Documente Academic
Documente Profesional
Documente Cultură
Description
Unit
Data
% of BMCR
1.
Quantities/Flows
1.1
kg/s
1.2
kg/s
1.3
kg/s
1.4
kg/s
1.5
kg/s
1.6
kg/s
1.7
kg/s
1.8
Lignite consumption
kg/s
1.9
kg/s
kg/s
1.11
kg/s
kg/s
kg/s
kg/s
kg/s
kg/s
kg/s
kg/s
kg/s
kg/s
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
kg/s
kg/s
kg/s
2.
Temperatures
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.11
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
3.
3.1
bar (a)
3.2
bar (a)
3.3
Drum
bar (a)
3.4
bar (a)
3.5
bar (a)
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
3.6
bar (a)
3.7
bar (a)
3.8
bar (a)
3.9
bar (a)
bar (a)
4.
4.1
SH2
bar
4.2
SH1
bar
4.3
ECO2
bar
4.4
ECO1
bar
4.5
bar
4.6
bar
4.7
bar
4.8
mWC
4.9
mWC
5.
5.1
mm WC
5.2
mm WC
5.3
Through ECO2
mm WC
5.4
Through ECO1
mm WC
5.5
Through AH1
mm WC
5.6
Through AH2
mm WC
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
5.7
5.8
Through ESP
mm WC
5.9
mm WC
mm WC
5.11
mm WC
6.
6.1
mm WC
6.2
Through AH2
mm WC
6.3
mm WC
6.4
mm WC
6.5
mm WC
7.
7.1
mm WC
7.2
Through AH1
mm WC
7.3
mm WC
7.4
mm WC
7.5
mm WC
7.6
mm WC
8.
8.1
m/s
8.2
m/s
8.3
m/s
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
8.4
m/s
8.5
m/s
8.6
m/s
8.7
m/s
8.8
m/s
8.9
m/s
m/s
8.11
m/s
9.
9.1
At furnace outlet
m/s
9.2
Through SH2
m/s
9.3
Through SH1
m/s
9.4
m/s
9.5
Through ECO2
m/s
9.6
Through ECO1
m/s
9.7
Through AH1
m/s
9.8
Through AH2
m/s
9.9
In main ducts
m/s
10.
m/s
m/s
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
10.3
Through AH2
m/s
10.4
m/s
10.5
Air to furnace
m/s
11.
11.1
In suction ducts
m/s
11.2
In pressure ducts
m/s
11.3
Through AH1
m/s
11.4
Ducts to pulverizers
m/s
11.5
m/s
12.
Heat Absorbed
12.1
MW
12.2
MW
12.3
By SH2
MW
12.4
By SH1
MW
12.5
By ECO2
MW
12.6
By ECO1
MW
12.7
By AH2
MW
12.8
By AH1
MW
12.9
MW
MW/m
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
13.
13.1
MW/m
13.2
MW/m
13.3
MW/m
13.4
MW/m
14.
14.1
14.2
14.3
14.4
14.5
14.6
14.7
14.8
14.9
15.
15.1
Coal feeders
kW
15.2
Coal pulverizers
kW
15.3
PA fans
kW
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
15.4
FD fans
kW
15.5
ID fans
kW
15.6
kW
15.7
kW
15.8
kW
15.9
kW
15.10 ESP
kW
15.11
kW
Other motors
kW
kW
16.
Emission Concentrations
(Based on dry flue gas at 1013 mbar, 0C,
with 6% O2)
16.1
16.2
mg/Nm
16.3
mg/Nm
16.4
mg/Nm
16.5
CO
mg/Nm
17.
Nm/s
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
% of BMCR
17.2
17.3
Drum level
17.4
Furnace pressure
17.5
18.
18.1
18.2
18.3
Drum level
18.4
Furnace pressure
18.5
18.7
18.8
Drum level
18.9
Furnace pressure
100
% TMCR
75
50
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Max
Power
kW
1.
FD fans
2.
ID fans
3.
PA fans
4.
5.
6.
7.
Coal Feeders
8.
Coal Pulverizers
9.
10.
11.
12.
Sootblower motors
13.
14.
30.
Data
Motor Motor
Rating Speed
kW
kW
Power
Supply
a.b.
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
1.
Arrangement Drawings
1.1
1.2
1.3
1.4
1.5
2.
