.458
-381.785
-157.980
1456.781
-394.950
-157.980
118.485
105.320

6.000
8.000
3.000
6.000
3.000
1.000
0.000

2.250
1.000
3.500
1.000
23.660
24.830
7.250

45.160
45.160
52.660
45.160
8.000
65.490
52.660

609.660
361.280
552.930
270.960
567.840
1626.117
0.000
###

1.000 106.000
8.000
1.000
5.000
1.000
2.000 24.000
4.000
5.500
2.000 19.500
1.000 23.000
2.000
7.500
2.000
7.750

52.660
45.160
45.160
1.000
1.000
1.000
1.000
1.000
1.000

5581.960
361.280
225.800
48.000
22.000
39.000
23.000
15.000
15.500

South Side - Plaster


Full Length of Building
1.000 251.000
Extra for Double Height Portio 1.000 34.000

52.660
5.000

###
170.000

Front Top of E

Unit

sqft

BILL OF QUANTITIES FOR EXTERIOR ELEVATION - Prayag Polymers (P)


Ltd., Bhiwadi
Extra for Mumty
do
Edge of U Box
Edge of E Box
Front Top of U

Front Top of E

1.000
1.000
###
5.000
4.000
8.000
4.000
1.000
2.000
2.000

22.160
24.083
1.000
1.000
25.000
5.500
19.500
24.000
8.250
8.250

West Side - Plaster


Full Length of Building
1.000 105.000
Edge of Shaft Box
8.000
1.000
North Side - Plaster
Full Length of Building
1.000 251.000
Extra for Double Height Portio 1.000 34.000
Extra for Mumty
1.000 24.083
Edge of U Box
###
1.000
Edge of I Box
###
1.000
Front Top of U
3.000
2.660
6.000
8.000
3.000 17.160

For M/s Neenv Infrastructures (P) Ltd.


Dated: 27-03-2015

7.830
7.830
45.160
45.160
1.000
1.000
1.000
1.000
1.000
1.000

173.513
188.570
722.560
225.800
100.000
44.000
78.000
24.000
16.500
16.500

57.660
57.660

6054.300
461.280

52.660
5.000
12.830
45.160
52.660
1.000
1.000
1.000

###
170.000
308.985
541.920
526.600
7.980
48.000
51.480
###

sqft