PROJECT: 777 - NBS PRIVATE RESIDENCE

LOCATION: DOHA, QATAR


SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

15-1

MECHANICAL - PLUMBING WORKS

Qty's

Unit Rate

Total Cost

THE CONTRACTOR SHALL PREPARE ALL THE SHOP


DRAWINGS FOR APPROVAL BEFORE CONSTRUCTION

SUPPLY, INSTALL, TEST, BALANCING, STARTUP AND


COMMESSIONING FOR ALL PLUMBING & FIRE FIGHTING
SYSTEM AND INCLUDING THE ALL WORKS, CONTROLS
AND ALL ACCESSORIES TO FINALIZED THE WORKS AS PER
SAUDI CODES, BRITCH STANDARD, NFPA, UPC

THE CONTRACTOR SHALL PREPARE AS-BUILT DRAWINGS


FOR APPROVAL AFTER CONSTRUCTION

ALL QUANTITIES AS PER DESIGN DRAWINGS AND WILL BE


MEASURMENTS EXCUTED ON SITE AND AS PER ITEM
RATE IN B.O.Q

ALL QUANTITIES, DESIGN DRAWINGS AND


SPECFICATIONS AS ONE SET AND COMPLETE TO GATHER
AS ONE

THE CONTRACTOR MUST BE PERPARING THE AS-BUILT


DRAWINGS FOR APPROVAL AFTER CONSTRUCTION

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 1 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

01st.

PIPING INSTALLATION

1 .1

SUPPLY WATER NETWORK

Unit

Qty's

Unit Rate

Total Cost

Supply and installation of pipes, a complete installation


of Supply water pipe (UPVC- CLASS-5 For clod water
pipes under ground & polypropylene - PPR-3 or CPVC For
cold & hot water pipes inside building ) complete with
excavation, back filling, insulation where indicated. Anticorrosion protection, fittings, thermal insulated for hot
water pipes only from arom-flex, automatic air vent, air
breakers, water hummers, bands, hangers, junctions,
tees, supports, sleeves, flexible wherever there is
expansion joint as indicated on drawings and all
accessories. Labor, tools, transport, testing, one year
guarantee, all overhead expenses and profit and ready
for operation as shown on plan. All installation shall be
in accordance with the manufacturers recommendation.
The system shall be installed completely and be ready for
operation.

1.1.1

Cold water pipes, exposed / CPVC

To Inner Dia 16

lin.m

36

To Inner Dia 20

lin.m

72

To Inner Dia 25

lin.m

200

To Inner Dia 32

lin.m

120

To Inner Dia 40

lin.m

150

1.1.2

Cold water pipes, Buried / UPVC

To Inner Dia 65

lin.m

36

To Inner Dia 80

lin.m

36

10

To Inner Dia 100

lin.m

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 2 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

1.1.3

HOT water pipes, exposed / CPVC

Unit

Qty's

To Inner Dia 16

lin.m

240

To Inner Dia 20

lin.m

275

To Inner Dia 25

lin.m

175

To Inner Dia 32

lin.m

75

To Inner Dia 40

lin.m

90

To Inner Dia 50

lin.m

36

To Inner Dia 65

lin.m

36

To Inner Dia 80

lin.m

To Inner Dia 100

lin.m

N/A

10

To Inner Dia 150

lin.m

N/A

1.1.4

Unit Rate

Total Cost

Treated gray water pipes, exposed / CPVC & UPVC

To Inner Dia 16

lin.m

N/A

To Inner Dia 20

lin.m

N/A

To Inner Dia 25

lin.m

N/A

To Inner Dia 32

lin.m

N/A

To Inner Dia 40

lin.m

N/A

To Inner Dia 50

lin.m

N/A

To Inner Dia 65

lin.m

N/A

To Inner Dia 80

lin.m

N/A

To Inner Dia 100

lin.m

N/A

10

To Inner Dia 150

lin.m

N/A

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 3 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

1.2

VALVES & ACCESSORIES COLD & HOT WATER (NETWORK)

Unit

Qty's

Unit Rate

Total Cost

Supply and installation of valves including: union, fixing,


insulation where needed, all necessary accessories.
Labor, tools, transport, testing, one year guarantee, all
overhead expenses and profit. Please see specs for
materials brand.
Brass ball and gate valves
1