Flow Diagrams
2.1
2.2
2.3
2.4
Sampling system
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
Unit
Data
Document References
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
2.13
2.14
2.15
2.16
2.17
2.18
2.19
Lubricating systems
3.
4.
4.1
FD fans
4.2
ID fans
4.3
PA fans
5.
6
7
Unit
Data
Document References
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
8.
10.1
10.2
10.3
10.4
10.5
Precipitator outlet
9
10
11
14
15
12
13
15.1
Drum internals
15.2
15.3
15.4
Unit
Data
Document References
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
15.5
Observation ports
15.6
Backstay connections
15.7
15.8
Pulverizes
15.9
Lignite feeders
Unit
Data
Document References
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
15.2
4
15.2
5
15.2
6
15.2
7
15.2
8
Description
ID fans
PA fans
Expansion joist
Silencer
Flues and ducts
The following additional drawings are
included with the Bid (list hereunder)
Unit
Data
Document References
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Description
Name of Bidder :
Unit
Data
Insulation
Lagging
Thickness
Thickness
Material
Material
mm
mm
Furnace/ Boiler
1.
2.
Furnace walls
3.
Superheater area
4.
5.
Roof (penthouse)
Pressure Parts
6.
Boiler drum
7.
Downcomers
8.
9.
Superheater header
9.1
SH2 inlet
9.2
SH2 inlet
9.3
SH1 outlet
9.4
SH2 inlet
10.
Economizer Headers :
10.
1
10.
2
10.
3
10.
4
ECO2 outlet
ECO2 inlet
ECO1 outlet
ECO1 inlet
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
11
11.1
Interconnecting pipes :
SH2 / SH1
Description
Name of Bidder :
Unit
Data
Insulation
Lagging
Thickness
Thickness
Material
Material
mm
mm
11.2
SH1 / Drum
11.3
Drum / ECO2
11.4
ECO2 / ECO1
Ducts
12.
13.
14.
ESP to ID fans
15.
ID fans to stack
16.
Stack flues
17.
Air to AH1
18.
Air to AH2
19.
20.
21.
Air/fuel to burners
Equipment
23.
24.
25.
26.
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
27.
ID fans
28.
Pulverizers
29.
FD fans
Description
Name of Bidder :
Unit
Data
Insulation
Lagging
Thickness
Thickness
Material
Material
mm
mm
30.
PA fans
31.
32.
33.
Main steam
34.
Feedwater
35.
Injection water
36.
Sootblowner steam
37.
Hot drains
38.
39.
40.
41.
42.
Clean condensate
43.
Auxiliary piping
44.
Manufacturer of insulations/
country of origin
Manufacturer of lagging/
country of origin
45.
46.
Weight of insulation
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
47.
Total Weight
49.
Total volume
m3
Name of Bidder :
MISCELLANEOUS HOISTS AND CRANES
Item
Description
Unit
Number
ID fans
2.
FD fans
3.
PA fans
4.
Pulverizers
5.
Air heater
6.
ESP
7.
Boiler House
8.
Stack
9.
10.
Manufacturer/country of origin
11.
Type to be specified
11.1
Type A
11.2
Type B
11.3
Type C
11.4
etc
Data
Type
Capacity
(A-Z)
kg
E-drive
kW
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
12.
13.
m3
Name of Bidder :
ELEVATOR
Item
Description
Unit
Number
Manufacturer/Country of Origin
2.
Model/Type
3.
Rated capacity
Kg
4.
Rated speed
m/s
5.
mm
6.
Kg
7.
Kg
8.
Kg
9.
10.
Data of motor
kW
10.3 Speed
rpm
12.
