Documente Academic
Documente Profesional
Documente Cultură
Item
Description
Unit
15-1
Qty's
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 1 / 25
Item
Description
01st.
PIPING INSTALLATION
1 .1
Unit
Qty's
Unit Rate
Total Cost
1.1.1
To Inner Dia 16
lin.m
36
To Inner Dia 20
lin.m
72
To Inner Dia 25
lin.m
200
To Inner Dia 32
lin.m
120
To Inner Dia 40
lin.m
150
1.1.2
To Inner Dia 65
lin.m
36
To Inner Dia 80
lin.m
36
10
lin.m
Carried to Collection
Division 15-1 - 2 / 25
Item
Description
1.1.3
Unit
Qty's
To Inner Dia 16
lin.m
240
To Inner Dia 20
lin.m
275
To Inner Dia 25
lin.m
175
To Inner Dia 32
lin.m
75
To Inner Dia 40
lin.m
90
To Inner Dia 50
lin.m
36
To Inner Dia 65
lin.m
36
To Inner Dia 80
lin.m
lin.m
N/A
10
lin.m
N/A
1.1.4
Unit Rate
Total Cost
To Inner Dia 16
lin.m
N/A
To Inner Dia 20
lin.m
N/A
To Inner Dia 25
lin.m
N/A
To Inner Dia 32
lin.m
N/A
To Inner Dia 40
lin.m
N/A
To Inner Dia 50
lin.m
N/A
To Inner Dia 65
lin.m
N/A
To Inner Dia 80
lin.m
N/A
lin.m
N/A
10
lin.m
N/A
Carried to Collection
Division 15-1 - 3 / 25
Item
Description
1.2
Unit
Qty's
Unit Rate
Total Cost
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
10
L.S
11
15 mm A.A.V
L.S
20 mm PRV
L.S
N/A
13
25 mm PRV
L.S
N/A
14
32 mm PRV
L.S
N/A
15
40 mm PRV
L.S
N/A
16
50 mm PRV
L.S
N/A
17
L.S
Carried to Collection
Division 15-1 - 4 / 25
Item
Description
Unit
Qty's
Unit Rate
Total Cost
2-1
To D 50
lin.m
150
To D 80
lin.m
45
To D 100
lin.m
To D 150
lin.m
Carried to Collection
Division 15-1 - 5 / 25
Item
Description
2-2
Unit
Qty's
To D 50
lin.m
45
To D 75
lin.m
90
To D 100
lin.m
120
To D 150
lin.m
150
To D 200
lin.m
12
To D 250
lin.m
120
2-3
To D 50
lin.m
90
To D75
lin.m
75
To D 100
lin.m
120
To D 150
lin.m
2-5
lin.m
72
To D50
lin.m
36
To D75
lin.m
72
To D100
lin.m
12
To D200
lin.m
L.S
90
2-6
1
Total Cost
Sewage and Drainage Pipes, Inside & Above Ground- UPVC- CLASS 04
2-4
Unit Rate
Carried to Collection
Division 15-1 - 6 / 25
Item
Description
Unit
Qty's
Unit Rate
Total Cost
3-1
To D 20
lin.m
60
To D 32
lin.m
60
To D 50
lin.m
120
To D 75
lin.m
12
3-2
V.B-IRR. V1 - diameter 20 mm
No.
V.B-IRR. V2 - diameter 50 mm
No.
Carried to Collection
Division 15-1 - 7 / 25
Item
Description
02nd.
PLUMBING ACCESSORIES
2-1
Unit
Qty's
Unit Rate
Total Cost
PLUMBING FIXTURES
The Rate of Plumbing Accessories shall include:
installation only
Carried to Collection
Division 15-1 - 8 / 25
Item
Description
Unit
Qty's
WC (flush valve)
No.
WC (flush tank)
No.
20
Lavatory
No.
41
Bathtub
No.
Shower
No.
17
Bidet
No.
11
No.
N/A
Ablution
No.
kitchen sink
No.
10
Connection to Sauna
No.
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 9 / 25
Item
Description
2.2
Plumbing Specialities
Unit
Qty's
Unit Rate
Total Cost
L.S
L.S
L.S
N/A
L.S
L.S
L.S
L.S
L.S
N/A
No.
