Programs and Projects in the Province were sustainably implemented through the Congressional Development Fund (CDF) to cater the social
protection for the constituents, the island was not so developed in terms of infrastructures, and agriculture and fishery were given less opportunity for
economic upliftment as tourism was the main source of livelihood. Only upon the inception of BUB Program that various projects were primarily and
specifically identified by the CSOs; the marginalized sectors were given an opportunity to take part in the identification of projects that would cater their
specific needs. With the BUB Program under the Aquino administration, more funding were downloaded for various projects supporting the environmental,
social and economic aspects that had helped augment the LGUs in the realization of the major thrusts in the delivery of basic services to the constituents who
are hopeful that such program may be continued to uplift the living standard of the populace.
In the previous years, a number of households province-wide used to defecate anywhere, fishermen used to fish offshore by renting fishing boats
or thru sharing of fish-catch, some had to contend with dirt roads leading to the highway which were impassable to motor vehicles during rainy days, health
centers were lacking health services providers but through bub projects; more were provided with sanitary toilets, fisher-folks were provided with their own
own motorized fishing boats with accessories, some households now enjoy about 2 kms of concreted access road leading to the highway, emergency
employment of nurses was also implemented to fill the gap.
PROGRAM/PROJECT
(description, cost and fund
source e.g.GAA wit year,ODA,
Corporate Funds,
etc.,objective)
1
STATUS TIMELINES
(started in (date), ongoing
(___%) complete as of
(date),completed in (date), or
Target completion
BENEFICIARIES
(who are the beneficiaries?, how
many are they?,Note: inslcude
th latest data for the year and if
available, yearly data)
OUTCOME/IMPACT
(how has the program/project
contributed to improving the
lives of the beneficiaries?
Indicators on the
outcomes/impact of agency
program/projects)
2013 Province
Camiguin Solidwaste Sanitary On-going
Landfill Management & Research
Development
Project
(CS2MRDP)cluster-alliance
project
of
the
five
(5)
municipalities of the province
spearheaded by the Provincial
Government (2.6M)
Dairy
Development
(2.2M) On going
(Purchase
of
Pasteurizing
equipment
and
other
accessories)
(Construction of milking Parlor/
Building)
and
Municipality of Catarman
Improvement of the Municipal
Gym Phase 5(45 sq.m annex
kitchen, construction of entrance
canopy and construction of 3
ventilation openings in the gyms
roofing costing 1 M) -a termbased disaster risk reduction and
management plan of the Local
Government
Municipality of Mahinog
Construction
of
Pasalubong
Center cum Waiting Lounge
complete with support amenities
like coffee shop, ticketing facility,
toilet and shower room for
tourists going to mantigue island
costing 1M)
Started
Construction
December 2014 and
actually completed on
28,2015
Municipality of Mambajao
Construction of OBOP (One Completed
Barangay
One
product)/
Pasalubong Center at Ardent
Provide
safe
and
comfortable waiting lounge
for foreign and local tourists;
and
serves as presentable
convergence
facility
for
MAMSA Operator
Municipality.
It
will
promote
entrepreneurship and create jobs in
the locality.
533 households
Installation
started
on
December 26, 2013 and was
completed on completed on
May 30, 2014.
201
4
60 households
Municipality of Catarman
Installation started on October
Improvement of Existing Quila-a 15, 2014 and was completed
Water System (500,000.00)
on December 15,2015.
533 households
Municipality of Mahinog
Rehabilitation of San Miguel Installation started on March
Water
System
Phase
II 02,2015 and was completed on
(Installation of 540lm HDPE June 14,2015
263 households
(SDR
11)
Pipes
costing
300,000.00
146 households
helped reduced
contaminating
diseases.
the risk of
water-borne
378 households
Increased
Agricultural
productivity and profitability
Fish Peddlers were able to
reach the interior area.
Comfort of the passersby
during rainy days
Improved
rural
infrastructures
200 persons
Municipality of Mambajao
Road Project (2 lane concrete Date started January 9,2015
pavement with a length of 201 and was completed on April
meters, 7.0 meters wide including 2,2015
shoulder and line canal in both
7 Barangays
sides) at Sitio Tambaan, Anito
costing 1,740,000.00.
Municipality of Guinsiliban
Equipment (Communication and Completed
Rescue) of Brgy. Disaster
Command Center and Mobility in
7 Brgys. (500,000.00)
CSO
Monitoring
and
Evaluation
Orientation
Training and Practicum
Prepared by:
sgd
CONSUELO B. BARBASO
LGOO V
sgd
RUBICONCEASAR U. AGCOPRA