m3
Data
Type
Capacity
(A-Z)
kg
E-drive
kW
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
BOILER AND AUXILIARIES
Ite
m
Description
Unit
Data
Number
Boiler Drum
1.1
Manufacturer/country of origin
1.2
Design pressure/temperature
bar (g)
0
1.3
bar (g)
1.4
Outside diameter
1.5
1.6
mm
Shell plates:
1.7
Material
1.8
Minimum thickness
mm
1.9
Nominal thickness
mm
1.1
0
Corrosions allowance
mm
Type
Number
mm
Type
(A-Z)
Capacity
kg
E-drive
kW
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
1.1
4
Efficiency
Circumferential joints:
1.1
5
1.1
6
1.1
7
Type
Number
Efficiency
Name of Bidder :
BOILER AND AUXILIARIES
Ite
m
Description
Unit
Head :
1.1
8
1.1
9
Shape
Nominal wall thickness
mm
Manholes:
1.2
0
1.2
1
1.2
2
2
2.1
Number
Size/Shape
mm
Kg
Downcomers
Design pressure/temperature
bar (g)
0
2.2
Number
2.3
Outside Diameter
mm
2.4
mm
2.5
mm
2.6
Corrosion allowance
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
2.7
Material
Front
Rear
Waterwalls
3.1
Manufacturer/Country of origin
3.2
Design pressure/temperature
3.3
Type of tubes
3.4
Number of tubes
bar (g)
0
C
Name of Bidder :
BOILER AND AUXILIARIES
Ite
m
Description
Unit
3.5
mm
3.6
Spacing of tubes
mm
3.7
mm
3.8
mm
3.9
Corrosion allowance
mm
3.1
0
Material
3.11
m2
Furnace
4.1
Widht
4.2
Depth
4.3
Height
4.4
m2
4.5
Volume (FV)
m3
4.6
m2
Data
Side
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Lower
5
Upper
Waterwall Headers
5.1
5.2
Design pressure/temperaure
5.3
Outside diameter
mm
5.4
mm
5.5
mm
5.6
Corrosion allowance
mm
bar (g)
0
C
Name of Bidder :
STEAM GENERATOR AND AUXILIARIES
Ite
m
Description
Unit
5.7
Material
5.8
Weight
5.9
5.1
0
Number of headers
6.1
Design pressure/temperature
6.2
Outside diameter
mm
6.3
mm
6.4
mm
6.5
Corrosion allowance
mm
6.6
Material
6.7
Weight
6.8
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
6.1
0
7
Number of heaters
1st pass
Sling tubes
7.1
Number of tubes
7.2
mm
7.3
mm
7.4
mm
7.5
Material
7.6
Weight
2nd pass
Name of Bidder :
BOILER AND AUXILIARIES
Ite
m
Description
Unit
Data
Primary
8.
Superheaters
8.1
Manufacturer/Country of origin
8.2
Type/Orientation
8.3
Design pressure/temperature
8.4
mm
8.5
mm
8.6
mm
8.7
mm
8.8
mm
8.9
Number of elements
8.1
0
bar (g)
0
C
8.11 Material
8.1
2
Heating Surface
m2
Secondary
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
8.1
3
Weight
Headers :
8.1
4
8.1
5
8.1
6
8.1
7
8.1
8
8.1
9
8.2
0
Inlet
Outside diameter
mm
mm
mm
Corrosion allowance
mm
Outlet
Inlet
Outlet
Material
Weight
Name of Bidder :
BOILER AND AUXILIARIES
Ite
m
Description
Unit
Data
Primary
Economisers
9.1
Manufacturer/Country of origin
9.2
Type / Orientation
9.3
Design Pressure/Temperature
bar (g)
0
C
9.4
mm
9.5
mm
9.6
mm
9.7
mm
9.8
mm
9.9
Corrosion allowance
mm
9.1
0
Number of elements
Secondary
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Material
Heating surface
Weight
m2
t
Headers :
9.1
5
9.1
6
9.1
7
9.1
8
9.1
9
Inlet
Outside diameter
mm
mm
mm
Corrosion allowance
mm
Outlet
Inlet
Outlet
Material
Name of Bidder :
BOILER AND AUXILIARIES
Item
Description
Unit
9,20
Weight
9.21
10
Interconnection Pipes
10.1
Manufacturer/Country of origin
10.2
Number
10.3
Design pressure/temperature
Data
EC01 to
EC02
bar (g)
0
C
10.4
Outside diameter
mm
10.5
mm
10.6
mm
10.7
Corrosion allowance
mm
10.8
Material
EC02
To drum
Drum to
SH 1
SH 1 to
SH2
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
10.9
10.10
Interconnection Pipes
11.1
Manufacturer/Country of origin
11.12
Number
11.13
Design Pressure/Temperature
SH2 to
main
Steam
Main
Steam
Line
(100%)
Main
Steam
Branch
(50%)
bar (g)
0
C
11.14
Outside diameter
mm
11.15
mm
Name of Bidder :
BOILER AND AUXILIARIES
Item
Description
Unit
11.6
mm
11.7
Corrosion allowance
mm
11.8
Material
11.9
11.10
11.11
11.12
12
12.1
Size
12.2
Number
12.3
Design Pressure/Temperature
mm
bar (g)
0
C
Data
Feed
Water
Line
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
14.4
Outside
mm
12.5
mm
12.6
mm
12.7
Corrosion allowance
mm
12.8
Material
10.9
10.1
0
Name of Bidder :
Description
Unit
Superheater
Steam
Water
13.