15 mm diameter gate valves

L.S

20 mm diameter gate valves

L.S

25 mm diameter gate valves

L.S

32 mm diameter gate valves

L.S

40 mm diameter gate valves

L.S

50 mm diameter gate valves

L.S

65 mm diameter gate valves

L.S

80 mm diameter gate valves

L.S

100 mm diameter gate valves

L.S

10

150 mm diameter gate valves

L.S

11

15 mm A.A.V

L.S

Pressure reducing station


12

20 mm PRV

L.S

N/A

13

25 mm PRV

L.S

N/A

14

32 mm PRV

L.S

N/A

15

40 mm PRV

L.S

N/A

16

50 mm PRV

L.S

N/A

17

16 mm water hummer arrestor

L.S

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 4 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

Unit Rate

Total Cost

SEWER & DRAINAGE WATER NETWORK


The Rate of Linear Meter shall include:

Supply and installation of pipes, a complete installation


of Sewer, Drainage, Vent, Rain and Storm water pipe
(UPVC- CLASS-5 For water pipes under ground and UPVC
- CLASS-04 For water pipes inside & above building )
complete with excavation, back filling, insulation where
indicated. Anti-corrosion protection, fittings, bands,
hangers, junctions, tees, supports, sleeves, roof vent
cowls, flexible wherever there is expansion joint as
indicated on drawings and all accessories. Labor, tools,
transport, testing, one year guarantee, all overhead
expenses and profit and ready for operation as shown on
plan. All installation shall be in accordance with the
manufacturers recommendation. The system shall be
installed completely and be ready for operation.

2-1

Vent Pipes, Inside Building- UPVC CLASS-04

To D 50

lin.m

150

To D 80

lin.m

45

To D 100

lin.m

To D 150

lin.m

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 5 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

2-2

Sewage and Drainage Pipes, Under Ground- UPVC- CLASS 05

Unit

Qty's

To D 50

lin.m

45

To D 75

lin.m

90

To D 100

lin.m

120

To D 150

lin.m

150

To D 200

lin.m

12

To D 250

lin.m

120

2-3

To D 50

lin.m

90

To D75

lin.m

75

To D 100

lin.m

120

To D 150

lin.m

2-5

Forced Sewage and Drainage Pipes, Under Ground - UPVC CLASS-05


To D 100

lin.m

72

Rain/ Storm Water Pipes, UPVC CLASS-05

To D50

lin.m

36

To D75

lin.m

72

To D100

lin.m

12

To D200

lin.m

FREE DISCHARGE FITTINGS DIA. 100 MM

L.S

90

2-6
1

Total Cost

Sewage and Drainage Pipes, Inside & Above Ground- UPVC- CLASS 04

2-4

Unit Rate

Sewage and Drainage Pipes, Under Ground for kitchen


area- POLYPROPYLENE PIPES
To D 100

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 6 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

Unit Rate

Total Cost

IRRIGATION WATER NETWORK


The Rate of Linear Meter shall include:

Supply and installation of pipes, a complete installation


of Irrigation water pipe (UPVC- CLASS-5 For water pipes
under ground and UPVC - CLASS-04 For water pipes
inside & above building ) complete with excavation, back
filling, insulation where indicated. Anti-corrosion
protection, fittings, bands, hangers, junctions, tees,
supports, sleeves, roof vent cowls, flexible wherever
there is expansion joint as indicated on drawings and all
accessories. Labor, tools, transport, testing, one year
guarantee, all overhead expenses and profit and ready
for operation as shown on plan. All installation shall be
in accordance with the manufacturers recommendation.
The system shall be installed completely and be ready for
operation.

3-1

Irrigation Water Pipes, Under Ground- UPVC- CLASS 05

To D 20

lin.m

60

To D 32

lin.m

60

To D 50

lin.m

120

To D 75

lin.m

12

3-2

VALVES & ACCESSORIES IRRIGATION WATER (NETWORK)


Supply and installation of valves box _concrete chamber
with floor drain, cast iron cover, 60x90 cm, 250 kg/m2
Verify designer for materials specs., cw. All accessories as
per specification, drawings ( as per Arch & ID including:
03 gate valve + 01 flow meter digital , union, fixing,
insulation where needed, all necessary accessories.
Labor, tools, transport, testing, one year guarantee, all
overhead expenses and profit. Please see specs for
materials brand.

V.B-IRR. V1 - diameter 20 mm

No.

V.B-IRR. V2 - diameter 50 mm

No.

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 7 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

02nd.

