ANALYSIS OF RATE FOR BULK / PACKED BITUMEN SUPPLY VARIOUS TYPE COLLECTION OF BITUMEN FROM PANIPAT REFINERY
I
II
Viscosity Grade-30
( 60/70 grade)
Crumb Rubber
III Modifed Bitumen 50
Crumb Rubber
IV Modifed Bitumen 55
Crumb Rubber
V Modifed Bitumen 60
Bitumen Emulsion VI Rapid Setting
Bitumen EmulsionVII Medium Setting
Bitumen EmulsionVIII Slow Setting
Grand Total
Total
9
481.50
55132.50
0.00
55132
PMT
481.50
58965.05
0.00
58965
PMT
481.50
56121.55
0.00
56122
PMT
481.50
59954.10
0.00
59954
PMT
481.50
55033.59
0.00
55034
PMT
481.50
59175.23
0.00
59175
PMT
481.50
55144.86
0.00
55145
PMT
481.50
52225.94
0.00
52226
PMT
481.50
54885.24
0.00
54885
PMT
481.50
52460.84
0.00
52461
PMT
481.50
45031.86
0.00
45032
PMT
481.50
49915.28
0.00
49915
PMT
481.50
45291.49
0.00
45291
PMT
481.50
50174.90
0.00
50175
PMT
481.50
43053.77
0.00
43054
PMT
481.50
47937.19
0.00
47937
PMT
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
10
( Amount in Rs.)
Bulk
Rates for
supply
Bulk
Sub Total
Add @ 6.05%
Punjab Sale Tax
Add @ 14.42 %
Excise Duty
( inclusive of
Education cess )
Product
Basic Rate from
Panipat Refnery
Sl.
Nr.
Add @ 2 % Central
Sale Tax
11
394.00 Say
394 Kms
Certifed that the lead provided in the analysis of rate is the shortest lead
and rate of bitumen provided in the analysis of rate is the latest rate.
Executive Enginereer,
BM
DBM& BC
TC
PRIMER
909
10.8 Tonne
1 Min
2 Min
2 Min
2 Min
7 Min
25 Km/hour
35 Km/hour
30 Km
26.5 Km
909
3.176101
Say
3.2
833
7.2 Tonne
1 Min
2 Min
2 Min
2 Min
7 Min
25 Km/hour
35 Km/hour
30 Km
26.5 Km
833
4.365828
Say
4.4
3.00
22
1 Min
13 Min
2 Min
4 Min
20 Min
25 Km/hour
35 Km/hour
30 Km
20 Km
440
440
3.00
24
1 Min
13 Min
2 Min
4 Min
20 Min
25 Km/hour
35 Km/hour
30 Km
20 Km
480
480
Description
(A )OWNERSHIP CHARGES
i Factory cost including packing
ii deduct solvage value 15%( I)
iii Total investment to be depriciated (I)-(ii)
iv Economic life of machine in Hours
v Depreciation per hour
iii/iv
vi storage charges per hour (1% of v)
vii Total ownership charges
(B) OPERATIONAL CHARGES
i Repair chrges per hour including maintenance
and replacement of tyres (150% of v)
(C) RUNNING CHARGES
i Operators (per month wage)
ii Cleaner/ Helper (per month wage)
vii Wages per hour
(D) CONSUMPTION CHARGES/HOUR
i Diesel consumption/electrical consumption Rs 42/
ii Lubricating oil 10% of fuel cunsumption
iii Oil,grease,& cotton waste 10% of fuel consumption
37.41
Water Tanker
70- hp
800,000
120,000
680,000
10,000
68
1
69
2,000,000
300,000
1,700,000
9,000
189
2
191
102
283
4,500
3,000
50
5,000
3,000
53
224
22
22
269
748
75
75
898
22
498
1,448
575000
86,250
488,750
10000
49
0
49
180000
27,000
153,000
10000
15
0
15
134
89
73
23
4,000
3,000
47
4,000
3,000
47
###
###
47
935
94
94
1,122
374
37
37
449
374
37
37
449
150
15
15
180
11
1,403
652
624
Market rate
1050000
157,500
892,500
10000
89
1
90
4,000
3,000
47
5000
266
Description of Machine
Activity
Output of
Machine
Output
Unit
Rate
P&M-001
Air Compressor
General Purpose
capacity in cfm
170/250
hour
319
P&M-002
Concrete Mixing
cum/hour
20
hour
2232
P&M-003
Concrete Mixing
cum/hour
13
hour
1860
P&M-004
sqm/hour
1750
hour
1073
P&M-005
Bitumen Spraying
capacity in litre
1500
hour
198
P&M-006
cum / hour
20
hour
2868
P&M-007
Pumping of concrete
cum / hour
33 / 22
hour
256
P&M-008
Concrete Bucket
capacity in cum
hour
16
P&M-009
Concrete Mixing
cum/hour
2.5
hour
233
P&M-010
Concrete Mixing
cum/hour
7.5
hour
233
P&M-011
Lifting Purpose
hour
1279
P&M-012
Cranes b) 35 tonnes
Lifting Purpose
hour
853
P&M-013
Cranes c) 3 tonnes
Lifting Purpose
hour
357
P&M-014
Dozer D - 80 - A 12
cum/hour
300/ 150/250
hour
3720
P&M-015
Dozer D - 50 - A 15
cum/hour
200/ 120/150
hour
2206
P&M-016
sqm/hour
1750
hour
800
P&M-017
cum/hour
60 /25
hour
806
P&M-018
KVA
100
hour
652
P&M-019
Generator( b) 63 KVA
KVA
50
hour
535
P&M-020
Producing GSB
cum/hour
40
hour
1039
P&M-021
DBM/BM/SDC/ Premix
cum/hour
40
hour
23405
P&M-022
DBM/BM/SDC/ Premix
cum/hour
30
hour
17309
P&M-023
DBM/BM/SDC/ Premix
cum/hour
25
hour
13842
P&M-024
DBM/BM/SDC/ Premix
cum/hour
17
hour
11083
P&M-025
Surface Dressing
sqm/hour
1500
hour
2635
P&M-026
cum/hour
60 /60 /60
hour
1302
P&M-027
Crushing of Spalls
TPH
100
hour
8665
P&M-028
Crushing of Spalls
TPH
200
hour
18228
P&M-029
Kerb Making
Rm/hour
80
hour
310
P&M-030
Mastic Cooker
capacity in tonne
hour
62
P&M-031
sqm/hour
1250
hour
357
P&M-032
cum/hour
200/200/50/50
hour
2395
P&M-033
Surface Cleaning
Clearing /Spreading /GSB
/WBM
Mixing and laying slurry seal
sqm/hour
2700
hour
1008
P&M-034
cum/hour
40
hour
2674
P&M-035
cum/hour
40/30
hour
975
P&M-036
Rm/hour
2 to 3
hour
5464
P&M-037
cum/hour
25
hour
1243
P&M-038
cum/hour
1.5 to 2.00
hour
4170
P&M-039
Repair of potholes
cum/hour
hour
907
P&M-040
hour
129
P&M-041
Ripper
Scarifying
60
hour
28
P&M-042
Rotavator
Scarifying
cum/hour
25
hour
17
P&M-043
Sqm/hour
100
hour
93
P&M-044
cum/hour
70/25
hour
460
P&M-045
Road marking
Soil Compaction /BM
Compaction
Rolling of Aspalt Surface
cum/hour
cum/hour
30
hour
1144
Capacity in cum
5.5
km
6.78
0.678
P&M-046
Tipper - 5 cum
P&M-047
Tipper - 5 cum
Capacity in cum
5.5
tonne.km
Tipper - 5 cum
Capacity in cum
5.5
hour
P&M-048
Page 1 of 264
339
P&M-049
cum/hour
4.5
hour
1017
P&M-050
cum/hour
4.5
tonne.km
2.034
cum/hour
hour
932.25
P&M-052
cum/hour
tonne.km
1.8645
P&M-053
Tractor
Pulling
capacity in HP
50
hour
282.5
P&M-054
hour
282.5
P&M-055
hour
282.5
P&M-056
Material Transport
capacity/cum
4.5
km
24.5775
P&M-057
Material Transport
capacity/cum
4.5
hour
315.27
P&M-058
Material Transport
capacity/cum
4.5
tonne.km
2.45775
P&M-059
cum/hour
100/60/60
hour
P&M-060
Water Tanker
Water Transport
capacity in KL
hour
200
P&M-061
Water Tanker
Water Transport
capacity in KL
km
7.0625
P&M-062
Wet Mix
cum/hour
25
hour
1317.015
Sl. No.