Attemperators
13.1
Manufacturer/Country of origin
13.2
Type
13.3
Number
13.4
13.5
Outside diameter
mm
13.6
mm
13.7
mm
13.8
Linear thickness
mm
13.9
Material body
Data
bar (g)
0
C
Sootblower
Steam
Water
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
kg
Safety Valves
14.1
Manufacturer/Country of origin
14.2
Type
14.3
Number
14.4
Size Intel/seat/outlet
14.5
Pressure setting
14.6
Capacity
14.7
Material of body
Drum
mm
bar (g)
kg/s
Name of Bidder :
Description
Material of steam
14.9
Material of seat
Main
Steam
Unit
Data
dBA
dBA
kg
Check
15.
Feedwater Valves
15.1
Manufacturer/Country of origin
15.2
Type
Stop
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
15.3
Number
15.4
Rated pressure/temperature
15.5
Diameter inlet/seat/outlet
15.6
Material of body
15.7
Material of stem
15.8
Material of seat
15.9
Material of disc
bar (g)
0
C
mm
Weight
Name of Bidder :
Description
Unit
16.
Feedwater Valve
16.1
16.2
Manufacture/Country of origin
Type
16.3
Number
16.4
Rated Pressure/temperature
16.5
16.6
Diameter inlet/seat/outlet
Material of body
16.7
Material of stem
16.8
Material of seat
16.9
Material of disc
16.10
Actuator type
16.11
Weight incl.actuator
kg
16.12
Weight
kg
17.
Data
Control 1
bar (g)
0
C
mm
Control 2
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
17.1
Number
17.2
Manufacture
17.3
Type
Optical fiber level Indicator :
17.4
Manufacturer
17.5
Type
17.6
17.7
mm
Manufacturer
17.9
Type
17.10
Name of Bidder :
Unit
mm
Pressure Gauges
17.12 Number
17.13 Manufacturer
17.14 Dial size
17.15 Pressure range
18.
mm
bar (g)
18.1
Manufacturer/Country of origin
18.2
Type
18.3
Number
18.4
Travel
18.5
Temperature rating
18.6
Rating of motor
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
18.7
Speed of motor
kW
18.8
Insulation of motor
rpm
18.9
Cooling system
kg/s
18.11
Manufacturer/country of Origin
18.12 Type
18.13 Number
0
Name of Bidder :
Description
Unit
Data
Number
19
Type
Thermocouples
19.1
Feedwater line
19.2
EC01
19.3
EC02
19.4
Drum
19.5
SH1
19.6
SH2
19.7
19.8
19.9
Isolating Valves
Drum
No.
Manufacturer
Type
Size
mm
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
20.2
Vent
20.3
Continuous blow-down
20.4
Steam sampling
20.5
20.6
20.7
20.8
Level gauge
20.9
Name of Bidder :
Description
Waterwall headers :
20.12 Drain
20.13 Blow-off
20.14 Chemical cleaning
Downcomers :
20.15 Drain
20.16 Water sampling
Feedwater pipe :
20.17 Vent
20.18 Water sampling
20.19 Boiler fill
Economiser headers :
20.20 Drain
20.21 Vent
Unit
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
22.1
Manufacture/Country of origin
22.2
Type
22.3
Number
22.4
Design Capacity
m3/h
22.5
Design head
mWC
22.6
Speed
rpm
22.7
Motor Rating
kW
22.8
Material of casing
22.9
Material of impeller
kg
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
23.