30
10
No.
11
No.
12
No.
13
No.
14
No.
Carried to Collection
Division 15-1 - 10 / 25
Description
Unit
Qty's
15
No.
N/A
16
No.
N/A
17
14
N/A
18
No.
19
Handhole
No.
N/A
20
Vent cap - D 50
16
21
Vent cap - D 80
No.
12
22
No.
23
No.
N/A
24
No.
N/A
25
No.
26
No.
27
No.
28
Header - D 65
No.
N/A
29
Header - D 150
No.
N/A
30
Hose bib
No.
N/A
31
No.
32
No.
33
No.
34
No.
Item
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 11 / 25
Description
Unit
Qty's
32
No.
12
33
No.
34
No.
35
No.
N/A
D 20
No.
N/A
Item
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 12 / 25
Item
Description
Unit
Qty's
L.S
SET
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 13 / 25
Item
Description
03rd.
3.1
Unit
Qty's
L.S
Unit Rate
Total Cost
3.2
Carried to Collection
Division 15-1 - 14 / 25
Description
Unit
Qty's
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
L.S
diameter 50 mm
L.S
diameter 100 mm
L.S
diameter 150 mm
L.S
diameter 200 mm
L.S
Item
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 15 / 25
Item
Description
Unit
Qty's
3.3
SET
SET
SET
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 16 / 25
Item
Description
Unit
Qty's
Unit Rate
Total Cost
SUBMERSIBLE PUMP
SET
SET
SET
SUMP PIT
Form sump pit in basement floor slab including
additional excavation, backfilling, removing surplus
excavated material, concrete, formwork, reinforcement,
waterproofing, with heavy duty ductile iron cover and
frame to EN 124,and frames and the like as Specification
and drawings
Carried to Collection
Division 15-1 - 17 / 25
Description
Unit
Qty's
SET
SET
SET
TREATEMENT SYSTEM
SET
item
Item
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 18 / 25
Item
Description
Unit
Qty's
FIRE PUMPS
2.1
No.
2.2
No.
2.3
No.
FIRE EXTINGUISHER
Unit Rate
Total Cost
NO
3.2
NO
Carried to Collection
Division 15-1 - 19 / 25
Item
Description
Unit
Qty's
Unit Rate
Total Cost
4.1
NO
4.2
NO
EXTERNAL HYDRENT
NO
Carried to Collection
Division 15-1 - 20 / 25
Description
Unit
Qty's
To Inner Dia 16
lin.m
N/A
To Inner Dia 20
lin.m
N/A
To Inner Dia 25
lin.m
36
To Inner Dia 32
lin.m
N/A
To Inner Dia 40
lin.m
N/A
To Inner Dia 50
lin.m
N/A
To Inner Dia 65
lin.m
36
To Inner Dia 80
lin.m
lin.m
240
10
lin.m
N/A
Item
04th.
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 21 / 25
Item
Description
4.1
Unit
Qty's
Item
Provide all builder work and opening for ducts ,pipes and
equipment as per specifications
Item
Item
L.S
L.S
4.2
Missing Items
4.4
Drawings
4.5
4.5
Total Cost
Painting to pipework
Painting to exposed piping as Specification
4.3
Unit Rate
Miscellaneous
Carried to Collection
Division 15-1 - 22 / 25
Item
Description
Unit
Qty's
L.S
L.S
Water supply
L.S
Drainage
L.S
Unit Rate
Total Cost
Carried to Collection
Division 15-1 - 23 / 25
Item
Description
Unit
Qty's
Unit Rate
Total Cost
Collection
Page No.
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
15 / 1 OF
10
15 / 1 OF
11
15 / 1 OF
12
15 / 1 OF
13
15 / 1 OF
14
15 / 1 OF
15
16 / 1 OF
16
17 / 1 OF
17
18 / 1 OF
18
19 / 1 OF
19
20 / 1 OF
20
Carried to Collection
Division 15-1 - 24 / 25
Item
Description
Unit
21 / 1 OF
21
22 / 1 OF
22
23 / 1 OF
23
Qty's
Unit Rate
Total Cost
NOTES:
Division 15-1 - 25 / 25