Multi Storey Building - Primary Beam
v 3.08
Parameters
General Parameters
Non composite Beam
Configuration :
Cutting :
End supports :
L = 16.70 m
n = 19
a0 = 497.5 mm
e = 870.6 mm
w = e - a0 = 373.1 mm
= e / a0 = 1.750
wend,l = 265.6 mm wend,r = 265.6 mm
Ht = 788.0 mm
Mass :
Total paint surface :
Paint surface (without upper face) :
m = 3810 kg
S = 39.74 m2
S' = 34.54 m2
Massiveness :
Massiveness (without upper face) :
M = 81.87 m-1
M' = 71.16 m-1
L1 = 7.600 m
L2 = 7.600 m
Width for the calculation of the surface loads supported by the beam :
on the left side :
d1 = 3.800 m
on the right side :
d2 = 3.800 m
Total width :
d1 + d2 = 7.600 m
Lateral restraint
Continuous lateral restraint of the flanges
19/11/2015
2 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
Cross-section
Upper chord
Lower chord
S460
S460
ht (mm)
635.8
635.8
bf (mm)
311.4
311.4
tf (mm)
31.4
31.4
tw (mm)
18.4
18.4
rc (mm)
16.5
16.5
311.4
145.2
394.0
497.5
692.2
788.0
725.2
788.0
394.0
145.2
311.4
Cross-section at web-post
Cross-section at opening no 1
Cross-section properties
Gross section
Net section
331.3
239.8
394.0
394.0
(cm 4 )
341469
322590
15843
15817
Area
(cm 2 )
19/11/2015
3 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
Load cases
Permanent loads (G)
Dead load :
Arising from :
Reactions at supports :
2.24 kN/m
Mass of the steel beam :
3810 kg
Left end :
RAv = 18.69 kN
Right end :
RBv = 18.69 kN
= 1.00
Location
x1 (m)
0.0
Reactions at supports :
Left end :
Right end :
Intensity
q1 (kN/m)
62.90
Location
x2 (m)
16.70
Intensity
q2 (kN/m)
62.90
Orientation
Normal
RAv = 525.22 kN
RBv = 525.22 kN
Partial factors
Factors on the loads :
G.sup
G.inf
Q
M0
M1
M2
M,fi
= 1.350
= 1.000
= 1.000
= 1.000
= 1.000
= 1.250
= 1.000
Steel properties
Both chords
Steel
Reduction curve from
Standard
S460 M/ML
EC3
EN 10025-4 : 2004
Flange f y | fu (MPa)
460 | 540
Web f y | fu (MPa)
460 | 540
Cross-section f y | fu (MPa)
460 | 540
Cross-section
0.715
Databases 2105-01
19/11/2015
4 / 28
ACB+
v 3.08
Load combinations
Ultimate Limit States
U1 =
U2 =
1.35 G +
1.35 G +
1.00 Q1
1.00 Q1
S1 =
S2 =
S3 =
S4 =
1.00 G +
1.00 G +
1.00 G
1.00 G +
1.00 Q1
1.00 Q1
19/11/2015
1.00 Q1
No combination
5 / 28
ACB+
394.0
265.6
497.5
1
497.5
373.1
870.6
x = 3126.2
x = 3996.9
x = 3561.6
x = 2255.6
x = 2690.9
x = 1385.0
x = 1820.3
x = 3996.9
Section no 11
x = 514.4
x = 949.7
x = 3126.2
Section no 9
x = 2255.6
Section no 7
MAIN SECTIONS
x = 1385.0
x = 4432.2
Section no 12
Web post
x = 4432.2
Cell
Web post
x = 3561.6
Section no 10
Web post
x = 2690.9
Cell
Web post
x = 1820.3
Section no 8
x = 949.7
Cell
Section no 5
Section no 6
Web post
Cell
x = 514.4
Section no 4
Section no 3
Cell
x = 0.0
x = 79.1
Section no 2
End
Section no 1
394.0
6 / 28
19/11/2015
788.0
ACB+
497.5
6
497.5
373.1
870.6
x = 8350.0
10
x = 8785.3
x = 7479.4
x = 7914.7
Section no 22
x = 6608.7
x = 7044.1
Section no 20
Web post
x = 8785.3
x = 5738.1
Section no 18
x = 7914.7
x = 4867.5
x = 6173.4
Section no 16
x = 7044.1
x = 5302.8
Section no 14
x = 6173.4
Section no 12
x = 5302.8
MAIN SECTIONS
x = 4432.2
Section no 21
Web post
Cell
x = 8350.0
Section no 19
Web post
Cell
x = 7479.4
Section no 17
Web post
Cell
x = 6608.7
Section no 15
Web post
Cell
x = 5738.1
Section no 13
Web post
Cell
x = 4867.5
7 / 28
19/11/2015
ACB+
497.5
11
497.5
373.1
870.6
12
13
14
x = 12703.1
15
x = 13138.4
x = 11832.5
x = 12267.8
Section no 32
x = 10961.9
x = 11397.2
Section no 30
Web post
x = 13138.4
x = 10091.3
Section no 28
x = 12267.8
x = 9220.6
x = 10526.6
Section no 26
x = 11397.2
x = 9655.9
Section no 24
x = 10526.6
Section no 22
x = 9655.9
MAIN SECTIONS
x = 8785.3
Section no 31
Web post
Cell
x = 12703.1
Section no 29
Web post
Cell
x = 11832.5
Section no 27
Web post
Cell
x = 10961.9
Section no 25
Web post
Cell
x = 10091.3
Section no 23
Web post
Cell
x = 9220.6
8 / 28
19/11/2015
ACB+
497.5
16
497.5
x = 13573.8
373.1
870.6
17
x = 14444.4
x = 14879.7
18
x = 15315.0
x = 15750.3
19
x = 16185.6
265.6
x = 16620.9
Section no 40
x = 14009.1
x = 15750.3
Section no 38
x = 14879.7