Water Wights
23.1
23.2
23.3
23.4
23.5
t
Net
weight
t
24
24,1
24.2
Shiiping Data
Boiler drum
Water walls with headers
Name of Bidder :
Downcomers
24.4
24.5
24.6
24.7
24.8
24.9
Description
Unit
Shipping
weight
t
25.1
Manufacturer/country of origin
25.2
25.3
Type
Number
25.4
kg/s
Data
Shipping
volume
m3
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
25.5
kg/s
25.6
25.7
Speed of motor
rpm
25.8
Motor rating
kW
25.9
Type of bearing
rpm
mm
Name of Bidder :
Unit
mm
mm
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Coal feeders
26.1
Manufacturer/Country of origin
26.2
Type
26.3
Number
26.4
kg/s
kg/s
Name of Bidder :
Description
Speed of conveyor belt at BMCR
25.6
25.7
Unit
m/s
Drive :
26.8
Manufacturer/Country of origin
26.9
Rating
kW
26.10 Enclosure
26.11 Insulation
26.12 Material of body
26.13 Speed
rpm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
t
m
(l x w x h)
27
27.1
Outside Diameter
mm
27.2
Wall Thickness
mm
27.3
Thickness of lining
mm
27.4
Type of valves
27.5
Name of Bidder :
Description
Material of ducting
27.7
Material of lining
27.8
Unit
Data
t
From
bunker
to feeder
28.
28.1
mm
28.2
Wall thickness
mm
28.3
Material of pipe
28.4
Material of lining
28.5
Type of valves
28.6
28.7
29
burner
kg
From
feeder to
pulverizer
From
pulverizer
to burner
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
29.1
Manufacture/country of origin
29.2
Type
29.3
Numbers of burners
29.4
Location at boiler
29.5
kg/s
29.6
kg/s
29.7
kg/s
29.8
Turn-down ratio
Register operator
29.9
Number
29.10
Type
Name of Bidder :
Description
Unit
Size
mm
mm
WG
Velovity at BMCR
29.1
4
29.1
5
29.1
6
29.1
7
Secondary air
Fuel/primary air
m/s
m/s
29.1
8
29.1
8
29.1
9
29.2
0
Number
Type
Manufacturer
Location
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
29.2
1
29.2
2
29.2
3
29.2
4
30
30.1
Manufacturer/country of origin
30.2
Type
30.3
Number
30.4
Design capacity
kg/s
30/5
bar
30. 6
Rated speed
rpm
30.7
Motor Rating
kW
Maintenance intervals
t
m3
h
months
Name of Bidder :
Description
Total weight of pump assembly
Material of casing
Unit
kg
kg/s
mm
30.17 Material
31.
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Auxiliary Burners :
31.1
Manufacturer/Country of origin
31.2
Type
31.3
Number
31.4
Location
31.5
31.6
Turn-down ratio
31.7
bar (g)
31.8
bar (g)
kg/s
Ignitors :
31.9
Manufacture/Country of origin
31.10 Type
31.11 Number
31.12 Location
Name of Bidder :
Description
Design fuel capacity (each)
Unit
kg/s
bar (g)
bar (g)
Data
Flame scanner :
31.1
6
31.1
7
31.1
8
31.1
9
Manufacturer/Country of origin
Type
Number
Location
Valves
31.2
Manucafturer/Country of origin
Control
Valve
Stop
Valve
Check
Valve
Other
Valve
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
0
31.2
1
31.2
2
31.2
3
31.2
4
Type
Design pressure
bar (g)
Material
Size (nominal bore)
mm
Piping
31.2
5
31.2
6
31.2
7
31.2
8
31.2
9
31.3
0
Suction
Line
Design pressure
bar (g)
Outside diameter
mm
Wall thickness
mm
Total length
Pressure
Line
Material
Pressure line to burners:
Shipping weight / volume
31.3
1
31.3
2
m3
Name of Bidder :
Description
Unit
Furnace
32.
