Documente Academic
Documente Profesional
Documente Cultură
REFERENCE NUMBER:
CR Submitters Details:
TYPE OF ACTIVITY:
Name:
Muhammad Zeeshan
Phone No:
055 3539351
Department:
Huawei
Name:
Muhammad Mesbah
Signature:
Muhammad Mesbah
SERVICE IMPACT
SEVERITY
None
Minor
PIP
Time: PIP
Time: PIP
Time: PIP/MOP
Outage Start Time: PIP
Outage End Time: PIP
DURATION OF INTERRUPTION
Outage
Major
Hazard
Critical
Outage: PIP
PIP
Site Location
PIP
N/A
RTN620/RTN950
.
www.du
.ae
APPROVALS LIST
Select the Domain affected by this Activity to have it approved by the Domain Approver.
Domain
Internet
Backbone
IP Core
( Core, POI, Offshore CC)
IP SDP
TSO
Transport Network
and Operations
IP Aggregation
Fixed Core Transmission
Backbone
Transmission(Fixed)
TSS- Network Core
Services
TSS- Transport EMS
TSS- Transport , AAA &
FM/PM
Fiber Maintenance
Access ISP
Handover Test &
Acceptance
MS Approver
Du Approver
Atif Cheema
.
www.du
.ae
Ahmed Ibnouf
Sayed El Faki
Khaled Hefaity
Jessrel Alojado
Mahtab Aziz
Ramzi Mahmood
Belal Jibril
Belal Jibril
Khulood Moosa
Khulood Moosa
Mohammed Dakal
Talal Juma
Kamarulzaman Karim
Hrishikesh Mulangil
Lony Lagdamen
Talal Juma
Lony Lagdamen /
Abdullah Al Faqeeh
Abbad Baroudi
Hamad Amiri
Ghassan Alhafiz
Daniel Gatfield
Zakaria Imam
Ali Mohammad
Adilahmed Shah
Fixed IP Access
National Voice
IPTV Services
Salem Altenaiji
Mohammed Shafi
Khalid Alghaith
Jaya Krishnan
Adnan Haif
Muhammad Metha
Yesu Dhas
Osama Hamdan
SAMACOM Teleport
Services
Electromechanical
Dubai Fixed
Electromechanical
Abu Dhabi
Civil and EM
Suresh Yadav
Khalid Ahli
Belal Jibril
Core Services
Broadcasting and
IPTV Services
Escalations
Electromechanical
Dubai Mobile
Electromechanical Northern
Emirates
Infrastructure-Operations
Transport and Access OSP
Khalid Alghaith
Shadi Hamed
Ashraf Abdulrahma
Ahmed Ahli
Ayman AbdelHamid
Mohammed Abu Hijleh
Enrico Julao / Abdullah Al
Faqeeh
Domain
Transport Network
and Operations
OSS Mobile
OSS Mobile
Mobile access
Network
.
www.du
.ae
Escalations
Jessrel Alojado
Mahtab Aziz
Mohammed Dakalbab
Wael Zakaria
WiFi Access-Praveen
Subramanian/Pre-WiMaxTeodoro Ramos/Core-Qadri
AlAhdal
Mobile FLM
Yaqoub AlZarouni
Radio Access
Transmission
Teodoro Ramos
IT
du Approver
Du_MS_WIFIWIMAX; Abdullah
Ibrahim
MS Approver
Antonio Tugagao; Rehan Mahmood
; Vishal Rampal Transmission Core
CR Management
du Cross; Khawar Mushtaq ,
Dheeraj Sharma , Anupam Saha ,
Khurram Malik
Yaqoub AlZarouni
Praveen Subramanian
MAN.Optimization@du.ae
Haytham Musa
CORE NETWORK
Packet Switch
Du MS SLO PS CORE
Qadri AlAhdal
CORE NETWORK
Evolved Packet Switch
Du MS SLO EPC
Qadri AlAhdal
CORE NETWORK
Circuit Switch
Du MS SLO CS CORE
Indranil Chitnis
Mobile Roaming
Haytham Musa
VAS Operations
Muhannad Kalbouneh
IN e-Serve
IN Operations
Muhammad Yaseen
Hammam Al Bashir
Khalid Alghaith
Rehan Yasin
Domain
Person on charge
Planning
Khalid AlHaway
Planning
Viral Shah
Planning
Planning
Fatima Al Saadi
Planning
IT Security
IOC
National Security
Maher Al Jassmi
Escalations
Samir Abdullah
Behak Kangarloo
Mubarak Ejtabi
ITCM
Domain
Person on charge
Second
IT Enterprise Systems
Oussama Assi
IT-HMC
Oussama Assi
IT OPERATIONS:
(Windows Admin)
Saran Duraisamy
IT OPERATIONS:
(UNIX Admin)
Saran Duraisamy
IT OPERATIONS:
(SAN Admin)
Saran Duraisamy
Saran Duraisamy
Saran Duraisamy
Escalations
Abdalla Alhammadi
INFORMATION TECHNOLOGY
Division
ITCM
.
www.du
.ae
Domain
Person on charge
Second
Balaji Donthi
Rehan Yasin
Balaji Donthi
Rehan Yasin
OSS HPSM
Shadi Trad
Rehan Yasin
Shadi Trad
Rehan Yasin
OSS Mediation
(Mobile, Fix and Interconnect)
Balaji Donthi
Rehan Yasin
OSS (GIS)
Balaji Donthi
Rehan Yasin
OSS (Billing)
Balaji Donthi
Rehan Yasin
OSS (CRM)
Shahid Bashir
Rehan Yasin
OSS (EAI)
Kareem Al Qady
Rehan Yasin
Escalations
Abdalla Alhammadi
Signature: ___________________
Signature: ___________________
Notes:
This page is to be filled if an exceptional approval from key role members is required.
Also, it is required for the changes that fall under an emergency situation or need special
approvals.
The CR Sponsor is required to provide a clear description to justify the reasons for
having an exceptional approval for his CR.
The CR Sponsor needs to collect the approvals from his Director and Vice President
prior to submit the CR to du.crcab@du.ae.
Change Management team will circulate the CR to rest of the approvals mentioned in this
page.
.
www.du
.ae
2) RISK ASSESSMENT
Before doing any activity inform NOC
MOP.doc
8) RESOURCE PLAN
(To ensure identification and assignment of the correct resources for Change Implementation.)
Resource Plan.xlsx
First : Muhammad Zeeshan (055-3539351) Second: Marvin (055-9531825) Third: Humphrey Chua
.
www.du
.ae
Standard escalation paths, for Change Type Categories, should be defined in the Escalation Management Process
IMPORTANT NOTE:
You have to contact Network Operation Monitoring Team in the following occasions:
Fixed Noc (04-3602200) Mobile Noc (04-3690428)
.
www.du
.ae