Section no 36
MAIN SECTIONS
x = 14009.1
Section no 34
Section no 39
End
x = 16700.0
Section no 41
Web post
Cell
x = 16185.6
Section no 37
Cell
x = 15315.0
Web post
Cell
x = 14444.4
Web post
Cell
788.0
x = 13573.8
Section no 33
x = 13138.4
Web post
Section no 32
Section no 35
394.0
394.0
9 / 28
19/11/2015
ACB+
Multi Storey Building - Primary Beam
v 3.08
()
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
19/11/2015
h
(mm)
145.2
145.3
145.5
145.8
146.2
146.7
147.4
148.2
149.1
150.1
151.3
152.6
154.0
155.6
157.3
159.1
161.1
163.2
165.5
167.9
170.5
173.3
176.2
179.2
182.5
186.0
189.6
193.4
197.5
201.7
206.2
210.9
215.8
221.0
226.5
232.2
238.2
244.6
251.2
258.2
265.5
273.3
281.4
289.9
298.9
308.4
318.4
328.9
A
(cm2 )
119.89
119.92
119.99
120.12
120.29
120.52
120.80
121.13
121.51
121.94
122.43
122.97
123.57
124.22
124.93
125.69
126.52
127.41
128.36
129.37
130.45
131.59
132.81
134.10
135.46
136.90
138.41
140.01
141.70
143.47
145.34
147.30
149.37
151.53
153.81
156.21
158.72
161.37
164.14
167.06
170.13
173.35
176.75
180.32
184.07
188.03
192.20
196.59
All openings - a 0
Av
zG
(cm2 )
(mm)
30.18
116.65
30.19
116.70
30.23
116.85
30.28
117.09
30.36
117.44
30.47
117.88
30.59
118.42
30.74
119.06
30.92
119.80
31.11
120.65
31.34
121.60
31.58
122.65
31.85
123.81
32.15
125.07
32.47
126.45
32.82
127.94
33.20
129.54
33.60
131.26
34.03
133.09
34.49
135.05
34.98
137.13
35.50
139.34
36.06
141.69
36.64
144.16
37.26
146.78
37.91
149.54
38.60
152.45
39.33
155.52
40.10
158.74
40.90
162.13
41.75
165.69
42.64
169.44
43.58
173.36
44.57
177.49
45.60
181.81
46.69
186.35
47.84
191.12
49.04
196.12
50.30
201.36
51.63
206.86
53.02
212.64
54.49
218.71
56.03
225.08
57.65
231.77
59.36
238.81
61.16
246.21
63.05
254.00
65.05
262.20
= 497.5 mm
Iy
Am /V
(cm4 )
(m-1 )
1216.57
75.0
1218.08
75.0
1222.60
75.0
1230.18
74.9
1240.85
74.9
1254.70
74.9
1271.80
74.8
1292.28
74.7
1316.27
74.6
1343.93
74.5
1375.45
74.4
1411.05
74.3
1450.97
74.2
1495.49
74.0
1544.93
73.9
1599.64
73.7
1660.02
73.6
1726.51
73.4
1799.61
73.2
1879.88
73.0
1967.94
72.8
2064.48
72.6
2170.27
72.4
2286.18
72.1
2413.17
71.9
2552.32
71.6
2704.83
71.4
2872.05
71.1
3055.48
70.8
3256.83
70.5
3478.00
70.2
3721.11
70.0
3988.58
69.6
4283.11
69.3
4607.78
69.0
4966.03
68.7
5361.80
68.4
5799.54
68.0
6284.30
67.7
6821.85
67.3
7418.77
67.0
8082.58
66.6
8821.92
66.3
9646.70
65.9
10568.33 65.5
11600.01 65.2
12757.01 64.8
14057.08 64.4
zANP
(mm)
125.98
126.03
126.20
126.48
126.87
127.38
128.00
128.74
129.59
130.56
131.65
132.86
134.19
135.64
137.23
138.94
140.79
142.77
144.89
147.15
149.56
152.13
154.84
157.72
160.76
163.97
167.36
170.94
174.70
178.67
182.84
187.22
191.83
196.68
201.77
207.12
212.75
218.65
224.86
231.38
238.23
245.44
253.02
260.99
269.39
278.23
287.54
297.36
Wpl
(cm3 )
227.2
227.3
227.8
228.6
229.7
231.1
232.9
235.0
237.4
240.2
243.4
246.9
250.8
255.2
259.9
265.2
270.8
277.0
283.7
290.9
298.8
307.2
316.3
326.1
336.7
348.0
360.2
373.3
387.4
402.5
418.7
436.2
455.0
475.2
496.9
520.3
545.5
572.7
602.0
633.6
667.7
704.7
744.6
787.9
834.8
885.8
941.2
1001
10 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
19/11/2015
RAv = 18.69 kN
RBv = 18.69 kN
Reactions at supports :
Left end :
Right end :
Maximum moment :
Maximum shear force :
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
0.000
0.00
-18.69
0.0
0.079
1.47
-18.51
-18.51
0.0
0.0
0.514
9.32
-17.54
-17.54
0.0
0.0
0.950
16.74
-16.56
-16.56
0.0
0.0
1.385
23.74
-15.59
-15.59
0.0
0.0
1.820
30.31
-14.61
-14.61
0.0
0.0
2.256
36.46
-13.64
-13.64
0.0
0.0
2.691
42.19
-12.67
-12.67
0.0
0.0
3.126
47.49
-11.69
-11.69
0.0
0.0
10
3.562
52.36
-10.72
-10.72
0.0
0.0
11
3.997
56.82
-9.74
-9.74
0.0
0.0
12
4.432
60.85
-8.77
-8.77
0.0
0.0
13
4.867
64.45
-7.79
-7.79
0.0
0.0
14
5.303
67.63
-6.82
-6.82
0.0
0.0
15
5.738
70.39
-5.85
-5.85
0.0
0.0
16
6.173
72.72
-4.87
-4.87
0.0
0.0
17
6.609
74.63
-3.90
-3.90
0.0
0.0
18
7.044
76.11
-2.92
-2.92
0.0
0.0
19
7.479
77.17
-1.95
-1.95
0.0
0.0
20
7.915
77.81
-0.97
-0.97
0.0
0.0
21
8.350
78.02
0.00
0.00
0.0
0.0
22
8.785
77.81
0.97
0.97
0.0
0.0
23
9.221
77.17
1.95
1.95
