(C1)
(S1)
4,400
41,500
The revised raw materials costs i.e., the rates adopted in the estimate.
Cement
Steel (MS Rods)
(C2)
(S2)
6,400
45,000
Total quantity of Concrete required (as per IS 458 : 1988 Table 2 & 3 in Pg.7 & 8)
NP3 Class pipes
Quantity per 1 RM
Quantity per 1 RM
300 MM dia
0.04274 Cum.
TTx0.340x1.000x0.040
0.03111 Cum.
TTx0.330x1.000x0.030
0.00424 Cum.
TTx0.300x0.150x0.030
450 MM dia
0.12375 Cum.
TTx0.525x1.000x0.075
0.05335 Cum.
TTx0.485x1.000x0.035
0.00990 Cum.
TTx0.450x0.200x0.035
600 MM dia
0.18299 Cum.
TTx0.685x1.000x0.085
0.09122 Cum.
TTx0.645x1.000x0.045
0.01609 Cum.
TTx0.640x0.200x0.040
Dia
300 MM dia
450 MM dia
600 MM dia
0.78 + 1.80
2.58 Kgs
0.78 + 0.79
1.57 Kgs
0.71 Kgs
0.78 + 3.79
4.57 Kgs
0.78 + 1.97
2.75 Kgs
1.48 Kgs
1.18 + 7.01
8.19 Kgs
0.78 + 3.47
4.25 Kgs
1.89 Kgs
(Contd)
Revised Cost
Revised Cost R1 : Variation (increase / decrease ) in cost (Rs. per metre)
due to change in the cost of M.S. Rods = (S2-S1)/1000 X Ws.
Dia
300 MM dia
450 MM dia
600 MM dia
300 MM dia
450 MM dia
600 MM dia
300 MM dia
724.00
9.03
30.78
= Rs. 763.81
320.00
5.50
22.40
= Rs. 347.90
450 MM dia
1,139.00 16.00
89.10
= Rs. 1,244.10
563.00
9.63
38.42
= Rs. 611.05
167.00
5.18
7.12
= Rs. 179.30
600 MM dia
1,859.00 28.67
131.76
= Rs. 2,019.43
914.00
14.88
65.68
= Rs. 994.56
255.00
6.62
11.58
= Rs. 273.20
79.00
2.49
3.06
= Rs. 84.55
Wt. of Cement Wc
0.00576 x 360
R1 : variation in Steel
(45,000 -41,500) /1000
x 0.79 Kgs.= Rs 2.77
Revised Cost=Cost as per the SSR+R1+R2
Wt. of Steel Ws
= 2.07 Kgs.
= 0.79
Kgs.
R2 : variation in Cement
(6,400 -4,400) /1000
x 2.07 Kgs.= Rs 4.14
97.00
2.77
4.14
= Rs. 103.91
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
24)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
Provision
Provision
Provision
Provision
Provision
Provision
for
for
for
for
for
for
The rates adopted in the estimate are as per SSR 2014-15 and the work will be
carried out as per relevant specifications of MORT&H.
Asst. Executive Engineer (R&B),
R&B Section : Malikipuram
Name IMPROVEMENTS
TO
RAMARAJULANKS-GONDI
ROAD
FROM
of
KM.0.000 TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY
Work: 4VX6.37M SPAN) IN EAST GODAVARI DISTRICT .
GENERAL ABSTRACT
S NO
1
ITEM
AMOUNT
Sub Total
19129189
19129189
L.S Provisions
2
956459
765168
231387
200000
200000
95646
50000
100000
10
1500000
11
12
13
10000
14
19599
300000
150000
23707448
(Rupees Two Hundred and Forty Two Lakhs only)
Quantity
7
0.60
154.3
Flexible approns
Aprons: U/S side
1 x 1 28.260
3.00
0.60
50.87
1 x 1 28.260
6.00
0.60
101.74
2x 1
8.000
3.10
1.60
79.36
2 x 1 15.000
2.30
1.60
110.4
2 x 1 26.000
2.30
1.60
191.36
2 x 1 10.000
1.40
1.10
30.8
5x 1
7.000
1.00
1.00
35
4x 1
6.751
0.60
0.60
9.72
Rate
8
763.545
764.00 31.00
cum
Raft
1 x 1 28.260
9.10
1.75
450.041
1 x 1 28.260
0.60
2.00
33.91
1 x 1 28.260
0.60
2.00
33.91
1 x 1 28.260
3.00
0.90
1 x 1 28.260
6.00
0.90
76.30
152.60
746.771
747.00 32.00
cum
Plain cement concrete (1:3:6) nominal mix in foundation with crushed stone
aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below raft and wing walls
Under Raft
1 x 1 28.260
9.10
0.150
38.57
2 x 1 8.000
3.10
0.100
4.96
2 x 1 15.000
2.30
0.100
6.90
2 x 1 26.000
2.30
0.100
11.96
2 x 1 10.000
1.40
0.100
2.80
5 x 1 7.000
1.00
0.100
1 x 1 28.26
1 x 1 28.26
2 x 1 8.45
3x 1
3x 1
8.50
8.50
2x 1
2x 1
8.00
8.00
2.00
2.00
1.00
33.91
33.91
37.18
0.50
0.50
33.15
22.95
3.10
1.70
0.50
1.20
24.80
32.64
2 x 1 15.00
2 x 1 15.00
2.30
1.20
0.50
0.75
34.50
27.00
2 x 1 26.00
2 x 1 26.00
2.30
1.20
0.50
0.75
59.80
46.80
2 x 1 10.00
2 x 1 10.00
1.40
0.65
0.50
0.50
14.00
6.50
5x 1
1.00
0.50
7.00
(
(
(
0.60
)
0.60
)
1.70 + 2.70
2
2.60
1.80
say
3.50
68.69
69.00 5318.00
cum
17.50
424.64
425.00 6637.00
cum
154.30
154.30
155.00 7195.00
cum
2x 1
8.45
For Pier:
3x 1
7.50
3x 1
2x 1
8.00
0.70 +
2
(
0.76 +
2
( 0.76^2 +
4
x
1.70
3.14
63.68
1.00
3.14
62.17
3.14
5.84
0.88
2.00
28
2 x 1 15.00
0.78
1.45
33.7125
2 x 1 26.00
0.78
1.45
58.435
2 x 1 10.00
0.53
0.70
7.35
5x 1
0.50
0.50
8.75
267.93
7.00
1.0^2)
2
268.00 7020.00
cum
6
V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage charges,labour charges for machine mixing, laying, compacting,
curing etc,including all other incidental and operational charges,T&P charges
etc, complete but excluding cost of steel and its fabrication charges, as per
MoRT&H Specifications 1500,1700,2100(4th Revision)For bed blocks &
backing walls
upto 5.0m height
Bed blocks over abutments 2 x 1
Backingwallsover abutmen 2 x 1
Bed blocks over pier :
-- do-- cut waters
deduct approach slab porti
7.50
7.50
0.75
0.30
0.300
0.515
0.90
/4 ( 0.9 )2
0.30
0.300
0.300
0.300
3.80
2.61
6.08
0.57
-1.35
11.71
12.00 7859.00
cum
3x 1
3x 1
2
8.45
8.45
4 x 1 28.87
m3
per
Span
say
Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 10001 and fine aggregate conforming to table 1000-2) including cost,seignorage and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.
115.48
116.00 8614.00
cum
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (4th Revision) for Levelling course
below approach slab.
Levelling course below
approach slab.
2x 1
7.50
4.00
0.150
9.00
9.00
9.00 5856.00
cum
V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
stone aggregate including cost and conveyance of all materials to site,
seigniorage
charges,labour
charges
for
machine
mixing,laying,compacting,curing etc,including all other incidental and
operational charges,T&P chargesetc, complete but excluding cost of steel and
its fabrication charges, as per MoRT&H Specifications 1500,1700,2704(4th
Revision) for Approach Slab.
For approach slab
2x 1
4.30
7.50
0.300
V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed
10 stone aggregate including cost and conveyance of all materials to site,
seigniorage
charges,labour
charges
for
machine
mixing,laying,compacting,curing etc,including all other incidental and
operational charges,T&P chargesetc, complete but excluding cost of steel and
its fabrication charges, as per MoRT&H Specifications 1500,1700,2702(4th
Revision). For Wearing coat .