PLUMBING ACCESSORIES

2-1

Unit

Qty's

Unit Rate

Total Cost

PLUMBING FIXTURES
The Rate of Plumbing Accessories shall include:

Supply & Installation of plumbing specialties ( not


including in this sector - refer to arch section) , drainage
pipes connected to the plumbing accessories inside
sanitary blocks, cold and hot water pipes connection with
pipe protection and insulation inside sanitary block
plumbing accessories as indicated on drawings and
described in the book of specifications. Labor, tools,
water hummer attester as we need, accessories,
transport, testing, one year guarantee, as per drawings,
specification and arch details & requirments all
overhead expenses and profit.
This section includes all supply, vent, sewer and drainage
pipes for all plumbing fixtures from inside Toilet and
Bath to the main risers outside Toilet and Bath with all
Accessories as indicated on the drawings and as per
standard specification requirements and manufacturer
standards.

This section not including all Toilet and Bath Accessories


refer to arch as indicated on the drawings and as per
standard specification requirements and manufacturer
standards.

installation only

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 8 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

For public hotel floors

WC (flush valve)

No.

WC (flush tank)

No.

20

Lavatory

No.

41

Bathtub

No.

Shower

No.

17

Bidet

No.

11

Urinal (flush valve)

No.

N/A

Ablution

No.

kitchen sink

No.

10

Connection to Sauna

No.

Unit Rate

Total Cost

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 9 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

2.2

Plumbing Specialities

Unit

Qty's

Unit Rate

Total Cost

The rate of plumbing specialties shall include:


Supply and installation of plumbing specialties, drainage
pipes connected to the plumbing accessories inside
sanitary block, cold and hot water pipes connection with
pipe protection and insulation inside sanitary block,
plumbing accessories, covers, traps, as indicated on
drawings and described in the book of specifications,
labor, tools, transport, testing, one year guarantee, all
overhead expenses and profit.
1

Pipe clean out (PCO) - D 80

L.S

Pipe clean out (PCO) - D 110

L.S

Pipe clean out (PCO) - D 125

L.S

N/A

Pipe clean out (PCO) - D 150

L.S

Pipe clean out (PCO) - D 200

L.S

Floor clean out (FCO) - D 110

L.S

Wall clean out (WCO) - D 80

L.S

Wall clean out (WCO) - D 110

L.S

N/A

Floor drain (FD) 50

No.

30

10

Floor drain (FD) 80

No.

11

Parking drain (PD) 75

No.

12

Roof drain (RD)- SRD- 80 cast iron

No.

13

Roof drain (RD)- SRD- 100 cast iron

No.

14

Flowerbed drain (FBD)

No.

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 10 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Description

Unit

Qty's

15

Manhole (MH) 400x400

No.

N/A

16

Manhole (MH) 600x600

No.

N/A

17

Manhole (MH) 900x600

14

N/A

18

Manhole (MH) 1000x1000

No.

19

Handhole

No.

N/A

20

Vent cap - D 50

16

21

Vent cap - D 80

No.

12

22

Vent cap - D 100

No.

23

Vent cap - D 160

No.

N/A

24

Vent cap - D 200

No.

N/A

25

Automatic air vent - D 16

No.

26

Automatic air vent - D 20

No.

27

Automatic air vent - D 25

No.

28

Header - D 65

No.

N/A

29

Header - D 150

No.

N/A

30

Hose bib

No.

N/A

31

Cast iron gutter 300x250(h) - L=5200

No.

32

Cast iron gutter 300x250(h) - L=3500

No.

33

Cast iron gutter 300x250(h) - L=1700

No.

34

Stainless steel gutter 300x250(h) - L=5200

No.

Item

Unit Rate

Total Cost

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 11 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Description

Unit

Qty's

32

Gully floor sand trap - 400*400*400

No.

12

33

Supply, install, connect, test and commission, Form


Petrol Oil Interceptor in basement floor slab including
additional excavation, backfilling, removing surplus
excavated material, concrete, formwork, reinforcement,
waterproofing, covers and frames and the like as
Specification and drawings- Oil interceptors with 3 No.
heavy duty ductile iron covers and frames to EN 124 and
all other accessories, internal size 1500 x 1000 mm and
1000 mm depth to invert level / To (S&T) -Oil and oil
interceptor chamber cast iron - as per drawing and as
per flow rate

No.

34

To (SDC) -slow down chamber cast iron for pressurized


sewer pipe from SSP-Submersible sumppit's - as per
drawing and as per flow rate / SDC-01 / L.1200 X W. 600
X D. 600

No.

35

Double regulating valve


D 16

No.

N/A

D 20

No.