0.0
0.0
24
9.656
76.11
2.92
2.92
0.0
0.0
25
10.091
74.63
3.90
3.90
0.0
0.0
26
10.527
72.72
4.87
4.87
0.0
0.0
27
10.962
70.39
5.85
5.85
0.0
0.0
28
11.397
67.63
6.82
6.82
0.0
0.0
29
11.833
64.45
7.79
7.79
0.0
0.0
11 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
30
12.268
60.85
8.77
8.77
0.0
0.0
31
12.703
56.82
9.74
9.74
0.0
0.0
32
13.138
52.36
10.72
10.72
0.0
0.0
33
13.574
47.49
11.69
11.69
0.0
0.0
34
14.009
42.19
12.67
12.67
0.0
0.0
35
14.444
36.46
13.64
13.64
0.0
0.0
36
14.880
30.31
14.61
14.61
0.0
0.0
37
15.315
23.74
15.59
15.59
0.0
0.0
38
15.750
16.74
16.56
16.56
0.0
0.0
39
16.186
9.32
17.54
17.54
0.0
0.0
40
16.621
1.47
18.51
18.51
0.0
0.0
41
16.700
0.00
18.69
0.0
19/11/2015
RAv = 525.22 kN
RBv = 525.22 kN
Reactions at supports :
Left end :
Right end :
Maximum moment :
Maximum shear force :
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
0.000
-525.2
0.0
0.079
41
-520.2
-520.2
0.0
0.0
0.514
262
-492.9
-492.9
0.0
0.0
0.950
470
-465.5
-465.5
0.0
0.0
1.385
667
-438.1
-438.1
0.0
0.0
1.820
852
-410.7
-410.7
0.0
0.0
2.256
1025
-383.3
-383.3
0.0
0.0
2.691
1186
-356.0
-356.0
0.0
0.0
3.126
1335
-328.6
-328.6
0.0
0.0
10
3.562
1472
-301.2
-301.2
0.0
0.0
11
3.997
1597
-273.8
-273.8
0.0
0.0
12
4.432
1710
-246.4
-246.4
0.0
0.0
13
4.867
1811
-219.0
-219.0
0.0
0.0
14
5.303
1901
-191.7
-191.7
0.0
0.0
15
5.738
1978
-164.3
-164.3
0.0
0.0
16
6.173
2044
-136.9
-136.9
0.0
0.0
17
6.609
2097
-109.5
-109.5
0.0
0.0
18
7.044
2139
-82.1
-82.1
0.0
0.0
19
7.479
2169
-54.8
-54.8
0.0
0.0
12 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
19/11/2015
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
20
7.915
2187
-27.4
-27.4
0.0
0.0
21
8.350
2193
0.0
0.0
0.0
0.0
22
8.785
2187
27.4
27.4
0.0
0.0
23
9.221
2169
54.8
54.8
0.0
0.0
24
9.656
2139
82.1
82.1
0.0
0.0
25
10.091
2097
109.5
109.5
0.0
0.0
26
10.527
2044
136.9
136.9
0.0
0.0
27
10.962
1978
164.3
164.3
0.0
0.0
28
11.397
1901
191.7
191.7
0.0
0.0
29
11.833
1811
219.0
219.0
0.0
0.0
30
12.268
1710
246.4
246.4
0.0
0.0
31
12.703
1597
273.8
273.8
0.0
0.0
32
13.138
1472
301.2
301.2
0.0
0.0
33
13.574
1335
328.6
328.6
0.0
0.0
34
14.009
1186
356.0
356.0
0.0
0.0
35
14.444
1025
383.3
383.3
0.0
0.0
36
14.880
852
410.7
410.7
0.0
0.0
37
15.315
667
438.1
438.1
0.0
0.0
38
15.750
470
465.5
465.5
0.0
0.0
39
16.186
262
492.9
492.9
0.0
0.0
40
16.621
41
520.2
520.2
0.0
0.0
41
16.700
525.2
0.0
13 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
19/11/2015
RAv = 550.44 kN
RBv = 550.44 kN
Reactions at supports :
Left end :
Right end :
Maximum moment :
Maximum shear force :
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
0.000
-550.4
0.0
0.079
43
-545.2
-545.2
0.0
0.0
0.514
274
-516.5
-516.5
0.0
0.0
0.950
493
-487.8
-487.8
0.0
0.0
1.385
699
-459.1
-459.1
0.0
0.0
1.820
893
-430.4
-430.4
0.0
0.0
2.256
1074
-401.7
-401.7
0.0
0.0
2.691
1243
-373.1
-373.1
0.0
0.0
3.126
1399
-344.4
-344.4
0.0
0.0
10
3.562
1542
-315.7
-315.7
0.0
0.0
11
3.997
1674
-287.0
-287.0
0.0
0.0
12
4.432
1792
-258.3
-258.3
0.0
0.0
13
4.867
1898
-229.6
-229.6
0.0
0.0
14
5.303
1992
-200.9
-200.9
0.0
0.0
15
5.738
2073
-172.2
-172.2
0.0
0.0
16
6.173
2142
-143.5
-143.5
0.0
0.0
17
6.609
2198
-114.8
-114.8
0.0
0.0
18
7.044
2242
-86.1
-86.1
0.0
0.0
19
7.479
2273
-57.4
-57.4
0.0
0.0
20
7.915
2292
-28.7
-28.7
0.0
0.0
21
8.350
2298
0.0
0.0
0.0
0.0
22
8.785
2292
28.7
28.7
0.0
0.0
23
9.221
2273
57.4
57.4
0.0
0.0
24
9.656
2242
86.1
86.1
0.0
0.0
25
10.091
2198
114.8
114.8
0.0
0.0
26
10.527
2142
143.5
143.5
0.0
0.0
27
10.962
2073
172.2
172.2
0.0
0.0
28
11.397
1992
200.9
200.9
0.0
0.0
29
11.833
1898
229.6
229.6
0.0
0.0
30
12.268
1792
258.3
258.3
0.0
0.0
31
12.703
1674
287.0
287.0
0.0
0.0
14 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
32
13.138
1542
315.7
315.7
0.0
0.0
33
13.574
1399
344.4
344.4
0.0
0.0
34
14.009
1243
373.1
373.1
0.0
0.0
35
14.444
1074
401.7
401.7
0.0
0.0
36
14.880
893
430.4
430.4
0.0
0.0
37
15.315
699
459.1
459.1
0.0
0.0
38
15.750
493
487.8
487.8
0.0
0.0
39
16.186
274
516.5
516.5
0.0
0.0
40
16.621
43
545.2
545.2
0.0
0.0
41
16.700
550.4
0.0
Open. Sect.
