Date

Description

Issue

16.02.2015

column concrete

Rejection of RMC

25.02.2015
28.02.2015
03.03.2015
04.03.2015
07.03.2015

Steel testing
Material testing lab
Mix design
slab surface
Mix design

Required both physical & chemical


test
Lab key missing
Delayed mix design
uneven slab surface finish
Reminder

13.03.2015
13.03.2015
19.03.2015
20.03.2015
24.03.2015
30.03.2015
06.04.2015

Steel testing
Mix design
material testing
column concrete
Email Id of QC person
Material test report
Mix design

09.04.2015

Batching plant production delay concrete production at batching


record
plant

15.04.2015

shortage of materials for mix


design

Mis design

27.04.2015
27.04.2015
06.05.2015
07.05.2015
08.05.2015
09.05.2015
11.05.2015
14.05.2015
15.05.2015

test for coupler 25mm & 32mm


dia
change of form release oil
Observation
Observation
Observation
Observation
Observation
Observation
Observation

Coupler testing
Shuttering oil
Steel stacking
Steel stacking
Rusticide not applied
Debris in shuttering
Form release oil poor quality
Concrete dumped on slab
Reinforcement

25.05.2015
25.05.2015
25.05.2015
27.05.2015
27.05.2015
27.05.2015
28.05.2015
01.06.2015
04.06.2015

Observation
Observation
Observation
Observation
Observation
Observation
Observation
Observation
Steel testing

Honeycombing & beam bulging


observed
Honey combing
Quality & Safety Issues
Form release oil poor quality
Honey combing & roughness
Debris in shuttering
Hessain cloth for curing
Curing
steel testing before usage

08.06.2015
26.06.2015

Observation
concrete curing

Columns being cast above beam


bottom level
No curing for rectified works

01.07.2015
04.07.2015

Material
Material

Non Availability of cement in RMC


plant
MTC of cement vasavdatta 53 grade

04.07.2015

Material testing

Material test report from CDC lab

Delay in sending materials for lab


test
status of mix design report
cement test report
workability of concrete
delayed material test report
Delayed mix design

11.07.2015
15.07.2015

concreting
Material

Uneven concrete level


Lumps in cement bags

29.07.2015
29.07.2015

Rectificatin works
Material

No labours for rectification works


MTC of cement vasavdatta 53 grade

04.08.2015

Quality

Curing, calibration report, excess


concrete

06.08.2015

concrete setting

Deshuttering before concrete setting

08.08.2015

Rectificatin works

No masons for rectification works

10.08.2015

Rectificatin works

No masons for rectification works in


C1

07.09.2015
09.10.2015
13.10.2015
20.10.2015
23.10.2015
30.10.2015
04.11.2015

Material testing
Quality issues
Document
concreting
Material testing
concrete quality
material testing

construction material not tested


coupler test, honeycombing
Submission of QAP
operation of vibrators
Steel used before testing
honeycombing, offsets
coupler testing not done

24.11.2015

concrete quality

Honeycombing & concrete offset

05.12.2015

concrete rectifications

Insufficient manpower for concrete


rectification works

Reference
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Email
Observation
Observation
Observation
Observation
Observation
Observation
Observation
Observation
Email
Email
Email
Email
Observation
Observation
Observation
Email

Report
Report
Report
Report
Report
Report
Report
Report

Report
Report
Report

Observation Report
Email
Email
Email
Email

Observation Report
Email
Observation Report
Observation Report
Observation Report
Observation Report
Observation Report
Observation Report
Observation
Observation
Observation
Observation
Observation
Observation
Email

Report
Report
Report
Report
Report
Report

Email
Observation Report