N/A

Item

Unit Rate

Total Cost

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 12 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

L.S

SET

Unit Rate

Total Cost

Water Meter Assembly


Supply, install, connect and test turbine type water
meter 100 complete and conforming to the
requirements of AWWA standard C702 and to local
governing authorities requirement.C/W. 03 Nos GV &01
FM
To D 100
HOT WATER HEATERS
Supply and installation of central and Indvidual Electric
hot water storage tanks, insulation and jacketing where
necessary, connections to cold and hot water pipes
according to detail drawings, electric heater, valves,
flanges, security valves, thermostat, wiring, according to
detail drawings. Labor, tools, transport, testing, one year
guarantee, all overhead expenses and profit

To EWHP-A01 / Electric Water Heaters / Q = 327 to 350


GPM/EACH + P= 50 KW /EACH _( 01 DUTY +01 STAND BY
)

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 13 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

03rd.

WATER TANKS & PUMP ROOM

3.1

Unit

Qty's

L.S

Unit Rate

Total Cost

PIPING INSTALLATION INSIDE PUMP ROOM


The Rate of Linear Meter shall include:
Supply and installation of pipes, insulation where
indicated. Anti-corrosion protection, fittings, bands,
hangers, junctions, tees, supports, sleeves, flexible
wherever there is expansion joint as indicated on
drawings and all accessories. Labor, tools, transport,
testing, one year guarantee, all overhead expenses and
profit

Domestic Water piping system

Supply, install, connect and test all galvanized steel or


upvc class-05, domestic water piping system within
pump room complete including pipes, fittings, flanges,
unions to sec.15410, valves to sec.15415, hangers,
supports, to sec.15245 and all other accessories as
specified and as shown on drawings.

for water tanks in Basement Floor

3.2

VALVES AND ACCESSORIES


Supplying, installing, connecting and testing all valves
and accessories works for domestic, irrigation, fire
protection system within the pump room including
suction and delivery line back to the tank , test line flow
meter, all drain pipes connecting relief valves to pump
room drain points & water level alarm connection
systems all with valves, supports, hangers, sleeves
inserts, painting controls, and all accessories as specified
and as shown on drawings.

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 14 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Description

Unit

Qty's

Foot suction strainer, all copper basket type or


perforated shell and flange type.

L.S

800 x 800 mm anti vortex baffle plate, fabricated od 10


mm thick steel sheet epoxy coated.

L.S

Electric floating valve diameter 100mm

L.S

Overflow valve diameter 100mm

L.S

Drain valve diameter 100 mm

L.S

All covers with water tied 600*600 MM

L.S

Vent pipes- upvc class-04

L.S

All air outlets

L.S

All wiring, panel for air fans

L.S

All Truck filling point D 100/80

L.S

All Stainless steel leaders

L.S

All Gate Valves, strainer, check valves, flexible


connections, pressure gauges, temperature gauges, and
all accessories, as per pipes diameters and pump's
suction and discharge

diameter 50 mm

L.S

diameter 100 mm

L.S

diameter 150 mm

L.S

diameter 200 mm

L.S

Item

Unit Rate

Total Cost

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 15 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

3.3

PUMPS AND WATER TANKS

BOOSTER PACKAGE - DOMESTIC + IRRIGATION

DPBP -01 / domestic Booster pumps , Factory assembly,


Variable speed Set With automatic control panel, tested
as per specification, 02 Duty + 01 - as per pump schedule
& drawings details

SET

IPBP -01 / domestic Booster pumps , Factory assembly,


Constant speed Set With automatic control panel, tested
as per specification, 02 Duty + 01 - as per pump schedule
& drawings details

SET

HOT WATER CIRCULATION PUMPS

SET

Unit Rate

Total Cost

Supply, install, connect, test and commission an


automatic factor assembly packaged, prefabricated,
tested certified and guaranteed nos. of pumps constant
pressure, variable speed domestic water booster
pumping system complete, including all controls, motors,
valves suction and discharge pipe manifold with all
interconnecting piping and wiring, as well as, copper
tubing with shutoff cocks for gauges, pressure switches
and vibration-isolating mounts,..etc., all mounted on a
common structural steel base prior to shipment. price
should be inclusive operation spare parts.

Supply materials and labor for a complete installation of


hot water circulation pump unit system complete with
constant speed, in-line centrifugal pump complete with
valves, gauges, & control box for automatic operation (02
duty + 1 stand).