Description of Machine
P&M-063
Air compressor with pneumatic chisel attachment for cutting hard clay.
hour
740.15
P&M-064
Batch type cold mixing plant 100-120 TPH capacity producing an average output of 75 tonne per hour
hour
25594.5
P&M-065
hour
100
P&M-066
hour
100
P&M-067
Cement concrete batch mix plant @ 175 cum per hour (effective output)
hour
14644.8
P&M-068
hour
9153
P&M-069
hour
300
P&M-070
hour
116.53125
P&M-071
hour
233.0625
P&M-072
hour
349.59375
P&M-073
hour
466.125
P&M-074
Crane 40 T capacity
hour
932.25
P&M-075
hour
1073.5
P&M-076
hour
349.17
P&M-077
Drum mix plant for cold mixes of appropriate capacity but not less than 75 tonnes/hour.
hour
3661.2
P&M-078
hour
100
P&M-079
Generator 33 KVA
hour
406.8
P&M-080
hour
762.75
P&M-081
hour
1906.875
P&M-082
Induction, deinduction and erection of plant and equipment including all components and accessories for pneumatic method
of well sinking.
hour
1000
P&M-083
hour
200
P&M-084
day
500
P&M-085
Piling rig Including double acting pile driving hammer (Hydraulic rig)
hrs
5974.875
P&M-086
Plate compactor
hour
101.7
P&M-087
hour
1000
P&M-088
hour
500
P&M-089
hour
847.50
P&M-051
Unit
1541
Rate
P&M-090
t.km
0.678
P&M-091
hour
5000
P&M-092
Vibrating Pile driving hammer complete with power unit and accessories.
hour
1000
P&M-093
hour
2195.025
P&M-094
2195.025
Page 2 of 264
(B) Labour
(based on PUNJAB GOVT. GAZ. (EXTRA), NOVEMBER 15,2012, DEPARTMENT OF LABOUR, (LABOUR BRANCH), No.
S.O. 94/C.A. 1111948/Ss.3and5/2012.-dated 15th November, 2012)
Sl. No.
Description of Labour
Unit
Rate
L-01
day
230.00
L-02
day
264.50
L-03
day
264.50
L-04
Carpenter I Class
day
264.50
L-05
day
264.50
L-06
Driller (Jumper)
day
264.50
L-07
Diver
day
264.50
L-08
Fitter
day
230.00
L-09
Mali
day
264.50
L-10
day
230.00
L-11
day
223.36
L-12
Mate / Supervisor
day
151.44
L-13
Mazdoor
day
136.69
L-14
day
230.00
L-15
Mazdoor/Dresser/Sinker (Skilled)
day
164.69
L-16
Medical Officer
day
304.20
L-17
Operator(grouting)
day
264.50
L-18
Painter I class
day
223.36
L-19
day
264.50
(C) Materials
Sl. No.
Description
Unit
Rate
M-001
cum
919
M-002
Supply of quarried stone 150 - 200 mm size for Hand Broken at site
cum
494.68
M-003
cum
494.68
M-004
cum
828
M-005
cum
710.46
M-006
cum
476.8
M-007
Moorum at Site
cum
461.9
M-008
Cum
921
M-009
Cum
727.79
M-010
Cum
461.9
Page 3 of 264
M-011
Fly ash conforming to IS: 3812 ( Part II & I) atHMP Plant / Batching Plant / Crushing Plant
Cum
8.94
M-012
Cum
894
Description
Unit
Rate at Plant
(HMP/Batching Rate at Site
)
M-013
cum
867
836.17
M-014
cum
867
867
M-015
cum
867
867
M-016
cum
867
867
M-017
cum
867
836.17
M-018
cum
867
867
M-019
867
867
M-020
cum
867
836.17
M-021
Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve.
cum
476.8
476.8
M-022
cum
992.3
867
M-023
867
867
M-024
cum
867
867
M-025
cum
867
867
M-026
cum
867
867
M-027
cum
867
867
M-028
cum
867
867
M-029
cum
867
867
M-030
cum
992.3
1066.89
M-031
cum
1012
1001
M-032
cum
1001
1001
M-033
Aggregates 45 mm to 2.8 mm
cum
968.6
968.6
M-034
Aggregates 45 mm to 22.4 mm
cum
1007.77
920.5
M-035
Aggregates 53 mm to 2.8 mm
990.25
990.25
M-036
Aggregates 53 mm to 22.4 mm
cum
959
959
M-037
Aggregates 63 mm to 2.8 mm
cum
982
982
M-038
Aggregates 63 mm to 45 mm
cum
949
949
M-039
Aggregates 90 mm to 45 mm
cum
938
938
M-040
Aggregates 10 mm to 5 mm
cum
1078.94
987
M-041
cum
987
987
M-042
cum
1001
1001
M-043
cum
998.5
998.5
M-044
Aggregates 13.2 mm to 10 mm
cum
1103.6
1016.5
M-045
Aggregates 20 mm to 10 mm
cum
1103.6
1016.5
M-046
Aggregates 25 mm to 10 mm
cum
1103.6
986
M-047
Aggregates 19 mm to 6 mm
cum
1001
1001
M-048
Aggregates 37.5 mm to 19 mm
cum
956
956
M-049
Aggregates 37.5 mm to 25 mm
cum
1011.94
920.5
M-050
cum
969
969
M-051
cum
1005
1005
M-052
cum
1028
1028
M-053
cum
1028
1028
M-054
cum
925
925
M-055
cum
916
916
Sl. No.
Description
Unit
Rate
M-056
metre
65
M-057
litre
485
M-058
Alluminium Paint
litre
132.61
Page 4 of 264
M-059
sqm
425
M-060
tonne
54574
M-061
Aluminium sheeting fixed with encapsulated lens type reflective sheeting including 2% towards lettering, cost of angle iron,
cost of drilling holes, nuts, bolts etc.and signs as applicable
sqm
6064
M-062
nos
546
M-063
Barbed wire
kg
65.56
M-064
nos
1213
M-065
nos
50000
M-066
Bearing (Elastomeric bearing assembly consisting of 7 internal layers of elastomer bonded to 6 nos. internal reinforcing steel
laminates by the process of vulcanisation,)
nos
15000
M-067
nos
41309
M-068
Bearing (Pot type bearing assembly consisting of a metal piston supported by a disc, PTFE pads providing sliding surfaces
against stainless steel mating together with cast steel assemblies/fabricated structural steel assemblies duly painted with all
components
nos
41309
M-069
nos
16378
M-070
nos
16378
M-071
Bentonite
kg
4.1
M-072
Binding wire
M-073
tonne
55145
M-074
tonne
55132
M-075
tonne
56122
M-076
Bitumen (Cutback )
tonne
47937
M-077
Bitumen (emulsion)
tonne
49915
M-078
tonne
38740
M-079
Brick
each
4.41818
M-080
kg
59.6
M-081
Cement
tonne
5000
M-082
tonne
45000
M-083
M-084
M-085
M-086
M-087
M-088
M-089
cum
37
M-090
Curing compound
liter
607
M-091
Delineators from ISI certified firm as per the standard drawing given in IRC - 79
each
834.4
M-092
cum
28
M-093
Elastomeric slab seal expansion joint assembly manufactured by using chloroprene, elastomer for elastomeric slab unit
conforming to clause 915.1 of IRC: 83 (part II),
M-094
Electric Detonators @ 1 detonator for 1/2 gelatin stick of 125 gms each
M-095
M-096
kg
100
nos
146
sqm
486
Connectors/ Staples
each
61
kg
290.55
tonne
46526
kg
49
metre
6064
100 nos
1456
kg
486
Epoxy mortar
kg
425
M-097
Epoxy primer
kg
417.2
M-098
kg
486
M-099
each
91
M-100
Flowering Plants
each
61
M-101
nos
25
M-102
Galvanised steel wire crates of mesh size 100 mm x 100 mm woven with 4mm dia. GI wire in rolls of required size.
