Name of Work :-Improvements to Ramarajulanka - Gondi road from km 0/02 to 7/350

(Construction of Low Level Cause Way 4V X 6.37m span) in E.G.Dt.

Revised Cost of RCC Plain Ended pipes


The rates of RCC Plain ended pipes as per SSR 2008-09 are based on the raw materials costs.
Cement
Steel (MS Rods)

(C1)
(S1)

4,400
41,500

The revised raw materials costs i.e., the rates adopted in the estimate.
Cement
Steel (MS Rods)

(C2)
(S2)

6,400
45,000

G.O. RT No. 269, April 2015, Dt. 28.05.2015

Total quantity of Concrete required (as per IS 458 : 1988 Table 2 & 3 in Pg.7 & 8)
NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

Quantity per 1 RM

Quantity per 1 RM

Quantity per each

300 MM dia

0.04274 Cum.
TTx0.340x1.000x0.040

0.03111 Cum.
TTx0.330x1.000x0.030

0.00424 Cum.
TTx0.300x0.150x0.030

450 MM dia

0.12375 Cum.
TTx0.525x1.000x0.075

0.05335 Cum.
TTx0.485x1.000x0.035

0.00990 Cum.
TTx0.450x0.200x0.035

600 MM dia

0.18299 Cum.
TTx0.685x1.000x0.085

0.09122 Cum.
TTx0.645x1.000x0.045

0.01609 Cum.
TTx0.640x0.200x0.040

Dia

Wc : Weight of Cement required (Kg.) per metre of pipe.


@ 360 Kgs. / Cum. as per IS 458 : 1988 Cl.4.5.1 Pg.3
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

0.04274 x 360 Kgs


15.39 Kgs

0.03111 x 360 Kgs


11.20 Kgs

0.00424 x 360 Kgs


1.53 Kgs

450 MM dia

0.12375 x 360 Kgs


44.55 Kgs

0.05335 x 360 Kgs


19.21 Kgs

0.00990 x 360 Kgs


3.56 Kgs

600 MM dia

0.18299 x 360 Kgs


65.88 Kgs

0.09122 x 360 Kgs


32.84 Kgs

0.01609 x 360 Kgs


5.79 Kgs

Ws : Weight of MS Rods required (Kg.) per metre of pipe


(as per IS 458 : 1988 Table 2 & 3 Pg.7 & 8)
Dia
300 MM dia
450 MM dia
600 MM dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

0.78 + 1.80
2.58 Kgs

0.78 + 0.79
1.57 Kgs

0.71 Kgs

0.78 + 3.79
4.57 Kgs

0.78 + 1.97
2.75 Kgs

1.48 Kgs

1.18 + 7.01
8.19 Kgs

0.78 + 3.47
4.25 Kgs

1.89 Kgs

(Contd)
Revised Cost
Revised Cost R1 : Variation (increase / decrease ) in cost (Rs. per metre)
due to change in the cost of M.S. Rods = (S2-S1)/1000 X Ws.
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

(45,000 -41,500) /1000


x 2.58 Kgs.= Rs 9.03

(45,000 -41,500) /1000


x 1.57 Kgs.= Rs 5.50

(45,000 -41,500) /1000


x 0.71 Kgs.= Rs 2.49

450 MM dia

(45,000 -41,500) /1000


x 4.57 Kgs.= Rs 16.00

(45,000 -41,500) /1000


x 2.75 Kgs.= Rs 9.63

(45,000 -41,500) /1000


x 1.48 Kgs.= Rs 5.18

600 MM dia

(45,000 -41,500) /1000


x 8.19 Kgs.= Rs 28.67

(45,000 -41,500) /1000


x 4.25 Kgs.= Rs 14.88

(45,000 -41,500) /1000


x 1.89 Kgs.= Rs 6.62

Revised Cost R2 : Variation (increase / decrease ) in cost (Rs. per metre)


due to change in the cost of Cement = (C2-C1)/1000 X Wc.
Dia

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

(6,400 -4,400) /1000


x15.39 Kgs.= Rs 30.78

(6,400 -4,400) /1000


x11.20 Kgs.= Rs 22.40

(6,400 -4,400) /1000


x1.53 Kgs.= Rs 3.06

450 MM dia

(6,400 -4,400) /1000


x44.55 Kgs.= Rs 89.10

(6,400 -4,400) /1000


x19.21 Kgs.= Rs 38.42

(6,400 -4,400) /1000


x3.56 Kgs.= Rs 7.12

600 MM dia

(6,400 -4,400) /1000


x65.88 Kgs.= Rs 131.76

(6,400 -4,400) /1000


x32.84 Kgs.= Rs 65.68

(6,400 -4,400) /1000


x5.79 Kgs.= Rs 11.58

NP3 Class pipes

NP2 Class pipes

NP2 Class Collars

300 MM dia

724.00
9.03
30.78
= Rs. 763.81

320.00
5.50
22.40
= Rs. 347.90

450 MM dia

1,139.00 16.00
89.10
= Rs. 1,244.10

563.00
9.63
38.42
= Rs. 611.05

167.00
5.18
7.12
= Rs. 179.30

600 MM dia

1,859.00 28.67
131.76
= Rs. 2,019.43

914.00
14.88
65.68
= Rs. 994.56

255.00
6.62
11.58
= Rs. 273.20

Revised Cost = Cost as per the SSR + R1 + R2


Dia

79.00

2.49
3.06
= Rs. 84.55

350MM dia NP2 class RCC Collars


Concrete Qty. =
0.00576 Cum.
TTx0.382x0.150x0.032

Wt. of Cement Wc
0.00576 x 360

R1 : variation in Steel
(45,000 -41,500) /1000
x 0.79 Kgs.= Rs 2.77
Revised Cost=Cost as per the SSR+R1+R2

Asst. Executive Engineer (R&B),

Wt. of Steel Ws
= 2.07 Kgs.

= 0.79
Kgs.

R2 : variation in Cement
(6,400 -4,400) /1000
x 2.07 Kgs.= Rs 4.14
97.00

2.77

4.14

Deputy Executive Engineer (R&B),

= Rs. 103.91

Executive Engineer (R&B),

R&B Section : Malikipuram

R&B Sub-division : Razole

R&B Division : Amalapuram

Specification Report to accompany the Estimate


Improvements to Ramarajulanka - Gondi road from km 0/02 to 7/350
(Construction of Low Level Cause Way 4V X 6.37m span) in E.G.Dt.
Estimate Amount : Rs. 242.00 Lakhs
The designs for construction of low level cause way 4V X 6.37m were approved
vide Memo No. 013263/((D&P)/DCEII/DEE-III/AEE-I/2010, Dt. 28.01.2013 of the Chief
Engineer (R&B), Designs & Planning wing, Errummanzil, Hyderabad. Accrodingly the
detailed estimate was prepared based on 2008-09 SSR and submitted vide Lr. No.
Estimates/HC/2010-11, Dt. 25.02.2013.
Now the Government of A.P. vide G.O. Ms. No.2, T,R&B (R.I) Dept., dt.12.01.2015
issued orders for adoption of MoRT&H, Govt. of India specifications and Data for Road and
Bridge works in Roads & Buildings Department, with current SSRs. Accordingly, the
estimate is recasted with current common SSR for the year 2014-15.
The estimate is prepared by adopting the provisions as stated.

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
1)
2)
3)
4)
5)
6)
7)
8)

Earth work excavation in all soils upto SDR


Plain cement concrete (1:3:6) nominal mix for levelling course under Raft and
wing
walls.
Vibrated
cement concrete M 20 Grade Concrete for footings.
Vibrated cement concrete M 25 Grade Concrete for Raft foundation
Vibrated cement concrete M 20 Grade for substructure
V.R.C.C. M25 grade concrete for bed blocks and backing walls
Furnishing and placing reinforced cement concrete VRCC M 25 grade for deck slab
Plain cement concrete M 15 Grade Concrete below approach slab
V.R.C.C. M30 grade concrete for approach slab
V.R.C.C. M30 grade concrete for wearing coat
Providing HYSD bars ( Fe-415 ) for foundation as skin reinforcement
Providing HYSD bars ( Fe-415 ) for sub structure
Providing HYSD bars ( Fe-415 ) for super structure
Back filling behind Abutments
Providing and laying filter media
Providing and laying filter material for pitching of slopes
Providing Grouted Revetment with rough stone
Providing rough stone revelment other than granite 300 mm thick
Providing and laying boulders apron on river bed for protecting against scour
Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C
Supplying and fixing of CI drainage spouts
Plain cement concrete (1:3:6) for levelling course under CC pavement
Vibrated cement concrete M30 grade for CC pavement
Providing Earthen shoulders for CC pavement
LS provisions:Provision towards VAT 5%
Provision towards Quality Control charges @0.5%
Provision towards Price Adjustment @ 4.0%
Provision towards Seigniorage Charges
Provision for soil investigation and soil testing
Provision for Pylon construction
Provision for mastic pads and expansion joints
Provision for Anchorage arrangements

9)
10)
11)
12)
13)
14)

Provision
Provision
Provision
Provision
Provision
Provision

for
for
for
for
for
for

Diversion of drain and Cross Bunds


Road Safety Intervensions like Guide posts, delineators
Pipes in CC approaches for dessipation of excess drain water during floods
Car hire charges, Xerox, DTP, unforeseen items and rounding of
Avagahana sadassu
Car hire charges, Xerox, DTP, unforeseen items and rounding of

The rates adopted in the estimate are as per SSR 2014-15 and the work will be
carried out as per relevant specifications of MORT&H.
Asst. Executive Engineer (R&B),
R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

Name IMPROVEMENTS
TO
RAMARAJULANKS-GONDI
ROAD
FROM
of
KM.0.000 TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY
Work: 4VX6.37M SPAN) IN EAST GODAVARI DISTRICT .

GENERAL ABSTRACT
S NO
1

ITEM

AMOUNT

Low level Cause way (4 vents of 6.37 m ef span without


footpaths)

Sub Total

19129189

19129189

L.S Provisions
2

Provision towards VAT 5%

956459

Provision towards Quality Control charges @0.5%

Provision towards Price Adjustment @ 4.0%

765168

Provision towards Seigniorage Charges

231387

Provision for soil investigation and soil testing

200000

Provision for Pylon construction

200000

Provision for mastic pads and expansion joints

Provision for Anchorage arrangements

95646

50000
100000

10

Provision for Diversion of drain and Cross Bunds

1500000

11
12

Provision for Road Safety Intervensions like Guide posts,


delineators
Provision for Pipes in CC approaches for dessipation of
excess drain water during floods

13

Provision for Avagahana Sadassulu

10000

14

Provision for Car hire charges, Xerox, DTP, unforeseen items


and rounding of

19599

300000
150000

23707448
(Rupees Two Hundred and Forty Two Lakhs only)

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

BRIDGE DETAILED CUM ABSTRACT ESTIMATE


Name of work:- IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000
(CONSTRUCTION OF LOW LEVEL CAUSE WAY 4V X 6.37M SPAN )
GODAVARI DISTRICT.
S.No.
Description of Item
No.
Length
Breadth
Depth
1
2
3
4
5
6
1 Earth work excavation in all soils upto SDR including removal of existing soil
backfill and depositing of surplus materialon bank at suitable places as directed
by the departmental officers including all leads and lifts,shoring,strutting
etc,complete as per APSS Specification No.308 and as directed by the Engineerin-Charge for foundations
Excluding dewatering 0-3.0M DEPTH above sill
level.
Raft
1 x 1 28.260
9.10

Quantity
7

0.60

154.3

Flexible approns
Aprons: U/S side

1 x 1 28.260

3.00

0.60

50.87

Aprons: D/S side

1 x 1 28.260

6.00

0.60

101.74

2x 1

8.000

3.10

1.60

79.36

2 x 1 15.000

2.30

1.60

110.4

2 x 1 26.000

2.30

1.60

191.36

2 x 1 10.000

1.40

1.10

30.8

5x 1

7.000

1.00

1.00

35

4x 1

6.751

0.60

0.60

9.72

Body walls on A-side


Non-vented level portion
Body walls on S-side Nonvented
level
Body
walls
onportion
S-side Nonvented level Ramp
portion
Body walls on S-side Nonvented level Ramp
portion
Cross walls on S-side Nonvented level Ramp
portion

Rate
8

For toe walls


2p(4.3)/4=6.751 m

763.545
764.00 31.00
cum

Including dewatering 0-3.0M DEPTH Below sill level.