Over deck slabs
4 x 1 6.74
7.50
0.075
Over approach slabs
2 x 1 4.30
7.50
0.075
19.35
19.35
20.00 7079.00
cum
15.17
4.84
20.00
20.00 7026.00
cum
4 x 1 ###
1
Wearing coat
kgs
per
Span
7464
19
85
kgs/cum
1644.75
###
60
kgs/cum
1200.18
or say
12
###
10.40
11.00 65422.0
M.T
11.71
100
kgs/cum
1171.20
2 x 1
350
kgs
700.00
3 x 1
350
kgs
1050.00
200
kgs
200.00
300
kgs
300.00
520
kgs
520.00
80
kgs
80.00
1 x 1
50
kgs
50.00
1 x 1
1.8
kgs
1 x 1
564
or say
13
1.80
4073.00
4.08
4.10 64224
M.T
Providing HYSD bars (Fe-415) of diferent diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th
revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
Raft
Skin reinforcement for
abutments
Skin reinforcement for
piers
Body walls on A-side Nonvented level portion
Body walls on S-side NonBody
walls
onportion
S-side Nonvented
level
vented level Ramp
Body walls on S-side
portion
Non-vented level Ramp
Cross walls on S-side Nonportion
vented level Ramp
portion
154.30
50
kgs/cum
7714.98
2 x 1
150
kgs
300.00
3 x 1
300
kgs
900.00
1 x 1
350
kgs
350.00
1 x 1
500
kgs
500.00
1 x 1
900
kgs
900.00
1 x 1
200
kgs
200.00
1 x 1
125
kgs
125.00
###
10.99
11.00
###
M.T
14 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought
and put up bars of all diameters including cost and conveyance of steel to site
and all labour charges for fabrication of reinforcement including cutting,
bending, binding rods, tying grills, placing them in position etc., complete
including cost and conveyance of binding wire and all handling charges and
operational charges etc., and including over lapping welding if required etc.,
complete for all R.C.C items for finished item of work as per standard drawings,
as per the directions of the Engineer-in-Charge and as per MoRT&H specification
1600 &2200 (4th Revision) and as per I.S.1786 of 1985 .
Approaches
CC pavement
5 x 30 0.500
11 x 28 0.500
75.00
154.00
229.00
881.65
0.90
M.T
RM
kgs
###
15 Back filling behind Abutments with gravel including cost ,conveyance and
seigniorage of all materials to site etc., complete as per Clause 710.1.4 of
IRC : 78and as per MoRT&H Specification No. 2200 (4th Revision) and as per
Drawing and technical specifications for finished item of work
In between Body walls on
Appanaramuni lanka side 1 x 1 8.00
7.500
In between Body walls on
Sakinetipally side
(15+36)
1 x 1 51.00
7.500
(in between body walls of non-vented and ramp portion)
1.500
1.500
or say
90.00
573.75
663.75
664.00 1454.00
cum
16 Providing and laying filter media with stone crushed aggregate satisfying the
requirements laid down in Clause 2504.2.2 of MORTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger
size towards the wall and provided over the entire surface behind abutment and
wing wall, to the full height , compacted to a firm condition complete as per
drawing and technical specification No.710.1.1 of IRC 78 and 2200(Sl.No.13.10)
Behind abutment
2x 1
8.00
0.60
1.500
or say
14.40
14.40
15.00 2407.00
cum
17 Providing and laying filter material with gravel underneath pitching in slopes
including cost and conveyance of materials to site including labour charges etc,
complete for finished item of work as per MoRTH Specification No.2504(4th
Revision)and as directed by the Engineer-in-Charge.
For pitching of slopes.
Quadrants
4x 1
17.760
0.15
or say
10.66
10.66
11.00 1887.00
cum
18 Providing Grouted Revetment with rough stone other than granite of not less
than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost,
seigniorage charges and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the
Engineer-in-Charge for quadrential revetment.
For quadrants
4x 1
17.760
0.30
21.31
21.31
22.00 2911.00
cum
19 Providing rough stone revelment other than granite 300 mm thick using 300
mm ize rough stonne varity including cost ,seigniorage and conveyance of all
materials to site , labour cgarges etc , complete as per MOST specification no.
2504
Toe walls
4
6.751
0.600
0.600
9.72
9.72
10.00 2207.00
cum
or say
20 Providing and laying boulders apron on river bed for protecting against scour
with jeddy stone of 450mm stone boulders weighing not less than 40 kg each
complete as per MOST specification no. 2504
1 x 1 51.26
3.00
0.90
1 x 1 51.26
6.00
0.90
21 Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C in both
horizontal and vertical directions so that the weep holes in each horizontal
dirction is staggered from the weep holes lying above and below lines as shown
in drawing for abutments, wing walls, including cost and conveyance of the AC
pipes and labour charges for cutting to required lenghts,placing the pipe with a
slope of 1:20 towards steam side face etc, complete for finished item of work
for weep holes, as per MoRTH Specification No.2706(4th Revision)and as
directed by the Engineer-in-Charge.
For abutments
2x 8
1.20
3.00
Body walls A-side
1x 8
0.90
2.00
Body walls S-SIDE
1 x 51
1.00
1.00
or say
138.40
276.80
415.21
416.00 2180.00
cum
57.60
14.40
51.00
123.00
123.00 269.00
R.M.
8
8 973.00
Nos
23 Plain cement concrete (1:3:6) nominal mix below CC pavemnet with crushed
stone aggregate 40 mm nominal size mechanically mixed, placed in and
compacted by vibration including curing complete as per MoRT&H Specification
2100 (4th Revision) for Levelling course below CC pavement
Appanaramuni lanka -side
1x 1
77.00
7.50
0.10
57.75
Sakinetipally -SIDE
1 x 1 71.00
7.50
(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 1 416.00
7.50
0.10
53.25
0.10
312.00
423.00
423.00
cum
or say
4653
24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, (excluding seigniorage)
conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including all other incidental and
operational charges of all T&P etc., complete for finished item of work as per
MoRT&H specification 1500, 1700, 2100 & 2702 (4th Revision) and as
directed by the Engineer-in-Charge for C.C Pavement.
Appanaramunilanka side
1 x 1 77.00
7.50
Sakinetipally -SIDE
1 x 1 71.00
7.50
(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 1 416.00
7.00
0.20
0.20
0.20
or say
115.50
106.50
582.40
804.40
805.00 6377.00
cum
7.00
--
0.20
or say
16.80
16.80
17.00 991.00
sqm
26 Supply and fixing of 25mm PVC/HDPE as per BIS N0. 7634 as per drawing and
technical specification and directed by the Engineer-in charge.
12 x 29
0.25
--
-or say
87.00
87.00
87.00 16.00
RM
---
577.50
532.50
2912.00
4022.00
4022.00
or say
4022.00 40.00
sqm
28 Saw cutting of concrete pavement using a self propelled walk behind, petro /
electric powered saw of suitable capacity to give a finished groove of 4 mm
width and 1/4 to 1/3 depth in the cured concrete in the longitudinal and
transverse directions along predetermined lines. The rate is inclusive of the cost
of consumable such as dimond blade, masons engaged for the marking is also
deemed to be included in the rate and poring of sealent in to the performed
groove. The rate is inclusive of cleaning of the groove of the sawing to remove
any cementecous particles to give a clean surface and surface preperation of
the sides of the groove to accommodate the sealent material etc. to give neat
finished look including cost of sealent , hire and operational charges of
generator of adequate capacity and T&P and other labour charges for all
operations etc. complete
Appanaramunilanka side
1 x 16
-7.50
1 x 1 77.00
-Sakinetipally -SIDE
1 x 16
-7.50
1 x 1 71.00
-(in between body walls of non-vented and ramp portion)
Road work
CC Pavement
1 x 80
-7.00
1 x 1 416.00
--
-----
---
or say
120.00
77.00
120.00
71.00
560.00
416.00
1364.00
1364.00
1364.00 60.00
RM
29 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all
leads and lifts including prewatering of soil at barrow area, removal of top soil,
excavation of soils at barrowed area, conveyance of soil, depositing the soils on
the embankment, spreading soils, beaking clods, sectioning and consoilidation
with vibratory road roller @ OMC to meet requirement of table 300-2 of
MoRT&H, including all hire and operational charges of T&P and complete for
finished item of work as per MoRT&H specification 305 ( 4th revision) ( Payment
will be made based on levels for finished item of work).
Road work
CC Pavement
1 x 2 416.00
1.00
0.30
or say
on Rs. 19129189
on Rs. 19129189
249.60
249.60
250.00 1245.00
cum
Executive Engineer
R&B Division : Amala
KM.0.000 TO 7.350
M SPAN ) IN EAST
Per
9
Amount
10
20.88
1.00
cum
23684
1.00
cum
23904
1.00 366942
cum
6.594
6.237
1.00 2820725
cum
1.00 1115225
cum
1.00 1881360
cum
1.00
cum
94308
craftpaperbearings
1.00 999224
cum
1.00
cum
52704
1.00 141580
cum
1.00 140520
cum
1.00 719642
M.T
564
2256
1128
1001.664
1.776
1.00 263318
M.T
1.00 704627
0.888
M.T
3.28888889
30
1.00
M.T
51332
1.00 965456
cum
1.00
36105
cum
1.00
cum
20757
1.00
cum
64042
1.00
cum
22070
1.00 906880
cum
1.00
R.M
33087
1.00
No.
7784
1.00 1968219
cum
1.00 5133485
cum
1.00
sqm
16847
28
1.00
RM
1392
1.00 160880
sqm
17.1111111
92.4444444
1.00
sqm
81840
1.00 311250
cum
###
956459
95646
765168
231387
200000
200000
ONLY)
50000
100000
###
300000
150000
10000
19599
###
e Engineer (R&B),
sion : Amalapuram
23687849
512151
Name of work :
Improvements to Ramarajulanka - Gondi Road from K.M. 0.000 to 7.350
( Construction of submersible bridge 4 x 6.00 M) in East Godavari District.