sqm
122
M-103
kg
61
M-104
Gelatin 80%
kg
146
M-105
Geo grids
sqm
607
M-106
Geomembrane
sqm
607
M-107
Geonets
sqm
607
M-108
Geotextile
sqm
37.25
M-109
sqm
37.25
M-110
GI bolt 10 mm Dia
nos
13
M-111
hour
304
Page 5 of 264
M-112
Grass (Doob)
kg
M-113
Grass (Fine)
kg
13
M-114
metre
607
M-115
metre
607
M-116
Hedge plants
each
61
M-117
metre
2426
M-118
M-119
HTS strand
M-120
kg
607
M-121
Jute netting, open weave, 2.5 cm square opening for seeding and Mulching
sqm
61
M-122
litre
43
M-123
M.S. Clamps
nos
13
M-124
M.S. Clamps
kg
52.15
M-125
kg
M-126
M-127
M-128
litre
tonne
Modular strip/box seal expansion joint including anchorage catering to a horizontal movement beyond 70 mm and upto
140mm assembly comprising of edge beams, central beam,2 modules chloroprene seal, anchorage elements, support and
control system, all steel sections protected against corrosion and installed by the manufacturer or his authorised
representative
Modular strip/box seal expansion joint catering to a horizontal movement beyond 140mm and upto 210mm box/box seal
joint assembly containing 3 modules/cells and comprising of edge beams, two central beams, chloroprene seal, anchorage
elements, support and control system, all steel sections protected against corrosion and installed by the manufacturer or his
authorised representative
150
57453
37
tonne
47307.5
metre
1820
metre
1820
M-129
Nipples 12mm
nos
243
M-130
kg
64.07
M-131
Paint
litre
192.81
M-132
litre
117.16
M-133
Paving Fabric
sqm
225
M-134
metre
182
M-135
metre
243
M-136
Pesticide
kg
1820
M-137
metre
243
M-138
sqm
61
M-139
nos
3639
M-140
Polymer braids
metre
364
M-141
sqm
965
M-142
cum
1213
M-143
Preformed continuous chloroprene elastomer or closed cell foam sealing element with high tear strength, vulcanised in a
single operation for the full length of a joint to ensure water tightness.
metre
668
M-144
sqm
425
M-145
kg
49
M-146
Primer
kg
102.94
M-147
kg
364
M-148
M-149
metre
5000
M-150
metre
4452
M-151
metre
1149
M-152
kg
75
M-153
metre
364
M-154
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Galvanised carbon steel strips)
metre
364
M-155
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Glass reinforced polymer/fibre reinforced
polymer/polymeric strips)
metre
364
M-156
Reinforcement strips 60 mm wide 5 mm thick as per clause 3102. (Stainless steel strips)
metre
364
M-157
metre
364
M-158
Rivets
each
101.32
M-159
nos
M-160
each
25
M-161
nos
364
M-162
Seeds
kg
243
M-163
Selected earth
cum
43
cum
Page 6 of 264
2604.51
M-164
sqm
61
M-165
Sheathing duct
metre
304
M-166
Shrubs
each
M-167
Sludge / Farm yard manure @ 0.18 cum per 100 sqm at site of work for turfing
cum
364
M-168
each
1213
M-169
cum
2705.04
M-170
Steel circular hollow pole of standard specification for street lighting to mount light at 5 m height above deck level
each
1213
M-171
Steel circular hollow pole of standard specification for street lighting to mount light at 9 m height above road level
each
1820
M-172
nos
79
M-173
Steel helmet and cushion block on top of pile head during driving.
kg
61
M-174
IS:1239
metre
182
M-175
IS:1239
metre
364
M-176
kg
61
M-177
kg
M-178
metre
7500
M-179
Structural Steel
tonne
45000
M-180
M-181
Synthetic Geogrids as per clause 3102.8 and approved design and specifications.
sqm
607
M-182
each
14.453
M-183
nos
49
M-184
each
15
M-185
Timber
cum
24255
M-186
nos
243
M-187
Tube anchorage set complete with bearing plate, permanent wedges etc
nos
6064
M-188
Unstaked lime
tonne
4500
M-189
Water
KL
10
M-190
litre
31
M-191
kg
61
M-192
kg
61
M-193
each
61
M-194
each
91
M-195
Wooden packing
cum
12000
M-196
each
122
Page 7 of 264
kg
61
44.7
10%
10%
20%
25%
Type symble of apostrope(') then input value then one space then symble
of percentage (%) for example '08 %
10%
1 km
20 km
53 km
Page 8 of 264
Items No.
Summary of Rates calculated and used for analysis of rates of other items
Item 8.3
Printing new letter and figures of any shade (ii) English Roman
Item 8.8
Item 8.9
Unit
Rate
per cm height
per letter
sqm
40.00
0.30
sqm
46.00
cum
4,152.00
cum
3,425.00
cum
2,422.00
Item 12.7 (A )
cum
6,211.00
cum
5,610.00
cum
4,228.00
cum
3,080.00
cum
3,390.00
cum
3,443.00
cum
4,650.00
cum
3,388.00
cum
3,667.00
cum
4,949.00
cum
3,614.00
cum
3,723.00
cum
3,740.00
cum
3,697.00
cum
3,641.00
cum
3,740.00
cum
3,686.00
cum
3,816.00
cum
3,952.00
cum
5,217.00
cum
3,838.00
cum
3,719.00
cum
3,558.00
cum
3,874.00
cum
3,712.00
cum
3,904.00
cum
3,743.00
cum
3,974.00
cum
5,260.00
PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Batching Plant
cum
3,812.00
PCC Grade M35 including OH & CP for Well Foundation (Well Cap) by Batching Plant
cum
5,114.00
cum
138.00
cum
36.00
Item 14.1(A)
cum
5,317.00
Item 14.1(B)
cum
5,783.00
Item 14.1(E)
cum
6,171.83
Item 14.1(C)
RCC Grade M30 for super-structure including formwork and excluding OH & CP by Batching Plant
cum
4,428.00
Item 14.1(C)
RCC Grade M30 for super-structure excluding formwork and excluding OH & CP by Batching Plant
cum
3,690.00
Item 14.2 A
Supplying ,fitting and placing HYSD bar reinforcement in super-structure exncluding OH & CP
tonne
50,004.00
Item 13.6
tonne
65,101.00
Item 5.17
Fog Seal
sqm
53.00
Crack Prevention courses. Case-I Stress Absorbing Membrane (SAM) crack width less than 6 mm
Crack Prevention courses. Case-II Stress Absorbing Membrane (SAM) with crack width 6 mm to 9
mm
Crack Prevention courses. Case-III Stress Absorbing Membrane (SAM) crack width above 9 mm
and cracked area above 50 %
sqm
57.00
sqm
67.00
sqm
88.00
sqm
124.00
sqm
82.00
sqm
57.00
sqm
35.00
sqm
104.00
by
by
by
by
by
by
by
by
by
by
by
by
by
RCC Grade M35 excluding OH & CP for Open Foundation by Batching Plant
RCC Grade M35 for Open Foundation Per Cum Basic Cost of Labour, Material & Mechinery by
Batching Plant
PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Mixer
PCC Grade M20 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Batching Plant
PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Mixer
PCC Grade M25 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Batching Plant
PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Mixer
PCC Grade M30 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Batching Plant
PCC Grade M35 for Open Foundation (Bottom Plug) Per Cum Basic Cost of Labour, Material &
Mechinery by Mixer
PCC Grade M35 including OH & CP for Well Foundation (Bottom Plug) by Batching Plant
Page 9 of 264
Page 10 of 264
sqm
85.00
Unit
Descriptions
Rate
CHAPTER-2
SITE CLEARANCE
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks,
branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth
filling in the depression/pit.)
2.1
(i)
(ii)
(iii)
(iv)
each
each
137.00
259.00
each
each
482.00
896.00
hectare
8636.00
hectare
49142.00
2.2
2.3
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and
disposal of top organic soil not exceeding 150 mm in thickness.)
(ii)
By Mechanical Means
A
2.4
(i)
I
A
B
C
II
A
B
(ii)
cum
cum
212.00
247.00
cum
623.00
cum
cum
372.00
634.00
cum
cum
143.00
177.00
cum
cum
129.00
122.00
cum
cum
157.00
177.00
cum
cum
cum
143.00
136.00
129.00
cum
cum
143.00
343.00
tonne
tonne
836.00
603.00
tonne
6.00
(iii)
A
B
C
D
E
F
(iv)
(v)
In lime mortar
In cement mortar
In mud mortar
Dry brick pitching or brick soling
Dismantling Stone Masonry
Rubble stone masonry in lime mortar
Rubble stone masonry in cement mortar.