Raft

1 x 1 28.260

9.10

1.75

450.041

Cut of walls: U/S side

1 x 1 28.260

0.60

2.00

33.91

Cut of walls: D/S side


Flexible approns
Aprons: U/S side

1 x 1 28.260

0.60

2.00

33.91

1 x 1 28.260

3.00

0.90

Aprons: D/S side

1 x 1 28.260

6.00

0.90

76.30
152.60
746.771
747.00 32.00
cum

Plain cement concrete (1:3:6) nominal mix in foundation with crushed stone
aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below raft and wing walls
Under Raft

1 x 1 28.260

9.10

0.150

38.57

Body walls on A-side


Non-vented level portion
Body walls on S-side Nonvented
level
Body walls
onportion
S-side Nonvented level Ramp
portion
Body walls on S-side Nonvented level Ramp
portion
Cross walls on S-side Nonvented level Ramp
portion

2 x 1 8.000

3.10

0.100

4.96

2 x 1 15.000

2.30

0.100

6.90

2 x 1 26.000

2.30

0.100

11.96

2 x 1 10.000

1.40

0.100

2.80

5 x 1 7.000

1.00

0.100

Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
footings of Abutments and Piers, Raft cut-off walls .
Cut of walls: U/S side
Cut of walls: D/S side
For Abutments

1 x 1 28.26
1 x 1 28.26
2 x 1 8.45

For Pier:1st footing


2nd footing
Body walls on A-side Nonvented level portion
Trep footing
Body walls on S-side Nonvented level portion
Trep
Bodyfooting
walls on S-side Nonvented level Ramp
portion
Trep footing
Body
walls on S-side Nonvented level Ramp
portion
Trep
Crossfooting
walls on S-side Nonvented level Ramp
portion

3x 1
3x 1

8.50
8.50

2x 1
2x 1

8.00
8.00

2.00
2.00
1.00

33.91
33.91
37.18

0.50
0.50

33.15
22.95

3.10
1.70

0.50
1.20

24.80
32.64

2 x 1 15.00
2 x 1 15.00

2.30
1.20

0.50
0.75

34.50
27.00

2 x 1 26.00
2 x 1 26.00

2.30
1.20

0.50
0.75

59.80
46.80

2 x 1 10.00
2 x 1 10.00

1.40
0.65

0.50
0.50

14.00
6.50

5x 1

1.00

0.50

7.00

(
(
(

0.60
)
0.60
)
1.70 + 2.70
2
2.60
1.80

say

Vibrated cement concrete M 25 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing,laying in position, Compacting , Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2100 (4th Revision) for
Raft.
RAFT Foundation
1 x 1 28.26
(
9.10
)
0.60
say

3.50
68.69
69.00 5318.00
cum

Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing, laying in position,Compacting, Vibrating and curing

17.50
424.64
425.00 6637.00
cum

154.30
154.30
155.00 7195.00
cum

Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and


10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including
cost,seignorage and conveyance of all materials to site and all labour charges
for machine mixing, laying in position,Compacting, Vibrating and curing
including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2200 (4th Revision) for
Sub structure of abutments, piers and wing walls.
For Abutments

2x 1

8.45

For Pier:

3x 1

7.50

For cut waters

3x 1

2x 1

8.00

Body walls on A-side Nonvented level portion


Body walls on S-side Nonventedwalls
levelon
portion
Body
S-side
Non-vented level Ramp
portion
Body walls on S-side Nonvented level Ramp
portion
Cross walls on S-side Nonvented level Ramp
portion

0.70 +
2
(
0.76 +
2
( 0.76^2 +
4
x

1.70

3.14

63.68

1.00

3.14

62.17

3.14

5.84

0.88

2.00

28

2 x 1 15.00

0.78

1.45

33.7125

2 x 1 26.00

0.78

1.45

58.435

2 x 1 10.00

0.53

0.70

7.35

5x 1

0.50

0.50

8.75
267.93

7.00

1.0^2)
2

268.00 7020.00
cum
6

V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing, laying, compacting,
curing etc,including all other incidental and operational charges,T&P charges
etc, complete but excluding cost of steel and its fabrication charges, as per
MoRT&H Specifications 1500,1700,2100(4th Revision)For bed blocks &
backing walls
upto 5.0m height
Bed blocks over abutments 2 x 1
Backingwallsover abutmen 2 x 1
Bed blocks over pier :
-- do-- cut waters
deduct approach slab porti

7.50
7.50

0.75
0.30

0.300
0.515

0.90
/4 ( 0.9 )2
0.30

0.300
0.300
0.300

3.80
2.61
6.08
0.57
-1.35
11.71
12.00 7859.00
cum

Furnishing and placing reinforced cement concrete VRCC M 25 grade as per


approved drawings and technical specifications as per MoRT&H specification
1500,1600,1700 (4th revision ) and as per M.O.T DRG No BD/1-74 A& 274excluding cost of steel and fabrication charges for VRCC M-25 Super structure
of deck slabs
upto 5.0m height
For deck slabs: As per
Standard Drg. BD/2-74

3x 1
3x 1
2

8.45
8.45

4 x 1 28.87

m3

per

Span
say

Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 10001 and fine aggregate conforming to table 1000-2) including cost,seignorage and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.

115.48
116.00 8614.00
cum

conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.
Levelling course below
approach slab.
2x 1
7.50
4.00
0.150

9.00
9.00
9.00 5856.00
cum

V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage
charges,labour
charges
for
machine
mixing,laying,compacting,curing etc,including all other incidental and
operational charges,T&P chargesetc, complete but excluding cost of steel and
its fabrication charges, as per MoRT&H Specifications 1500,1700,2704(4th
Revision) for Approach Slab.
For approach slab

2x 1

4.30

7.50

0.300

V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
10 stone aggregate including cost and conveyance of all materials to site,
seigniorage
charges,labour
charges
for
machine
mixing,laying,compacting,curing etc,including all other incidental and
operational charges,T&P chargesetc, complete but excluding cost of steel and
its fabrication charges, as per MoRT&H Specifications 1500,1700,2702(4th
Revision). For Wearing coat .
Over deck slabs
4 x 1 6.74
7.50
0.075
Over approach slabs
2 x 1 4.30
7.50
0.075

19.35
19.35
20.00 7079.00
cum

15.17
4.84
20.00
20.00 7026.00
cum

11 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up


bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including cost
and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600
&2200 (4th revision) and as per I.S.1786 of 1985 for Super structure of
R.C.C items.
For deck slabs: As per
Standard Drg.BD/4-74
Approach slab

4 x 1 ###
1

Wearing coat

kgs

per

Span

7464

19

85

kgs/cum

1644.75

###

60

kgs/cum

1200.18

or say

12

Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up


bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending,
binding rods, tying grills, placing them in position etc., complete including cost
and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600
&2200 (4th revision) and as per I.S.1786 of 1985 for Sub structure of
R.C.C items.

###
10.40
11.00 65422.0
M.T

labour charges for fabrication of reinforcement including cutting, bending,


binding rods, tying grills, placing them in position etc., complete including cost
and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all
R.C.C items for finished item of work as per standard drawings, as per the
directions of the Engineer-in-Charge and as per MoRT&H specification 1600
&2200 (4th revision) and as per I.S.1786 of 1985 for Sub structure of
R.C.C items.
Bed blocks&backing walls 1

11.71

100

kgs/cum

1171.20

Skin reinforcement for


abutments

2 x 1

350

kgs

700.00

Skin reinforcement for


piers

3 x 1

350

kgs

1050.00

Body walls on A-side Nonvented level portion


1 x 1

200

kgs

200.00

Body walls on S-side


Non-vented
level
portion
Body
walls on
S-side
Non- 1 x 1

300

kgs

300.00

vented level Ramp


portion
Body walls on S-side

520

kgs

520.00

Non-vented level Ramp


portion
Cross walls on S-side Non- 1 x 1

80

kgs

80.00

vented level Ramp


portion

1 x 1

50

kgs

50.00

Longitudinal joints for CC


pavement

1 x 1

1.8

kgs

1 x 1

564

or say

13

1.80
4073.00
4.08
4.10 64224
M.T

Providing HYSD bars (Fe-415) of diferent diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
Raft
Skin reinforcement for
abutments
Skin reinforcement for
piers
Body walls on A-side Nonvented level portion
Body walls on S-side NonBody
walls
onportion
S-side Nonvented
level
vented level Ramp
Body walls on S-side
portion
Non-vented level Ramp
Cross walls on S-side Nonportion
vented level Ramp
portion

154.30

50

kgs/cum

7714.98

2 x 1

150

kgs

300.00

3 x 1

300

kgs

900.00

1 x 1

350

kgs

350.00

1 x 1

500

kgs

500.00

1 x 1

900

kgs

900.00

1 x 1

200

kgs

200.00

1 x 1

125

kgs

125.00
###
10.99
11.00

###

M.T
14 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought
and put up bars of all diameters including cost and conveyance of steel to site
and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc.,
complete for all R.C.C items for finished item of work as per standard drawings,
as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (4th Revision) and as per I.S.1786 of 1985 .
Approaches
CC pavement

5 x 30 0.500
11 x 28 0.500

75.00
154.00
229.00
881.65
0.90
M.T

RM
kgs
###

15 Back filling behind Abutments with gravel including cost ,conveyance and
seigniorage of all materials to site etc., complete as per Clause 710.1.4 of
IRC : 78and as per MoRT&H Specification No. 2200 (4th Revision) and as per
Drawing and technical specifications for finished item of work
In between Body walls on
Appanaramuni lanka side 1 x 1 8.00
7.500
In between Body walls on
Sakinetipally side
(15+36)
1 x 1 51.00
7.500
(in between body walls of non-vented and ramp portion)

1.500
1.500
or say

90.00
573.75
663.75
664.00 1454.00
cum

16 Providing and laying filter media with stone crushed aggregate satisfying the
requirements laid down in Clause 2504.2.2 of MORTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger
size towards the wall and provided over the entire surface behind abutment and
wing wall, to the full height , compacted to a firm condition complete as per
drawing and technical specification No.710.1.1 of IRC 78 and 2200(Sl.No.13.10)
Behind abutment

2x 1

8.00

0.60

1.500
or say

14.40
14.40
15.00 2407.00
cum

17 Providing and laying filter material with gravel underneath pitching in slopes
including cost and conveyance of materials to site including labour charges etc,
complete for finished item of work as per MoRTH Specification No.2504(4th
Revision)and as directed by the Engineer-in-Charge.
For pitching of slopes.
Quadrants

4x 1

17.760

0.15

or say

10.66
10.66
11.00 1887.00
cum

18 Providing Grouted Revetment with rough stone other than granite of not less
than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost,
seigniorage charges and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the
Engineer-in-Charge for quadrential revetment.
For quadrants

4x 1

17.760

0.30

21.31
21.31
22.00 2911.00
cum

19 Providing rough stone revelment other than granite 300 mm thick using 300
mm ize rough stonne varity including cost ,seigniorage and conveyance of all
materials to site , labour cgarges etc , complete as per MOST specification no.
2504
Toe walls
4
6.751
0.600
0.600

9.72
9.72
10.00 2207.00
cum

or say

20 Providing and laying boulders apron on river bed for protecting against scour
with jeddy stone of 450mm stone boulders weighing not less than 40 kg each
complete as per MOST specification no. 2504

Aprons: U/S side

1 x 1 51.26

3.00

0.90

Aprons: D/S side

1 x 1 51.26

6.00

0.90

21 Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C in both
horizontal and vertical directions so that the weep holes in each horizontal
dirction is staggered from the weep holes lying above and below lines as shown
in drawing for abutments, wing walls, including cost and conveyance of the AC
pipes and labour charges for cutting to required lenghts,placing the pipe with a
slope of 1:20 towards steam side face etc, complete for finished item of work
for weep holes, as per MoRTH Specification No.2706(4th Revision)and as
directed by the Engineer-in-Charge.
For abutments
2x 8
1.20
3.00
Body walls A-side
1x 8
0.90
2.00
Body walls S-SIDE
1 x 51
1.00
1.00
or say

22 Supplying and fixing of CI drainage spouts complete as per MoRT&H


Specification No.2705 and as per drawing BD / 1-69.
4x 2
say

138.40
276.80
415.21
416.00 2180.00
cum

57.60
14.40
51.00
123.00
123.00 269.00
R.M.