LEAD STATEMENT
1 HBG Metal from Katheru Quarry :
From
To
MR
CT
Quarry to Lalacheruvu 2 Kms CT = 2x1.10
0.000
2.000
2.000 1.1
NH 16
###
944.805
38.405
NH 16 to Rajavaram - Podalada Road
###
31.735
29.690
NH 214 (115.760 to 125.135)
###
115.760
9.375
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
3.000
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2
Or
2 BITUMEN AND EMULSION FROM VISAKHA REFINARY :
From
To
Refinery to V.V. Road NH 16
Visakhapatanam to Kathipudi Junction NH
###
839.600
Kathipudi to Amalapuram NH 216
0.000
125.135
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
0.000
6.000)
(Working Reach = (6.600 - 6.000)/2
MR
CT
###
###
3.000
6.000
Or
3 Gravel from Kadiyam Quarry :
From
Quarry to Vemagiri
NH 16
NH 16 to Rajavaram - Podalada Road
NH 216 (115.760 to 125.135)
Sivakodu - Ramarajulanka Road (1.200 to
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000)
(Working Reach = (6.600 - 6.000)/2
To
MR
###
###
###
944.805
61.425
115.760
26.605
29.690
9.375
1.200
4.200
3.000
6.000
0.000
6.000
CT
Or
4 Sand
Sand Quarry at River Godavari at P. Gannavaram
From
River bed to Panchayat road
Panchayat Road
R.P. Road (49.072 to 61.425)
###
NH 216 (115.760 to 125.135)
###
Sivakodu - Ramarajulanka Road (1.200 to
1.200
4.200)
Ramarajulanka - Gondi Road (0.000 to
6.000
6.000)
(Working Reach = (6.600 - 6.000)/2
To
MR
61.425
115.760
12.353
9.375
4.200
3.000
0.000
6.000
CT
Or
0.000 to 7.350
odavari District.
Lead
2.200
38.405
29.690
9.375
3.000
6.000
0.300
###
89.000
Kms.
Lead
1.600
120.600
96.300
3.000
6.000
0.300
###
###
Kms.
Lead
4.600
26.605
29.690
9.375
3.000
6.000
0.300
79.570
###
Kms.
Lead
0.110
0.200
12.353
9.375
3.000
6.000
0.300
31.338
###
Kms.
Sl. No
Description of Metal
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less
stacking
89.00
1018.60
419.00
"
89.00
1018.60
456.00
"
89.00
1018.60
588.00
"
89.00
1018.60
164.00
"
89.00
1018.60
45.00
"
89.00
1018.60
95.00
40 to 45 mm IRC and MoRTH HBG M/C HBG Metal from Katheru Quarry :
metal
89.00
1018.60
588.00
"
89.00
1018.60
944.00
"
89.00
1018.60
984.00
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less
stacking
"
89.00
1018.60
780.00
"
89.00
1018.60
656.00
"
89.00
1018.60
504.00
"
89.00
1018.60
308.00
"
89.00
1018.60
340.00
79.50
918.85
50.50
89.00
1018.60
620.00
Description of Metal
Sl. No
14
15 Gravel
"
89.00
1018.60
994.00
"
89.00
1018.60
1036.00
"
89.00
1018.60
822.00
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less
stacking
"
89.00
1018.60
692.00
"
89.00
1018.60
532.00
"
89.00
1018.60
172.10
31.50
414.85
462.00
31.50
273.10
342.00
Description of Metal
Sl. No
43500.00
"
42500.00
27 Mild Steel
"
44500.00
28 Cement
"
5000.00
Sl. No
Description of Metal
Source of Supply
Lead in
Kms
Conveyance
Initial cost
less
stacking
S-GONDI ROAD FROM KM.0.000 TO 7.350 (CONSTRUCTION OF LOW LEVEL CAUSE WAY
RI DISTRICT .
Seigniorage
charges
Deduct 14%
CP & OH
charges from
conveyance
Toal Cost
per Cum
0.00
0.00
-125.09
1382.51
70.00
0.00
0.00
-125.09
1419.51
70.00
0.00
0.00
-125.09
1551.51
67.00
0.00
0.00
-125.09
1124.51
0.00
0.00
0.00
-125.09
938.51
70.00
0.00
0.00
-125.09
1058.51
70.00
0.00
0.00
-125.09
1551.51
70.00
236.00
0.00
-125.09
2143.51
70.00
246.00
0.00
-125.09
2193.51
Blasting
charges
Machine
crushing
charges
70.00
Seigniorage
charges
Deduct 14%
CP & OH
charges from
conveyance
Toal Cost
per Cum
195.00
0.00
-125.09
1938.51
70.00
164.00
0.00
-125.09
1783.51
70.00
126.00
0.00
-125.09
1593.51
70.00
77.00
0.00
-125.09
1348.51
0.00
0.00
0.00
-125.09
1233.51
0.00
0.00
0.00
-112.84
856.51
70.00
155.00
0.00
-125.09
1738.51
70.00
248.50
0.00
-125.09
2206.01
70.00
259.00
0.00
-125.09
2258.51
70.00
205.50
0.00
-125.09
1991.01
Blasting
charges
Machine
crushing
charges
70.00
Seigniorage
charges
Deduct 14%
CP & OH
charges from
conveyance
Toal Cost
per Cum
173.00
0.00
-125.09
1828.51
70.00
133.00
0.00
-125.09
1628.51
0.00
0.00
0.00
-125.09
1065.61
0.00
0.00
0.00
-50.95
825.90
0.00
0.00
0.00
-33.54
581.56
0.00
0.00
0.00
43500.00
0.00
0.00
0.00
42500.00
Blasting
charges
Machine
crushing
charges
70.00
44500.00
0.00
0.00
0.00
5000.00
Blasting
charges
Machine
crushing
charges
Seigniorage
charges
Deduct 14%
CP & OH
charges from
conveyance
Toal Cost
per Cum
Bridge portion
Description of Item
Rate
per
Mate
8.00 day
0.00 %
Mazdoor unskilled
MAA
Total
(B) Machinery
Rate as per G.O. Ms No 10, Dt 26/7/2005
240.00 cum
(C) Seigniorage charges
240.00 Cum Seigniorage charges
345.00
day
295.00
2470.40
day
13.00
cum
0.00
cum
Quantity
Description of Item
Rate
per
Rate to be adopted
(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
3.45 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
2.00 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 20% (25%-VAT)
20.00 %
Add for Over head charges @ 25% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
day
day
day
1738.51
825.90
5000.00
cum
cum
MT
453.00
861.70
624.00
hr
hr
hr
Note: Vibrator is a part of minor T&P which is already included in over head
charges of the contractor
3 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing,laying in position, Compacting , Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2100 (4th Revision) VCC M-20 for footings of Abut
Piers ,and Wing walls Cut of walls.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
Quantity
Description of Item
20.00 nos
0.00 %
Mazdoor
MAA
Total
(B) Material
5.40 cum
Cost of 40mm SS-5 HBG
5.40 cum
Cost of 20mm SS-5 HBG
2.70 cum
Cost of 10mm SS-5 HBG
6.75 cum
Sand at site
5.16 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28
6.00 hr
Generator set 35 KVA
Total
M/C metal
M/C metal
M/C metal
cum
Rate
per
295.00
6732.20
day
1738.51
2258.51
1828.51
825.90
5000.00
cum
cum
cum
cum
MT
453.00
861.70
hr
hr
Cum
4 Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm siz
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine agg
conforming to table 1000-2) including cost,seignorage and conveyance of all materials
and all labour charges for machine mixing, laying in position,Compacting, Vibrating and
including all other incidental and all other operational charges of T&P required etc., comp
per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub structure .VCC M-15 f
structure of Abutments, Piers and wing walls
Unit = cum
Page 335,455 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
5.40 cum
1738.51
cum
Cost of 40mm SS-5 HBG M/C metal
5.40 cum
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
2.70 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
5.16 MT
Cement at site
5000.00
MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr
Quantity
6.00 hr
Description of Item
Generator set 35 KVA
Rate
per
861.70
hr
Cum
Cum
Quantity
Description of Item
Rate
per
Cum
7 V.R.C.C. M25 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing, laying, compacting, curing etc,including all other incidental and oper
charges,T&P charges etc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100(4th Revision)For bed blocks & backing walls.
