If this indicator is set, then it means there are automatic goods movements
between the production orders in a collective order. When the goods
movement is posted, costs are credited from the subordinate order& costs
are debited to the superior order.
Special Procurement Key:
IMG path: Production > Material requirement planning > Master data >
Define special procurement type
Case Study:
Let us take manufacturing of Ball Pen.
Product structure:
1 Ball Pen (Finished Product) - ZBP01 (Work Center ZBP003 Routing Group
50001303)
1.1 Pen casing ( Halb)- ZPC01 (Work Center ZBP001 Routing Group
50001301)
1.1.1 Refill for Pen casing (ROH)- Z_REFILL
1.2 Pen Cap (Halb)- ZPCAP01 (Work Center ZBP002 Routing Group
50001302)
1.2.1 Slug for Pen cap (ROH)- Z_PENCAP
Material Master:
Header Material MRP View:
TCODE: MM03
Create PIR :
T-Code: MD61
MRP RUN:
T-CODE: MD02
Planned order :
Here is the advantage of collective order concept. Subordinate planned orders
are linked to
superior header order which can be seen in assignment tab of below screen shot
of child planned
orders.
TCODE: MD13
Header Material Planned Order:
Here is the benefit of Collective Order scenario. Only Header Material Planned
Order is converting to Production Order but child material planned order is also
converted to production order automatically.
Now Release the production order and save it.
We can also change the quantity of the production order using the T-Code CO02.
Display Production Order T-CODE CO03
Check warehouse stock for the direct components which is nil. TCODE: MB52
Check Material document for the direct components which shows GI for order
(261) TCODE:
MB51
As per the report all the orders have been released and material is delivered.
Now check the header material document & stock overview.