8
8 973.00
Nos

23 Plain cement concrete (1:3:6) nominal mix below CC pavemnet with crushed
stone aggregate 40 mm nominal size mechanically mixed, placed in and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below CC pavement
Appanaramuni lanka -side

1x 1

77.00

7.50

0.10

57.75

Sakinetipally -SIDE
1 x 1 71.00
7.50
(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 1 416.00
7.50

0.10

53.25

0.10

312.00
423.00
423.00
cum

or say

4653

24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500, 1700, 2100 & 2702 (4th Revision) and as
directed by the Engineer-in-Charge for C.C Pavement.
Appanaramunilanka side
1 x 1 77.00
7.50
Sakinetipally -SIDE
1 x 1 71.00
7.50
(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 1 416.00
7.00

0.20
0.20

0.20
or say

115.50
106.50

582.40
804.40
805.00 6377.00
cum

25 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion


joints and Construction joints of approved quality including cost, conveyance
and placing in position, etc., complete as directed by the Engineer-in-charge.
12 x 1

7.00

--

0.20
or say

16.80
16.80
17.00 991.00
sqm

26 Supply and fixing of 25mm PVC/HDPE as per BIS N0. 7634 as per drawing and
technical specification and directed by the Engineer-in charge.
12 x 29

0.25

--

-or say

87.00
87.00
87.00 16.00
RM

27 Providing Vaccum Dewatered Flooring services including leveling of the placed


concrete to be followed by placement of the bottom and top mat , operation of
the vaccum machine to release the excess free water in the concrete , removal
of the mat after completion of dewatering process, conduction of the initial
flooting to be followed by finishing using power trowel of pin vibration of the
concrete, palcement of the concrete and / or provision of the special topings but
including hire and operational charges of generator of adequate capacity and
other T&P and labourcharges for all operations etc. complete.
Appanaramunilanka side
1 x 1 77.00
7.50
Sakinetipally -SIDE
1 x 1 71.00
7.50
(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 1 416.00
7.00

---

577.50
532.50

2912.00
4022.00
4022.00

or say

4022.00 40.00
sqm

28 Saw cutting of concrete pavement using a self propelled walk behind, petro /
electric powered saw of suitable capacity to give a finished groove of 4 mm
width and 1/4 to 1/3 depth in the cured concrete in the longitudinal and
transverse directions along predetermined lines. The rate is inclusive of the cost
of consumable such as dimond blade, masons engaged for the marking is also
deemed to be included in the rate and poring of sealent in to the performed
groove. The rate is inclusive of cleaning of the groove of the sawing to remove
any cementecous particles to give a clean surface and surface preperation of
the sides of the groove to accommodate the sealent material etc. to give neat
finished look including cost of sealent , hire and operational charges of
generator of adequate capacity and T&P and other labour charges for all
operations etc. complete
Appanaramunilanka side

1 x 16
-7.50
1 x 1 77.00
-Sakinetipally -SIDE
1 x 16
-7.50
1 x 1 71.00
-(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 80
-7.00
1 x 1 416.00
--

-----

---

or say

120.00
77.00
120.00
71.00

560.00
416.00
1364.00
1364.00
1364.00 60.00
RM

29 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all
leads and lifts including prewatering of soil at barrow area, removal of top soil,
excavation of soils at barrowed area, conveyance of soil, depositing the soils on
the embankment, spreading soils, beaking clods, sectioning and consoilidation
with vibratory road roller @ OMC to meet requirement of table 300-2 of
MoRT&H, including all hire and operational charges of T&P and complete for
finished item of work as per MoRT&H specification 305 ( 4th revision) ( Payment
will be made based on levels for finished item of work).

Road work
CC Pavement

1 x 2 416.00

1.00

0.30
or say

30 Provision towards VAT 5%

on Rs. 19129189

31 Provision towards Quality Control charges @0.5 on Rs. 19129189


32 Provision towards Price Adjustment @ 4.0%
33 Provision towards Seigniorage Charges
34 Provision for soil investigation and soil testing
35 Provision for Pylon construction

on Rs. 19129189

249.60
249.60
250.00 1245.00
cum

36 Provision for mastic pads and expansion joints


37 Provision for Anchorage arrangements
38 Provision for Diversion of drain and Cross Bunds
39 Provision for Road Safety Intervensions like Guide posts, delineators
40 Provision for Pipes in CC approaches for dessipation of excess drain water during floods
41 Provision for Avagahana Sadassulu
42 Provision for Car hire charges, Xerox, DTP, unforeseen items and rounding of
(RUPEES TWO HUNDRED AND FORTY TWO LAKHS ONLY)

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Superintending Engineer (R&B),


R&B Circle : Kakinada

Executive Engineer
R&B Division : Amala

KM.0.000 TO 7.350
M SPAN ) IN EAST
Per
9

Amount
10

20.88

1.00
cum

23684

1.00
cum

23904

1.00 366942
cum

6.594

6.237

1.00 2820725
cum

1.00 1115225
cum

1.00 1881360
cum

1.00
cum

94308

craftpaperbearings

1.00 999224
cum

1.00
cum

52704

1.00 141580
cum

1.00 140520
cum

1.00 719642
M.T

564
2256
1128
1001.664

1.776

1.00 263318
M.T

1.00 704627

0.888

M.T

3.28888889
30

1.00
M.T

51332

1.00 965456
cum

1.00

36105

cum

1.00
cum

20757

1.00
cum

64042

1.00
cum

22070

1.00 906880
cum

1.00
R.M

33087

1.00
No.

7784

1.00 1968219
cum

1.00 5133485
cum

1.00
sqm

16847

28
1.00
RM

1392

1.00 160880
sqm

17.1111111

92.4444444

1.00
sqm

81840

1.00 311250
cum

###
956459
95646
765168
231387
200000
200000

ONLY)

50000
100000
###
300000
150000
10000
19599
###

e Engineer (R&B),
sion : Amalapuram

23687849
512151

Name of work :
Improvements to Ramarajulanka - Gondi Road from K.M. 0.000 to 7.350
( Construction of submersible bridge 4 x 6.00 M) in East Godavari District.
LEAD STATEMENT
1 HBG Metal from Katheru Quarry :
From
To
MR
CT
Quarry to Lalacheruvu 2 Kms CT = 2x1.10
0.000
2.000
2.000 1.1
NH 16
###
944.805
38.405
NH 16 to Rajavaram - Podalada Road
###
31.735
29.690
NH 214 (115.760 to 125.135)
###
115.760
9.375
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
3.000
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2
Or
2 BITUMEN AND EMULSION FROM VISAKHA REFINARY :
From
To
Refinery to V.V. Road NH 16
Visakhapatanam to Kathipudi Junction NH
###
839.600
Kathipudi to Amalapuram NH 216
0.000
125.135
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000)
(Working Reach = (6.600 - 6.000)/2

MR

CT

###
###
3.000
6.000

Or
3 Gravel from Kadiyam Quarry :
From
Quarry to Vemagiri
NH 16
NH 16 to Rajavaram - Podalada Road
NH 216 (115.760 to 125.135)
Sivakodu - Ramarajulanka Road (1.200 to
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000)
(Working Reach = (6.600 - 6.000)/2

To

MR

###
###
###

944.805
61.425
115.760

26.605
29.690
9.375

1.200

4.200

3.000

6.000

0.000

6.000

CT

Or
4 Sand
Sand Quarry at River Godavari at P. Gannavaram
From
River bed to Panchayat road
Panchayat Road
R.P. Road (49.072 to 61.425)
###
NH 216 (115.760 to 125.135)
###
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2

To

MR

61.425
115.760

12.353
9.375

4.200

3.000

0.000

6.000

CT

Or

Asst. Executive Engineer (R&B)


R&B Section, Malikipuram

Deputy Executive Engineer (R&B)


R&B Sub-division, Razole.

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

0.000 to 7.350
odavari District.

Lead
2.200
38.405
29.690
9.375
3.000
6.000
0.300
###
89.000
Kms.
Lead
1.600
120.600
96.300
3.000
6.000
0.300
###
###
Kms.
Lead
4.600
26.605
29.690
9.375
3.000
6.000
0.300
79.570
###
Kms.

Lead
0.110
0.200
12.353
9.375
3.000
6.000
0.300
31.338
###
Kms.

ecutive Engineer (R&B)


ub-division, Razole.

nding Engineer (R&B),


Circle : Kakinada

ROAD METAL RATES as per 2008-2009 SSR


Name of the Work::- IMPROVEMENTS TO RAMARAJULANKS-GONDI ROAD FROM KM.0.000 TO 7.350
4VX6.37M SPAN )

Sl. No

Description of Metal

IN EAST GODAVARI DISTRICT .

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

89.00

1018.60

419.00

A) FOR ROAD WORKS


60 to 63 mm IRC and MoRTH HBG
metal

50 to 55 mm IRC and MoRTH HBG


metal

"

89.00

1018.60

456.00

40 to 45 mm IRC and MoRTH HBG


metal

"

89.00

1018.60

588.00

HBG Metal from Katheru Quarry :

SS Revetment work 300mm thick


rough stone

"

89.00

1018.60

164.00

Quarry spall(Field picked metal)


Av. Of rate 25mm & 40mm

"

89.00

1018.60

45.00

150 mm soling stone


HBG metal

"

89.00

1018.60

95.00

40 to 45 mm IRC and MoRTH HBG M/C HBG Metal from Katheru Quarry :
metal

89.00

1018.60

588.00

25 to 27 mm IRC and MoRTH HBG M/C


metal

"

89.00

1018.60

944.00

19 to 22 mm IRC and MoRTH HBG M/C


metal

"

89.00

1018.60

984.00

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

12 to 14 mm IRC and MoRTH HBG M/C


10 metal

"

89.00

1018.60

780.00

9.5 to 11.20 mm IRC and MoRTH HBG


11 M/C metal

"

89.00

1018.60

656.00

5 to 7 mm IRC and MoRTH HBG M/C


12 metal

"

89.00

1018.60

504.00

2.36 to 5 mm IRC and MoRTH HBG


13 M/C metal

"

89.00

1018.60

308.00

"

89.00

1018.60

340.00

79.50

918.85

50.50

89.00

1018.60

620.00

Description of Metal

Sl. No

14

HBG Stone chips 2.36mm


and below

15 Gravel

Gravel from Kadiyam Quarry :

B) FOR BRIDGE WORK


16 40 mm SS-5 HBG M/C metal

HBG Metal from Katheru Quarry :

17 25 mm SS-5 HBG M/C metal

"

89.00

1018.60

994.00

18 20 mm SS-5 HBG M/C metal

"

89.00

1018.60

1036.00

19 12 mm SS-5 HBG M/C metal

"

89.00

1018.60

822.00

Source of Supply

Lead in
Kms

Conveyance

Initial cost
less
stacking

20 10 mm SS-5 HBG M/C metal

"

89.00

1018.60

692.00

21 6 mm SS-5 HBG M/C metal

"

89.00

1018.60

532.00

22 Jeddy stone 450 to 600 mm

"

89.00

1018.60

172.10

31.50

414.85

462.00

31.50

273.10

342.00

Description of Metal

Sl. No

23 Sand for Mortar


24 Sand for Filling
25 HYSD Steel (Fe-415 TMT Bars)

at River Godavari at P. Gannavaram


at River Godavari at P. Gannavaram

G.O RT NO 61 Dt. 02.02.2015

43500.00

26 6mm Mild Steel

"

42500.00

27 Mild Steel

"

44500.00

28 Cement

"

5000.00

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

Executive Engineer (R&B),

Sl. No

Description of Metal

R&B Section : Malikipuram

Source of Supply

R&B Sub-division : Razole

Lead in
Kms

Conveyance

Initial cost
less
stacking

R&B Division : Amalapuram

ATES as per 2008-2009 SSR

S-GONDI ROAD FROM KM.0.000 TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY
RI DISTRICT .

Seigniorage
charges

Deduct 14%
CP & OH
charges from
conveyance

Toal Cost
per Cum

0.00

0.00

-125.09

1382.51

70.00

0.00

0.00

-125.09

1419.51

70.00

0.00

0.00

-125.09

1551.51

67.00

0.00

0.00

-125.09

1124.51

0.00

0.00

0.00

-125.09

938.51

70.00

0.00

0.00

-125.09

1058.51

70.00

0.00

0.00

-125.09

1551.51

70.00

236.00

0.00

-125.09

2143.51

70.00

246.00

0.00

-125.09

2193.51

Blasting
charges

Machine
crushing
charges

70.00

Seigniorage
charges

Deduct 14%
CP & OH
charges from
conveyance

Toal Cost
per Cum

195.00

0.00

-125.09

1938.51

70.00

164.00

0.00

-125.09

1783.51

70.00

126.00

0.00

-125.09

1593.51

70.00

77.00

0.00

-125.09

1348.51

0.00

0.00

0.00

-125.09

1233.51

0.00

0.00

0.00

-112.84

856.51

70.00

155.00

0.00

-125.09

1738.51

70.00

248.50

0.00

-125.09

2206.01

70.00

259.00

0.00

-125.09

2258.51

70.00

205.50

0.00

-125.09

1991.01

Blasting
charges

Machine
crushing
charges

70.00

Seigniorage
charges

Deduct 14%
CP & OH
charges from
conveyance

Toal Cost
per Cum

173.00

0.00

-125.09

1828.51

70.00

133.00

0.00

-125.09

1628.51

0.00

0.00

0.00

-125.09

1065.61

0.00

0.00

0.00

-50.95

825.90

0.00

0.00

0.00

-33.54

581.56

0.00

0.00

0.00

43500.00

0.00

0.00

0.00

42500.00

Blasting
charges

Machine
crushing
charges

70.00

44500.00
0.00

0.00

0.00

Superintending Engineer (R&B),

5000.00

Blasting
charges

Machine
crushing
charges

Seigniorage
charges

R&B Circle : Kakinada

Deduct 14%
CP & OH
charges from
conveyance

Toal Cost
per Cum

Bridge portion

Name of Work IMPROVEMENTS


:
TO RAMARAJULANKS-GONDI ROAD FROM KM.0.00
7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY 4VX6.37M SPAN
EAST GODAVARI DISTRICT .
Quantity

