BOOSTERS
BUYING GAS
FROM
PIPELINE TO
START UBD
Pipeline
H2S SCRUBBER
Valve
SHAKER
COMPRESSORS
STANDPIPE
RIG
PUMPS
ANNULAR
UBD
CHOKE
PRODUCING
NATURAL
GAS WHILE
DRILLING
Natural Gas From Formation
Gas
Drilling Mud
SHUT OFF
SUPPLY GAS
AND OPEN
SALES LINE
NOT
NECESSARY
TO FLARE
WHILE
SEPARATOR
DRILLING BY
R&R
Flare Stack
Scrubber
Compressors
Flare Stack
UBD ChokeMAC
& Skid
Separator
7
1400
1500
900
1600
800
1700
1800
1900
600
2000
500
2100
400
3 3
700
2200
2300
300
2400
200
2500
100
2600
0
00:00
02/02
2700
12:00
02/02
00:00
03/02
12:00
03/02
00:00
04/02
12:00
04/02
00:00
05/02
12:00
05/02
00:00
06/02
12:00
06/02
00:00
07/02
12:00
07/02
00:00
08/02
12:00
08/02
00:00
09/02
12:00
09/02
00:00
10/02
11
YEAR 1
2500
YEAR 2
YEAR 3
YEAR 4
2000
1500
1000
500
Wellhead Number
12
110
106
102
98
94
90
86
82
78
74
70
66
62
58
54
50
46
42
38
34
30
26
22
18
14
10
Flush
Production
Matrix
Production
13
14
3000
YEAR 1
2500
YEAR 2
YEAR 3
YEAR 4
2000
1500
1000
500
Wellhead Number
15
110
106
102
98
94
90
86
82
78
74
70
66
62
58
54
50
46
42
38
34
30
26
22
18
14
10
$10,000,000
65000
60000
CDN $ 9,855,058
Recovered Gas
55000
$8,000,000
50000
61,600 e3m3
$6,000,000
45000
40000
35000
30000
$4,000,000
25000
20000
15000
$2,000,000
10000
5000
$0
PROJECT TIMELINE
The gross heat of combustion of 1 m3 of commercial quality natural gas is around 0.039 GJ
Gas price is based on monthly average gas price in Alberta from http://www.ngx.com/natgas.html
16
$6,000,000
36000
CDN $ 5,261,960
30000
$4,000,000
24000
$3,000,000
29,983 e3m3
$2,000,000
18000
12000
$1,000,000
6000
$0
PROJECT TIMELINE
17
18
Potential for sour gas, estimated to be 13.7% H2S (12% on real test)
The regulatory board issued a flare permit for a maximum of 240 e3m3
cumulative gas flared throughout the entire operation (National Park).
19
Standpipe
Manifold
WFT
Control
Manifold
RBOP
Flare
Stack
Bleed Off
To Shakers
Oil Dump to
Tank Farm
Processing
Unit
Rigs Choke
Manifold
Annular
H2S
Scrubber
Compressor
Pipe line
Produced gas
to pipeline
WFT
4 Phase
Separator
Produced
Water
Gas
Oil
Water
Solids
Multiphase Flow
Low Volume
Pump
Compressor
Supply gas
Supply gas
from pipeline
Foam
Tank Farm
Settling Time
Defoamer
OPEN FLUID
H2S
Scrubber
CLOSED FLUID
OPEN SOLIDS
CLOSED SOLIDS
SCRUBBERS ON TANK VENTS
21
23
Reduce/Eliminate Flaring
Safety
Environmental
Economic
26
Thank you!