Page 472,457 of MoRT&H SDB
Unit = cum
Taking output = 15 cum
(A) Labour
345.00
0.86 nos
Mate
357.00
1.50 nos
Mason
295.00
20.00 nos
Mazdoor
0.00 %
MAA
6732.20
(B) Material
day
day
day
Quantity
8.10 cum
5.40 cum
6.75 cum
6.05 MT
Description of Item
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site
Rate
per
2258.51
1828.51
825.90
5000.00
cum
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
6.00 hr
Generator set 35 KVA
861.70
Total
Total A+B+C for 15 cum
a) Height from 5m to 10m
Basic rate for 15 cum of concrete
1.80 %
Add on cost of concrete to cater extra lift
78613.11
11.80 %
Add for Form work on cost of concrete
78613.11
Total
20.00 %
Add for Over head charges
10.00 %
cum
MT
hr
hr
Rs
Rs
Rs
b) Height upto 5m
Basic rate for 15 cum of concrete
10.00 %
Add for Form work on cost of concrete
20.00 %
10.00 %
78613.11
Total
Rs
Rs
8 V.R.C.C concrete M - 25 grade for Super Structure with 20 mm(SS5)HBG M/C graded metal
a cube strength of 25 N / mm2 at 28 days work test on 150 X 150 X 150 mm cubes an
and and conveyance of all materials, vibrating centering machine mixing, curing hi
operational charges of all T& P but excluding cost and its fabrication charges of ste
complete as per MoRT&H spcn. No. 1500, 1600 & 1700 as per MOST Drg. No BD/4-74
74FOR VRCC M-25 Super structure of Deck slabs
Unit = cum
Page 472 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
345.00
0.86 nos
Mate
day
357.00
1.50 nos
Mason
day
295.00
20.00 nos
Mazdoor
day
MAA
6732.20
0.00 %
Total
Quantity
Description of Item
(B) Material
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
6.75 cum
Sand at site
5.99 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
Rate
per
2258.51
1828.51
825.90
5000.00
cum
453.00
861.70
hr
hr
cum
MT
Total
a) For form work add the following (Height 0 - 5 m)
for Deck slab slab Super structure
20.00 %
78313.11
20.00 %
93975.73
10.00 %
10.00 %
112770.88
Rate per 15 cum
Rate per cum
Or Say
78313.11
97891.39
117469.67
Rate per 15 cum
Rate per cum
Or Say
9 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2704(4th Revision). For Approach Slab .
Unit = cum
Page 340,501 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
345.00
1.50 nos
Mason
357.00
day
day
Quantity
20.00 nos
0.00 %
Description of Item
Mazdoor
MAA
Total
(B) Material
8.10 cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
6.10 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
(D) Form work
2.00 %
Form work @ 2% on (A)+(B)+( C)
(E) Over head charges @ 21% (10%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(D)
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum M 30 Concrete
Rate to be adopted
Rate
per
295.00
6732.20
day
2258.51
1828.51
825.90
5000.00
cum
cum
cum
MT
453.00
861.70
hr
hr
78863.11
Cum
10 V.R.C.C. M30 grade concrete using 20mm and 10mm size SS5 HBG crushed stone agg
including cost and conveyance of all materials to site, seigniorage charges,labour charg
machine mixing,laying,compacting,curing etc,including all other incidental and oper
charges,T&P chargesetc, complete but excluding cost of steel and its fabrication charges,
MoRT&H Specifications 1500,1700,2100 & 2702(4th Revision). For Wearing coat over Deck
Unit = cum
Page 477,492 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.90 nos
Mate
345.00
1.50 nos
Mason
357.00
21.00 nos
Mazdoor
295.00
0.00 %
MAA
7041.00
Total
(B) Material
8.10 cum
2258.51
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1828.51
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
6.10 MT
Cement at site
5000.00
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
6.00 hr
Generator set 35 KVA
861.70
(A+B+C) =Rate per 15 cum
Basic Rate per cum
day
day
day
cum
cum
cum
MT
hr
hr
Quantity
0.15 nos
0.00 %
Description of Item
Labour for cleaning deck slab concrete
MAA
Rate
per
295.00
44.25
Rate per cum
day
5322.38
11 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Super structure of R.C.C items.
Unit = MT
Page 489,490 of MoRT&H
Taking output = 1 MT
(A) Labour
0.44 nos
Mate
3.00 nos
Black smith
8.00 nos
Mazdoor
0.00 %
MAA
Total
(B) Material
1.05 MT
HYSD bars including overlaps
8.00 Kg
Binding wire
Total
(C) Over head charges @ 21% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted
SDB
345.00
345.00
295.00
3546.80
day
day
day
43500.00
42500.00
MT
MT
12 Providing HYSD bars ( Fe-415 ) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 198
Sub structure of R.C.C items.
Unit = MT
Page 459,460 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.34 nos
Mate
day
345.00
2.00 nos
Black smith
day
345.00
6.50 nos
Mazdoor
day
295.00
Quantity
0.00 %
Description of Item
MAA
Total
(B) Material
1.05 MT
HYSD bars including overlaps
6.00 Kg
Binding wire
Total
(C) Over head charges @ 20% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted
Rate
per
2724.80
43500.00
42500.00
MT
MT
13 Providing HYSD bars (Fe-415) of diferent diameters, wrought and put up bars of all diam
including cost and conveyance of steel to site and all labour charges for fabricat
reinforcement including cutting, bending, binding rods, tying grills, placing them in positio
complete including cost and conveyance of binding wire and all handling charges and oper
charges etc., and including over lapping welding if required etc., complete for all R.C.C ite
finished item of work as per standard drawings, as per the directions of the Engineer-in-C
and as per MoRT&H specification 1600 &2200 (4th revision) and as per I.S.1786 of 19
foundations of R.C.C items.
Unit = MT
Page 448 of MoRT&H SDB
Taking output = 1 MT
(A) Labour
0.40 nos
Mate
day
345.00
2.00 nos
Black smith
day
345.00
6.00 nos
Mazdoor
day
295.00
0.00 %
MAA
2598.00
Total
(B) Material
1.05 MT
HYSD bars including overlaps
43500.00
MT
6.00 Kg
Binding wire
42500.00
MT
Total
(C) Over head charges @ 21% (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate to be adopted
14 Back filling behind Abutments with gravel including cost ,conveyance and seigniorage
materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per M
Specification No. 2200 (4th Revision) and as per Drawing and technical specifications for fi
item of work
Unit = cum
Page 462 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.28 nos
Mate
345.00
day
7.00 nos
Mazdoor
295.00
day
0.00 %
MAA
2161.60
Quantity
Description of Item
Total
(B) Material
12.00 cum
Cost of Granular material
Total
Machinery
2.50 hr
Plate compactor/Power rammer/road roller
0.05 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 20% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Rate
per
856.51
cum
48.00
624.00
hr
hr
15 Providing and laying of filter media with Granular materials / stone crushed aggr
satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thi
of not less than 600mm with smaller size towards the soil and bigger size towards the w
provided over the entire surface behind the abutment, wing wall and return wall to the full
compacted to a firm condition including cost and conveyance of all metal seignorage c
,and all labour charges as directed by the departmental officers as per drawing and Tec
specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (4 th Revisio
finished item of work.
Unit = cum
Page 463 of MoRT&H SDB
Taking output = 10 cum
(A) Labour
0.32 nos
Mate
7.00 nos
Mazdoor for filling watering, ramming etc
1.00 nos
Mazdoor skilled
0.00 %
MAA
Total
(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum
Cost of 150mm size IRC soling stone (HBG)
6.00 cum
Cost of 40mm size IRC HBG metal
Total
Machinery
0.06 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
345.00
295.00
357.00
2532.40
day
day
day
1058.51
1551.51
cum
cum
624.00
hr
Quantity
Description of Item
Rate
per
16 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size g
with 0.20 cum of CC (1:4:8) including cost, seigniorage charges and conveyance of mate
site and including labour charges for packing the stones for revetment etc., complete for fi
item of work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engin
Charge for quadrential revetment.
Cost of CC(1:4:8) Page 331,522 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
345.00
1.00 nos
Mason
day
357.00
15.00 nos
Mazdoor
day
295.00
0.00 %
MAA
5002.80
Total
(B) Material
13.50 cum
1738.51
cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
825.90
cum
2.43 MT
Cement at site
5000.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
453.00
hr
6.00 hr
Generator set 35 KVA
861.70
hr
Cost per 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
0.35 nos
Mason / Stone packer / Cutter
0.75 nos
Mazdoor for laying stones, filling quarry spall
0.00 %
MAA
Total
(B) Material
0.20 cum
Cost of CC(1:4:8)
1.00 cum
Cost of Rough stone 300mm thick at work
Total
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 21% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
345.00
357.00
295.00
360.00
day
day
day
3605.71
1124.51
cum
cum
2205.65
17 Pitching
with 300 mm size rough stone
including cost, seigniorage charge
conveyance of materials to site and including labour charges for packing the ston
revetment etc., complete for finished item of work as per MoRT&H specification 250
Quantity
Description of Item
Rate
per
Pitching
with 300 mm size rough stone
including cost, seigniorage charge
conveyance of materials to site and including labour charges for packing the ston
revetment etc., complete for finished item of work as per MoRT&H specification 250
revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wal
(A) Labour
Page 522 of MoRT&H SDB
0.04 nos
Mate
0.35 nos
Mason
0.75 nos
Mazdoor for laying stones, filling quarry spall
0.00 %
MAA
Total
(B) Material
1.00 cum
Cost of Rough stone 300mm thick
0.20 cum
Cost of stone spalls
Total
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
345.00
357.00
295.00
360.00
day
day
day
1124.51
938.51
cum
cum
1672.21
18 Providing and laying filter material with Gravel underneath pitching in slopes inc
cost, seigniorage charges and conveyance of materials to site including labour charges
complete for finished item of work as per MoRT&H Specification 2504 (4th Revision) a
directed by the Engineer-in-Charge under Revetment.