Description of Item

Rate

per

1 Earthwork in excavation of foundation of structures as per drawing and technical specifi


including setting out, construction of shoring and bracing, removal of stumps and
deleterious matter, dressing sides of bottom, back filling the excavation earth to the
required etc., complete including seignioarge charges for finished item of work as per M
specification 304(4th Revision)
Unit : Cum
Page 323 of MoRT&H SDB
Taking out put = 240 Cum
a) excluding dewatering charges In all soils upto SDR upto 3.0 m depth using mach
(A) Labour
0.32 day

Mate

8.00 day
0.00 %

Mazdoor unskilled
MAA
Total
(B) Machinery
Rate as per G.O. Ms No 10, Dt 26/7/2005
240.00 cum
(C) Seigniorage charges
240.00 Cum Seigniorage charges

345.00

day

295.00
2470.40

day

13.00

cum

0.00

cum

(D) Over head charges @ 20% on (A) + (B)+( C)


(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 240 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
b) including dewatering charges In all soils upto SDR upto 3.0 m depth using
machinary
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day
Mate
345.00
day
8.00 day
Mazdoor unskilled
295.00
day
0.00 %
MAA
2470.40
Total
(B) Machinery
Rate as per G.O. Ms No 10, Dt 26/7/2005
240.00 cum
13.00
cum
(C) Seigniorage charges
240.00 Cum Seigniorage charges
0.00
cum
5.00 %
Dewatering charges (labour+machinery)
5590.40
(D) Over head charges @ 20% on (A) + (B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 240 cum (E)+(F)
Rate for 1 cum

Quantity

Description of Item

Rate

per

Rate to be adopted

2 Providing PCC(1:3:6) nominal mix in foundation with crushed stone aggregate 40 mm n


size mechanically mixed , placed in foundation and compacted by vibration including curin
including all other incidental and operational charges of all T&P etc., complete for finishe
of work as per MoRT&H specification 2100 (4th Revision) .
Unit = cum
Page 331 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
345.00
1.00 nos
Mason
357.00
15.00 nos
Mazdoor
295.00
0.00 %
MAA
5002.80
Total

(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
3.45 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
2.00 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 20% (25%-VAT)
20.00 %
Add for Over head charges @ 25% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

day
day
day

1738.51
825.90
5000.00

cum
cum
MT

453.00
861.70
624.00

hr
hr
hr

Note: Vibrator is a part of minor T&P which is already included in over head
charges of the contractor
3 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing,laying in position, Compacting , Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2100 (4th Revision) VCC M-20 for footings of Abut
Piers ,and Wing walls Cut of walls.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00

Quantity

Description of Item

20.00 nos
0.00 %

Mazdoor
MAA
Total
(B) Material
5.40 cum
Cost of 40mm SS-5 HBG
5.40 cum
Cost of 20mm SS-5 HBG
2.70 cum
Cost of 10mm SS-5 HBG
6.75 cum
Sand at site
5.16 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28
6.00 hr
Generator set 35 KVA
Total

M/C metal
M/C metal
M/C metal

cum

Rate

per

295.00
6732.20

day

1738.51
2258.51
1828.51
825.90
5000.00

cum
cum
cum
cum
MT

453.00
861.70

hr
hr

(D) Form work


4.00 %
Form work @ 4% on (A)+(B)+( C)
72516.11
(E) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

4 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing, laying in position,Compacting, Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub structure .VCC M-15 f
structure of Abutments, Piers and wing walls
Unit = cum
Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
5.40 cum
1738.51
cum
Cost of 40mm SS-5 HBG M/C metal
5.40 cum
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
2.70 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
5.16 MT
Cement at site
5000.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr

Quantity
6.00 hr

Description of Item
Generator set 35 KVA

Rate

per

861.70

hr

(D) Form work


10.00 %
Form work @ 10% on (A)+(B)+( C)
72516.11
(E) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

5 Vibrated Reinforced cement concrete M 25 Grade Concrete in foundations with 20 mm(SS


M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X
150 mm cubes and cost and and conveyance of all materials, vibrating centering m
mixing, curing hire and operational charges of all T& P but excluding cost and its fabr
charges of steel etc complete as per MoRT&H Specification 1500,1700, 2100 (4th Revi
VRCC M-25 for RAFT FOUNDATION.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
8.10 cum
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
6.05 MT
Cement at site
5000.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr
6.00 hr
Generator set 35 KVA
861.70
hr
Total
(D) Form work
4.00 %
Form work @ 4% on (A)+(B)+( C)
78613.11
(E) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

Quantity

Description of Item

Rate

per

6 Vibrated Reinforced cement concrete M 25 Grade Concrete in foundations with 20 mm(SS


M/C graded metal with a cube strength of 25 N / mm2 at 28 days work test on 150 X
150 mm cubes and cost and and conveyance of all materials, vibrating centering m
mixing, curing hire and operational charges of all T& P but excluding cost and its fabr
charges of steel etc complete as per MoRT&H Specification 1500,1700, 2100 (4th Revi
VRCC M-25 for RAFT foundation
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
8.10 cum
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
6.05 MT
Cement at site
5000.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr
6.00 hr
Generator set 35 KVA
861.70
hr
Total
(D) Form work
4.00 %
Form work @ 4% on (A)+(B)+( C)
78613.11
(E) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 21% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

7 V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing, laying, compacting, curing etc,including all other incidental and oper
charges,T&P charges etc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100(4th Revision)For bed blocks & backing walls.
Page 472,457 of MoRT&H SDB
Unit = cum
Taking output = 15 cum
(A) Labour
345.00
0.86 nos
Mate
357.00
1.50 nos
Mason
295.00
20.00 nos
Mazdoor
0.00 %
MAA
6732.20
(B) Material

day
day
day

Quantity
8.10 cum
5.40 cum
6.75 cum
6.05 MT

Description of Item
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site

Rate

per

2258.51
1828.51
825.90
5000.00

cum

Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
6.00 hr
Generator set 35 KVA
861.70
Total
Total A+B+C for 15 cum
a) Height from 5m to 10m
Basic rate for 15 cum of concrete
1.80 %
Add on cost of concrete to cater extra lift
78613.11
11.80 %
Add for Form work on cost of concrete
78613.11
Total
20.00 %
Add for Over head charges
10.00 %

cum
MT

hr
hr

Rs
Rs
Rs

Add for Contractors profit


Rate Per 15 Cum
Rate Per 1 Cum
Rate to be adopted

b) Height upto 5m
Basic rate for 15 cum of concrete
10.00 %
Add for Form work on cost of concrete
20.00 %

Add for Over head charges

10.00 %

Add for Contractors profit

78613.11
Total

Rs
Rs

Rate Per 15 Cum


Rate Per 1 Cum
Rate to be adopted

8 V.R.C.C concrete M - 25 grade for Super Structure with 20 mm(SS5)HBG M/C graded metal
a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes an
and and conveyance of all materials, vibrating centering machine mixing, curing hi
operational charges of all T& P but excluding cost and its fabrication charges of ste
complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No BD/4-74
74FOR VRCC M-25 Super structure of Deck slabs
Unit = cum
Page 472 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
345.00
0.86 nos
Mate
day
357.00
1.50 nos
Mason
day
295.00
20.00 nos
Mazdoor
day
MAA
6732.20
0.00 %
Total

Quantity

Description of Item

(B) Material
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
6.75 cum
Sand at site
5.99 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total

Rate

per

2258.51
1828.51
825.90
5000.00

cum

453.00
861.70

hr
hr

cum
MT

Total
a) For form work add the following (Height 0 - 5 m)
for Deck slab slab Super structure
20.00 %

Height upto 5m - 20 percent

78313.11

20.00 %

Add Over Head Charges

93975.73

10.00 %

Add Contractor's Profit

b) For form work add the following (Height 5 - 10 m)


for Deck slab Super structure 25
of Basic rate of concrete
25.00 %
Height above 5m to 10m - 25 percent
20.00 %

Add Over Head Charges

10.00 %

Add Contractor's Profit

112770.88
Rate per 15 cum
Rate per cum
Or Say

78313.11
97891.39
117469.67
Rate per 15 cum
Rate per cum
Or Say

9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2704(4th Revision). For Approach Slab .
Unit = cum
Page 340,501 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
345.00
1.50 nos
Mason
357.00

day
day

Quantity
20.00 nos
0.00 %

Description of Item
Mazdoor
MAA
Total

(B) Material
8.10 cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
6.10 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
(D) Form work
2.00 %
Form work @ 2% on (A)+(B)+( C)
(E) Over head charges @ 21% (10%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum M 30 Concrete
Rate to be adopted

Rate

per

295.00
6732.20

day

2258.51
1828.51
825.90
5000.00

cum
cum
cum
MT

453.00
861.70

hr
hr

78863.11

Cum

10 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2702(4th Revision). For Wearing coat over Deck
Unit = cum
Page 477,492 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.90 nos
Mate
345.00
1.50 nos
Mason
357.00
21.00 nos
Mazdoor
295.00
0.00 %
MAA
7041.00
Total
(B) Material
8.10 cum
2258.51
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1828.51
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
6.10 MT
Cement at site
5000.00
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
6.00 hr
Generator set 35 KVA
861.70
(A+B+C) =Rate per 15 cum
Basic Rate per cum

day
day
day

cum
cum
cum
MT

hr
hr

Quantity
0.15 nos
0.00 %

Description of Item
Labour for cleaning deck slab concrete
MAA

(D) Over head charges @ 21% (25%-VAT)


Add for Over head charges @ 20% on
20.00 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate to be adopted

Rate

per

295.00
44.25
Rate per cum

day

5322.38

11 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Super structure of R.C.C items.
Unit = MT
Page 489,490 of MoRT&H
Taking output = 1 MT
(A) Labour
0.44 nos
Mate
3.00 nos
Black smith
8.00 nos
Mazdoor
0.00 %
MAA
Total
(B) Material
1.05 MT
HYSD bars including overlaps
8.00 Kg
Binding wire
Total
(C) Over head charges @ 21% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

SDB

345.00
345.00
295.00
3546.80

day
day
day

43500.00
42500.00

MT
MT

12 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Sub structure of R.C.C items.
Unit = MT
Page 459,460 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.34 nos
Mate
day
345.00
2.00 nos
Black smith
day
345.00
6.50 nos
Mazdoor
day
295.00

Quantity
0.00 %

Description of Item

MAA
Total
(B) Material
1.05 MT
HYSD bars including overlaps
6.00 Kg
Binding wire
Total
(C) Over head charges @ 20% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

Rate

per

2724.80
43500.00
42500.00

MT
MT

13 Providing HYSD bars (Fe-415) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 19
foundations of R.C.C items.
Unit = MT
Page 448 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.40 nos
Mate
day
345.00
2.00 nos
Black smith
day
345.00
6.00 nos
Mazdoor
day
295.00
0.00 %
MAA
2598.00
Total
(B) Material
1.05 MT
HYSD bars including overlaps
43500.00
MT
6.00 Kg
Binding wire
42500.00
MT
Total
(C) Over head charges @ 21% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted

14 Back filling behind Abutments with gravel including cost ,conveyance and seigniorage
materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per M
Specification No. 2200 (4th Revision) and as per Drawing and technical specifications for fi
item of work
Unit = cum
Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos
Mate
345.00
day
7.00 nos
Mazdoor
295.00
day
0.00 %
MAA
2161.60

Quantity

Description of Item

Total
(B) Material
12.00 cum
Cost of Granular material
Total
Machinery
2.50 hr
Plate compactor/Power rammer/road roller
0.05 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 20% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Rate

per

856.51

cum

48.00
624.00

hr
hr

15 Providing and laying of filter media with Granular materials / stone crushed aggr
satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thi
of not less than 600mm with smaller size towards the soil and bigger size towards the w
provided over the entire surface behind the abutment, wing wall and return wall to the full
compacted to a firm condition including cost and conveyance of all metal seignorage c
,and all labour charges as directed by the departmental officers as per drawing and Tec
specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (4 th Revisio
finished item of work.
Unit = cum
Page 463 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.32 nos
Mate
7.00 nos
Mazdoor for filling watering, ramming etc
1.00 nos
Mazdoor skilled
0.00 %
MAA
Total
(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum
Cost of 150mm size IRC soling stone (HBG)
6.00 cum
Cost of 40mm size IRC HBG metal
Total
Machinery
0.06 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

345.00
295.00
357.00
2532.40

day
day
day

1058.51
1551.51

cum
cum

624.00

hr

Quantity

Description of Item

Rate

per

16 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size g
with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of mate
site and including labour charges for packing the stones for revetment etc., complete for fi
item of work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engin
Charge for quadrential revetment.
Cost of CC(1:4:8) Page 331,522 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
345.00
1.00 nos
Mason
day
357.00
15.00 nos
Mazdoor
day
295.00
0.00 %
MAA
5002.80
Total
(B) Material
13.50 cum
1738.51
cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
2.43 MT
Cement at site
5000.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr
6.00 hr
Generator set 35 KVA
861.70
hr
Cost per 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
0.35 nos
Mason / Stone packer / Cutter
0.75 nos
Mazdoor for laying stones, filling quarry spall
0.00 %
MAA
Total
(B) Material
0.20 cum
Cost of CC(1:4:8)
1.00 cum
Cost of Rough stone 300mm thick at work
Total
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 21% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