CHP -01 / hot water circulation pumps, Factory


assembly, constant speed Set with automatic control
panel, tested as per specification, 01 Duty + 01 - as per
pump schedule & drawings details _ system complete
with 10.00 gpm - head 32 ft - qty-03_02 stand by + 01
duty

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 16 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

Unit Rate

Total Cost

SUBMERSIBLE PUMP

Supply, install, connect, test and commission


Submersilable tripx - Sumpit pump set, each consisting
of nos. of duty and one standby pump, including hoisting
and fixing in position, interconnecting pipes, valves,
connection to pipe work, control panel, interconnecting
wiring, final connection to power, complete including but
not limited to pumps, motors, foot elbows, guide rails,
lifting chains, level switches, spare parts, accessories and
all ancillary work as specified and as scheduled, detailed
and shown on drawings.

SSP-01B/ submersible clean pumps, for sump-pit's in


Basement/ 2 Duty + 1 Standby-staff house- as per pump
schedule & drawings details

SET

SSP-02B/ submersible clean pumps, for sump-pit's in


Basement/ 2Duty + 1 Standby-staff house- as per pump
schedule & drawings details

SET

SSP-03B/ submersible clean pumps, for sump-pit's in


Basement/ 1 Duty + 1 Standby-staff house- as per pump
schedule & drawings details

SET

SUMP PIT
Form sump pit in basement floor slab including
additional excavation, backfilling, removing surplus
excavated material, concrete, formwork, reinforcement,
waterproofing, with heavy duty ductile iron cover and
frame to EN 124,and frames and the like as Specification
and drawings

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 17 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Description

Unit

Qty's

Sump pit -01B_1,500 x 2,500 x 1,500 mm deep


(SP-01B)

SET

Sump pit -02B_1,500 x 2,500 x 1,500 mm deep


(SP-02B)

SET

Sump pit -03B_1,500 x 1,500 x 1,200 mm deep


(SP-03B)

SET

TREATEMENT SYSTEM

Supply materials and labor for a complete installation of


domestic softener and sand filter unit system complete
with chemical pumps and tanks, as per analysis water
test approved, at roof or attic floor system complete
with valves, panel, cables, gauges, & control box for
automatic operation treatment system set.

SET

BOOSTER PACKAGE - FIRE FIGHTING

FIRE FIGHTING WATER PIPING SYSTEM

item

Item

Supplying, installing, connecting and testing all seamless


black & galvanized steel piping works for fire protection
system within the pump room including fire and jockey
pumps suction and delivery piping system, fire pump test
line back to the tank, test line flow meter, all drain pipes
connecting relief valves to pump room drain points &
water level alarm connection systems all with valves,
supports, hangers, sleeves inserts, painting controls, and
all accessories as specified and as shown on drawings.

Unit Rate

Total Cost

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 18 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

FIRE PUMPS

2.1

Supplying, installing, connecting, testing and


commissioning an automatic, The Building assembled
wired and tested electric driven fire vertical pump
system consisting of the pump, motor, control panel and
controller, (pump & motor) to be 500 GPM at a design
head of 200 FT & 50 H.P when operating at 2900 RPM.
The pump complete package shall be UL listed and FM
approved including all accessories and fittings all as
specified and as shown on drawings.

No.

2.2

Supplying, installing, connecting, testing and


commissioning an automatic, The Building assembled
wired and tested deisel driven fire vertical pump system
consisting of the pump, motor, control panel and
controller, (pump & motor) to be500GPM at a design
head of 200 FT when operating at 2900 RPM. The pump
complete package shall be UL listed and FM approved
including all accessories and fittings all as specified and
as shown on drawings.

No.

2.3

Supplying, installing, connecting, testing and


commissioning an automatic packaged vertical multistage jockey pump having a design cap. of 25.0 GPM at a
design head of 213.0 FT & 5.00 H.P when operation at
2400RPM. complete including the UL listed controller,
electric control panel and all other accessories as
specified and as shown on drawings.

No.

FIRE EXTINGUISHER

Unit Rate

Total Cost

Supplying, installing, connecting and testing of dry


powder manual portable hand held fire extinguishers to
be installed all around the building and CO2 fire
extinguishers all as specified and as shown on drawings.
3.1

Wall mounted dry powder fire extinguishers 6kg.

NO

3.2

Wall mounted CO2 fire extinguishers 6 kg.

NO

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 19 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

Unit Rate

Total Cost

FHS for ordinary hazard OFFICE area's


Supplying, installing, connecting and testing of fire hose
stations steel cabinet with fire extinguisher consisting of
25 mm brass valve, fire hose reel, fire hose 25mm Dia.
and 30 m long, and 65 mm brass valve, fire hose Reel,
fire hose 25mm Dia. and 30 m long.Approved fire hose
rack steel cabinet vertical recess or wall mounted as
required, material stainless steel with mirror finish,
including forming recess and all builder's work as per
Specification.