Sootblowers
32.1
Manufacturer/Country of origin
32.2
Type
32.3
32.4
Data
SH2
EC02
SH1
EC01
AH2
AH1
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
32.5
Material of body
32.6
32.7
Manufacturer/type of motors
32.8
kW
32.9
kW
bar (g)
mm
min
kg/s
kg
kg
Name of Bidder :
Description
Unit
Manual
Manufacturer
Type
Number
Size
Material
Data
mm
Motor Operated
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
5
Isolation valves
32.2
6
32.2
7
32.2
8
32.2
9
32.3
0
Manufacturer
Type
Number
Size
mm
Material
Bypass valves
32.3
1
32.3
2
32.3
3
32.3
4
32.3
5
Manufacturer
Type
Number
Size
mm
Material
Reflef Valves
32.3
6
32.3
7
32.3
8
Manufacturer
Type
Number
Name of Bidder :
Description
Unit
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
32.41 Manufacture
32.42 Type
32.43 Number
32.44 Size
mm
32.45 Material
Steam traps
32.46 Manufacturer
32.47 Type
32.48 Number
32.49 Size
mm
32.50 Material
Shipping Weight / Volume
32.51 Total Weight
m3
Blow-Down Tank
33.1
Manufacturer/country of origin
33.2
Design pressure/temperature
33.3
Outside diameter
Clean Drain
bar (g)
0
C
mm
Name of Bidder :
Blow Down
Item
33.4
Height
Unit
mm
33.5
Wall thickness
mm
33.6
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
33.7
33.8
Material :
33.9
mm
mm
mm
33.1
2
33.1
3
33.1
4
33.1
5
33.1
6
mm
mm
Cooling system :
Design max. flow spray water
kg/s
kg/s
m2
Cooling surface
Drain Pumps :
33.1
7
33.1
8
33.1
9
33.2
0
33.2
1
33.2
2
33.2
3
33.2
4
32.2
5
32.2
6
Manufacturer/Country of origin
Type
Number
Design capacity
Design head
kg/s
mWC
Speed
rpm
Motor Rating
kW
Material of casing
Material of impeller
Material of shaft
Name of Bidder :
Description
Unit
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
34.
34.1
Manufacturer
34.2
34.3
Type
Number
34.3
34.5
Volume (ech)
Max. pressure (full)
m3
bar (g)
Manufacture
Type
34.8
34.9
kg/s
mm
Material of valves
Auxiliary Cooling Water system
(Design Cold Water temperature 400C)
System design :
35.1
35.2
35.3
35.4
35.5
35.6
35.7
35.8
kW
kW
kg/s
bar
bar (g)
Name of Bidder :
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Item
35.9
Description
Max. System operating pressure
Unit
bar (g)
Piping
35.1
Outside diameter
0
35.11 Wall thickness
35.1
2
35.1
3
mm
mm
Pipe Material
Type of protective coating inside
Valve
35.1
4
35.1
5
35.1
6
35.1
7
35.1
8
35.1
9
35.2
0
35.2
1
35.2
2
Manufacturer
Material of body
Material of stem
Material of seat
Size nominal
mm
35.2
3
35.2
4
36.
m3
36.1
Design capacity
36.2
36.3
36.4
Material of pipes
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Pipe nominal size at terminal point
37.
Unit
mm
37.1
Design capacity
kg/s
37.2
bar (g)
37.3
bar (g)
37.4
Material of pipes
37.5
38.
38.1
Design Capacity
38.2
bar (g)
38.3
bar (g)
38.4
Material of pipes
38.5
mm
kg/s
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
1.
Description
Secondary Air Heater
Unit
Manufacture/Country of origin
1.2
Type/Model
1.3
Number
1.4
Diameter
mm
1.5
mm
1.6
mm
1.7
m2
1.8
1.9
Type of seals
1.10
1.11
1.12
Material of housing
1.13
mm
1.14
mm
1.15
Thickness of housing
mm
Main Drive
1.16
Speed of rotor
rpm
1.17
Motor speed
rpm
1.18
Motor rating
kW
Auxiliary Drive
1.19
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
1.20
Description
Pressure of drive medium required
Unit
bar (g)
1.21
kg/s
1.23
1.24
Medium capacity
kg/s
Washing Device
1.25
Type
1.26
Number of nozzles
1.27
Washing Medium
1.28
Medium capacity
I/min
1.29
Medium pressure
bar (g)
1.30
min
1.31
m3
Ash Hoppers :
1.32
Hoppers :
1.33
Number
1.34
Storage capacity
1.35
1.36
Outlet dimensions
1.37
1.38
1.39
Fluidizing/Heating Device :
m3
degree
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
1.40
Description
Unit
Type
1.41
Manufacturer/Country of origin
1.42