345.00
357.00
295.00
360.00

day
day
day

3605.71
1124.51

cum
cum

2205.65

Rate to be adopted for 1cum

17 Pitching
with 300 mm size rough stone
including cost, seigniorage charge
conveyance of materials to site and including labour charges for packing the ston
revetment etc., complete for finished item of work as per MoRT&H specification 250

Quantity
Description of Item
Rate
per
Pitching
with 300 mm size rough stone
including cost, seigniorage charge
conveyance of materials to site and including labour charges for packing the ston
revetment etc., complete for finished item of work as per MoRT&H specification 250
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wal
(A) Labour
Page 522 of MoRT&H SDB
0.04 nos
Mate
0.35 nos
Mason
0.75 nos
Mazdoor for laying stones, filling quarry spall
0.00 %
MAA
Total
(B) Material
1.00 cum
Cost of Rough stone 300mm thick
0.20 cum
Cost of stone spalls
Total
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

345.00
357.00
295.00
360.00

day
day
day

1124.51
938.51

cum
cum

1672.21

Cost per 1 cum


Rate to be adopted

18 Providing and laying filter material with Gravel underneath pitching in slopes inc
cost, seigniorage charges and conveyance of materials to site including labour charges
complete for finished item of work as per MoRT&H Specification 2504 (4th Revision) a
directed by the Engineer-in-Charge under Revetment.
Unit = cum
Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos
Mate
345.00
0.25 nos
Mazdoor skilled
357.00
1.00 nos
Mazdoor for laying stones, filling quarry spall
295.00
0.00 %
MAA
401.50
Total
(B) Material
1.20 cum
Cost of gravel
856.51
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)+( C)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum
Rate to be adopted

day
day
day

cum
1429.31

Quantity

Description of Item

Rate

per

19 Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Ret


wall with 100mm dia meter A/C pipe extending through the full width of the structure with s
of about 1 V : 20H towards drawing face Complete as per drawing and technical specificati
complete for finished item of work for weep holes as per MORTH specification No 2706 & 22
(4th Revision)
Unit = nos
Taking output = 30 RM
Output = 1 Cum, Material for 1:3 Cement Mortor
(A) Labour
0.04 nos
Mate
345.00
day
0.90 nos
Mazdoor
295.00
day
0.00 %
MAA
279.30
Total
(B) Material
0.51 MT
Cost of Cement
5000.00
MT
1.05 Cum Cost of Sand
825.90
cum
Total
Cost per 1 Cum CM (1:3)
(A) Labour
0.03 nos
Mate
345.00
day
0.50 nos
Mason
357.00
day
0.25
Mazdoor
295.00
day
0.00 %
MAA
262.60
Total
(B) Material
31.5 RM
Cost of 100mm dia AC pipe
161.00
RM
including 5% wastage (average length= 1m)
10.00 Nos
Collors for AC pipe (average) taking 10 of pipe 16.10
Each
30.00 Nos
MS clamps
13.00
Each
0.05 cum
Cement mortor (1:3)
3696.50
Cum
Total
(C) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 21% on (A)+(B)+( C)
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost Per 30 RM (D)+(E)
Cost per 1RM
Rate to be adopted

20 Supplying and fixing CI drianage spoutes complete as per MORTH specification no. 2705
Unit = 1 Nos
Taking output = 1Nos
(a) Material
Corrosion resistant structural steel including
4 kg
5 percent wastage
2.00 meter G.I Pipe 100mm dia
6.00 each GI Bolt 10mm dia

44.50
161.00
11.00

kg
meter
each

Quantity

Rate

per

25.00

each

(b) Labour for fabrication


0.02 day
Mate
0.02 day
Skilled (Blacksmith, welder etc.)
0.02 day
Mazdoor
0.00 %
MAA
Total

345.00
357.00
295.00
19.94

day
day
day

(c) Labour for fixing in position


0.01 day
Mate
0.01 day
Mason
0.20 day
Mazdoor
0.00 %
MAA
Total

345.00
357.00
295.00
66.02

day
day
day

2.00 each

5%

Description of Item
Galvanized MS Flat clamp
Total

Add 5% of cost of material and labour for


electrodes, cutting gas, sealant, anticorrosive bituminous paint, mild steel
grating etc.

(C) Over head charges @ 21% (25%-VAT)


20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)

701.96

737.06

Cost per 1 Nos (E)+(F)


Rate to be adopted

21 Providing and laying Launching aprons for protection against scour with 450 mm to 60
jeddy stones as per drawing and MoRT&H SpecificationNo.2503.
Unit = cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
0.35 nos
Mazdoor for filling watering, ramming etc
0.75 nos
Mazdoor skilled
0.00 %
MAA
Total
(B) Material
1.00 cum
Stone (jeddy stone)
0.20 cum
Stone spalls
Total
Total of (A) + (B)
(C) Over head charges @ 20% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)

345.00
295.00
357.00
384.80

day
day
day

1065.61
938.51

cum
cum

1638.11

Quantity

Description of Item

Rate

per

(D) Total of (A) + (B)+( C)+(D)


(F) Add Contractors Profit at 10% on (E)
Cost per 1 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

22 Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG c
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conform
table 1000-2) including cost,seignorage and conveyance of all materials to site and all
charges for machine mixing,laying in position, Compacting , Vibrating and curing includ
other incidental and all other operational charges of T&P required etc., complete as per M
Specification 1500,1700, 2100 & 2700 (4th Revision) for Levelling course below approach s
Unit = cum
Page 335
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
1.50 nos
Mason
20.00 nos
Mazdoor
0.00 %
MAA
Total
(B) Material
8.10 cum
Cost of 40mm SS-5 HBG M/C
4.05 cum
Cost of 20mm SS-5 HBG M/C
1.35 cum
Cost of 10mm SS-5 HBG M/C
6.75 cum
Sand at site
4.13 MT
Cement at site
Total

of MoRT&H SDB

metal
metal
metal

Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
(D) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

345.00
357.00
295.00
6732.20

day
day
day

1738.51
2258.51
1828.51
825.90
5000.00

cum
cum
cum
cum
MT

453.00
861.70

hr
hr

66542.62

23 Plain cement concrete (1:3:6) nominal mix below CC pavemnet with crushed stone aggreg
mm nominal size mechanically mixed, placed in and compacted by vibration including
complete as per MoRT&H Specification 2100 (4th Revision) for Levelling course bel
pavement
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour

Quantity

Description of Item

0.64 nos
1.00 nos
15.00 nos
0.00 %

Mate
Mason
Mazdoor
MAA
Total
(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
3.45 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
2.00 Hr
Water tanker 6KL capacity
Total
(D) Over head charges @ 21% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

Rate

per

345.00
357.00
295.00
5002.80

day
day
day

1738.51
825.90
5000.00

cum
cum
MT

453.00
861.70
624.00

hr
hr
hr

60433.72

24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone agg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1
including cost, (excluding seigniorage) conveyance of all materials to site and labour ch
centering, machine mixing, laying, vibrating, curing etc., including all other incident
operational charges of all T&P etc., complete for finished item of work as per M
specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed by the Engin
Charge for C.C Pavement.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
Sand at site
825.90
cum
6.75 cum
Cement at site
5000.00
MT
6.33 MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

453.00
861.70

hr
hr

Quantity

Description of Item

Rate

Total
3.50
%
Form work @ 3.5% on A+B+C
(D) Over head charges @ 21% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

per

80013.11
82813.57

Asst. Executive Engineer (R&B),


R&B Section : Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Superintending Engineer (R&B),


R&B Circle : Kakinada

M KM.0.000 TO
37M SPAN ) IN

Amount

ical specification
umps and other
th to the extent
k as per MoRT&H

ing machinary

110.40
2360.00
0.00
2470.40
3120.00
0.00
1118.08
6708.48
670.85
7379.33
30.75
31.00
1 Cum

110.40
2360.00
0.00
2470.40
3120.00
0.00
279.52
1173.98
7043.90
704.39
7748.29
32.28

Amount
32.00
1 Cum

40 mm nominal
uding curing etc.,
for finished item

220.80
357.00
4425.00
0.00
5002.80

23469.89
5574.83
17250.00
46294.72

2718.00
5170.20
1248.00
9136.20
12086.74
###
7252.05
###
5318.17
5318.00
1 Cum

10mm size HBG


d fine aggregate
materials to site
ating and curing
etc., complete as
gs of Abutments,

296.70
535.50

Amount
5900.00
0.00
6732.20
9387.95
12195.95
4936.98
5574.83
25800.00
57895.71
2718.00
5170.20
7888.20
###
2900.64
15083.35
###
9050.01
99550.11
6636.67
6637.00
1 Cum

10mm size HBG


d fine aggregate
materials to site
ating and curing
etc., complete as
CC M-15 for Sub

296.70
535.50
5900.00
0.00
6732.20
9387.95
12195.95
4936.98
5574.83
25800.00
57895.71
2718.00

Amount
5170.20
7888.20
72516.11
7251.61
15953.54
###
9572.13
###
7019.56
7020.00
1 Cum

20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)

296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
###
3144.52
16351.53
###
9810.92
107920.08
7194.67
7195.00
1 Cum

Amount

20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)

296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
###
3144.52
16351.53
###
9810.92
107920.08
7194.67
7195.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
alls.

296.70
535.50
5900.00
0.00
6732.20

Amount
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
78613.11
78613.11
1415.04
9276.35
89304.50
17860.90
###
10716.54
###
7858.80
7859.00
cum
78613.11
7861.31
86474.42
17294.88
###
10376.93
###
7609.75
7610.00
cum

ded metal with


m cubes and cost
curing hire and
ges of steel etc
BD/4-74A & 2-

296.70
535.50
5900.00
0.00
6732.20

Amount
18293.93
9873.95
5574.83
29950.00
63692.71
2718.00
5170.20
7888.20
78313.11

78313.11
15662.62
93975.73
18795.15
###
11277.09
###
8269.86
8270.00

78313.11
19578.28
97891.39
19578.28
###
11746.97
###
8614.44
8614.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
.

296.70
535.50

Amount
5900.00
0.00
6732.20

18293.93
9873.95
5574.83
30500.00
64242.71
2718.00
5170.20
7888.20
1577.26
16088.07
###
9652.84
###
7078.75
7079.00
1 Cum

stone aggregate
bour charges for
and operational
n charges, as per
over Deck slabs

310.50
535.50
6195.00
0.00
7041.00
18293.93
9873.95
5574.83
30500.00
64242.71
2718.00
5170.20
7888.20
79171.91
5278.13

Amount
44.25
0.00
5322.38
1064.48
6386.86
638.69
7025.55
7026.00
1 Cum

of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for

151.80
1035.00
2360.00
0.00
3546.80
45675.00
340.00
46015.00

9912.36
###
5947.42
65421.58
###
1 MT
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for

117.30
690.00
1917.50

Amount
0.00
2724.80
45675.00
255.00
45930.00
9730.96
###
5838.58
64224.34
###
1 MT

of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
1786 of 1985 for

138.00
690.00
1770.00
0.00
2598.00
45675.00
255.00
45930.00
9705.60
###
5823.36
64056.96
###
1 MT

eigniorage of all
as per MoRT&H
tions for finished

96.60
2065.00
0.00

Amount
2161.60
10278.12
10278.12
120.00
31.20
151.20
629.55
###
1322.05
###
1454.25
1454.00
1 Cum

shed aggregates
ns to a thickness
ards the wall and
to the full height
gnorage charges
ng and Technical
(4 th Revision) for

110.40
2065.00
357.00
0.00
2532.40

6351.06
9309.06
15660.12
37.44
37.44
3645.99
###
2187.60
###
2406.35
2407.00

Amount
1 Cum

mm size grouted
e of materials to
plete for finished
y the Engineer-in-

220.80
357.00
4425.00
0.00
5002.80
23469.89
5574.83
12150.00
41194.72
2718.00
5170.20
7888.20
###
3605.71

13.80
124.95
221.25
0.00
360.00
721.14
1124.51
1845.65
441.13
2646.78
264.68
2911.46
2911.46
2911.00
1 Cum

ge charges and
the stones for
ation 2504 ( 4 th

Amount

13.80
124.95
221.25
0.00
360.00
1124.51
187.70
1312.21
334.44
2006.65
200.67
2207.32
2207.32
2207.00
1 Cum

slopes including
ur charges etc.,
Revision) and as

17.25
89.25
295.00
0.00
401.50
1027.81
285.86
1715.17
171.52
1886.69
1886.69
1887.00
1 Cum

Amount

g wall/Return
cture with slope
specification,
2706 & 2200

13.80
265.50
0.00
279.30
2550.00
867.20
3417.20
3696.50
10.35
178.50
73.75
0.00
262.60
5071.50
161.00
390.00
184.83
5807.33
1274.69
7344.62
734.46
8079.08
269.30
269.00
1 RM

n no. 2705

178.00
322.00
66.00

Amount
50.00
616.00

6.90
7.14
5.90
0.00
19.94
3.45
3.57
59.00
0.00
66.02
701.96

35.10
737.06
147.41
884.47
88.45
972.91
973.00
1 Nos
mm to 600 mm

13.80
103.25
267.75
0.00
384.80

1065.61
187.70
1253.31
1638.11
344.00

Amount
1982.11
198.21
2180.32
2180.32
2180.00
1 Cum

ize HBG crushed


ate conforming to
te and all labour
ring including all
e as per MoRT&H
approach slab.