19/11/2015
Nm,top
Nm,bot
Vm,top
Vm,bot
(kN)
(kN)
(kN)
(kN)
375.496
-375.496
-258.268
-258.268
956.670
-956.670
-229.571
-229.571
1469.471
-1469.471
-200.875
-200.875
1913.899
-1913.899
-172.179
-172.179
11
2289.953
-2289.953
-143.482
-143.482
13
2597.634
-2597.634
-114.786
-114.786
15
2836.941
-2836.941
-86.089
-86.089
17
3007.875
-3007.875
-57.393
-57.393
19
3110.435
-3110.435
-28.696
-28.696
10
21
3144.622
-3144.622
0.000
0.000
11
23
3110.435
-3110.435
28.696
28.696
12
25
3007.875
-3007.875
57.393
57.393
13
27
2836.941
-2836.941
86.089
86.089
14
29
2597.634
-2597.634
114.786
114.786
15
31
2289.953
-2289.953
143.482
143.482
16
33
1913.899
-1913.899
172.179
172.179
17
35
1469.471
-1469.471
200.875
200.875
18
37
956.670
-956.670
229.571
229.571
19
39
375.496
-375.496
258.268
258.268
15 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
U2 = 1.35 G + 1.00 Q1
Left end :
Right end :
Maximum moment :
Maximum shear force :
x (m)
19/11/2015
RAv = 550.44 kN
RBv = 550.44 kN
Reactions at supports :
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
0.000
-550.4
0.0
0.079
43
-545.2
-545.2
0.0
0.0
0.514
274
-516.5
-516.5
0.0
0.0
0.950
493
-487.8
-487.8
0.0
0.0
1.385
699
-459.1
-459.1
0.0
0.0
1.820
893
-430.4
-430.4
0.0
0.0
2.256
1074
-401.7
-401.7
0.0
0.0
2.691
1243
-373.1
-373.1
0.0
0.0
3.126
1399
-344.4
-344.4
0.0
0.0
10
3.562
1542
-315.7
-315.7
0.0
0.0
11
3.997
1674
-287.0
-287.0
0.0
0.0
12
4.432
1792
-258.3
-258.3
0.0
0.0
13
4.867
1898
-229.6
-229.6
0.0
0.0
14
5.303
1992
-200.9
-200.9
0.0
0.0
15
5.738
2073
-172.2
-172.2
0.0
0.0
16
6.173
2142
-143.5
-143.5
0.0
0.0
17
6.609
2198
-114.8
-114.8
0.0
0.0
18
7.044
2242
-86.1
-86.1
0.0
0.0
19
7.479
2273
-57.4
-57.4
0.0
0.0
20
7.915
2292
-28.7
-28.7
0.0
0.0
21
8.350
2298
0.0
0.0
0.0
0.0
22
8.785
2292
28.7
28.7
0.0
0.0
23
9.221
2273
57.4
57.4
0.0
0.0
24
9.656
2242
86.1
86.1
0.0
0.0
25
10.091
2198
114.8
114.8
0.0
0.0
26
10.527
2142
143.5
143.5
0.0
0.0
27
10.962
2073
172.2
172.2
0.0
0.0
28
11.397
1992
200.9
200.9
0.0
0.0
29
11.833
1898
229.6
229.6
0.0
0.0
30
12.268
1792
258.3
258.3
0.0
0.0
31
12.703
1674
287.0
287.0
0.0
0.0
32
13.138
1542
315.7
315.7
0.0
0.0
33
13.574
1399
344.4
344.4
0.0
0.0
16 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
x (m)
M (kNm)
VL (kN)
VR (kN)
NL (kN)
NR (kN)
34
14.009
1243
373.1
373.1
0.0
0.0
35
14.444
1074
401.7
401.7
0.0
0.0
36
14.880
893
430.4
430.4
0.0
0.0
37
15.315
699
459.1
459.1
0.0
0.0
38
15.750
493
487.8
487.8
0.0
0.0
39
16.186
274
516.5
516.5
0.0
0.0
40
16.621
43
545.2
545.2
0.0
0.0
41
16.700
550.4
0.0
Open. Sect.
