TUGAS WORKOVER

Dosen Pembimbing : Idham khalid,ST.MT

Oleh :
Nama

: Zano Ayoka S

NPM

: 123210348

Kelas

: VI B

JURUSAN PERMINYAKAN
FAKULTAS TEKNIK
UNIVERSITAS ISLAM RIAU
T.A. 2014/2015

TUGAS

Casing Data:
Prod. Csg = 7
Int. Csg = 9.625
Capacity:
Cap.Int. Casing = 9.625 , 0.0745 bbl/ft
Cap.Prod. Casing = 7 , 0.0394 bbl/ft
Cap.ann. 7 csg x 3.5 tbg = 0.0275 bbl/ft
Cap.ann. 9.625 csg x 3.5 tbg = 0.0629 bbl/ft
Cap.ann Bit 9-7/8 x 7 csg = 0.0471 bbl/ft
Cap.ann Bit 12 x 9.625 csg = 0.0058 bbl/ft
Penyelesaian :
1.

Untuk swadge @2200


Open Ended Squeeze Method Casing Swadge
Cement calculation

Volume casing from OE to top perforation


= (OE top_perf) * cap.casing
= (2364 2150) * 0.0394 = 8.43 bbls

Volume Casing 100 ft above top perforation


= (Top_perf Swadge_depth) * cap.casing + Remaining depth * cap.casing
= (2150 2200) * 0.0394+ [(100 (2150- 2200)) * 0.0745]
= -1.97 + 11.175 = 9 bbls

Volume behind casing


= Length of perf * Cap.Ann.OH_Casing
= 50 * 0.0471 = 2.35 bbls

100% Excess cement = 2.35 bbls

Volume for Hesitation = 9 bbls

Total cement volumes = 8.43 + 9 + 2.35 + 2.35+ 9 = 31.13 bbls

Number of sack required


= Total cement volumes(bbl)*5.615(cuft/bbl)/1.16(cuft/sax)
= 31.13 * 5.615 / 1.16 = 150.7 sax 151 sax
Volume of water required

Volume of Water = Number of Sax (sax)*4.93(gal/sax)/42(gal/bbl)


= 151 * 4.93 / 42 = 17.7 bbls
Volume of displacement water

Displacement water = (TOC 50) * cap.tbg


Top of cement for no slurry enter into formation, TOC
- Vol 7 casing = ( OE Swadge depth) * (cap.tubing + cap.ann.tbg-csg)
= (2364 2200) * (0.0087 + 0.0275) = 5.94 bbls
- Cement in 9.625 casing = (slurry used cement in 7 casing)
= 31.13 bbls 5.94 = 25.19 bbls
TOC@9 5/8csg = Swadge depth [cement in 9 5/8/(cap.tbg+cap.ann.tbg-csg)]
= [2200 (25.19 / (0.0087 + 0.0629)] = 1848 ft
Displacement Water = (1848 ft 50 ft) * 0.0087 bbl/ft = 15.6 bbls

Packer Squeeze Method Casing Swadge


Cement calculation

Volume casing from bottom to top perforation


= (bottom_perf top_perf) * cap.casing
= (2364 2150) * 0.0394 = 8.43 bbls

Total cement volumes 8.43 + 9 + 2.35 + 2.35+ 9 = 31.13 bbls

Number of sack required


= Total cement volumes(bbl)*5.615(cuft/bbl)/1.16(cuft/sax)
= 31.13 * 5.615/ 1.16 = 150.7 sax 151 sax

Volume of water Required

Volume of Water = Number of Sax (sax)*4.93(gal/sax)/42(gal/bbl)


= 151 * 4.93 / 42 = 11.7bbls

Volume of Displacement water

Displacement water = (TOC 50) * cap.tbg


Top of cement for no slurry enter into formation, TOC
- Vol 7 casing = ( Bottom_perf Swadge depth) * cap.casing
= (2364 2200) * 0.0394 = 6.46 bbls
- Cement in 9.625 casing = (slurry used cement in 7 casing)
= 31.13 bbls 6.46 = 24.67 bbls
TOC @ 9 5/8 csg = [Swadge depth (cement in 9 5/8 / cap.casing)]
= [2200 (24.67 / 0.0745)] = 1869 ft
Displacement Water = (1869 ft 50 ft) * 0.0087 bbl/ft = 16 bbls

2.

Untuk swadge @1750


Open Ended Squeeze Method Casing Swadge
Cement calculation

Volume casing from OE to top perforation

= (OE top_perf) * cap.casing


= (2364 1600) * 0.0394 = 30.1 bbls

Volume Casing 100 ft above top perforation


= (Top_perf Swadge_depth) * cap.casing + Remaining depth * cap.casing
= (1600 1750) * 0.0394+ [(100 (1600- 1750)) * 0.0745]
= -5.91 + 111.175 = 105 bbls

Volume behind casing


= Length of perf * Cap.Ann.OH_Casing
= 70 * 0.0471 = 3.29 bbls

100% Excess cement = 3.29 bbls

Volume for Hesitation = 105 bbls

Total cement volumes = 30.1 + 105 + 3.29 + 3.29+ 105 = 246.68 bbls

Number of sack required


= Total cement volumes(bbl)*5.615(cuft/bbl)/1.16(cuft/sax)
= 246.68 * 5.615 / 1.16 = 1194 sax
Volume of water required

Volume of Water = Number of Sax (sax)*4.93(gal/sax)/42(gal/bbl)


= 1194 * 4.93 / 42 = 140.15 bbls
Volume of displacement water

Displacement water = (TOC 50) * cap.tbg


Top of cement for no slurry enter into formation, TOC
- Vol 7 casing = ( OE Swadge depth) * (cap.tubing + cap.ann.tbg-csg)
= (2364 1750) * (0.0087 + 0.0275) = 22.23 bbls
- Cement in 9.625 casing = (slurry used cement in 7 casing)
= 246.68 bbls 22.23 = 226.45 bbls
TOC@9 5/8csg = Swadge depth [cement in 9 5/8/(cap.tbg+cap.ann.tbg-csg)]
= [1750 (226.45 / (0.0087 + 0.0629)] = -1413 ft

Displacement Water = (-1413 ft 50 ft) * 0.0087 bbl/ft = 11.8 bbls

Packer Squeeze Method Casing Swadge


Cement calculation

Volume casing from bottom to top perforation


= (bottom_perf top_perf) * cap.casing
= (2364 1600) * 0.0394 = 30.1 bbls

Total cement volumes 30.1 + 105 + 3.29 + 3.29+ 105 = 246.68 bbls

Number of sack required


= Total cement volumes(bbl)*5.615(cuft/bbl)/1.16(cuft/sax)
= 264.68 * 5.615/ 1.16 = 1194 sax

Volume of water Required

Volume of Water = Number of Sax (sax)*4.93(gal/sax)/42(gal/bbl)


= 1194 * 4.93 / 42 = 140 bbls

Volume of Displacement water

Displacement water = (TOC 50) * cap.tbg


Top of cement for no slurry enter into formation, TOC
- Vol 7 casing = ( Bottom_perf Swadge depth) * cap.casing
= (2364 1750) * 0.0394 = 24.19 bbls
- Cement in 9.625 casing = (slurry used cement in 7 casing)
= 264.68 bbls 24.19 bbls = 240.49 bbls
TOC @ 9 5/8 csg = [Swadge depth (cement in 9 5/8 / cap.casing)]
= [1750 (240.49 / 0.0745)] = -1478 ft
Displacement Water = (1478 ft 50 ft) * 0.0087 bbl/ft = 12 bbls