Rubble Stone Masonry in mud mortar.
Dry rubble masonry
Dismantling stone pitching/ dry stone spalls.
Dismantling boulders laid in wire crates including opening of crates and stacking dismantled materials.
Wood work wrought framed and fixed in frames of trusses upto a height of 5 m above plinth level
Steel work in all types of sections upto a height of 5 m above plinth level excluding cutting of rivet.
A
B
C
(vi)
A
B
(vii)
A
B
Including dismembering
Excluding dismembering.
Extra over item No( V ) A and( V ) B for cutting rivets.
Scraping of bricks dismantled from brick work including stacking.
In lime/Cement mortar
In mud mortar
Scraping of Stone from dismantled stone masonry
In cement and lime mortar
In Mud mortar
(viii)
(ix)
Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of
masonry works.
A
B
C
Up to 600 mm dia
Above 600 mm to 900 mm dia
Above 900 mm
Page 11 of 264
1000
numbers
605.00
1000
numbers
216.00
cum
243.00
cum
sqm
51.00
8.00
metre
90.00
metre
metre
121.00
208.00
Descriptions
2.5
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead
of 1000 metres, stacking serviceable and unserviceable materials separately)
Unit
Rate
By Manual Means
A
Bituminous courses
cum
389.00
Granular courses
By Mechanical Means
cum
286.00
Bituminous course
II
A
cum
187.00
2.6
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using
pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal
of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)
cum
992.00
2.7
Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of dismantled material with all lifts and
up to a lead of 1000 metres, stacking serviceable materials and unserviceable materials separately.)
metre
43.00
2.8
Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up
to a lead of 1000 metre)
metre
10.00
2.9
Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and disposal of dismantled material
with all lifts and up to a lead of 1000 metre)
metre
14.00
2.10
Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of
dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
each
199.00
each
each
121.00
24.00
A
B
C
5th KM stone
Ordinary KM Stone
Hectometre Stone
2.11
Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including posts, foundation concrete, back
filling of pit by manual means including disposal of dismantled material with all lifts and up to a lead of 1000 metres, stacking
serviceable material and unserviceable material separately. )
metre
27.00
2.12
Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including disposal with all lifts and lead
upto 1000 metres and stacking of serviceable material and unserviceable material separately under supervision of
concerned department)
metre
74.00
metre
86.00
each
101.00
2.13
2.14
Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of sewer gutter 1500 mm dia
under the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking
of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works.)
Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and
dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to
a lead of 1000 metres and stacking the serviceable and unserviceable material separately)
Page 12 of 264
Unit
Descriptions
Rate
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
3.1
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for
carrying of cut earth to embankment site with all lifts and lead upto1000 metres.)
cum
97.00
3.2
Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a
truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres )
cum
133.00
3.3
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including
cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including
trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
cum
152.00
3.4
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by
deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres
( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross
sections.)
cum
255.00
cum
292.00
3.6
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for
roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom
and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment
location within all lifts and lead upto 1000m)
cum
45.00
3.7
Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres.
(Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in
tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross sections.)
cum
60.00
3.8
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock
breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom
and side slopes in accordance with requirements of lines, grades and cross sections.)
cum
cum
362.00
736.00
3.9
Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock
with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000
metres )
cum
379.00
3.10
Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity
including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side
slopes in accordance with requirements of lines, grades and cross sections.)
cum
51.00
3.11
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of unserviceable soil including excavation,
loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per
clause 305.)
cum
46.00
3.12
Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a specified slope of the rock
face by controlled use of explosives and blasting accessories in properly aligned and spaced drill holes, collection of the
excavated rock by a 80 HP dozer, loading in tipper by a front end loader and disposing of the material with all lifts and lead
upto 1000 m, all as specified in clause No. 303)
sqm
143.00
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock
(requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements
of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres )
3.5
A
B
Mechanised
Manual Method
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides
and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
3.13
(i)
Ordinary soil
A
B
cum
cum
138.00
36.00
A
B
cum
cum
173.00
49.00
Manual Means
Hard rock ( blasting prohibited )
cum
360.00
Mechanical Means
Marshy soil
Manual means ( upto 3 m depth)
cum
472.00
cum
290.00
(ii)
(iii)
(iv)
(v)
A
Page 13 of 264
Unit
Descriptions
B
Rate
cum
106.00
3.14
Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying the existing granular road
surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. )
sqm
14.00
3.15
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous
road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.)
sqm
4.00
Mechanical Means
3.16
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved
material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and
compacting to meet requirement of table 300-2)
cum
249.00
3.17
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with
approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement of table 300-2)
cum
84.00
3.18
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved
material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and
compacted to meet requirement of table No. 300-2)
cum
293.00
3.19
cum
60.00
Case-I
Case-II
cum
29.00
3.20
Stripping and Storing Top Soil (Stripping, storing of top soil by road side at 15 m internal and re-application on
embankment slopes, cut slopes and other areas in localities where the available embankment material is not conducive to
plant growth)
cum
131.00
3.21
Stripping, storing and re-laying top soil from borrow areas in agriculture fields. (Stripping of top soil from borrow
areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to
maintain fertility of the agricultural field, finishing it to the required levels and satisfaction of the farmer.)
cum
91.00
3.22
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or
other locations shown on the drawing or as directed by the engineer including preparation of ground, fetching of rods and
watering)
sqm
16.00
3.23
Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and placing of seeds, fertilizer,
mulching material, applying bituminous emulsion at the rate of0.23 litres per sqm and laying and fixing jute netting, including
watering for 3 months all as per clause 308)
sqm
129.00
3.24
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified
lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in
embankment within a lead of50 metres (average lead 25 metres))
metre
56.00
metre
35.00
metre
114.00
metre
metre
52.00
A
B
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in
ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301
to 309. Excavated material to be used in embankment at site.)
3.25
A
B
3.26
3.27
Mechanical means
Manual Means
Mechanical Means
Manual Means
Surface Drains in Hard Rock (Rate per metre may be worked out based on quantity of hard rock as per design.)
Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated pipe of 100 mm internal
diameter of metal/ asbestos cement/ cement concrete/PVC, closely jointed, perforations ranging from 3 mm to 6 mm
depending upon size of material surrounding the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the
pipe, cross section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site )
587.00
3.28
Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450 mm with aggregates
conforming to table 300-4, excavated material to be utilised in roadway )
metre
171.00
3.29
Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m (inside dimensions) lined with
RCC-20 cm thick and covered with RCC slab10 cm in thickness on urban roads)
metre
2356.00
3.30
Preparation and Surface Treatment of formation. (Preparation and surface treatment of formation by removing mud and
slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile
and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.)
sqm
1.00
3.31
Construction of Rock fill Embankment (Construction of rock fill embankment with broken hard rock fragments of size not
exceeding 300 mm laid in layers not exceeding 500 mm thick including filling of surface voids with stone spalls, blinding top
layer with granular material, rolled with vibratory road roller, all complete as per clause 313)
cum
50.00
3.32
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including
cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
cum
149.00
Page 14 of 264
Descriptions
Unit
3.33
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in
ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut
material with all lift and lead upto 1000 metres )
cum
224.00
cum
293.00
cum
314.00
3.34
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by
mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)
3.35
Work in Urban Roads (The cost of earth work in urban roads inhabited area will be comparatively higher due to following
reasons:)
3.36
Embankment Construction with Fly ash/Pond ash available from coal or lignite burning Thermal Plants as waste
material. (Construction of embankment with fly ash conforming to table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite
burning thermal power stations as waste material, spread and compacted in layer of 200mm thickness each at OMC, all as
specified in IRC: SP: 58-2001 and as per approved plans.)
Page 15 of 264
Rate
Unit
Descriptions
Rate
CHAPTER-4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
4.1
A
(i)
cum
1606.00
cum
cum
400.00
376.00
cum
561.00
cum
698.00
Lime Stabilisation for Improving Subgrade (Laying and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotavator with 3 % slaked lime having minimum content of 70% of CaO,
grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub
grade)
4.3
A
B
By Mechanical Means
By Manual Means
Lime Treated Soil for Sub- Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, mixing the
spread soil in place with rotavator with 3 % slaked lime with minimum content of 70% of CaO, grading with motor grader and
compacting with the road roller at OMC to achieve at least 98%of the max dry density to form a layer of sub base.)