19/11/2015
Nm,top
Nm,bot
Vm,top
Vm,bot
(kN)
(kN)
(kN)
(kN)
375.496
-375.496
-258.268
-258.268
956.670
-956.670
-229.571
-229.571
1469.471
-1469.471
-200.875
-200.875
1913.899
-1913.899
-172.179
-172.179
11
2289.953
-2289.953
-143.482
-143.482
13
2597.634
-2597.634
-114.786
-114.786
15
2836.941
-2836.941
-86.089
-86.089
17
3007.875
-3007.875
-57.393
-57.393
19
3110.435
-3110.435
-28.696
-28.696
10
21
3144.622
-3144.622
0.000
0.000
11
23
3110.435
-3110.435
28.696
28.696
12
25
3007.875
-3007.875
57.393
57.393
13
27
2836.941
-2836.941
86.089
86.089
14
29
2597.634
-2597.634
114.786
114.786
15
31
2289.953
-2289.953
143.482
143.482
16
33
1913.899
-1913.899
172.179
172.179
17
35
1469.471
-1469.471
200.875
200.875
18
37
956.670
-956.670
229.571
229.571
19
39
375.496
-375.496
258.268
258.268
17 / 28
ACB+
v 3.08
NS = Not satisfactory
M,max
N,max
V,max
MN,max
NV,max
MV,max
MNV,max
=
=
=
=
=
=
=
0.290
0.570
0.459
0.585
0.570
0.290
0.585
<1
<1
<1
<1
<1
<1
<1
S
S
S
S
S
S
S
= 0.319
= 0.309
= 3.12 mm
<1
<1
S
S
= 0.503 (Classe 1)
= 0.136
<1
<1
S
S
Web checkings
According to web slenderness, shear buckling check not required (hw / tw < 72 / )
Posts checkings
Resistance to shear (Post no 1 - Comb. U1) :
Vh,max
Resistance to buckling (Post no 18 - Comb. U1) :
b,max
Minimum throat thickness (Post no 18 - Comb. U1) :
amin
Warning: the throat thickness is assessed by assuming two welds
The total thickness of welds should be at least 6.24 mm
Gross sections checkings
Resistance to bending (Post no 9 - Comb. U1) :
Resistance to shear (Left end - Comb. U1) :
19/11/2015
Mg,max
Vg,max
18 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
U1 = 1.35 G + 1.00 Q1
0.074 (15)
Bot
0.074 (-15)
Top
0.176 (6)
Bot
0.176 (-6)
Top
0.267 (3)
Bot
0.267 (-3)
Top
Bot
Top
Bot
Top
0.471 (1)
Bot
0.471 (-1)
Top
0.514 (1)
Bot
0.514 (-1)
Top
0.545 (0)
Bot
0.545 (0)
Top
Bot
Top
Bot
11
12
Bot
13
Top
MN
MV
MNV
0.074 (15)
0.335 (28)
0.328 (6)
0.290 (30)
0.074 (-15)
0.329 (-16)
0.280 (-31)
0.176 (6)
0.329 (16)
0.280 (31)
0.176 (-6)
0.391 (26)
0.280 (31)
0.391 (26)
0.352 (-25)
0.267 (-32)
0.267 (3)
0.450 (-25)
0.267 (-32)
0.450 (-25)
0.352 (25)
0.267 (32)
0.267 (-3)
0.450 (25)
0.267 (32)
0.450 (25)
0.348 (2)
0.382 (-30)
0.252 (-33)
0.348 (2)
0.498 (-24)
0.252 (-33)
0.498 (-24)
0.348 (-2)
0.382 (30)
0.252 (33)
0.348 (-2)
0.498 (24)
0.252 (33)
0.498 (24)
0.416 (2)
0.412 (-34)
0.236 (-34)
0.416 (2)
0.536 (-22)
0.236 (-34)
0.536 (-22)
0.416 (-2)
0.412 (34)
0.236 (34)
0.416 (-2)
0.536 (22)
0.236 (34)
0.536 (22)
0.435 (-36)
0.217 (-35)
0.471 (1)
0.563 (-21)
0.217 (-35)
0.563 (-21)
0.435 (36)
0.217 (35)
0.471 (-1)
0.563 (21)
0.217 (35)
0.563 (21)
0.451 (-38)
0.197 (-36)
0.514 (1)
0.580 (-19)
0.197 (-36)
0.580 (-19)
0.451 (38)
0.197 (36)
0.514 (-1)
0.580 (19)
0.197 (36)
0.580 (19)
0.459 (-39)
0.174 (-37)
0.545 (0)
0.585 (-18)
0.174 (-37)
0.585 (-18)
0.459 (39)
0.174 (37)
0.545 (0)
0.585 (18)
0.174 (37)
0.585 (18)
0.564 (0)
0.458 (-41)
0.149 (-39)
0.564 (0)
0.581 (-15)
0.149 (-39)
0.581 (-15)
0.564 (0)
0.458 (41)
0.149 (39)
0.564 (0)
0.581 (15)
0.149 (39)
0.581 (15)
0.570 (0)
0.448 (-42)
0.122 (-40)
0.570 (0)
0.570 (0)
0.122 (-40)
0.570 (0)
0.570 (0)
0.448 (-42)
0.122 (-40)
0.570 (0)
0.570 (0)
0.122 (-40)
0.570 (0)
Top
0.564 (0)
0.458 (41)
0.149 (39)
0.564 (0)
0.581 (15)
0.149 (39)
0.581 (15)
Bot
0.564 (0)
0.458 (-41)
0.149 (-39)
0.564 (0)
0.581 (-15)
0.149 (-39)
0.581 (-15)
Top
0.545 (0)
0.459 (39)
0.174 (37)
0.545 (0)
0.585 (18)
0.174 (37)
0.585 (18)
0.545 (0)
0.459 (-39)
0.174 (-37)
0.545 (0)
0.585 (-18)
0.174 (-37)
0.585 (-18)
0.514 (-1)
0.451 (38)
0.197 (36)
0.514 (-1)
0.580 (19)
0.197 (36)
0.580 (19)
Bot
0.514 (1)
0.451 (-38)
0.197 (-36)
0.514 (1)
0.580 (-19)
0.197 (-36)
0.580 (-19)
Top
0.471 (-1)
0.435 (36)
0.217 (35)
0.471 (-1)
0.563 (21)
0.217 (35)
0.563 (21)
Bot
0.471 (1)
0.435 (-36)
0.217 (-35)
0.471 (1)
0.563 (-21)
0.217 (-35)
0.563 (-21)
Top
0.416 (-2)
0.412 (34)
0.236 (34)
0.416 (-2)
0.536 (22)
0.236 (34)
0.536 (22)
Bot
0.416 (2)
0.412 (-34)
0.236 (-34)
0.416 (2)
0.536 (-22)
0.236 (-34)