296.70
535.50
5900.00
0.00
6732.20
14081.93
9146.97
2468.49
5574.83
20650.00
51922.22

2718.00
5170.20
7888.20
13308.52
###
7985.11
###
5855.75
5856.00
1 Cum

one aggregate 40
including curing
ourse below CC

Amount
220.80
357.00
4425.00
0.00
5002.80
23469.89
5574.83
17250.00
46294.72

2718.00
5170.20
1248.00
9136.20
3021.69
###
6345.54
###
4653.40
4653.00
1 Cum

stone aggregate
to table 1000-2)
d labour charges,
r incidental and
as per MoRT&H
the Engineer-in-

296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
31650.00
65392.71

2718.00
5170.20

Amount
7888.20
2800.46
4140.68
###
8695.42
###
6376.64
6377.00
1 Cum

Improvements
to Malikipuram
- Kesavadasupalem
Road from
km 0/0per
to 5/886 in
Quantity
Description
of Item
Rate
Godavari District.
25 Provding and filling joints sealing compound
directed by the Engineer in charge.

as per Drawing and Technical specification

Course sand wih bitumen


12.00M long x 10mm wide x 10mm deep
Material
Cost of sand for filling
0.012 cum
Cost of Bitumen 80/100
0.001 MT
Labour
Man Mazdoor for heating bitumen
0.500 cum
Rate for 12 RM
Rate for 1 RM
Rate to be adopted

313.00
###

cum
MT

295.00

each

33.49

26 Supply and fixing of 25mm PVC/HDPE as per BIS N0. 7634 as per drawing and te
specification and directed by the Engineer-in charge.
1.000 RM

25mm Dia
Part III/75 PVC/HDPE as per BIS N0. 7634
Rate to be adopted

15.84

RM

27 Providing Vaccum Dewatered Flooring services including leveling of the placed concrete
followed by placement of the bottom and top mat , operation of the vaccum machine to
the excess free water in the concrete , removal of the mat after completion of dewatering p
conduction of the initial flooting to be followed by finishing using power trowel of pin vibra
the concrete, palcement of the concrete and / or provision of the special topings but includ
and operational charges of generator of adequate capacity and other T&P and labourchar
all operations etc. complete.
Rate per Sqm
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada

28 Saw cutting of concrete pavement using a self propelled walk behind, petro / electric power
of suitable capacity to give a finished groove of 4 mm width and 1/4 to 1/3 depth in the
concrete in the longitudinal and transverse directions along predetermined lines. The
inclusive of the cost of consumable such as dimond blade, masons engaged for the marking
deemed to be included in the rate and poring of sealent in to the performed groove. The
inclusive of cleaning of the groove of the sawing to remove any cementecous particles to
clean surface and surface preperation of the sides of the groove to accommodate the
material etc. to give neat finished look including cost of sealent , hire and operational cha
generator of adequate capacity and T&P and other labour charges for all operations etc. com

Rate per RM
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada

29 Conveying the excavated earth with a carting lead of 2.00KMs from work site including
unloading and all other incidental, hire and operational charges of all T&P etc., complet
soils up to SDR and stone matrix for finished item of work as per MORTH Specification No.

Conveying the excavated earth with a carting lead of 2.00KMs from work site including
unloading and all other incidental, hire and operational charges of all T&P etc., complet
soils up to SDR and stone matrix for finished item of work as per MORTH Specification No.
th Revision) as per directions of Engineer - in - charge

1.00

cum

5.00 %

Conveyance charges for 2.00 KMs


Deduct loading&unloading and stacking
charges (-)

106.00
24.00

cum
cum

Add for Over head charges @ 5% ( 10- VAT )

Add Contractors Profit at 10% on (D)


Cost per 1 cum (D)+(E)
Or say

D
E

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

compound

Amount
as per Drawing and Technical specification and as

3.76
49.68
147.50
200.93
401.87
33.00
RM

/HDPE as per BIS N0. 7634 as per drawing and technical


ngineer-in charge.
15.84
16.00
RM

ring services including leveling of the placed concrete to be


om and top mat , operation of the vaccum machine to release
te , removal of the mat after completion of dewatering process,
be followed by finishing using power trowel of pin vibration of
crete and / or provision of the special topings but including hire
tor of adequate capacity and other T&P and labourcharges for
40.00
Sqm

using a self propelled walk behind, petro / electric powered saw


hed groove of 4 mm width and 1/4 to 1/3 depth in the cured
transverse directions along predetermined lines. The rate is
such as dimond blade, masons engaged for the marking is also
and poring of sealent in to the performed groove. The rate is
of the sawing to remove any cementecous particles to give a
ation of the sides of the groove to accommodate the sealent
look including cost of sealent , hire and operational charges of
d T&P and other labour charges for all operations etc. complete

60.00
RM

th a carting lead of 2.00KMs from work site including loading


, hire and operational charges of all T&P etc., complete in all
or finished item of work as per MORTH Specification No. 305 (4

106.00
-24.00
82.00
4.92
86.92
8.69
95.61
95.60
1 cum

Quantity

Description of Item

Rate

per

30 Providing, laying Reinforced cement concrete Hume pipes of NP-3 class for pipe culverts including
cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of
300mm/450mm/600mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (4 th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
300 mm Dia.,
(A) Labour
0.07 nos
Mate
day
188.00
0.25 nos
Mason
day
193.40
1.50 nos
Mazdoor
day
146.00
Total
(B) Material
12.50 RM
Cost of 300mm Dia., pipes
763.81
RM
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
450 mm Dia.,
(A) Labour
0.11 nos
0.38 nos
2.25 nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 450mm Dia., pipes
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

188.00
193.40
146.00

day
day
day

1244.10

RM

188.00
193.40
146.00

nos.
nos.
nos.

2019.43

RM

600 mm Dia.,
(A) Labour
0.14 nos
0.50 nos
3.00 nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 600mm Dia., pipes
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

Amount

pe culverts including
r laying, jointing of
aligning, lowering and
nd 2906 (4 th Revision)
e for finished item of

13.16
48.35
219.00
280.51
9547.63
9547.63
0.00
9828.14
0.00
9828.14
786.25
786.00
1 RM

20.68
73.49
328.50
422.67
15551.25
15551.25
0.00
15973.92
0.00
15973.92
1277.91
1278.00
1 RM

26.32
96.70
438.00
561.02
25242.88
25242.88
0.00
25803.90
0.00
25803.90
2064.31
2064.00

1 RM

Name of Work ::- Improvements to KANF Road to Antervedi (R&B) Road from

5/850 to 6/320 in E.G.Dt.

DATA
SSR :: 2014-15
SNo Quantity Unit

Municipal Area
Allowance ::

Date ::
Description of Item

Rate

per

31 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all leads
and lifts including prewatering of soil at barrow area, removal of top soil, excavation
of soils at barrowed area, conveyance of soil, depositing the soils on the
embankment, spreading soils, beaking clods, sectioning and consoilidation with
vibratory road roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and complete for finished item of
work as per MoRT&H specification 305 ( 4th revision) ( Payment will be made based
on levels for finished item of work).
(4th Revision) With a lead of 79.500 km (Payment will be made based on
levels for finished item of work).
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.04
1.00

day
day

Page 68,69 of MoRT&H SDB


Unit : Cum
Taking out put = 100 Cum
(A) Labour
Mate
Mazdoor unskilled

0.0

Municipal Area Allowance

345.00
295.00
308.80
TOTAL

100.00 cum
12720.00 t.km

A=

(B) Machinery
13.00
Rate as per G.O. Ms. No 10, Dt 26/7/2005
7.22
Tipper ( for 79.500 km = 160 x 79.500) t.km
Add 10% of cost of carriage to cover
cost of loading and unloading
0.00
Dozer 80 HP for spreading @ 200 cum per hour
0.00
Motor Graders for Grading @ 100 cum per hour
624.00
Water tanker 6 KL
2678.30
Vibratory roller 8T
TOTAL
(A + B )

4.00
1.00

hour
hour
hour
hour

5.00

(C) Over Head Charges on (A+B)

107805.34

10.00

(D) Contractors Profit on (A+B+C)

113195.61

100.00

cum

(E ) Seigniorage charges
Earth

0.00

100.00

cum

TOTAL Cost for 100 cum = (A+B+C+D+E)


Rate per 1 cum

1.00
1.00

1.00
t.km

1.00
1.00
1.00
1.00
B=

1.00

SNo Quantity Unit

Description of Item

Rate

per

Rate per 1 cum

31 Providing 25.4 mm mastic pads for Longitudinal joints, Transversal expansion


joints and Construction joints of approved quality including cost, conveyance and
placing in position, etc., complete as directed by the Engineer-in-charge.
31

Unit = Sqm.

31

(A) Material

31

1.00

Sqm

Rate as per Building SSR Item No.197

991.00

1.00

Rate per sqm

31

31
32 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending, binding
rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc.,
and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the
Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th Revision)
and as per I.S.1786 of 1985 .
32

Page 460 of MoRT&H SDB

32

Unit = MT

32

Taking output = 1 MT

32

(A) Labour

32

0.28

no

Mate

345.00

1.00

32

1.50

no

Black smith

345.00

1.00
1.00

32

5.50

no

Mazdoor

295.00

0.0

Municipal Area Allowance

2236.60

32
32

TOTAL

32
32

TOTAL

32

(B) Material

32

1.05

MT

Mild steel bars including overlaps

32

6.00

Kg

Binding wire ( Building SSR item no.757 )

A=

44500.00 1.00

32

TOTAL

32

(A + B )

70.00

B=

32
32

5.00

(C) Over Head Charges on (A+B)

49381.60

10.00

(D) Contractors Profit on (A+B+C)

51850.68

1.00

MT

TOTAL Cost for 1 MT = (A+B+C+D)

32
32
32
32
32

Rate per 1 MT

1.00

SNo Quantity Unit

Description of Item

Rate

per

Rate per 1 MT

32
32

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

Executive Engineer (R&B),


R&B Division, Amalapuram

Deputy Executive Engineer (R&


R&B Sub-division, Razole

Superintending Engineer (R&B


R&B Circle, Kakinada

B) Road from km

0.0%
Amount

13.80
295.00
308.80
0.00
308.80

1300.00
91838.40
9183.84
0.00
0.00
2496.00
2678.30
107496.54
107805.34
5390.27
11319.56

0.00
124515.17
1245.15

Amount
1245.00

991.00
991.00

96.60
517.50
1622.50
2236.60
0.00
2236.60

46725.00
420.00
47145.00
49381.60
2469.08
5185.07
57035.75
57035.75

Amount
57036.00

ve Engineer (R&B),
division, Razole

g Engineer (R&B),

le, Kakinada

ok

Name of Work :- Improvements to Ramarajulanka - Gondi road from km 0/02 to 7/350 (C


Low Level Cause Way 4V X 6.37m span) in E.G.Dt.

S.No

Specification in Brief

Unit

Earth/ Gravel

Metal/ Stone

cum

cum

Quantity

Factor Quantity Factor Quantity


1
1
2
3
4
5

2
E/W for Foundation Excluding
dewatering
E/W for Foundation including
dewatering
PCC 1:3:6
VCC M20 for Footings of
Abutments, Piers
VCC M20 for substructure of
Abutments, Piers

1 cum

764.00

1.000

764.000

1 cum

747.00

1.000

747.000

1 cum

69.00

0.900

62.10

1 cum

425.00

0.900

382.50

1 cum

268.00

0.900

241.20

VRCC M25 for Raft

1 cum

155.00

0.900

139.50

VRCC M25 for Bedblocks

1 cum

12.00

0.900

10.80

VRCC M25 for Deck Slab

1 cum

116.00

0.900

104.40

VRCC M30 for Approach Slab

1 cum

20.00

0.900

18.00

10 VRCC M30 for Wearing Coat

1 cum

20.00

0.900

18.00

11 Back filling with gravel

1 cum

664.00

12 Filter media using 150 mm ston 1 cum

15.00

1.200

18.00

13 Grouted Revetment with CC(1:4:8)1 cum

22.00

1.180

25.96

1 cum

10.00

1.200

12.00

15 Filter Material with Gravel

1 cum

11.00

0.900

9.90

16 100 mm dia AC Weep holes

416.00

1.200

499.20

14

Stone pitching with 300mm


rough stone

17 Launching apron with Jeddy stone1 cum

1.200

1.200

796.800

13.200

123.00

M15 Grade concrete below


approach slab

1 cum

9.00

0.900

8.10

19 PCC 1:3:6 for Levelling course

1 cum

423.00

0.900

380.70

20 VRCC M30 Grade for CC pavement1 cum

805.00

0.900

724.50

21 Earthen Shoulders

250.00

18

1 cum

Total Quantity
Rate
Amount Rs
Total Amount Rs

1.000

250.000
2571.00

2654.86

22.00
56562.00

50.00
132743.00

231387.00

Asst Executive Engineer (R&B),Deputy Executive Engineer (R&B), Executive Engineer (R&B), Superintending
R&B Section, Malikipuram
R&B Sub-division, Razole
R&B Division, Amalapuram
R&B Circle

marajulanka - Gondi road from km 0/02 to 7/350 (Construction of


4V X 6.37m span) in E.G.Dt.