1.43
1.44
1.45
kW
1.46
Heater capacity
kW
Nm3/h
Sootblowers :
1.47
Manufacturer/Country of origin
1.48
Type
1.49
1.50
1.51
Material of body
1.52
1.53
Manufacturer/type of motors
1.54
kW
1.55
kW
1.56
Enclosure of motors
1.57
Insulation of motors
1.58
min
1.59
kg/s
1.60
kg
1.61
kg
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
1.62
Description
For 24 h period when burning worst lignite
Unit
kg
Weight :
1.63
1.64
m3
2.1
2.2
Number
2.3
Type/Model
2.4
Tube arrangement
2.5
Medium in tubes
2.6
2.7
Length of tubes
2.8
mm
2.9
mm
2.10
mm
2.11
mm
2.12
Corrosion allowance
mm
2.13
2.14
2.15
2.16
2.17
Material of enclosure
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
2.18
Description
Overall dimensions (L x W x H)
Unit
m
Ash Hoppers :
2.19
Hoppers
2.20
Number
2.21
Storage capacity
2.22
2.23
Outlet dimensions
2.24
2.25
2.26
Fluidizing/Heating device :
2.27
Type
2.28
Manufacturer/Country of origin
2.29
2.30
2.31
2.32
kW
2.33
Heater capacity
kW
Sootblowers :
2.34
Manufacturer/Country of origin
2.35
Type
2.36
2.37
2.38
Material of body
m3
degree
mm
Nm3/h
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
AIR HEATERS
Item
2.39
Description
Material of tube nozzle
Unit
2.40
Manufacturer/type of motors
2.41
kW
2.42
kW
2.43
Enclosure of motors
2.44
Insulation of motors
2.45
min
2.46
kg/s
2.47
kg
2.48
kg
2.49
kg
Shipping Weight/Volume
2.50
Weight total
2.51
Volume total
m3
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
ELECTROSTATIC PRECIPITATOR
Item
Description
Electrostatic precipitator (ESP)
1.
Manufacturer/Country of origin
2.
Type
3.
Number
Unit
Data
Design Guarantee
lignite
lignite
4.
kg/s
5.
6.
7.
8.
mg/Nm3
9.
mg/Nm3
10.
11.
12.
Power consumption
13.
Draft loss
14.
15.
16.
17.
18.
m2
19.
m2
Nm3/s
0
mm
WC
m/s
s
kW
mm WC
Rainy
season
Worst
lignite
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
ELECTROSTATIC PRECIPITATOR
Item
20.
Description
Unit
21.
22.
23.
mA/m2
24.
mA/m2
25.
mm WC
26.
mm WC
27
Not used
28.
Not used
29.
Wall thickness :
29.1
Electrodes
mm
29.2
Collecting plates
mm
29.3
Housing
mm
30.
Materials :
30.1
Electrodes
30.2
Collecting plates
30.3
Housing
31.
Ash hoppers :
31.1
Hoppers :
31.2
Number
31.3
Storage capacity
31.4
m2
m3
degree
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
ELECTROSTATIC PRECIPITATOR
Item
31.5
Description
Outlet dimensions
31.6
31.7
31.8
Fluidizing/Heating device :
31.9
Type
Unit
mm
33.
Not used
34.
34.1
34.2
34.3
34.4
34.5
34.6
34.7
34.8
Nm3/h
kW
kW
Not used
mA
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
ELECTROSTATIC PRECIPITATOR
Item
34.9
Description
Number and type of high voltage switches
Unit
35.1
Transformer/rectifiers (T/R)
kW
35.2
Rappers
kW
35.3
35.4
Hopper heaters
kW
35.5
Hopper fluidizer
kW
35.6
Others
kW
35.7
kW
36.
Weights :
36.1
Electrical equipment
36.2
Housing
36.3
Interior parts
36.4
Special parts
36.5
36.6
Supporting structures
36.7
36.8
Total weight
37.
Shipping Weight/Volume
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
ELECTROSTATIC PRECIPITATOR
Item
37.1
Total weight
Description
Unit
t
37.2
Total volume
m3
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
DRAFT FANS
Item
Description
Unit
FD
fans
1.
Manufacturer/Country of origin
2.
Type / Model
3.
4.
Type of blades
5.
Number of blades
6.
Rotor speed
rpm
7.
Peripheral speed
m/s
8.
rpm
9.
rpm
10.
m2
11.
m2
12.
13.
14.
Diameter of rotor
mm
15.
Thickness of blades
mm
16
mm
17.
mm
18.
mm
19.
mm
20.
mm
21.
mm
22.
mm
Data
ID
fans
PRIMARY
air fans
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
DRAFT FANS
Item
Description
Unit
FD
fans
23.
23.1
Sides
mm
23.2
Scroll
mm
23.3
Lining
mm
2
kg m2
24.
25.
Material of shaft
26.
Material of blades
27.
28.
Material of housing
29.
Material of lining
30.