0.536 (-22)
16
Top
0.348 (-2)
0.382 (30)
0.252 (33)
0.348 (-2)
0.498 (24)
0.252 (33)
0.498 (24)
Bot
0.348 (2)
0.382 (-30)
0.252 (-33)
0.348 (2)
0.498 (-24)
0.252 (-33)
0.498 (-24)
17
Top
0.267 (-3)
0.352 (25)
0.267 (32)
0.267 (-3)
0.450 (25)
0.267 (32)
0.450 (25)
Bot
0.267 (3)
0.352 (-25)
0.267 (-32)
0.267 (3)
0.450 (-25)
0.267 (-32)
0.450 (-25)
9
10
14
15
0.328 (-6)
NV
0.290 (-30)
19/11/2015
0.290 (-30)
0.335 (28)
0.335 (-28)
0.290 (30)
0.335 (-28)
0.391 (-26)
0.280 (-31)
0.391 (-26)
19 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
Top
Bot
19
Top
Bot
0.176 (-6)
0.329 (16)
0.280 (31)
0.176 (6)
0.329 (-16)
0.074 (-15)
0.328 (6)
0.074 (15)
0.328 (-6)
NV
MN
MV
MNV
0.176 (-6)
0.391 (26)
0.280 (31)
0.391 (26)
0.280 (-31)
0.176 (6)
0.391 (-26)
0.280 (-31)
0.391 (-26)
0.290 (30)
0.074 (-15)
0.335 (-28)
0.290 (30)
0.335 (-28)
0.290 (-30)
0.074 (15)
0.335 (28)
0.290 (-30)
0.335 (28)
19/11/2015
Vh
0.32
0.31
0.28
0.27
0.24
0.22
0.21
0.18
0.17
0.15
0.13
0.12
0.09
0.12
0.06
0.10
0.02
0.08
10
0.02
0.08
11
0.06
0.10
12
0.09
0.12
13
0.13
0.12
14
0.17
0.15
15
0.21
0.18
16
0.24
0.22
17
0.28
0.27
18
0.32
0.31
20 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
ULS Combination U2
U2 = 1.35 G + 1.00 Q1
0.074 (15)
Bot
0.074 (-15)
Top
0.176 (6)
Bot
0.176 (-6)
Top
Bot
Top
Bot
Top
0.416 (2)
Bot
0.416 (-2)
Top
0.471 (1)
Bot
0.471 (-1)
Top
0.514 (1)
Bot
0.514 (-1)
Top
Bot
Top
Bot
10
11
12
MN
0.290 (30)
0.335 (-28)
0.391 (-26)
0.280 (-31)
0.391 (-26)
0.176 (-6)
0.391 (26)
0.280 (31)
0.391 (26)
0.267 (-32)
0.267 (3)
0.450 (-25)
0.267 (-32)
0.450 (-25)
0.267 (32)
0.267 (-3)
0.450 (25)
0.267 (32)
0.450 (25)
0.252 (-33)
0.348 (2)
0.498 (-24)
0.252 (-33)
0.498 (-24)
0.252 (33)
0.348 (-2)
0.498 (24)
0.252 (33)
0.498 (24)
0.236 (-34)
0.416 (2)
0.536 (-22)
0.236 (-34)
0.536 (-22)
0.412 (34)
0.236 (34)
0.416 (-2)
0.536 (22)
0.236 (34)
0.536 (22)
0.435 (-36)
0.217 (-35)
0.471 (1)
0.563 (-21)
0.217 (-35)
0.563 (-21)
0.435 (36)
0.217 (35)
0.471 (-1)
0.563 (21)
0.217 (35)
0.563 (21)
0.451 (-38)
0.197 (-36)
0.514 (1)
0.580 (-19)
0.197 (-36)
0.580 (-19)
0.451 (38)
0.197 (36)
0.514 (-1)
0.580 (19)
0.197 (36)
0.580 (19)
0.545 (0)
0.459 (-39)
0.174 (-37)
0.545 (0)
0.585 (-18)
0.174 (-37)
0.585 (-18)
0.545 (0)
0.459 (39)
0.174 (37)
0.545 (0)
0.585 (18)
0.174 (37)
0.585 (18)
0.564 (0)
0.458 (-41)
0.149 (-39)
0.564 (0)
0.581 (-15)
0.149 (-39)
0.581 (-15)
0.564 (0)
0.458 (41)
0.149 (39)
0.564 (0)
0.581 (15)
0.149 (39)
0.581 (15)
Top
0.570 (0)
0.448 (-42)
0.122 (-40)
0.570 (0)
0.570 (0)
0.122 (-40)
0.570 (0)
Bot
0.570 (0)
0.448 (-42)
0.122 (-40)
0.570 (0)
0.570 (0)
0.122 (-40)
0.570 (0)
Top
0.564 (0)
0.458 (41)
0.149 (39)
0.564 (0)
0.581 (15)
0.149 (39)
0.581 (15)
Bot
0.564 (0)
0.458 (-41)
0.149 (-39)
0.564 (0)
0.581 (-15)
0.149 (-39)
0.581 (-15)
Top
0.545 (0)
0.459 (39)
0.174 (37)
0.545 (0)
0.585 (18)
0.174 (37)
0.585 (18)
Bot
0.545 (0)
0.459 (-39)
0.174 (-37)
0.545 (0)
0.585 (-18)
0.174 (-37)
0.585 (-18)
Top
0.514 (-1)
0.451 (38)
0.197 (36)
0.514 (-1)
0.580 (19)
0.197 (36)
0.580 (19)
Bot
0.514 (1)
0.451 (-38)
0.197 (-36)
0.514 (1)
0.580 (-19)
0.197 (-36)
0.580 (-19)
Top
0.471 (-1)
0.435 (36)
0.217 (35)
0.471 (-1)
0.563 (21)
0.217 (35)
0.563 (21)
Bot
0.471 (1)
0.435 (-36)
0.217 (-35)
0.471 (1)
0.563 (-21)
0.217 (-35)
0.563 (-21)
15
Top
0.416 (-2)
0.412 (34)
0.236 (34)
0.416 (-2)
0.536 (22)
0.236 (34)
0.536 (22)
Bot
0.416 (2)
0.412 (-34)
0.236 (-34)
0.416 (2)
0.536 (-22)
0.236 (-34)
0.536 (-22)
16
Top
0.348 (-2)
0.382 (30)
0.252 (33)
0.348 (-2)
0.498 (24)
0.252 (33)
0.498 (24)
Bot
0.348 (2)
0.382 (-30)
0.252 (-33)
0.348 (2)
0.498 (-24)
0.252 (-33)
0.498 (-24)
Top
0.267 (-3)
0.352 (25)
0.267 (32)
0.267 (-3)
0.450 (25)
0.267 (32)
0.450 (25)
Bot
0.267 (3)
0.352 (-25)
0.267 (-32)
0.267 (3)
0.450 (-25)
0.267 (-32)
0.450 (-25)
Top
0.176 (-6)
0.329 (16)
0.280 (31)
0.176 (-6)
0.391 (26)
0.280 (31)
0.391 (26)
Bot
0.176 (6)
0.329 (-16)
0.280 (-31)
0.176 (6)
0.391 (-26)
0.280 (-31)
0.391 (-26)
13
14
17
18
0.074 (15)
0.335 (28)
0.328 (6)
0.290 (30)
0.074 (-15)
0.329 (-16)
0.280 (-31)