Unit = cum
Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos
Mate
345.00
0.25 nos
Mazdoor skilled
357.00
1.00 nos
Mazdoor for laying stones, filling quarry spall
295.00
0.00 %
MAA
401.50
Total
(B) Material
1.20 cum
Cost of gravel
856.51
(C) Over head charges @ 21 % (25%-VAT)
Add for Over head charges @ 20% on (A)+(B)+( C)
20.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum
Rate to be adopted
day
day
day
cum
1429.31
Quantity
Description of Item
Rate
per
20 Supplying and fixing CI drianage spoutes complete as per MORTH specification no. 2705
Unit = 1 Nos
Taking output = 1Nos
(a) Material
Corrosion resistant structural steel including
4 kg
5 percent wastage
2.00 meter G.I Pipe 100mm dia
6.00 each GI Bolt 10mm dia
44.50
161.00
11.00
kg
meter
each
Quantity
Rate
per
25.00
each
345.00
357.00
295.00
19.94
day
day
day
345.00
357.00
295.00
66.02
day
day
day
2.00 each
5%
Description of Item
Galvanized MS Flat clamp
Total
701.96
737.06
21 Providing and laying Launching aprons for protection against scour with 450 mm to 60
jeddy stones as per drawing and MoRT&H SpecificationNo.2503.
Unit = cum
Taking output = 1 cum
(A) Labour
0.04 nos
Mate
0.35 nos
Mazdoor for filling watering, ramming etc
0.75 nos
Mazdoor skilled
0.00 %
MAA
Total
(B) Material
1.00 cum
Stone (jeddy stone)
0.20 cum
Stone spalls
Total
Total of (A) + (B)
(C) Over head charges @ 20% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)
345.00
295.00
357.00
384.80
day
day
day
1065.61
938.51
cum
cum
1638.11
Quantity
Description of Item
Rate
per
22 Plain cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG c
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conform
table 1000-2) including cost,seignorage and conveyance of all materials to site and all
charges for machine mixing,laying in position, Compacting , Vibrating and curing includ
other incidental and all other operational charges of T&P required etc., complete as per M
Specification 1500,1700, 2100 & 2700 (4th Revision) for Levelling course below approach s
Unit = cum
Page 335
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
1.50 nos
Mason
20.00 nos
Mazdoor
0.00 %
MAA
Total
(B) Material
8.10 cum
Cost of 40mm SS-5 HBG M/C
4.05 cum
Cost of 20mm SS-5 HBG M/C
1.35 cum
Cost of 10mm SS-5 HBG M/C
6.75 cum
Sand at site
4.13 MT
Cement at site
Total
of MoRT&H SDB
metal
metal
metal
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
(D) Over head charges @ 21% (25%-VAT)
20.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
345.00
357.00
295.00
6732.20
day
day
day
1738.51
2258.51
1828.51
825.90
5000.00
cum
cum
cum
cum
MT
453.00
861.70
hr
hr
66542.62
23 Plain cement concrete (1:3:6) nominal mix below CC pavemnet with crushed stone aggreg
mm nominal size mechanically mixed, placed in and compacted by vibration including
complete as per MoRT&H Specification 2100 (4th Revision) for Levelling course bel
pavement
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
Quantity
Description of Item
0.64 nos
1.00 nos
15.00 nos
0.00 %
Mate
Mason
Mazdoor
MAA
Total
(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
3.45 MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
2.00 Hr
Water tanker 6KL capacity
Total
(D) Over head charges @ 21% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
Rate
per
345.00
357.00
295.00
5002.80
day
day
day
1738.51
825.90
5000.00
cum
cum
MT
453.00
861.70
624.00
hr
hr
hr
60433.72
24 Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone agg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1
including cost, (excluding seigniorage) conveyance of all materials to site and labour ch
centering, machine mixing, laying, vibrating, curing etc., including all other incident
operational charges of all T&P etc., complete for finished item of work as per M
specification 1500, 1700, 2100 & 2702 (4th Revision) and as directed by the Engin
Charge for C.C Pavement.
Unit = cum
Page 335 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
345.00
1.50 nos
Mason
day
357.00
20.00 nos
Mazdoor
day
295.00
0.00 %
MAA
6732.20
Total
(B) Material
2258.51
cum
Cost of 20mm SS-5 HBG M/C metal
8.10 cum
1828.51
cum
Cost of 10mm SS-5 HBG M/C metal
5.40 cum
Sand at site
825.90
cum
6.75 cum
Cement at site
5000.00
MT
6.33 MT
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
453.00
861.70
hr
hr
Quantity
Description of Item
Rate
Total
3.50
%
Form work @ 3.5% on A+B+C
(D) Over head charges @ 21% (25%-VAT)
5.00 %
Add for Over head charges @ 20% on (A)+(B)+( C)+(
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum (E)+(F)
Rate for 1 cum
Rate to be adopted
per
80013.11
82813.57
M KM.0.000 TO
37M SPAN ) IN
Amount
ical specification
umps and other
th to the extent
k as per MoRT&H
ing machinary
110.40
2360.00
0.00
2470.40
3120.00
0.00
1118.08
6708.48
670.85
7379.33
30.75
31.00
1 Cum
110.40
2360.00
0.00
2470.40
3120.00
0.00
279.52
1173.98
7043.90
704.39
7748.29
32.28
Amount
32.00
1 Cum
40 mm nominal
uding curing etc.,
for finished item
220.80
357.00
4425.00
0.00
5002.80
23469.89
5574.83
17250.00
46294.72
2718.00
5170.20
1248.00
9136.20
12086.74
###
7252.05
###
5318.17
5318.00
1 Cum
296.70
535.50
Amount
5900.00
0.00
6732.20
9387.95
12195.95
4936.98
5574.83
25800.00
57895.71
2718.00
5170.20
7888.20
###
2900.64
15083.35
###
9050.01
99550.11
6636.67
6637.00
1 Cum
296.70
535.50
5900.00
0.00
6732.20
9387.95
12195.95
4936.98
5574.83
25800.00
57895.71
2718.00
Amount
5170.20
7888.20
72516.11
7251.61
15953.54
###
9572.13
###
7019.56
7020.00
1 Cum
20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)
296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
###
3144.52
16351.53
###
9810.92
107920.08
7194.67
7195.00
1 Cum
Amount
20 mm(SS5)HBG
t on 150 X 150 X
ntering machine
nd its fabrication
(4th Revision)
296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
###
3144.52
16351.53
###
9810.92
107920.08
7194.67
7195.00
1 Cum
stone aggregate
bour charges for
and operational
n charges, as per
alls.
296.70
535.50
5900.00
0.00
6732.20
Amount
18293.93
9873.95
5574.83
30250.00
63992.71
2718.00
5170.20
7888.20
78613.11
78613.11
1415.04
9276.35
89304.50
17860.90
###
10716.54
###
7858.80
7859.00
cum
78613.11
7861.31
86474.42
17294.88
###
10376.93
###
7609.75
7610.00
cum
296.70
535.50
5900.00
0.00
6732.20
Amount
18293.93
9873.95
5574.83
29950.00
63692.71
2718.00
5170.20
7888.20
78313.11
78313.11
15662.62
93975.73
18795.15
###
11277.09
###
8269.86
8270.00
78313.11
19578.28
97891.39
19578.28
###
11746.97
###
8614.44
8614.00
1 Cum
stone aggregate
bour charges for
and operational
n charges, as per
.
