Sunteți pe pagina 1din 1

TOTAL STEAM REQUIREMENT OF PLANT (TENTATIVE)

KASSIM TEXTILE MILLS LTD.

S.No

MACHINES

QTY

STEAM
CONSUMPTION
(tons/hr)

TOTAL STEAM CONSUMPTION


(tons/hr) Future

(tons/hr)

(tons/hr)

REMARKS

Thermosole

Provided by KASSIM

Pad Steam

Provided by KASSIM

Mercerizing

Existing

Provided by KASSIM

Sanforizing

0.7

0.7

Existing

Provided by KASSIM

Stenter

Slasher

NEW

Ball Warping

NEW

10

Total Consumption

NEW
Awaited

Note:
Awaited result has been taken as a reference from previous project data.
Steam consumption for sanforizing seems quite low, kindly review it.
Steam Distribution Network will be desgin on maximum requirment of steam respectively.

M.G ENGINEERING ASSOCIATES.


(An Engineering Solution Co.)

KASSIM TEXTILE MILLS LTD.

S-ar putea să vă placă și