0.176 (6)
0.329 (16)
0.280 (31)
0.267 (3)
0.352 (-25)
0.267 (-3)
0.352 (25)
0.348 (2)
0.382 (-30)
0.348 (-2)
0.382 (30)
0.412 (-34)
MNV
0.335 (-28)
0.290 (-30)
MV
0.335 (28)
0.328 (-6)
NV
0.290 (-30)
19/11/2015
21 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
NV
MN
MV
MNV
Top
0.074 (-15)
0.328 (6)
0.290 (30)
0.074 (-15)
0.335 (-28)
0.290 (30)
0.335 (-28)
Bot
0.074 (15)
0.328 (-6)
0.290 (-30)
0.074 (15)
0.335 (28)
0.290 (-30)
0.335 (28)
19/11/2015
Vh
0.32
0.31
0.28
0.27
0.24
0.22
0.21
0.18
0.17
0.15
0.13
0.12
0.09
0.12
0.06
0.10
0.02
0.08
10
0.02
0.08
11
0.06
0.10
12
0.09
0.12
13
0.13
0.12
14
0.17
0.15
15
0.21
0.18
16
0.24
0.22
17
0.28
0.27
18
0.32
0.31
22 / 28
ACB+
v 3.08
Detailed checkings
Net section at opening no 1 - Resistance to bending moment
Combination U1
Bending moment
Shear forces
Axial forces
Axial forces in chord
Shear forces in chord
Angle
Partial factor
Yield strengths
Bottom chord
Inclined Tee section
Projected forces
Class of the chord
Bending resistant moment
Criterion
MEd
VEd,l
NEd,l
Nm,sup,l
Nm,inf,l
Vm,sup,l
Vm,inf,l
M0
fy,top
h
A
N
M
Class 1
Mc,Rd
M
=
=
=
=
=
=
=
=
=
=
274.4 kNm
-516.5 kN
0.0 kN
375.5 kN
-375.5 kN
-258.3 kN
-258.3 kN
30.0
1.00
460 MPa
=
=
=
=
206 mm
14534 mm2
-196.1 kN
-55.95 kNm
=
=
192.6 kNm
0.290
VEd,r
NEd,r
Nm,sup,r
Nm,inf,r
Vm,sup,r
Vm,inf,r
=
=
=
=
=
=
-516.5 kN
0.0 kN
375.5 kN
-375.5 kN
-258.3 kN
-258.3 kN
fy,bot
460 MPa
Av
V
=
=
4175 mm2
-277.6 kN
VEd,r
NEd,r
Nm,sup,r
Nm,inf,r
Vm,sup,r
Vm,inf,r
=
=
=
=
=
=
0.0 kN
0.0 kN
3145 kN
-3145 kN
0.0 kN
0.0 kN
fy,bot
460 MPa
Av
V
=
=
3018 mm2
0.0 kN
VEd,r
NEd,r
Nm,sup,r
Nm,inf,r
=
=
=
=
-114.8 kN
0.0 kN
3008 kN
-3008 kN
MEd
VEd,l
NEd,l
Nm,sup,l
Nm,inf,l
Vm,sup,l
Vm,inf,l
M0
fy,top
h
A
N
M
Class 2
Nc,Rd
N
=
=
=
=
=
=
=
=
=
=
2298 kNm
0.0 kN
0.0 kN
3145 kN
-3145 kN
0.0 kN
0.0 kN
0.0
1.00
460 MPa
=
=
=
=
145 mm
11989 mm2
3145 kN
0.0 kNm
=
=
5515 kN
0.570
19/11/2015
MEd
VEd,l
NEd,l
Nm,sup,l
Nm,inf,l
=
=
=
=
=
2198 kNm
-114.8 kN
0.0 kN
3008 kN
-3008 kN
23 / 28
ACB+
v 3.08
Vm,sup,l
Vm,inf,l
M0
fy,top
h
A
N
M
Vc,Rd
V
=
=
=
=
=
-57.39 kN
-57.39 kN
-39.0
1.00
460 MPa
=
=
=
=
=
=
258 mm
16706 mm2
2301 kN
50.52 kNm
1371 kN
0.459
=
=
=
=
=
=
=
=
=
=
2198 kNm
-114.8 kN
0.0 kN
3008 kN
-3008 kN
-57.39 kN
-57.39 kN
-18.0
1.00
460 MPa
=
=
=
=
=
=
=
=
=
166 mm
12836 mm2
2843 kN
13.53 kNm
903.8 kN
0.000
5904 kN
130.5 kNm
0.585
Vm,sup,r
Vm,inf,r
=
=
-57.39 kN
-57.39 kN
fy,bot
460 MPa
Av
V
=
=
5163 mm2
-629.6 kN
VEd,r
NEd,r
Nm,sup,r
Nm,inf,r
Vm,sup,r
Vm,inf,r
=
=
=
=
=
=
-114.8 kN
0.0 kN
3008 kN
-3008 kN
-57.39 kN
-57.39 kN
fy,bot
460 MPa
Av
V
=
=
3403 mm2
-301.0 kN
MEd
VEd,l
NEd,l
Nm,sup,l
Nm,inf,l
Vm,sup,l
Vm,inf,l
M0
fy,top
h
A
N
M
Vc,Rd
NV,Rd
MV,Rd
MNV
= 0.333
V
(No reduction)
= 0.481
NV
= 0.104
MV
Shear buckling
Section at (infilled) cell no 1
Web dimensions
Yield strengths
hw / tw = 39.41 < 72 / = 42.89
hw
fy
= 725.2 mm
tw
= 460 MPa
= 1.20
Shear buckling check is not required
=
=
18.4 mm
0.715
MEd,r
Nm,Inf,l
Nm,Inf,r
=
=
=
699.1 kNm
-375.5 kN
-956.7 kN
VhRd,bot
=
=
1823.35 kN
0.319
19/11/2015
dG
MEd,l
Nm,Sup,l
Nm,Sup,r
Vhm
w
VhRd,top
Vh,top
=
=
=
=
=
=
=
=
730.8 mm
274.4 kNm
375.5 kN
956.7 kN
581.2 kN
373.1 mm
1823.35 kN
0.319
Vh,bot
24 / 28
ACB+
v 3.08
a0
e
Ht
hm,top
hTe,top
dG,top
dG
A0,top
Av0,top
=
=
=
=
=
=
=
=
=
497.5 mm
870.6 mm
788.0 mm
394.0 mm
145.2 mm
365.4 mm
730.8 mm
11989.2 mm2
3018.2 mm2
hm,bot
hTe,bot
dG,bot
=
=
=
394.0 mm
145.2 mm
365.4 mm
A0,bot
Av0,bot
=
=
11989.2 mm2
3018.2 mm2
Yield strengths
fy,top
460 MPa
fy,bot
460 MPa
Shear forces
Moments
Shear parameters
VEd,l
MEd,l
=
=
=
-459.14 kN
699.14 kNm
0.990
VEd,r
MEd,r
kAv
=
=
=
-516.54 kN
274.41 kNm
0.500
Nm,ltop
Nm,rtop
Vm,ltop
Vm,rtop
Vhm
dW
McEd,top
=
=
=
=
=
=
=
=
956.67 kN
375.50 kN
-229.57 kN
-258.27 kN
-581.17 kN
153.1 mm
-89.00 kNm
204 MPa
Nm,lbot
Nm,rbot
Vm,lbot
Vm,rbot
Mhm
LW
McEd,bot
=
=
=
=
=
=
=
=
-956.67 kN
-375.50 kN
-229.57 kN
-258.27 kN
0.00 kNm
478.6 mm
-89.00 kNm
204 MPa
=
=
=
=
=
4621.43 kN
6859.36 kN
7.361
7.795
1591 MPa
VhCr,bot
NmCr,bot
Cr,bot
=
=
=
=
=
4621.43 kN
6859.36 kN