296.70
535.50
Amount
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
30500.00
64242.71
2718.00
5170.20
7888.20
1577.26
16088.07
###
9652.84
###
7078.75
7079.00
1 Cum
stone aggregate
bour charges for
and operational
n charges, as per
over Deck slabs
310.50
535.50
6195.00
0.00
7041.00
18293.93
9873.95
5574.83
30500.00
64242.71
2718.00
5170.20
7888.20
79171.91
5278.13
Amount
44.25
0.00
5322.38
1064.48
6386.86
638.69
7025.55
7026.00
1 Cum
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for
151.80
1035.00
2360.00
0.00
3546.80
45675.00
340.00
46015.00
9912.36
###
5947.42
65421.58
###
1 MT
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
786 of 1985 for
117.30
690.00
1917.50
Amount
0.00
2724.80
45675.00
255.00
45930.00
9730.96
###
5838.58
64224.34
###
1 MT
of all diameters
or fabrication of
m in position etc.,
s and operational
ll R.C.C items for
ngineer-in-Charge
1786 of 1985 for
138.00
690.00
1770.00
0.00
2598.00
45675.00
255.00
45930.00
9705.60
###
5823.36
64056.96
###
1 MT
eigniorage of all
as per MoRT&H
tions for finished
96.60
2065.00
0.00
Amount
2161.60
10278.12
10278.12
120.00
31.20
151.20
629.55
###
1322.05
###
1454.25
1454.00
1 Cum
shed aggregates
ns to a thickness
ards the wall and
to the full height
gnorage charges
ng and Technical
(4 th Revision) for
110.40
2065.00
357.00
0.00
2532.40
6351.06
9309.06
15660.12
37.44
37.44
3645.99
###
2187.60
###
2406.35
2407.00
Amount
1 Cum
mm size grouted
e of materials to
plete for finished
y the Engineer-in-
220.80
357.00
4425.00
0.00
5002.80
23469.89
5574.83
12150.00
41194.72
2718.00
5170.20
7888.20
###
3605.71
13.80
124.95
221.25
0.00
360.00
721.14
1124.51
1845.65
441.13
2646.78
264.68
2911.46
2911.46
2911.00
1 Cum
ge charges and
the stones for
ation 2504 ( 4 th
Amount
13.80
124.95
221.25
0.00
360.00
1124.51
187.70
1312.21
334.44
2006.65
200.67
2207.32
2207.32
2207.00
1 Cum
slopes including
ur charges etc.,
Revision) and as
17.25
89.25
295.00
0.00
401.50
1027.81
285.86
1715.17
171.52
1886.69
1886.69
1887.00
1 Cum
Amount
g wall/Return
cture with slope
specification,
2706 & 2200
13.80
265.50
0.00
279.30
2550.00
867.20
3417.20
3696.50
10.35
178.50
73.75
0.00
262.60
5071.50
161.00
390.00
184.83
5807.33
1274.69
7344.62
734.46
8079.08
269.30
269.00
1 RM
n no. 2705
178.00
322.00
66.00
Amount
50.00
616.00
6.90
7.14
5.90
0.00
19.94
3.45
3.57
59.00
0.00
66.02
701.96
35.10
737.06
147.41
884.47
88.45
972.91
973.00
1 Nos
mm to 600 mm
13.80
103.25
267.75
0.00
384.80
1065.61
187.70
1253.31
1638.11
344.00
Amount
1982.11
198.21
2180.32
2180.32
2180.00
1 Cum
296.70
535.50
5900.00
0.00
6732.20
14081.93
9146.97
2468.49
5574.83
20650.00
51922.22
2718.00
5170.20
7888.20
13308.52
###
7985.11
###
5855.75
5856.00
1 Cum
one aggregate 40
including curing
ourse below CC
Amount
220.80
357.00
4425.00
0.00
5002.80
23469.89
5574.83
17250.00
46294.72
2718.00
5170.20
1248.00
9136.20
3021.69
###
6345.54
###
4653.40
4653.00
1 Cum
stone aggregate
to table 1000-2)
d labour charges,
r incidental and
as per MoRT&H
the Engineer-in-
296.70
535.50
5900.00
0.00
6732.20
18293.93
9873.95
5574.83
31650.00
65392.71
2718.00
5170.20
Amount
7888.20
2800.46
4140.68
###
8695.42
###
6376.64
6377.00
1 Cum
Improvements
to Malikipuram
- Kesavadasupalem
Road from
km 0/0per
to 5/886 in
Quantity
Description
of Item
Rate
Godavari District.
25 Provding and filling joints sealing compound
directed by the Engineer in charge.
313.00
###
cum
MT
295.00
each
33.49
26 Supply and fixing of 25mm PVC/HDPE as per BIS N0. 7634 as per drawing and te
specification and directed by the Engineer-in charge.
1.000 RM
25mm Dia
Part III/75 PVC/HDPE as per BIS N0. 7634
Rate to be adopted
15.84
RM
27 Providing Vaccum Dewatered Flooring services including leveling of the placed concrete
followed by placement of the bottom and top mat , operation of the vaccum machine to
the excess free water in the concrete , removal of the mat after completion of dewatering p
conduction of the initial flooting to be followed by finishing using power trowel of pin vibra
the concrete, palcement of the concrete and / or provision of the special topings but includ
and operational charges of generator of adequate capacity and other T&P and labourchar
all operations etc. complete.
Rate per Sqm
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada
28 Saw cutting of concrete pavement using a self propelled walk behind, petro / electric power
of suitable capacity to give a finished groove of 4 mm width and 1/4 to 1/3 depth in the
concrete in the longitudinal and transverse directions along predetermined lines. The
inclusive of the cost of consumable such as dimond blade, masons engaged for the marking
deemed to be included in the rate and poring of sealent in to the performed groove. The
inclusive of cleaning of the groove of the sawing to remove any cementecous particles to
clean surface and surface preperation of the sides of the groove to accommodate the
material etc. to give neat finished look including cost of sealent , hire and operational cha
generator of adequate capacity and T&P and other labour charges for all operations etc. com
Rate per RM
As per the approved rate vide C.R. Agr. No. 59/2007-08 of
Superintendent Engineer (R&B) Kakinada
29 Conveying the excavated earth with a carting lead of 2.00KMs from work site including
unloading and all other incidental, hire and operational charges of all T&P etc., complet
soils up to SDR and stone matrix for finished item of work as per MORTH Specification No.
Conveying the excavated earth with a carting lead of 2.00KMs from work site including
unloading and all other incidental, hire and operational charges of all T&P etc., complet
soils up to SDR and stone matrix for finished item of work as per MORTH Specification No.
th Revision) as per directions of Engineer - in - charge
1.00
cum
5.00 %
106.00
24.00
cum
cum
D
E
compound
Amount
as per Drawing and Technical specification and as
3.76
49.68
147.50
200.93
401.87
33.00
RM
60.00
RM
106.00
-24.00
82.00
4.92
86.92
8.69
95.61
95.60
1 cum
Quantity
Description of Item
Rate
per
30 Providing, laying Reinforced cement concrete Hume pipes of NP-3 class for pipe culverts including
cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of
300mm/450mm/600mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (4 th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
300 mm Dia.,
(A) Labour
0.07 nos
Mate
day
188.00
0.25 nos
Mason
day
193.40
1.50 nos
Mazdoor
day
146.00
Total
(B) Material
12.50 RM
Cost of 300mm Dia., pipes
763.81
RM
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
450 mm Dia.,
(A) Labour
0.11 nos
0.38 nos
2.25 nos
Mate
Mason
Mazdoor
Total
(B) Material
12.50 RM
Cost of 450mm Dia., pipes
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
188.00
193.40
146.00
day
day
day
1244.10
RM
188.00
193.40
146.00
nos.
nos.
nos.
2019.43
RM
600 mm Dia.,
(A) Labour
0.14 nos
0.50 nos
3.00 nos
Mate
Mason
Mazdoor
Total
(B) Material
12.50 RM
Cost of 600mm Dia., pipes
Total
(C) Over head charges @ 5% (10%-VAT)
Add for Over head charges @ 5% on (A)+(B)
5.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
Amount
pe culverts including
r laying, jointing of
aligning, lowering and
nd 2906 (4 th Revision)
e for finished item of
13.16
48.35
219.00
280.51
9547.63
9547.63
0.00
9828.14
0.00
9828.14
786.25
786.00
1 RM
20.68
73.49
328.50
422.67
15551.25
15551.25
0.00
15973.92
0.00
15973.92
1277.91
1278.00
1 RM
26.32
96.70
438.00
561.02
25242.88
25242.88
0.00
25803.90
0.00
25803.90
2064.31
2064.00
1 RM
Name of Work ::- Improvements to KANF Road to Antervedi (R&B) Road from
DATA
SSR :: 2014-15
SNo Quantity Unit
Municipal Area
Allowance ::
Date ::
Description of Item
Rate
per
31 Forming shoulders with barrowed useful selected earth having MDD of not less
than 1.75 Gms/CC from out side road boundary by mechanical means with all leads
and lifts including prewatering of soil at barrow area, removal of top soil, excavation
of soils at barrowed area, conveyance of soil, depositing the soils on the
embankment, spreading soils, beaking clods, sectioning and consoilidation with
vibratory road roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and complete for finished item of
work as per MoRT&H specification 305 ( 4th revision) ( Payment will be made based
on levels for finished item of work).
(4th Revision) With a lead of 79.500 km (Payment will be made based on
levels for finished item of work).
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.04
1.00
day
day
0.0
345.00
295.00
308.80
TOTAL
100.00 cum
12720.00 t.km
A=
(B) Machinery
13.00
Rate as per G.O. Ms. No 10, Dt 26/7/2005
7.22
Tipper ( for 79.500 km = 160 x 79.500) t.km
Add 10% of cost of carriage to cover
cost of loading and unloading
0.00
Dozer 80 HP for spreading @ 200 cum per hour
0.00
Motor Graders for Grading @ 100 cum per hour
624.00
Water tanker 6 KL
2678.30
Vibratory roller 8T
TOTAL
(A + B )
4.00
1.00
hour
hour
hour
hour
5.00
107805.34
10.00
113195.61
100.00
cum
(E ) Seigniorage charges
Earth
0.00
100.00
cum
1.00
1.00
1.00
t.km
1.00
1.00
1.00
1.00
B=
1.00
Description of Item
Rate
per
Unit = Sqm.