Sand
cum
Factor Quantity
9

10

0.450

31.05

0.450

191.25

0.450

120.60

0.450

69.75

0.450

5.40

0.450

52.20

0.450

9.00

0.450

9.00

0.090

1.98

0.450

4.95

0.002

0.220

0.450

4.05

0.450

190.35

0.450

362.25

1052.05
40.00
42082.00

Superintending Engineer (R&B),


R&B Circle, Kakinada

C E R T I F I C A T E
Name of Work:
Improvements to Ramarajulanka - Gondi road from km 0/02 to 7/350 (Construction
of Low Level Cause Way 4V X 6.37m span) in E.G.Dt.
1)

Certified that I have personally inspected the above Road on . and the
provisions made in the estimate for the above work are adequate and essential.

2)

Certified that the leads provided in the R.M.R of the estimate are shortest and there is
sufficient yield of good quality material from the quarries proposed in the estimate.

3)

Certified that all the distances in the quarry map are correct.

4)

Certified that the quarries provided are the nearest.

5)

Certified that the routes shown in the quarry map are the shortest for the transportation of
the materials.

6)

Certified that all the materials can be easily quarried.

7)

Certified that the description of all materials mentioned are correct to the best of my
knowledge.

8)

It is certified that no soil having MDD not less than 17.50 kN/cum and suitable for
shoulders is available within a lead of 79.500 km. Hence a lead of 79.500 km is proposed
for selected soil to be used for shoulders.

9)

Certified that the above work is not taken up in any other scheme. Hence there is no
overlap in the execution of work.

Asst Executive Engineer (R&B),


R&B Section, Malikipuram

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

LEAD CHARGES (SSR 2014-15)


Earth/Gravel/
Metal
Sand
loading
52.50
105.00
unloading
15.90
15.90
stacking
0.00
0.00
0.25 xx
xx
0.5 xx
xx
1
31.50
30.40
2
44.10
42.60
3
58.90
58.90
4
71.50
71.50
5
84.10
84.10
6
96.70
96.70
7
109.30
109.30
8
9
10

121.90
134.50
147.10

121.90
134.50
147.10

11

159.70

159.70

12

172.30

172.30

13
14
15
16
17
18
19

184.90
197.50
210.10
222.70
235.30
247.90
260.50

184.90
197.50
210.10
222.70
235.30
247.90
260.50

20

273.10

273.10

21

285.70

285.70

22
23
24
25
26
27
28
29
30
31
32
33
34
35

298.30
310.90
323.50
336.10
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
441.10
451.60

298.30
310.90
323.50
336.10
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
441.10
451.60

Cost of Materials, Labour


SSR 2014-15
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for Concrete
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
850.60
861.10
871.60
882.10
892.60
903.10
913.60
924.10
934.60
945.10
955.60
966.10
976.60

462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
850.60
861.10
871.60
882.10
892.60
903.10
913.60
924.10
934.60
945.10
955.60
966.10
976.60

Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (385 x 30% + 345 x 70%)
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
Sand for Mortar

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

987.10
997.60
1008.10
1018.60
1029.10
1039.60
1050.10
1060.60
1071.10
1081.60
1092.10
1102.60
1113.10
1123.60
1134.10
1144.60
1155.10
1165.60
1176.10
1186.60
1197.10
1207.60
1218.10
1228.60
1239.10
1249.60
1260.10
1270.60
1281.10
1291.60
1302.10
1312.60
1323.10
1333.60
1344.10
1354.60
1365.10
1375.60
1386.10
1396.60
1407.10
1417.60
1428.10
1438.60
1449.10
1459.60
1470.10
1480.60
1491.10
1501.60

987.10
997.60
1008.10
1018.60
1029.10
1039.60
1050.10
1060.60
1071.10
1081.60
1092.10
1102.60
1113.10
1123.60
1134.10
1144.60
1155.10
1165.60
1176.10
1186.60
1197.10
1207.60
1218.10
1228.60
1239.10
1249.60
1260.10
1270.60
1281.10
1291.60
1302.10
1312.60
1323.10
1333.60
1344.10
1354.60
1365.10
1375.60
1386.10
1396.60
1407.10
1417.60
1428.10
1438.60
1449.10
1459.60
1470.10
1480.60
1491.10
1501.60

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

1512.10
1522.60
1533.10
1543.60
1554.10
1564.60
1575.10
1585.60
1596.10
1606.60
1617.10
1627.60
1638.10
1648.60
1659.10

1512.10
1522.60
1533.10
1543.60
1554.10
1564.60
1575.10
1585.60
1596.10
1606.60
1617.10
1627.60
1638.10
1648.60
1659.10

abour
SSR 2014-15
As per SSR of PR Dept.
419.00 Pg. No.17, Sl.53 (Roads)
456.00 Pg. No.17, Sl.52 (Roads)
588.00 Pg. No.16, Sl.51 (Roads) Pg. No.275, M-055 (Rs.845)
156.00 Pg. No.13, Sl.9 (Roads)
154.00 Pg. No.13, Sl.8 (Roads)
144.00 Pg. No.13, Sl.2 (Roads)
164.00 Pg. No.13, Sl.3 (Roads)
Pg. No.272, M-003
136.00 Pg. No.13, Sl.4 (Roads)
118.00 Pg. No.13, Sl.6 (Roads)
138.00 Pg. No.13, Sl.7 (Roads)
188.00 Pg. No.13, Sl.5 (Roads)
(42+48)/2 Pg.18
45.00
Sl. No.84 & 85
95.00 Pg. No.18, Sl.79 (Roads)
588.00 Pg. No.16, Sl.51 (Roads) Pg. No.275, M-055 (Rs.845)

SSR 2013-14
419.00
456.00
588.00
156.00
154.00
140.00
156.00
136.00
118.00
138.00
188.00
45.00
95.00
588.00

944.00 Pg. No.16, Sl.50 (Roads)

Pg. No.275, M-054 (Rs.1313)

944.00

984.00 Pg. No.16, Sl.49 (Roads)

Pg. No.275, M-053 (Rs.1365)

984.00

780.00 Pg. No.16, Sl.48 (Roads)

Pg. No.275, M-052 (Rs.1097)

780.00

656.00 Pg. No.16, Sl.47 (Roads)


504.00 Pg. No.16, Sl.46 (Roads)
308.00 Pg. No.16, Sl.45 (Roads)
340.00 Pg. No.18, Sl.92 (Roads)
103.00 Pg. No.18, Sl.90 (Roads)
620.00 Pg. No.15, Sl.30 (Roads)

Pg. No.274, M-051 (Rs.935)


Pg. No.274, M-050 (Rs.735)
Pg. No.273, M-024 (Rs.474)
Pg. No.261, Sl.No.67
Pg. No.272, M-008
Pg. No.275, M-055 (Rs.845)

656.00
504.00
308.00
330.00
98.00
588.00

994.00 Pg. No.15, Sl.29 (Roads)

Pg. No.275, M-054 (Rs.1313)

944.00

1036.00 Pg. No.15, Sl.28 (Roads)

Pg. No.275, M-053 (Rs.1365)

984.00

822.00 Pg. No.15, Sl.27 (Roads)

Pg. No.275, M-052 (Rs.1097)

780.00

Pg. No.274, M-051 (Rs.935)


Pg. No.274, M-050 (Rs.735)
Pg. No.259, Sl. 27(a)
Pg. No.259, Sl. 27(b)

656.00
504.00
385.00
285.00
44000.00
43000.00
5900.00
45000.00

692.00 Pg. No.14, Sl.26 (Roads)


532.00 Pg. No.14, Sl.25 (Roads)
462.00 Pg. No.19, Sl.94 (Roads)
342.00 Pg. No.19, Sl.95 (Roads)
44000.00
43000.00 As per the G.O.s
5900.00 October, 2014 GO RT
45000.00 No.869, dt.31.12.2014
70.00 Pg. No.19, Sl.95 (Roads)
xx
50.00

As per the G.O.s


October, 2014 GO RT
No.869, dt.31.12.2014
Pg. No.273

70.00
xx
50.00

22.00 As per the G.O.s


40.00
345.00
357.00
295.00

Pg. No.10, Sl.71 (Roads)

2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
4.50
4.50
48.00

Pg. No.25, Sl.1 (Roads)


Pg. No.25, Sl.3 (Roads)
Pg. No.25, Sl.4 (Roads)
Pg. No.25, Sl.5 (Roads)
Pg. No.25, Sl.6 (Roads)
Pg. No.25, Sl.7 (Roads)
Pg. No.25, Sl.8 (Roads)
Pg. No.25, Sl.10 (Roads)
Pg. No.25, Sl.11 (Roads)
Pg. No.25, Sl.12 (Roads)
Pg. No.25, Sl.13 (Roads)
Pg. No.25, Sl.14 (Roads)
Pg. No.26, Sl.15 (Roads)
Pg. No.26, Sl.16 (Roads)
Pg. No.26, Sl.17 (Roads)
Pg. No.26, Sl.18 (Roads)
Pg. No.26, Sl.22 (Roads)
Pg. No.26, Sl.24 (Roads)
Pg. No.26, Sl.25 (Roads)
Pg. No.26, Sl.26 (Roads)
Pg. No.26, Sl.27 (Roads)
Pg. No.26, Sl.30 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.28, Sl.43 (Roads)
Pg. No.27, Sl.38 (Roads)
(As per SSR 2008-2009)
(As per SSR 2008-2009)
Pg. No.28, Sl.48 (Roads)

606.00

Pg. No.19, Sl.93 (Roads)

Pg. No.10, Sl.73 (Roads)

As per the G.O.s

Semi-skilled Mazdoor
Skilled 30% + Semi 70%
Un-skilled Mazdoor
Pg. No.288, Sl.No.8
Pg. No.289, Sl.No.52
Pg. No.289, Sl.No.54
Pg. No.290, Sl.No.62
Pg. No.289, Sl.No.50

Pg. No.288, Sl.No.2

Pg. No.289, Sl.No.24


Pg. No.289, Sl.No.18

22.00
40.00
Pg.254(4)
Pg.256(3)

320.00
329.00
280.00
2511.70
3216.00
2754.50
1646.00
877.30
2541.40
1038.40
624.00
415.00
422.00
422.00
499.40
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
766.40
417.40
xx
xx
48.00

SSR 2013-14
Pg.18, Sl. No.53
Pg.18, Sl. No.52
Pg.18, Sl. No.51
Pg.15, Sl. No.9
Pg.15, Sl. No.8
Pg.15, Sl. No.2
Pg.15, Sl. No.3
Pg.15, Sl. No.4
Pg.15, Sl. No.6
Pg.15, Sl. No.7
Pg.15, Sl. No.5
(42+48)/2 Pg.20
Sl. No.84 & 85
Pg.19, Sl. No.79
Pg.18, Sl. No.51
Pg.18, Sl. No.50
Pg.18, Sl. No.49
Pg.18, Sl. No.48
Pg.18, Sl. No.47
Pg.18, Sl. No.46
Pg.18, Sl. No.45
Pg.20, Sl. No.92
Pg.20, Sl. No.90
Pg.17, Sl. No.30
Pg.17, Sl. No.29
Pg.17, Sl. No.28
Pg.17, Sl. No.27
Pg.16, Sl. No.26
Pg.16, Sl. No.25
Pg.20, Sl. No.94
Pg.20, Sl. No.95
As per the G.O.s
October, 2014 GO RT
No.869, dt.31.12.2014
Pg.18, Sl. No.56

LEAD CHARGES (SSR 2013-14)


Earth/Gravel/
Sand
loading
50.50
unloading
15.20
stacking xx
0.25 xx
0.5 xx
1
30.00
2
42.00
3
56.00
4
68.00
5
80.00
6
92.00
7
104.00

SSR 2008-09
360.00
390.00
500.00
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
39.75
82.00
500.00
830.00
845.00
690.00
560.00
430.00
234.00
225.00
56.00
500.00
830.00
845.00
690.00
560.00
430.00
175.00
60.00
44000.00
43000.00
5900.00
45000.00
70.00
67.00
50.00

As per the G.O.s


October, 2014 GO RT
No.869, dt.31.12.2014

8
9
10

116.00
128.00
140.00

11

152.00

12

164.00

13
14
15
16
17
18
19

176.00
188.00
200.00
212.00
224.00
236.00
248.00

20

260.00

21

272.00

22
23
24
25
26
27
28
29
30
31
32
33
34
35

284.00
296.00
308.00
320.00
332.00
344.00
356.00
368.00
380.00
390.00
400.00
410.00
420.00
430.00