4.4
4.5
Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared sub grade, pulverising, adding
the designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and
compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of subbase/base.)
4.6
Cement Treated Crushed Rock or combination as per clause 403.2 and table 400.4in Sub base/ Base (Providing,
laying and spreading Material on a prepared sub grade, adding the designed quantity of cement to the spread Material,
mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the
desired unconfined compressive strength and to form a layer of sub-base/base.)
(i)
cum
1953.00
(ii)
cum
1953.00
sqm
404.00
cum
1266.00
cum
1714.00
cum
1927.03
cum
cum
cum
1727.00
1806.00
1899.00
cum
1741.00
cum
1914.00
cum
cum
1659.00
1872.24
cum
cum
1672.00
1752.00
cum
1844.00
cum
1686.00
cum
1859.00
Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows, 25mm deep, 450 to the center line of the road and at
one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material
within 1000 metres lead)
4.7
Inverted Choke (Construction of inverted choke by providing, laying, spreading and compacting screening B type/ coarse
sand of specified grade in uniform layer on a prepared surface with motor grader and compacting with power roller etc)
4.8
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in
stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and compacting to the required density.)
4.9
A
(i)
By Manual Means
(a)
(b)
(ii)
(a)
(b)
(c)
(iii)
(a)
(b)
B
(i)
(a)
(b)
(ii)
(a)
(b)
(c)
(iii)
(a)
(b)
Page 16 of 264
Descriptions
Unit
4.10
Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by breaking damaged cement
concrete slabs to size range not exceeding 75 mm as specified in table 400.7 transporting the aggregates obtained from
breaking of cement concrete slabs at a lead of L km., laying and compacting the same as sub base/ base course,
constructed as WBM to clause 404 except the use of screening or binding Material.)
cum
163.00
sqm
24.00
4.12
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper
to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with
vibratory roller to achieve the desired density.)
cum
1861.26
4.13
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above
road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other
structures, spread, graded and compacted as per clause 407)
cum
99.00
4.14
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of median and Island above road
level with approved material brought from borrow pits, spread, sloped and compacted as per clause 407)
cum
284.00
4.15
4.16
Footpaths and Separators (Construction of footpath/separator by providing a 150 mm compacted granular sub base as
per clause 401 and 25 mm thick cement concrete grade M15, over laid with precast concrete tiles in cement mortar 1:3
including provision of all drainage arrangements but excluding kerb channel..)
sqm
586.00
4.17
Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles,
spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of
sub-base/Base)
cum
1710.00
cum
1741.00
cum
1868.00
cum
1188.00
cum
580.00
Penetration Coat Over Top Layer of Crushed Cement Concrete Base (Spraying of bitumen over cleaned dry surface of
crushed cement concrete base at the rate of 25 kg per 10 sqm by a bitumen pressure distributor, spreading of key
aggregates at the rate of 0.13 cum per 10 sqm by a mechanical gritter and rolling the surface as per clause 506.3.8)
4.11
(i)
(ii)
(i)
(ii)
4.18
Rate
By Mixing Plant :
Page 17 of 264
Unit
Descriptions
Rate
CHAPTER-5
BASES AND SURFACE COURSES (BITUMINOUS)
5.1
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including
clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
5.2
Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20
kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
sqm
51.40
sqm
16.76
cum
cum
7863.79
7871.54
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average
output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to
site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction)
5.3
(i)
(ii)
5.4
50 mm thick
sqm
432.00
75 mm thick
sqm
590.00
sqm
351.00
cum
10006.88
cum
cum
9943.00
10693.00
cum
11688.42
sqm
104.00
sqm
85.00
Built-Up-Spray Grout (Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two
layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips
spreader may be used with application of bituminous binder after each layer, and with key aggregates placed on top of the
second layer to serve as a Base conforming to the line, grades and cross-section specified, the compacted layer thickness
being 75 mm)
5.5
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type
HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with
bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all
respects.)
5.6
(i)
5.7
(i)
(ii)
5.8
(i)
5.9
Case -1
Case - II
5.10
(i)
Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate capacity not less than 75
tonnes/hour .
sqm
152.00
(ii)
sqm
186.00
Page 18 of 264
Unit
Descriptions
Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of appropriate capacity not
less than 75 tonnes/hour. Providing, laying and rolling of close-graded premix surfacing material of 20 mm
thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using
penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne
capacity, and finishing to required level and grade. )
5.11
Rate
sqm
200.00
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and
cross fall using Type A and B seal coats)
5.12
(i)
Case - I : Type A
sqm
80.00
(ii)
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75
tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.)
sqm
60.00
Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from approved sources confirming to
the physical requirement, specified in the respective specified clauses, including royalties, fees rents, collection,
transportation, stacking and testing and measured in cum as per clause 514.5 Competitive market rates to be ascertained.
Alternatively, rates for stone crushing given in chapter 1may be adopted, if found economical. In case for supply of
aggregates at site are not available, nearest crusher site may be ascertained. Loading and un-loading charges and cost of
carriage may be added to these rates to arrive at the cost at site.)
5.13
Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the
surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal
size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions,
pressed into surface when the temperature of surfaces not less than 1000C, protruding 1 mm to 4 mm over mastic surface,
all complete as per clause 515.)
5.14
cum
sqm
592.00
sqm
sqm
sqm
85.45
58.00
35.00
cum
7908.00
sqm
47.00
sqm
6.00
cum
12877.00
cum
cum
cum
12772.00
8695.00
8585.00
cum
9750.00
Slurry Seal Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous
emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying
and compacting to provide even riding surface)
5.15
(i)
(ii)
(iii)
5 mm thickness
3 mm thickness
1.5 mm thickness
Recycling of Bituminous Pavement with Central Recycling Plant (Recycling pavement by cold milling of exiting
bituminous layers, planning the surface after cold milling, reclaiming excavated material to the extent of 30 % of the required
quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks
and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at
site and compacting to the required grade, level and thickness, all as specified in clause 517.)
5.16
5.17
added
Fog Spray
1.In case it is decided by the engineer to blind the fog spray, the following may be added
Bituminous Cold Mix ( Including Gravel Emulsion) (Providing, laying and rolling of bituminous cold mix on prepared base
consisting of a mixture of unheated mineral aggregate and emulsified or cutback bitumen, including mixing in a plant of
suitable type and capacity, transporting, laying, compacting and finishing to specified grades and levels.)
5.18
(i)
(ii)
(iii)
(iv)
5.19
Modified Binder (Supply of modified binder produced by mixing bitumen with modifier such as natural rubber or crumb
rubber or any other polymer found compatible with bitumen and which allows properties given in clause 521.3 and IRC: SP:
53 blending of modifier with bitumen to be done either at the refinery or at the site plant capable of producing the modified
binder to be delivered in drums which shall be agitated in melted condition using suitable device before use to ensure
uniform dispersion.)
5.20
5.21
tonne
(i)
Stress Absorbing Membrane (SAM) crack width less than 6 mm (Providing and laying of a stress absorbing
membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using
modified binder complying with clause 521, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone
aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates
and surface finished to conform to clause 902.)
Page 19 of 264
sqm
57.00
Unit
Descriptions
(ii)
(iii)
(iv)
Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying of a stress absorbing
membrane over a cracked road surface, with crack width 6 to 9 mm after cleaning with a mechanical broom, using
modified binder complying with clause 521, sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed
stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished
to conform to clause 902.)
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50 % (Providing and laying a
single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area
above 50 % after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the
rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the
surface for uniform spread of aggregates and surface finished to conform to clause 902.)
Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated geotextile layer after
cleaning the road surface, geotextile conforming to requirements of clause 704.3, laid over a tack coat with 1.05 kg per
sqm of paving grade bitumen 80 - 100 penetration and constructed to the requirement of clause 704.4.5)
Rate
sqm
67.00
sqm
88.00
sqm
124.00
Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion binder, mixed in a batch type
cold mixing plant, laid over prepared surface, by paver finisher, rolled with a pneumatic tyred roller initially and finished with
a smooth steel wheel roller, all as per clause 519.3)
5.22
(i)
75 mm thickness
cum
8688.00
(ii)
40 mm thickness
cum
12138.00
(iii)
25 mm thickness
cum
13930.00
Page 20 of 264
Unit
Descriptions
Rate
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and bottom width 115 and 165
mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm
projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as
per clause 408)
8.1
metre
226.00
metre
231.00
metre
439.00
Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete kerb with channel with top and
bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb
channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb
laying machine, foundation concrete laid manually, all complete as per clause 408)
8.2
8.3
(i)
(ii)
Hindi ( Matras commas and the like not to be measured and paid for Half letter shall be counted as half )
cm height per
letter
0.60
cm height per
letter
0.30
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign
as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5
mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing)
8.4
(i)
( ii )
90 cm equilateral triangle
60 cm equilateral triangle
each
each
4206.00
2783.00
( iii )
( iv )
60 cm circular
80 mm x 60 mm rectangular
each
each
3715.00
5160.00
(v)
(vi )
( vii )
60 cm x 45 cm rectangular
each
each
each
3619.00
4280.00
6569.00
sqm
9152.00
sqm
15825.00
tonne
tonne
83366.00
575.00
60 cm x 60 cm square
90 cm high octagon
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting direction and place
identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide clause 801.3,
fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post
75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x
45 x 60 cm, 60 cm below ground level as per approved drawing)
8.5
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and
place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause
801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75
mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement
concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)
8.6
Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium alloy sheet reflectorised with
high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2
and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles
and trusses of sections and type as per structural design requirements and approved plans)
8.7
A
B
8.8
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in
all shades on new plastered concrete surfaces)
sqm
42.00
8.9
Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved brand on steel surface after
through cleaning of surface to give an even shade)
sqm
49.00
8.10
Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of approved brand on wood surface after
through cleaning of surface to give an even shade)
sqm
55.00
8.11
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads
in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including
cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )
sqm
63.00
sqm
54.00
(i)
(ii)
Over 10 cm in width
Up to 10 cm in width
Page 21 of 264
Descriptions
8.12
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work (Painting lines, dashes, arrows etc on roads in
two coats on old work with ready mixed road marking paint confirming to IS: 164 on bituminous surface, including cleaning
the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )
Unit
Rate
(i)
Over 10 cm in width
sqm
43.00
(ii)
Up to 10 cm in width
sqm
46.00
sqm
607.78
each
2632.00
each
each
1610.00
460.00
8.15
Road Delineators (Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100
cm high above ground level, painted black and white in 15 cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm
dia circular reflectorised panels at the top, buried or pressed into the ground and confirming toIRC-79 and the drawings.)
each
1116.00
8.16
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in
position including finishing and lettering but excluding painting)
each
535.00
metre
251.00
metre
415.00
8.19
Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 metre high fencing with angle iron
posts 50 mm x 50 mm x 6 mm at 3 metre center to center with 0.40 metre embedded in M15 grade cement concrete,
corner, end and every 10th post to be strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x
25 mm mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.)
metre
647.00
8.20
Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm (Providing, fixing and erecting
50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2
metres high above ground, 2 m centre to centre, complete as per approved drawings)
metre
2270.00
8.21
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing, fencing and erecting 50 mm dia
painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes
50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing)
metre
1820.00
metre
3469.00
metre
2721.00
metre
3525.00
8.13
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
(Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms
per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes.)
8.14
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in
position including painting and printing etc)
(i)
(ii)
(iii)
G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron
posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples,
turn buckles etc complete as per clause 807 )
8.17
G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GI barbed wire fencing with 2.4 m angle iron
posts 50 mm x 50 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre
below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on
one side only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples,
turn buckles etc complete as per clause 807 )
8.18
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of
the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler
board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No.
RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the
Engineer, all as specified)
8.22
(i)
8.23
M 20 grade concrete
Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm
thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x
75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical
post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)
Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam crash barrier comprising
of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical
post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments
to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the
vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810)
Page 22 of 264
Descriptions
8.24
Road Traffic Signals electrically operated (Since it is a ready made item commercially produced and erected by
specialised firm in the electrical and electronic field, rate may be taken based on market enquiry from firms specialised in
this field and ISI certified for the approved design and drawing.)
Unit
Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety barrier with vertical posts of
medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50 kg/m), 1.50 m long 0.85 m above ground and 0.65 m below
ground level, split at the bottom for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m
center to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m apart. Terminal post to
be embedded in M 15 gradecementconcretefoundation2400 x 450 x 900 mm (depth), strengthened by a strut of RS joist
100 x 75 mm, 2 m long at 450 inclination and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation
concrete as per approved design and drawing, rate excluding excavation and cement concrete.)
8.25
8.26
Rate
metre
2055.00
metre
4323.00
metre
807.00
each
each
4286.00
4235.00
each
3226.00
metre
2474.00
metre
metre
4566.00
6666.00
tonne
81484.00
Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular vans (Providing and
erecting an anti - glare screen with 25 mm dia vertical pipes fabricated and framed in the form of panels of one metre
length and 1.75 mtr height fixed with circular vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle,
made out of steel sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in foundation
concrete, applying 2 coats of paint on all exposed surfaces, all as per approved design and drawings.)
Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare screen with rectangular
vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and fixed on MS angle 50 x 50 x 6 mm at an angle of 450
to the direction of flow of traffic, 1.5 m center to center, top edge of the screen 1.75 m above ground level, vertical post
firmly embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint on exposed faces,
all complete as per approved design and drawings)
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for
street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on both sides if fixed in the median and on one side if fixed on
the footpath, fitted with sodium vapour lamp and fixed firmly in concrete foundation.)
8.27
(i)
(ii)
8.28
Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the
road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls
at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a
0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to
minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher
than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.)
8.29
(i)
(ii)
(iii)
8.30
Items related to under pass/ subway/ overhead bridge/ overhead foot bridge (The items involved for underpass/
subway/ overhead bridge/ overhead foot bridge are earthwork, plain cement concrete, plastering, painting, information sign
etc. The rates for these items are available in respective chapters which can be adopted for the quantities derived from the
approved designs and drawings)
8.31
Traffic Control System and Communication system (Providing a traffic control centre and communication system
including telecommunication facilities and related accessories, CCTV, radar, vehicle detection camera, central computer
system These are specialised item of telecommunication system and are the commercial products. The designer is required
to contact the manufacturers to ascertain market prices. In case of civil works required to be executed for these
installations, pricing may be done as per rates in relevant chapters for quantities derived approved design and drawing.)
8.32
Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted variable message sign board
electronically operated capable of flashing the desired message over a designed support system of aluminium alloy or
galvanised steel, erected as per approved design and drawings and with lateral clearance as per clause 802.3)
8.33
(i)
(ii)
Message Display (Message display board 6 sqm electronically operated with complete electronic fitments for flashing
the pre-determined messages.)
Page 23 of 264
Descriptions
8.34
Unit
Rate
With Scrap Tyres (Provision and installation of traffic attenuators at abutment/pier of flyovers bridges using scrap tyres
of size 100 x 20 retrieved from trucks laid in 2 rows and 4 tiers, one above the other and tied with 20 mm wire rope as
per approved design and drawings.)
sqm
2389.00
Using Plastic/Steel Barrel, Filled with Sand (Provision and installation of traffic impact attenuator at abutment/pier of
flyovers bridges using plastic/steel barrels 0.60 m dia and 1.0 m in height, filled with sand in three rows and tied with20
mm steel wire rope as per approved design and drawings)
sqm
760.00
With HI - DRO cell Sandwich (Patented) ((In this patented HI - DRO cell system, water gets discharged from plastic
tubes on impact over a pre-determined time, thus absorbing the energy))
sqm
18533.00
8.35
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100 mm, die cast in aluminium,
resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling
hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part
4:1973)
each
730.00
8.36
Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low density polyethylene (LDPE)
material with a square base of 390 x 390 x 35 mm and a height of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as
per BS 873)
each
296.00
8.37
Roadside Amenities
Rest Areas (Providing plainly furnished accommodation for rest rooms, dormitories, restaurants, stalls, shops, petrol pump,
telephone booth, first aid room, traffic aid post, police assistance booth, including electricity, toilet and sewerage system
Pricing may be done based on current plinth area rates approved by PWD/CPWD/MES for a particular zone. Area is
required to be assessed for specific location as per actual site conditions)
Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking areas may be done for the
quantities of various items based on the approved dimensions and pavement design for a particular terrain and soil. Rates
for items may be from respective chapters.)