31
(A) Material
31
1.00
Sqm
991.00
1.00
31
31
32 Providing Uncoated Mild Steel bars ( Fe-250 ) of diferent diameters, wrought and
put up bars of all diameters including cost and conveyance of steel to site and all
labour charges for fabrication of reinforcement including cutting, bending, binding
rods, tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges etc.,
and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the
Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (4th Revision)
and as per I.S.1786 of 1985 .
32
32
Unit = MT
32
Taking output = 1 MT
32
(A) Labour
32
0.28
no
Mate
345.00
1.00
32
1.50
no
Black smith
345.00
1.00
1.00
32
5.50
no
Mazdoor
295.00
0.0
2236.60
32
32
TOTAL
32
32
TOTAL
32
(B) Material
32
1.05
MT
32
6.00
Kg
A=
44500.00 1.00
32
TOTAL
32
(A + B )
70.00
B=
32
32
5.00
49381.60
10.00
51850.68
1.00
MT
32
32
32
32
32
Rate per 1 MT
1.00
Description of Item
Rate
per
Rate per 1 MT
32
32
B) Road from km
0.0%
Amount
13.80
295.00
308.80
0.00
308.80
1300.00
91838.40
9183.84
0.00
0.00
2496.00
2678.30
107496.54
107805.34
5390.27
11319.56
0.00
124515.17
1245.15
Amount
1245.00
991.00
991.00
96.60
517.50
1622.50
2236.60
0.00
2236.60
46725.00
420.00
47145.00
49381.60
2469.08
5185.07
57035.75
57035.75
Amount
57036.00
ve Engineer (R&B),
division, Razole
g Engineer (R&B),
le, Kakinada
ok
S.No
Specification in Brief
Unit
Earth/ Gravel
Metal/ Stone
cum
cum
Quantity
2
E/W for Foundation Excluding
dewatering
E/W for Foundation including
dewatering
PCC 1:3:6
VCC M20 for Footings of
Abutments, Piers
VCC M20 for substructure of
Abutments, Piers
1 cum
764.00
1.000
764.000
1 cum
747.00
1.000
747.000
1 cum
69.00
0.900
62.10
1 cum
425.00
0.900
382.50
1 cum
268.00
0.900
241.20
1 cum
155.00
0.900
139.50
1 cum
12.00
0.900
10.80
1 cum
116.00
0.900
104.40
1 cum
20.00
0.900
18.00
1 cum
20.00
0.900
18.00
1 cum
664.00
15.00
1.200
18.00
22.00
1.180
25.96
1 cum
10.00
1.200
12.00
1 cum
11.00
0.900
9.90
416.00
1.200
499.20
14
1.200
1.200
796.800
13.200
123.00
1 cum
9.00
0.900
8.10
1 cum
423.00
0.900
380.70
805.00
0.900
724.50
21 Earthen Shoulders
250.00
18
1 cum
Total Quantity
Rate
Amount Rs
Total Amount Rs
1.000
250.000
2571.00
2654.86
22.00
56562.00
50.00
132743.00
231387.00
Asst Executive Engineer (R&B),Deputy Executive Engineer (R&B), Executive Engineer (R&B), Superintending
R&B Section, Malikipuram
R&B Sub-division, Razole
R&B Division, Amalapuram
R&B Circle
Sand
cum
Factor Quantity
9
10
0.450
31.05
0.450
191.25
0.450
120.60
0.450
69.75
0.450
5.40
0.450
52.20
0.450
9.00
0.450
9.00
0.090
1.98
0.450
4.95
0.002
0.220
0.450
4.05
0.450
190.35
0.450
362.25
1052.05
40.00
42082.00
C E R T I F I C A T E
Name of Work:
Improvements to Ramarajulanka - Gondi road from km 0/02 to 7/350 (Construction
of Low Level Cause Way 4V X 6.37m span) in E.G.Dt.
1)
Certified that I have personally inspected the above Road on . and the
provisions made in the estimate for the above work are adequate and essential.
2)
Certified that the leads provided in the R.M.R of the estimate are shortest and there is
sufficient yield of good quality material from the quarries proposed in the estimate.
3)
Certified that all the distances in the quarry map are correct.
4)
5)
Certified that the routes shown in the quarry map are the shortest for the transportation of
the materials.
6)
7)
Certified that the description of all materials mentioned are correct to the best of my
knowledge.
8)
It is certified that no soil having MDD not less than 17.50 kN/cum and suitable for
shoulders is available within a lead of 79.500 km. Hence a lead of 79.500 km is proposed
for selected soil to be used for shoulders.
9)
Certified that the above work is not taken up in any other scheme. Hence there is no
overlap in the execution of work.
121.90
134.50
147.10
121.90
134.50
147.10
11
159.70
159.70
12
172.30
172.30
13
14
15
16
17
18
19
184.90
197.50
210.10
222.70
235.30
247.90
260.50
184.90
197.50
210.10
222.70
235.30
247.90
260.50
20
273.10
273.10
21
285.70
285.70
22
23
24
25
26
27
28
29
30
31
32
33
34
35
298.30
310.90
323.50
336.10
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
441.10
451.60
298.30
310.90
323.50
336.10
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
441.10
451.60
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
850.60
861.10
871.60
882.10
892.60
903.10
913.60
924.10
934.60
945.10
955.60
966.10
976.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
850.60
861.10
871.60
882.10
892.60
903.10
913.60
924.10
934.60
945.10
955.60
966.10
976.60
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled (385 x 30% + 345 x 70%)
Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
Sand for Mortar
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
987.10
997.60
1008.10
1018.60
1029.10
1039.60
1050.10
1060.60
1071.10
1081.60
1092.10
1102.60
1113.10
1123.60
1134.10
1144.60
1155.10
1165.60
1176.10
1186.60
1197.10
1207.60
1218.10
1228.60
1239.10
1249.60
1260.10
1270.60
1281.10
1291.60
1302.10
1312.60
1323.10
1333.60
1344.10
1354.60
1365.10
1375.60
1386.10
1396.60
1407.10
1417.60
1428.10
1438.60
1449.10
1459.60
1470.10
1480.60
1491.10
1501.60
987.10
997.60
1008.10
1018.60
1029.10
1039.60
1050.10
1060.60
1071.10
1081.60
1092.10
1102.60
1113.10
1123.60
1134.10
1144.60
1155.10
1165.60
1176.10
1186.60
1197.10
1207.60
1218.10
1228.60
1239.10
1249.60
1260.10
1270.60
1281.10
1291.60
1302.10
1312.60
1323.10
1333.60
1344.10
1354.60
1365.10
1375.60
1386.10
1396.60
1407.10
1417.60
1428.10
1438.60
1449.10
1459.60
1470.10
1480.60
1491.10
1501.60
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
1512.10
1522.60
1533.10
1543.60
1554.10
1564.60
1575.10
1585.60
1596.10
1606.60
1617.10
1627.60
1638.10
1648.60
1659.10
1512.10
1522.60
1533.10
1543.60
1554.10
1564.60
1575.10
1585.60
1596.10
1606.60
1617.10
1627.60
1638.10
1648.60
1659.10
abour
SSR 2014-15
As per SSR of PR Dept.