4.1

FHS dia. 25/ 65 mm - Site

NO

4.2

FHS dia. 25 mm - basement

NO

EXTERNAL HYDRENT

NO

Supply, install and test the following fire department


connections complete as specified,shown on drawings
and and as per civil defense approval.

4" x 21/2" x 21/2" FIRE HYDRANT/ For site and Retails

PIPING AND FITTING MATERIALS


Supply and install black seamless steel pipes sch20 & 40Groved coupling according to specification, and as shown
on drawings complete with pipes, all isloating valves,
double regulating valves, pressure releif valves,
automatic air valves, flashing air valves, stainers, fitting,
specialties tags, connections, flanges, bolts, nuts,
gaskets, scalers, coupling and expansion joint supports
hangers including rods, anchors beams rollers saddle and
surface cleaning treatment painting of flow indicators
with color code finishing, welding, cutting normalizing
bending as well as .rubber pads for sound isolation. Item
including testing, balancing, startup and - commissioning
of the units.

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 20 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Description

Unit

Qty's

To Inner Dia 16

lin.m

N/A

To Inner Dia 20

lin.m

N/A

To Inner Dia 25

lin.m

36

To Inner Dia 32

lin.m

N/A

To Inner Dia 40

lin.m

N/A

To Inner Dia 50

lin.m

N/A

To Inner Dia 65

lin.m

36

To Inner Dia 80

lin.m

To Inner Dia 100

lin.m

240

10

To Inner Dia 150

lin.m

N/A

Item

04th.

Unit Rate

Total Cost

GENERAL ITEMS OF WORKS

The Contractor shall not alter, change or modify any


description of works, quantities, units and the liked
under this Division. Changes in descriptions, quantities,
units and the likes including for any additional new items
as well shall be set out below and shall be priced
accordingly.

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 21 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

4.1

Equipment bases and builder's work

Unit

Qty's

Provide concrete bases for all equipment including all


formwork and towelling on top

Item

Provide all builder work and opening for ducts ,pipes and
equipment as per specifications

Item

Item

L.S

L.S

4.2

Missing Items

Sepcified, listed, clarifcation, priced, supply and install


any any missing items the contractor noted we need to
complete all HVAC works, and attached as separter with
his quation to study and review (not add the value )

4.4

Drawings

4.5

The rate of drawings shall include:


The preparation of shop and as built drawings according
to design drawings, required modifications and
equipments selection

4.5

Total Cost

Painting to pipework
Painting to exposed piping as Specification

4.3

Unit Rate

Miscellaneous

The rate of miscellaneous items shall include:

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 22 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

L.S

L.S

Water supply

L.S

Drainage

L.S

Unit Rate

Total Cost

Supply and installation of the item and all necessary

accessories in order to have a good running of systems.

Labor, tools, transport, testing, one year guarantee, all

overhead expenses and profit.

The rate of two sump pits shall include:

drainage and vent pipes connections, sleeves, controls

provisions and all necessary accessories.

The rate of concrete water tank shall include:

drainage pipes, water supply pipes connections, valves,

sleeves, float valve, and all necessary accessories.

Connection to infrastructure network services

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 23 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

Qty's

Unit Rate

Total Cost

Collection
Page No.

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

15 / 1 OF

10

15 / 1 OF

11

15 / 1 OF

12

15 / 1 OF

13

15 / 1 OF

14

15 / 1 OF

15

16 / 1 OF

16

17 / 1 OF

17

18 / 1 OF

18

19 / 1 OF

19

20 / 1 OF

20

Carried to Collection

MHA -MEP- 777 - PLUMBING

BILL OF QUANTITIES - PLUMBING

Division 15-1 - 24 / 25

PROJECT: 777 - NBS PRIVATE RESIDENCE


LOCATION: DOHA, QATAR
SUBJECT: Division 15 - 1 Mechanical Works

Item

Description

Unit

21 / 1 OF

21

22 / 1 OF

22

23 / 1 OF

23

Qty's

Unit Rate

Total Cost

NOTES:

A breakdown analysis of the prices should be submitted with tenderers' offers


including the following divisions:
1 - supply of equipment
2 - supply of accessories needed for the installation
3 - workmanship for isntallation
4 - overhead
5 - profit
6 - VAT

PLUMBING WORKS / Total Carried to Summary