8.38
Policeman Umbrella (Provision of a 2 m high (floor to roof) umbrella for traffic policeman at road crossings, where
necessary, installed on a raised platform, built on a central support of a steel pipe 100 mm dia, roof made of 25 mm dia steel
pipe to provide covered area of 3 sqm, roofed with CGI sheets, all steel parts to be given 2 coats of paint)
8.39
sqm
each
High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast pole lighting with 30 m high
hot dip galvanised mast designed to withstand forces exerted with wind speeds of 180 km per hour with 3 seconds gust, as
per IS:875 (Part 3) - 1978, fitted with a base flange, door at the base of mast with heavy duty internal lock, lantern
carriage, suitable winching arrangement for safe working load of 750 kg and high powered electrically driven power tools
for raising and lowering of lantern carriage, flexible 8 core electric cable, lightening conductor, earthing terminal, and
fixing 2 nos aviation obstruction lights on top of the mast, all complete as per approved design and drawings This is a
specialised work and is generally done by firms who specialise in such jobs. The detailed designs and estimates are
submitted by the firms alongwith their tender for checks by the Department. The cost of this work is required to be worked
out based on approved design, drawings and estimate of the lowest tender. A separate contract for this work is concluded
as the contractors for road and bridge works generally donot undertake such jobs.)
8.40
Toll Plaza (The construction, operation and maintenance of Toll Plaza can be broken into separate items of work as under
based on the approved design and drawings:-)
8.41
Safety Devices and signs in Construction Zones (Provision and fixing of traffic signs for limited period at suitable
locations in construction zone comprising of warning zone, approach transition zone, working zone and terminal transition
zone with a minimum distance of 60 cm from the edge of the kerb in case of kerbed roads and 2 to 3 m from the edge of the
carriageway in case of un-kerbed roads, the bottom edge of the lowest sign plate to be not less than 2 m above the road
level, fixed on 60 mm x 60 mm x 6 mm angle iron post, founded and installed as per approved design and drawings,
removed and disposed of after completion of construction work, all as per IRC:SP:55-2001)
8.42
8.43
Portable Barricade in Construction Zone (Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5
m in length fitted on a 'A' frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2
coats) with yellow and white stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint,
complete as per IRC:SP:55-2001 )
8.44
With Steel Components (Construction of a permanent type barricade made of steel components, 1.5 m high from road
level, fitted with 3 horizontal rails 200 mm wide and 4 m long on 50 x 50 x 5 mm angle iron vertical support, painted with
yellow and white strips, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 )
Page 24 of 264
each
2598.00
each
4160.00
Descriptions
Unit
Rate
With Wooden Components (Construction of a permanent type barricade made of wooden components, 1.5 m high
from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post,
painted with yellow and white striups, 150 mm in width at an angle of450, complete as per IRC:SP:55-2001 )
each
5749.00
With Bricks (Construction of a permanent type barricade made with brick work in mud mortar, 1.5 m high, 4 m long,
600 mm thick, plastered with cement mortar 1:6, painted with yellow and white strips)
each
11476.00
8.45
Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum delineator, 300 mm in diameter,
800 mm high, filled with earth for stability, painted in circumferential strips of alternate black and white 100 mm wide fitted
with reflectors 3 Nos of 7.5 cm dia, all as per IRC:SP:55-2001)
each
325.00
8.46
Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag 600 x 600 mm securely
fastened to a staff 1 m in length for guiding the traffic)
each
430.00
cum
66.00
cum
cum
85.00
113.00
Depth upto 3 m
Depth 3 m to 6 m
cum
cum
49.00
56.00
Depth above 6m
cum
68.00
cum
cum
94.00
64.00
cum
314.00
cum
347.00
cum
cum
288.00
67.00
cum
219.00
CHAPTER-12
FOUNDATIONS
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,
including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.)
12.1
I
Ordinary soil
Manual Means
(i)
(ii)
(iii)
B
(i)
(ii)
(iii)
II
A
upto 3 m depth
3 m to 6 m depth
Above 6 m depth
Mechanical Means
Manual Means
Depth upto 3 m
Mechanical Means
Hard rock ( requiring blasting )
III
A
IV
A
V
Manual Means
Hard rock ( blasting prohibited )
Mechanical Means
Marshy soil
upto 3 m depth
(i)
A
B
VI
Manual means
Mechanical Means
Back Filling in Marshy Foundation Pits
12.2
Filling Annular Space Around Footing in Rock (Lean cement concrete 1:3:6 nominal mix. Rate may be taken as per
items 13.4.)
12.3
cum
811.00
12.4
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm
nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
cum
3626.00
12.5
Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per
drawing and technical specifications
cum
4545.00
cum
cum
3425.00
4150.00
cum
cum
2941.00
2519.00
cum
cum
6211.00
6020.00
cum
4228.00
cum
4653.00
cum
4726.00
cum
4650.00
cum
cum
5021.00
4949.00
cum
5098.00
12.6 A
B
C
D
12.7
(a)
(b)
12.8
A
B
C
Case I
Case II
D
Case I
Case II
E
Case I
CHAPTER-1
CARRIAGE OF MATERIALS
Sr No
Ref. to
MoRTH
Spec.
1.1
Note
1.2
Note
1.3
Description
Unit
cum
Unit = cum
Taking output = 5.5 cum
a) Labour
Mate
Mazdoor for loading and unloading
b) Machinery
Tipper 5.5 tonne capacity
c) Overhead charges @ 0.1 on (a+b)
d) Contractor's profit @ 0.1 on (a+b+c)
Cost for5.5 cum = a+b+c+d
Rate per cum = (a+b+c+d)/5.5
Unloading will be by tipping.
Loading and Unloading of Cement or Steel by Manual
Means and Stacking.
Unit = tonne
Taking output = 10 tonnes
a) Labour
Mate
Mazdoor for loading and unloading
b) Machinery
Truck 10 tonne capacity
c) Overhead charges @ 0.1 on (a+b)
d) Contractor's profit @ 0.1 on (a+b+c)
Cost for10 tonnes = a+b+c+d
Rate per tonnes = (a+b+c+d)/10
Quantity
Rate Rs
Cost Rs
1 Min
13 Min
2 Min
4 Min
20 Min
hour
hour
0.330
0.330
339.00
806.00
111.87
265.98
say
37.79
41.56
457.20
83.13
83.00
P&M-048
P&M-017
day
day
0.110
0.750
151.44
136.69
16.66
102.52
L-12
L-13
hour
0.750
339.00
P&M-048
say
254.25
37.34
41.08
451.85
82.15
82.00
day
day
0.080
2.000
151.44
136.69
12.12
273.38
L-12
L-13
hour
2.000
315.27
630.54
91.60
100.76
1108.40
110.84
111.00
P&M-057
135.60
98.31
23.39
25.73
P&M-048
P&M-048
say
1.4
Remarks/
Input ref.
Surfaced Road
Speed with load : 25 km / hour.
Speed while Returning empty :35 km / hour.
a) Machinery.
Tipper 10 tonne capacity
Time taken for onward haulage with load
Time taken for empty return trip.
b) Overhead charges @ 0.1 on (a)
c) Contractor's profit @ 0.1 on (a+b)
Page 1 of 264
hour
hour
0.400
0.290
339.00
339.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
(ii)
say
283.03
2.83
2.80
Remarks/
Input ref.
hour
0.500
339.00
169.50
P&M-048
hour
0.330
339.00
111.87
P&M-048
b)
28.14
c)
30.95
340.46
(iii)
3.40
say
3.40
Machinery
Tipper 10 tonnes capacity
Time taken for onward haulage
hour
1.000
339.00
339.00
P&M-048
hour
0.670
339.00
227.13
P&M-048
b)
56.61
c)
62.27
685.02
6.85
say
1.5
6.90
b)
Labour
Mate
day
0.060
151.44
9.09
L-12
Mazdoor
day
1.500
136.69
205.04
L-13
cum
1.100
494.68
544.15
M-002
Material
Supply of quarried stone 150 - 200 mm size
c)
d)
75.83
83.41
917.51
say
1.6
918.00
b)
Mate
day
0.760
151.44
115.09
L-12
Mazdoor Skilled
day
2.000
230.00
460.00
L-14
day
17.000
136.69
2323.73
L-13
cum
800.000
919.00
735200.00
Material
Stone Boulder of size 150 mm and below
Page 2 of 264
M-001
Sr No
Ref. to
MoRTH
Spec.
c)
Cost Rs
Remarks/
Input ref.
