Ratio (OPR)
Alain Prioul
2007
June
GAP
PDP
Leveling
Board
FCA conditions
Shop
stocks
Customer
TPA
CUSTOMER
or
SUPPLIER
A
Internal MPM
PRODUCTION:
OPR= achievement of requested
quantity
Plant MPM
PC&L:
PDP Steering /
Monitoring
2
PDPs achievement
KEY ASSUMPTION: the daily / by shift quantities in PDP
have to be achieved, whatever unplanned losses occur.
There are 2 main ways to make it:
1st
1st way
way
z Production Cycle Time must be faster than Takt Time to absorb the difference:
TT =
TCT =
OPR=
Actual Output
Parts Boards requirements
Explanations
for losses
must
appear on
the parts
boards
hour after
hour
PLANNED STOPS:
Top 5
Paid breaks
Planned Changeovers
Paid
Hours
Cleaning Time*
Preventive Maintenance**
Time spent
on the
shopfloor
Time
planned for
Production
based on
Takt Times
LOSSES/HAZARDS:
Scraps
Machine Breakdowns
Change over > standards
Efficient time
Based on
Hazards
observed
from
previous
periods:
Taken
into
account
by Mgt
decision
Time used to
calculate
Parts Boards
Target Cycle
Times
*: should not exist **: should be outside of working hours 5
OPR
z The ability of the Production line to reach the goal has
to be measured by shift.
z Ideally, the OPR should be between 95% and 98%.
must be reconsidered.
z If target is never achieved, meaning not feasible, we
TARGETS = PDP
TIME
TT
LOSSES
COMPENSATED
BY OVERTIME
OPR
TCT
COMPENSATED
BY HIGHER TARGETS &
RESOURCES
ACTUAL (before overtime)
TARGETS (> PDP)
TOP 5
= (55 x 60)/60
53
2 scraps
60
= (60 x 60)/60
56
= (50x60)/60
50
= (60x60)/60
58
= (50x60)/60
50
= (60x60)/60
60
= (50x60)/60
50
= (50x60)/60
42
419
BREAK 10 Minutes
50
60
Hour 5
MAINTENANCE
50
60
Hour 7
BREAK 10 minutes
Hour 8
CLEANING 10 minutes
TOTAL
OPR
Overtime
Explanations
55
Hour 4
Hour 6
Targets
Actual
calculation (nb of parts)
50
50
435
= 96.3% = 419/435
16 minutes
16
2 scraps
TOP 5
= (55 x 60)/58
55
2 scraps
62
= (60 x 60)/58
58
= (50x60)/58
52
= (60x60)/58
60
= (50x60)/58
52
= (60x60)/58
62
= (50x60)/58
52
= (50x60)/58
44
435
BREAK 10 Minutes
52
62
Hour 5
MAINTENANCE
52
62
Hour 7
BREAK 10 minutes
Hour 8
CLEANING 10 minutes
TOTAL
OPR
Explanations
57
Hour 4
Hour 6
Targets
Actual
calculation (nb of parts)
52
52
451
= 96.4% = 435/451
2 scraps