8.284
8.284
1690 MPa
bot
0.639
W,top
VhCr,top
NmCr,top
Cr,top
Cr,top
Critical stresses
Reduced slendernesses
With
Reduction factors
Resistant stresses
Plastic moments of tees
Psi factor
Post-buckling factor
Checkings
Cr,top
=
=
=
top
=
WRd,top
MplRd,Te,top =
=
top
=
top
=
b,top
top
0.659
1.500
0.866
598 MPa
104.50 kNm
0.465
1.103
0.309
= e / a0 =
W,bot
Cr,bot
Cr,bot
1.75
=
=
MplRd,Te,bot =
=
bot
=
bot
=
b,bot
0.875
604 MPa
104.50 kNm
0.465
1.103
0.307
NEd
0.00 kN
0.715
460 MPa
bot
WRd,bot
19/11/2015
fy,bot
25 / 28
ACB+
v 3.08
Mpl,Rd
MW
=
=
4554.14 kNm
0.503
Av,bot
fy,bot
M0
=
=
7595.2 mm2
460 MPa
1.00
=
=
=
=
1.00
274.4 kNm
730.8 mm
375.5 kN
w
fu
MEd,l
dG,l
Nm,Ed,l
Vh,Ed
Mh,Ed
M2
=
=
=
=
=
=
=
=
=
373.1 mm
540.0 MPa
699.1 kNm
730.8 mm
956.7 kN
581.2 kN
0.0 kNm
1.25
3.122 mm
MEd,r
dG,r
Nm,Ed,r
19/11/2015
26 / 28
ACB+
Multi Storey Building - Primary Beam
v 3.08
v = 3.66 mm (S21)
v = 103.0 mm (S21)
= L / 4558
= L / 162
v = 107 mm (S21)
v = 107 mm (S21)
v = 3.66 mm (S21)
v = 107 mm (S21)
= L / 157
= L / 157
= L / 4558
= L / 157
The user has to check whether the deflections are acceptable according to the project requirements
and to consider a precambering if necessary.
Natural frequencies
Load case / Combination
19/11/2015
8.25Hz
9.40Hz
G + 0.1 Q1
4.23Hz
4.82Hz
G + 0.2 Q1
3.21Hz
3.65Hz
G + 0.3 Q1
2.69Hz
3.06Hz
G + 0.4 Q1
2.36Hz
2.69Hz
G + 0.5 Q1
2.13Hz
2.42Hz
27 / 28
ACB+
v 3.08
WARNING!
This software facilitates the preliminary engineering studies with respect to steel constructions.
Based on calculation methods complying with the principles of the applied standards, this software
enables to make a certain number of verifications in view of evaluating a solution for a pre-design.
It does not enable to analyse all situations and to make in an exhaustive way all relevant
calculations needed for a study of execution which requires in every case the advice of an
external Engineering Office.
Given the complexity of the calculation methods, this software is only intended for professional
users active in the sector of steel constructions (who are fully aware of the possibilities, limits and
its adequacy thereof for specific practical cases). The users shall use the software under his own
responsibility and at his own risks.
This software may be used free of charge. No right is granted to the user of the software, the
property and intellectual rights of which continue to belong exclusively to ArcelorMittal Commercial
Sections S.A. (or, depending on the case, to the company of the ArcelorMittal Group who is
owner of these rights.) No warranty is granted to the user. ArcelorMittal Commercial Sections S.A.
and/or any other subsidiaries of the ArcelorMittal Group cannot be held liable for any loss or
damage directly and/or indirectly sustained as a result of the use of the software. The user
undertakes to hold ArcelorMittal Commercial Sections S.A. free and harmless from any claim and
any direct, indirect and/or consequential damages, in particular those resulting from an incorrect or
inappropriate use or a use made for an inadequate or inappropriate purpose of the software.
All the preliminary design notes done by ARCELORMITTAL and/or by any other subsidiaries of the
ARCELORMITTAL group are based on the information received from the Customer. These
preliminary design notes are given for guidance only. As such, they do not commit our company
and/or any other subsidiary of the ARCELORMITTAL group to the achievement of a result
expected by the Customer and/or any third person. These preliminary design notes cannot replace
all the design notes which shall be done by an external engineering office chosen by the
Customer. ARCELORMITTAL and/or any other subsidiary of the ARCELORMITTAL group cannot be
held liable for any loss or damage, directly or indirectly sustained as a result of the use of the
preliminary design notes done by ARCELORMITTAL and\or by any other subsidiaries of the
ARCELORMITTAL group, whatever the origin of the damage.
19/11/2015
28 / 28