Coupling :
30.1
Manufacturer/Country of origin
30.2
Type/Model
31.
Motor :
31.1
Manufacturer/Country of origin
31.2
Type/Model
31.3
Power rating
kW
31.4
Speed
rpm
32.
32.1
Manufacturer/Country of origin
32.2
Type/Model
mm
Data
ID
fans
PRIMARY
air fans
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
DRAFT FANS
Item
Description
Unit
FD
fans
32.3
Speed in/out
rpm
32.4
Efficiency
33.
Lubrication system :
33.1
Type
33.2
33.3
I/min
33.4
bar (g)
33.5
34.
Oil coolers :
34.1
Number of coolers
34.2
Cooling surface
34.3
34.4
m3
kW
m2
kg/s
0
Performance data
35.
kg/s
36.
m3/s
37.
mm WC
38.
mm WC
39.
kW
40.
Design efficiency
41.
Weights :
41.1
Data
ID
fans
PRIMARY
air fans
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
DRAFT FANS
Item
Description
Unit
FD
fans
41.2
41.3
41.4
Silencer
41.5
Complete fan
kg
Shipping Weight/Volume
42.
Total weight
43.
Total volume
m3
Data
ID
fans
PRIMARY
air fans
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
Material
Summary of ducts
1.
Manufacturer/Country of origin
2.
2.1
2.2
2.3
Bypass ducts
2.4
3.
3.1
3.2
3.3
3.4
Bypass ducts :
4.
4.1
EC02 to EC01
4.2
EC02 to AH1
4.3
EC01 to AH2
4.4
AH1 to ESP
4.5
AH2 to ESP
4.6
ESP to ID fans
4.7
ID fans to stack
4.8
Stack flues
Plate
thickness
mm
Cross
section
m2
Weight
t
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
Material
5.
Ash hoppers :
5.1
5.2
5.3
5.4
6.
SHIPPING Weight/Volume
6.1
Total weight
6.2
Total volume
m3
Summary of Dampers
7.
7.1
FD fan outlet
7.2
AH2 inlet
7.3
AH2 bypass
7.4
windboxes
8.
8.1
PA fan outlet
8.2
8.3
8.4
8.5
Plate
thickness
mm
4
Cross
section
m2
Weight
t
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
Description
Unit
Data
Material
9.
9.1
AH2 outlet
9.2
AH1 outlet
9.3
ID fan inlet
9.4
ID fan outlet
10.
Shipping Weight/Volume
10.1
Total weight
10.2
Total volume
m3
Plate
thickness
mm
Cross
section
m2
Weight
t
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
STACK
Item
1.
Description
Unit
FLUES
1.1
OUTSIDE DIAMETER
mm
1.2
Wall thickness
mm
1.3
Total length
1.4
Length of sections
1.5
Material of sections
1.6
Material of bottom
1.7
Design pressure
1.8
Design temperature
1.9
2.
Lining
2.2
Thickness
2.3
Temperature limit
2.4
3.
3.1
Type/material of insulation
3.2
Type/material of loggins
3.3
Thickness
mm
3.4
Insuled surface
m2
3.5
4.
LATTICE STEELWORK
4.1
Material
bar (g)
0
C
t
mm
0
C
t
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
STACK
Item
4.2
Description
Surface protection
4.3
4.4
Number of platforms
4.5
4.6
4.7
4.8
m2
4.9
5.
APPERTUNANCES
5.1
5.2
5.3
Unit
m
t
mm
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
COAL BUNKERS
Item
1.
Description
Lignite Bunkers
Unit
1.1
Number of bunkers
1.2
1.3
1.4
1.5
Total height
1.6
1.7
mm
1.8
mm
1.9
mm
1.10
1.11
1.12
1.13
Thickness of lining
1.14
Material of lining
1.15
m3
t
degree
mm
mm
2.
Air Canons :
2.1
2.2
Nm3/h
2.3
bar (g)
2.4
Type of activation
3.1
Data
BOOK IV
PART 5 Forms and Schedules
SCHEDULE 7 Technical Data
7.2.2 Boiler and Auxiliary Equipment
Name of Bidder :
COAL BUNKERS
Item
3.2
Description
Fire fighting medium
Unit
3.3
kg/s
3.4
4.
Level Measurement :
4.1
4.2
Number of sensors
4.3
4.4
5.
Weights :
5.1
5.2
kg
t
%
Data