As per the G.O.s

350 x 30% + 320 x 70%

Pg.27, Sl. No.1


Pg.27, Sl. No.3
Pg.27, Sl. No.4
Pg.27, Sl. No.5
Pg.27, Sl. No.6
Pg.27, Sl. No.7
Pg.27, Sl. No.8
Pg.27, Sl. No.10
Pg.27, Sl. No.11
Pg.28, Sl. No.12
Pg.28, Sl. No.13
Pg.28, Sl. No.14
Pg.28, Sl. No.15
Pg.28, Sl. No.16
Pg.28, Sl. No.17
Pg.28, Sl. No.18
Pg.28, Sl. No.22
Pg.28, Sl. No.24
Pg.28, Sl. No.25
Pg.28, Sl. No.26
Pg.28, Sl. No.27
Pg.29, Sl. No.30
Pg.30, Sl. No.43
Pg.30, Sl. No.43
Pg.30, Sl. No.43
Pg.29, Sl. No.38

Pg.30, Sl. No.48

22.00
40.00
188.00
193.40
146.00
2760.00
2600.00
2250.00
1320.00
575.00
1550.00
540.00
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
1090.00
620.00
345.00
4.50
4.50
40.00

206 x 30% + 188 x 70%

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

440.00
450.00
460.00
470.00
480.00
490.00
500.00
510.00
520.00
530.00
540.00
550.00
560.00
570.00
580.00
590.00
600.00
610.00
620.00
630.00
640.00
650.00
660.00
670.00
680.00
690.00
700.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
790.00
800.00
810.00
820.00
830.00
840.00
850.00
860.00
870.00
880.00
890.00
900.00
910.00
920.00
930.00

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

940.00
950.00
960.00
970.00
980.00
990.00
1000.00
1010.00
1020.00
1030.00
1040.00
1050.00
1060.00
1070.00
1080.00
1090.00
1100.00
1110.00
1120.00
1130.00
1140.00
1150.00
1160.00
1170.00
1180.00
1190.00
1200.00
1210.00
1220.00
1230.00
1240.00
1250.00
1260.00
1270.00
1280.00
1290.00
1300.00
1310.00
1320.00
1330.00
1340.00
1350.00
1360.00
1370.00
1380.00
1390.00
1400.00
1410.00
1420.00
1430.00

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

1440.00
1450.00
1460.00
1470.00
1480.00
1490.00
1500.00
1510.00
1520.00
1530.00
1540.00
1550.00
1560.00
1570.00
1580.00

ARGES (SSR 2013-14)


Metal
101.10
15.20
xx
xx
xx
28.90
40.40
56.00
68.00
80.00
92.00
104.00

LEAD CHARGES (SSR 2008-09)


Earth/Gravel/
Metal
Sand
loading
10.00
12.80
unloading
8.50
8.70
stacking
5.50
8.70
0.25
50.00
110.00
0.5
75.00
110.00
1
100.00
120.00
2
106.00
126.00
3
112.00
132.00
4
118.00
138.00
5
124.00
144.00
6
130.00
150.00
7
136.00
156.00

116.00
128.00
140.00

8
9
10

142.00
148.00
154.00

162.00
168.00
174.00

152.00

11

160.00

180.00

164.00

12

166.00

186.00

176.00
188.00
200.00
212.00
224.00
236.00
248.00

13
14
15
16
17
18
19

172.00
178.00
184.00
190.00
196.00
202.00
208.00

192.00
198.00
204.00
210.00
216.00
222.00
228.00

260.00

20

214.00

234.00

272.00

21

278.10

278.85

284.00
296.00
308.00
320.00
332.00
344.00
356.00
368.00
380.00
390.00
400.00
410.00
420.00
430.00

22
23
24
25
26
27
28
29
30
31
32
33
34
35

283.10
288.10
293.10
298.10
303.10
308.10
313.10
318.10
323.10
327.90
332.70
337.50
342.30
347.10

284.60
290.35
296.10
301.85
307.60
313.35
319.10
324.85
330.60
336.10
341.60
347.10
352.60
358.10

440.00
450.00
460.00
470.00
480.00
490.00
500.00
510.00
520.00
530.00
540.00
550.00
560.00
570.00
580.00
590.00
600.00
610.00
620.00
630.00
640.00
650.00
660.00
670.00
680.00
690.00
700.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
790.00
800.00
810.00
820.00
830.00
840.00
850.00
860.00
870.00
880.00
890.00
900.00
910.00
920.00
930.00

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85

351.90
356.70
361.50
366.30
371.10
375.90
380.70
385.50
390.30
395.10
399.90
404.70
409.50
414.30
419.10
423.70
428.30
432.90
437.50
442.10
446.70
451.30
455.90
460.50
465.10
469.70
474.30
478.90
483.50
488.10
492.70
497.30
501.90
506.50
511.10
515.70
520.30
524.90
529.50
534.10
538.70
543.30
547.90
552.50
557.10
561.50
565.90
570.30
574.70
579.10

363.60
369.10
374.60
380.10
385.60
391.10
396.60
402.10
407.60
413.10
418.60
424.10
429.60
435.10
440.60
445.60
450.60
455.60
460.60
465.60
470.60
475.60
480.60
485.60
490.60
495.60
500.60
505.60
510.60
515.60
520.60
525.60
530.60
535.60
540.60
545.60
550.60
555.60
560.60
565.60
570.60
575.60
580.60
585.60
590.60
595.35
600.10
604.85
609.60
614.35

241.5
115.5

940.00
950.00
960.00
970.00
980.00
990.00
1000.00
1010.00
1020.00
1030.00
1040.00
1050.00
1060.00
1070.00
1080.00
1090.00
1100.00
1110.00
1120.00
1130.00
1140.00
1150.00
1160.00
1170.00
1180.00
1190.00
1200.00
1210.00
1220.00
1230.00
1240.00
1250.00
1260.00
1270.00
1280.00
1290.00
1300.00
1310.00
1320.00
1330.00
1340.00
1350.00
1360.00
1370.00
1380.00
1390.00
1400.00
1410.00
1420.00
1430.00

86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135

583.50
587.90
592.30
596.70
601.10
605.50
609.90
614.30
618.70
623.10
627.50
631.90
636.30
640.70
645.10
649.30
653.50
657.70
661.90
666.10
670.30
674.50
678.70
682.90
687.10
691.30
695.50
699.70
703.90
708.10
712.30
716.50
720.70
724.90
729.10
733.30
737.50
741.70
745.90
750.10
754.30
758.50
762.70
766.90
771.10
775.30
779.50
783.70
787.90
792.10

619.10
623.85
628.60
633.35
638.10
642.85
647.60
652.35
657.10
661.85
666.60
671.35
676.10
680.85
685.60
690.10
694.60
699.10
703.60
708.10
712.60
717.10
721.60
726.10
730.60
735.10
739.60
744.10
748.60
753.10
757.60
762.10
766.60
771.10
775.60
780.10
784.60
789.10
793.60
798.10
802.60
807.10
811.60
816.10
820.60
825.10
829.60
834.10
838.60
843.10

1440.00
1450.00
1460.00
1470.00
1480.00
1490.00
1500.00
1510.00
1520.00
1530.00
1540.00
1550.00
1560.00
1570.00
1580.00

136
137
138
139
140
141
142
143
144
145
146
147
148
149
150

796.30
800.50
804.70
808.90
813.10
817.30
821.50
825.70
829.90
834.10
838.30
842.50
846.70
850.90
855.10

847.60
852.10
856.60
861.10
865.60
870.10
874.60
879.10
883.60
888.10
892.60
897.10
901.60
906.10
910.60

LEAD CHARGES (SSR 2014-15)


Earth/Gravel/
Metal
Sand
loading
52.50
105.00
unloading
15.90
15.90
stacking xx
xx
0.25 xx
xx
0.5 xx
xx
1
31.50
30.40
2
44.10
42.60
3
58.90
58.90
4
71.50
71.50
5
84.10
84.10
6
96.70
96.70
7
109.30
109.30
8
9
10

121.90
134.50
147.10

121.90
134.50
147.10

11

159.70

159.70

12

172.30

172.30

13
14
15
16
17
18
19

184.90
197.50
210.10
222.70
235.30
247.90
260.50

184.90
197.50
210.10
222.70
235.30
247.90
260.50

20

273.10

273.10

21

285.70

285.70

22
23
24
25

298.30
310.90
323.50
336.10

298.30
310.90
323.50
336.10

Cost of Materials, Labour


SSR 2014-15
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal

As per SSR of PR Dept.


419.00 Pg. No.17, Sl.53 (Roads)
456.00 Pg. No.17, Sl.52 (Roads)
588.00 Pg. No.16, Sl.51 (Roads)
156.00 Pg. No.13, Sl.9 (Roads)
154.00 Pg. No.13, Sl.8 (Roads)
144.00 Pg. No.13, Sl.2 (Roads)
164.00 Pg. No.13, Sl.3 (Roads)
136.00 Pg. No.13, Sl.4 (Roads)
118.00 Pg. No.13, Sl.6 (Roads)
138.00 Pg. No.13, Sl.7 (Roads)
188.00 Pg. No.13, Sl.5 (Roads)
(42+48)/2 Pg.18
45.00
Sl. No.84 & 85
95.00 Pg. No.18, Sl.79 (Roads)
588.00 Pg. No.16, Sl.51 (Roads)

25 to 27 mm IRC & MoRTH HBG M/C metal

944.00 Pg. No.16, Sl.50 (Roads)

19 to 22 mm IRC & MoRTH HBG M/C metal

984.00 Pg. No.16, Sl.49 (Roads)

12 to 14 mm IRC & MoRTH HBG M/C metal

780.00 Pg. No.16, Sl.48 (Roads)

9.5 to 11.20 mm IRC & MoRTH HBG M/C metal


5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal(Excluding Blasting &

656.00 Pg. No.16, Sl.47 (Roads)


504.00 Pg. No.16, Sl.46 (Roads)
308.00 Pg. No.16, Sl.45 (Roads)
340.00 Pg. No.18, Sl.92 (Roads)
103.00 Pg. No.18, Sl.90 (Roads)
620.00 Pg. No.15, Sl.30 (Roads)

25 mm SS-5 m/c HBG metal ''

994.00 Pg. No.15, Sl.29 (Roads)

20 mm SS-5 m/c HBG metal

''

1036.00 Pg. No.15, Sl.28 (Roads)

12 mm SS-5 m/c HBG metal

''

822.00 Pg. No.15, Sl.27 (Roads)

10 mm SS-5 m/c HBG metal ''


6 mm SS-5 m/c HBG metal ''
Sand for Concrete

692.00 Pg. No.14, Sl.26 (Roads)


532.00 Pg. No.14, Sl.25 (Roads)
462.00 Pg. No.19, Sl.94 (Roads)

26
27
28
29
30
31
32
33

348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60

348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60

Sand for Filling


Sand for Masonry
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges

342.00 Pg. No.19, Sl.95 (Roads)


606.00 Pg. No.19, Sl.93 (Roads)
44000.00
43000.00 As per the G.O.s
5900.00 October, 2014 GO RT
45000.00 No.869, dt.31.12.2014
70.00 Pg. No.19, Sl.95 (Roads)

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10

441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10

Blasting charges for rough stone


Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (385 x 30% + 345 x 70%)
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer

xx
50.00
22.00 As per the G.O.s
40.00
345.00
357.00
295.00

Pg. No.10, Sl.71 (Roads)

2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
4.50
4.50
48.00

Pg. No.25, Sl.1 (Roads)


Pg. No.25, Sl.3 (Roads)
Pg. No.25, Sl.4 (Roads)
Pg. No.25, Sl.5 (Roads)
Pg. No.25, Sl.6 (Roads)
Pg. No.25, Sl.7 (Roads)
Pg. No.25, Sl.8 (Roads)
Pg. No.25, Sl.10 (Roads)
Pg. No.25, Sl.11 (Roads)
Pg. No.25, Sl.12 (Roads)
Pg. No.25, Sl.13 (Roads)
Pg. No.25, Sl.14 (Roads)
Pg. No.26, Sl.15 (Roads)
Pg. No.26, Sl.16 (Roads)
Pg. No.26, Sl.17 (Roads)
Pg. No.26, Sl.18 (Roads)
Pg. No.26, Sl.22 (Roads)
Pg. No.26, Sl.24 (Roads)
Pg. No.26, Sl.25 (Roads)
Pg. No.26, Sl.26 (Roads)
Pg. No.26, Sl.27 (Roads)
Pg. No.26, Sl.30 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.27, Sl.43 (Roads)
Pg. No.28, Sl.43 (Roads)
Pg. No.27, Sl.38 (Roads)
(As per SSR 2008-2009)
(As per SSR 2008-2009)
Pg. No.28, Sl.48 (Roads)

Pg. No.10, Sl.73 (Roads)

73
74
75

850.60
861.10
871.60

850.60
861.10
871.60

Sand for Mortar

606.00

Pg. No.19, Sl.93 (Roads)