419.00 Pg. No.17, Sl.53 (Roads)
456.00 Pg. No.17, Sl.52 (Roads)
588.00 Pg. No.16, Sl.51 (Roads) Pg. No.275, M-055 (Rs.845)
156.00 Pg. No.13, Sl.9 (Roads)
154.00 Pg. No.13, Sl.8 (Roads)
144.00 Pg. No.13, Sl.2 (Roads)
164.00 Pg. No.13, Sl.3 (Roads)
Pg. No.272, M-003
136.00 Pg. No.13, Sl.4 (Roads)
118.00 Pg. No.13, Sl.6 (Roads)
138.00 Pg. No.13, Sl.7 (Roads)
188.00 Pg. No.13, Sl.5 (Roads)
(42+48)/2 Pg.18
45.00
Sl. No.84 & 85
95.00 Pg. No.18, Sl.79 (Roads)
588.00 Pg. No.16, Sl.51 (Roads) Pg. No.275, M-055 (Rs.845)
SSR 2013-14
419.00
456.00
588.00
156.00
154.00
140.00
156.00
136.00
118.00
138.00
188.00
45.00
95.00
588.00
944.00
984.00
780.00
656.00
504.00
308.00
330.00
98.00
588.00
944.00
984.00
780.00
656.00
504.00
385.00
285.00
44000.00
43000.00
5900.00
45000.00
70.00
xx
50.00
2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
4.50
4.50
48.00
606.00
Semi-skilled Mazdoor
Skilled 30% + Semi 70%
Un-skilled Mazdoor
Pg. No.288, Sl.No.8
Pg. No.289, Sl.No.52
Pg. No.289, Sl.No.54
Pg. No.290, Sl.No.62
Pg. No.289, Sl.No.50
22.00
40.00
Pg.254(4)
Pg.256(3)
320.00
329.00
280.00
2511.70
3216.00
2754.50
1646.00
877.30
2541.40
1038.40
624.00
415.00
422.00
422.00
499.40
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
766.40
417.40
xx
xx
48.00
SSR 2013-14
Pg.18, Sl. No.53
Pg.18, Sl. No.52
Pg.18, Sl. No.51
Pg.15, Sl. No.9
Pg.15, Sl. No.8
Pg.15, Sl. No.2
Pg.15, Sl. No.3
Pg.15, Sl. No.4
Pg.15, Sl. No.6
Pg.15, Sl. No.7
Pg.15, Sl. No.5
(42+48)/2 Pg.20
Sl. No.84 & 85
Pg.19, Sl. No.79
Pg.18, Sl. No.51
Pg.18, Sl. No.50
Pg.18, Sl. No.49
Pg.18, Sl. No.48
Pg.18, Sl. No.47
Pg.18, Sl. No.46
Pg.18, Sl. No.45
Pg.20, Sl. No.92
Pg.20, Sl. No.90
Pg.17, Sl. No.30
Pg.17, Sl. No.29
Pg.17, Sl. No.28
Pg.17, Sl. No.27
Pg.16, Sl. No.26
Pg.16, Sl. No.25
Pg.20, Sl. No.94
Pg.20, Sl. No.95
As per the G.O.s
October, 2014 GO RT
No.869, dt.31.12.2014
Pg.18, Sl. No.56
SSR 2008-09
360.00
390.00
500.00
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
39.75
82.00
500.00
830.00
845.00
690.00
560.00
430.00
234.00
225.00
56.00
500.00
830.00
845.00
690.00
560.00
430.00
175.00
60.00
44000.00
43000.00
5900.00
45000.00
70.00
67.00
50.00
8
9
10
116.00
128.00
140.00
11
152.00
12
164.00
13
14
15
16
17
18
19
176.00
188.00
200.00
212.00
224.00
236.00
248.00
20
260.00
21
272.00
22
23
24
25
26
27
28
29
30
31
32
33
34
35
284.00
296.00
308.00
320.00
332.00
344.00
356.00
368.00
380.00
390.00
400.00
410.00
420.00
430.00
22.00
40.00
188.00
193.40
146.00
2760.00
2600.00
2250.00
1320.00
575.00
1550.00
540.00
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
1090.00
620.00
345.00
4.50
4.50
40.00
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
440.00
450.00
460.00
470.00
480.00
490.00
500.00
510.00
520.00
530.00
540.00
550.00
560.00
570.00
580.00
590.00
600.00
610.00
620.00
630.00
640.00
650.00
660.00
670.00
680.00
690.00
700.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
790.00
800.00
810.00
820.00
830.00
840.00
850.00
860.00
870.00
880.00
890.00
900.00
910.00
920.00
930.00
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
940.00
950.00
960.00
970.00
980.00
990.00
1000.00
1010.00
1020.00
1030.00
1040.00
1050.00
1060.00
1070.00
1080.00
1090.00
1100.00
1110.00
1120.00
1130.00
1140.00
1150.00
1160.00
1170.00
1180.00
1190.00
1200.00
1210.00
1220.00
1230.00
1240.00
1250.00
1260.00
1270.00
1280.00
1290.00
1300.00
1310.00
1320.00
1330.00
1340.00
1350.00
1360.00
1370.00
1380.00
1390.00
1400.00
1410.00
1420.00
1430.00
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
1440.00
1450.00
1460.00
1470.00
1480.00
1490.00
1500.00
1510.00
1520.00
1530.00
1540.00
1550.00
1560.00
1570.00
1580.00
116.00
128.00
140.00
8
9
10
142.00
148.00
154.00
162.00
168.00
174.00
152.00
11
160.00
180.00
164.00
12
166.00
186.00
176.00
188.00
200.00
212.00
224.00
236.00
248.00
13
14
15
16
17
18
19
172.00
178.00
184.00
190.00
196.00
202.00
208.00
192.00
198.00
204.00
210.00
216.00
222.00
228.00
260.00
20
214.00
234.00
272.00
21
278.10
278.85
284.00
296.00
308.00
320.00
332.00
344.00
356.00
368.00
380.00
390.00
400.00
410.00
420.00
430.00
22
23
24
25
26
27
28
29
30
31
32
33
34
35
283.10
288.10
293.10
298.10
303.10
308.10
313.10
318.10
323.10
327.90
332.70
337.50
342.30
347.10
284.60
290.35
296.10
301.85
307.60
313.35
319.10
324.85
330.60
336.10
341.60
347.10
352.60
358.10
440.00
450.00
460.00
470.00
480.00
490.00
500.00
510.00
520.00
530.00
540.00
550.00
560.00
570.00
580.00
590.00
600.00
610.00
620.00
630.00
640.00
650.00
660.00
670.00
680.00
690.00
700.00
710.00
720.00
730.00
740.00
750.00
760.00
770.00
780.00
790.00
800.00
810.00
820.00
830.00
840.00
850.00
860.00
870.00
880.00
890.00
900.00
910.00
920.00
930.00
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
351.90
356.70
361.50
366.30
371.10
375.90
380.70
385.50
390.30
395.10
399.90
404.70
409.50
414.30
419.10
423.70
428.30
432.90
437.50
442.10
446.70
451.30
455.90
460.50
465.10
469.70
474.30
478.90
483.50
488.10
492.70
497.30
501.90
506.50
511.10
515.70
520.30
524.90
529.50
534.10
538.70
543.30
547.90
552.50
557.10
561.50
565.90
570.30
574.70
579.10
363.60
369.10
374.60
380.10
385.60
391.10
396.60
402.10
407.60
413.10
418.60
424.10
429.60
435.10
440.60
445.60
450.60
455.60
460.60
465.60
470.60
475.60
480.60
485.60
490.60
495.60
500.60
505.60
510.60
515.60
520.60
525.60
530.60
535.60
540.60
545.60
550.60
555.60
560.60
565.60
570.60
575.60
580.60
585.60
590.60
595.35
600.10
604.85
609.60
614.35
241.5
115.5
940.00
950.00
960.00
970.00
980.00
990.00
1000.00
1010.00
1020.00
1030.00
1040.00
1050.00
1060.00
1070.00
1080.00
1090.00
1100.00
1110.00
1120.00
1130.00
1140.00
1150.00
1160.00
1170.00
1180.00
1190.00
1200.00
1210.00
1220.00
1230.00
1240.00
1250.00
1260.00
1270.00
1280.00
1290.00
1300.00
1310.00
1320.00
1330.00
1340.00
1350.00
1360.00
1370.00
1380.00
1390.00
1400.00
1410.00
1420.00
1430.00
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
583.50
587.90
592.30
596.70
601.10
605.50
609.90
614.30
618.70
623.10
627.50
631.90
636.30
640.70
645.10
649.30
653.50
657.70
661.90
666.10
670.30
674.50
678.70
682.90
687.10
691.30
695.50
699.70
703.90
708.10
712.30
716.50
720.70
724.90
729.10
733.30
737.50
741.70
745.90
750.10
754.30
758.50
762.70
766.90
771.10
775.30
779.50
783.70
787.90
792.10
619.10
623.85
628.60
633.35
638.10
642.85
647.60
652.35
657.10
661.85
666.60
671.35
676.10
680.85
685.60
690.10
694.60
699.10
703.60
708.10
712.60
717.10
721.60
726.10
730.60
735.10
739.60
744.10
748.60
753.10
757.60
762.10
766.60
771.10
775.60
780.10
784.60
789.10
793.60
798.10
802.60
807.10
811.60
816.10
820.60
825.10
829.60
834.10
838.60
843.10
1440.00
1450.00
1460.00
1470.00
1480.00
1490.00
1500.00
1510.00
1520.00
1530.00
1540.00
1550.00
1560.00
1570.00
1580.00
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
796.30
800.50
804.70
808.90
813.10
817.30
821.50
825.70
829.90
834.10
838.30
842.50
846.70
850.90
855.10
847.60
852.10
856.60
861.10
865.60
870.10
874.60
879.10
883.60
888.10
892.60
897.10
901.60
906.10
910.60
121.90
134.50
147.10
121.90
134.50
147.10
11
159.70
159.70
12
172.30
172.30
13
14
15
16
17
18
19
184.90
197.50
210.10
222.70
235.30
247.90
260.50
184.90
197.50
210.10
222.70
235.30
247.90
260.50
20
273.10
273.10
21
285.70
285.70
22
23
24
25
298.30
310.90
323.50
336.10
298.30
310.90
323.50
336.10
''
''
26
27
28
29
30
31
32
33
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
348.70
361.30
373.90
386.50
399.10
409.60
420.10
430.60
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
441.10
451.60
462.10
472.60
483.10
493.60
504.10
514.60
525.10
535.60
546.10
556.60
567.10
577.60
588.10
598.60
609.10
619.60
630.10
640.60
651.10
661.60
672.10
682.60
693.10
703.60
714.10
724.60
735.10
745.60
756.10
766.60
777.10
787.60
798.10
808.60
819.10
829.60
840.10
xx
50.00
22.00 As per the G.O.s
40.00
345.00
357.00
295.00
2575.60
3216.00
2848.50
1646.00
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
19120.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
4.50
4.50
48.00
73
74
75
850.60
861.10
871.60
850.60
861.10
871.60
606.00