18228.00
109368.00
P&M-028
20.000
806.00
16120.00
P&M-017
20.000
339.00
6780.00
P&M-048
Description
Unit
Quantity
Hour
6.000
Hour
Hour
Rate Rs
Machinery
d)
e)
87036.68
95740.35
1053143.86
1667.48
say
Note
1667.00
1.7
day
0.760
151.44
115.09
L-12
Mazdoor Skilled
day
2.000
230.00
460.00
L-14
day
17.000
136.69
2323.73
L-13
cum
800.000
919.00
735200.00
M-001
Hour
6.000
18228.00
109368.00
P&M-028
Hour
20.000
806.00
16120.00
P&M-017
Hour
20.000
339.00
6780.00
P&M-048
b)
Material
c)
Machinery
d)
e)
87036.68
95740.35
1053143.86
1414.67
say
Note
1.8
1415.00
day
0.760
151.44
115.09
L-12
Mazdoor Skilled
day
2.000
230.00
460.00
L-14
Page 3 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
Quantity
Rate Rs
Cost Rs
day
17.000
136.69
2323.73
cum
800.000
919.00
735200.00
M-001
Hour
6.000
18228.00
109368.00
P&M-028
Hour
20.000
806.00
16120.00
P&M-017
Hour
20.000
339.00
6780.00
P&M-048
b)
Material
c)
Machinery
d)
e)
87036.68
95740.35
895172.28
1193.56
say
Note
Remarks/
Input ref.
Page 4 of 264
1194.00
L-13
CHAPTER-2
SITE CLEARANCE
Sr No
Ref. to
MoRTH
Spec.
2.1
201
Description
Unit
Quantity
Rate Rs
Cost Rs
Unit = Each
Girth from 300 mm to 600 mm
a)
Labour
Mate
day
0.020
151.44
3.03
L-12
day
0.600
136.69
82.01
L-13
b)
hour
0.100
282.50
28.25
P&M-053
Tractor-trolley
c)
d)
11.33
12.46
137.08
say
2.1
(ii)
Mate
day
0.040
151.44
6.06
L-12
day
0.900
136.69
123.02
L-13
hour
0.300
282.50
84.75
P&M-053
Machinery
Tractor-trolley
c)
d)
21.38
23.52
258.73
say
(iii)
Mate
day
0.080
151.44
12.12
L-12
day
2.000
136.69
273.38
L-13
hour
0.400
282.50
113.00
P&M-053
Machinery
Tractor-trolley
c)
d)
39.85
43.83
259.00
b)
2.1
137.00
b)
2.1
Remarks/
Input ref.
482.18
say
482.00
day
day
0.160
4.000
151.44
136.69
24.23
546.76
L-12
L-13
hour
0.600
282.50
169.50
74.05
81.45
895.99
896.00
P&M-053
b)
say
2.2
201
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Labour
Mate
Mazdoor
b) Overhead charges @ 0.1 on (a)
c) Contractor's profit @ 0.1 on (a+b)
Rate per Hectare = a+b+c
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
a)
day
day
2.000
50.000
151.44
136.69
say
2.3
201
Unit = Hectare
Taking output = 1 Hectare
By Manual Means:In area of light jungle
a)
b)
Labour
Mate
day
6.000
151.44
908.64
L-12
Mazdoor
day
150.000
136.69
20503.50
L-13
hour
1.000
282.50
Machinery
Tractor-trolley
c)
d)
2386.41
b)
Labour
Mate
day
8.000
151.44
1211.52
L-12
Mazdoor
day
200.000
136.69
27338.00
L-13
hour
2.000
282.50
Machinery
Tractor-trolley
c)
d)
By Mechanical Means
b)
P&M-053
3202.60
35228.57
say
(ii)
565.00
2911.45
35229.00
Labour
Mate
day
0.160
151.44
24.23
L-12
Mazdoor
day
4.000
136.69
546.76
L-13
hour
10.000
3720.00
37200.00
P&M-014
hour
1.000
282.50
282.50
P&M-053
Machinery
Dozer 80 HP with attachment for removal of trees &
stumps
Tractor-trolley
c)
3805.35
d)
4185.88
46044.72
5525.37
Total =
51570.09
say
34411.00
2.3 (ii)
P&M-053
26250.51
say
282.50
2169.46
2.3
L-12
L-13
(i)
2.3 (i)
302.88
6834.50
713.74
785.11
8636.23
8636.00
49142.00
b)
Labour
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
12.000
3720.00
44640.00
Machinery
Dozer 80 HP with attachment for removal of trees &
stumps
Page 2 of 264
P&M-014
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Tractor-trolley
Quantity
hour
c)
d)
1.500
Rate Rs
Cost Rs
282.50
5051.23
55563.49
say
202
P&M-053
4592.02
423.75
Remarks/
Input ref.
55563.00
Dismantling of Structures
Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable material and stacking the
serviceable material with all lifts and lead of 1000 metres
Unit = cum
Taking output = 1.25 cum
(i)
By Manual Means
b)
Labour
Mate
day
0.040
151.44
6.06
L-12
day
1.000
136.69
136.69
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
21.90
24.09
265.02
212.01
say
2.4 (i)
a)
b)
Labour
Mate
day
0.050
151.44
7.57
L-12
day
1.250
136.69
170.86
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
25.47
28.02
308.20
246.56
say
247.00
b)
Mate
day
0.150
151.44
22.72
L-12
Blacksmith
day
0.250
264.50
66.13
L-02
day
3.500
136.69
478.42
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
64.35
70.79
778.67
622.94
say
2.4
212.00
II
623.00
Labour
Mate
day
0.020
151.44
3.03
L-12
day
0.250
136.69
34.17
L-13
Page 3 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
day
0.250
230.00
57.50
L-14
hour
0.670
319.00
213.73
P&M-001
hour
0.270
282.50
76.28
P&M-053
Machinery
Air Compressor 250 cfm with 2 leads of pneumatic
breaker @ 1.5 cum per hour
Tractor-trolley
c)
d)
38.47
42.32
465.49
372.40
say
2.4 II
Mate
day
0.050
151.44
7.57
L-12
day
0.660
230.00
151.80
L-14
Blacksmith
day
0.250
264.50
66.13
L-02
day
0.250
136.69
34.17
L-13
hour
1.000
319.00
319.00
P&M-001
hour
0.270
282.50
76.28
P&M-053
Machinery
Air Compressor 250 cfm with 2 leads of pneumatic
breaker @ 1.00 cum per hour
Tractor-trolley
c)
d)
65.49
72.04
792.48
633.99
say
(ii)
In lime mortar
a)
b)
Mate
day
0.020
151.44
3.03
L-12
day
0.500
136.69
68.35
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
c)
d)
14.76
16.24
178.66
142.92
say
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
day
0.750
136.69
102.52
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
18.33
20.17
221.84
177.47
say
143.00
In cement mortar
a)
2.4 (ii)
634.00
Labour
Tractor-trolley
2.4 (ii)
372.00
b)
2.4
Remarks/
Input ref.
177.00
In mud mortar
a)
b)
Labour
Mate
day
0.016
151.44
2.42
L-12
day
0.400
136.69
54.68
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
13.34
d)
14.67
Page 4 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
161.38
129.11
say
2.4 (ii)
b)
Labour
Mate
day
0.014
151.44
2.12
L-12
day
0.350
136.69
47.84
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
12.62
13.89
152.75
122.20
say
(iii)
A
b)
Labour
Mate
day
0.024
151.44
3.63
L-12
day
0.600
136.69
82.01
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
16.19
17.81
195.93
156.74
say
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
day
0.750
136.69
102.52
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
18.33
20.17
221.84
177.47
say
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
day
0.500
136.69
68.35
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
14.76
16.24
178.66
177.00
2.4 (iii)
157.00
2.4 (iii)
122.00
2.4 (iii)
129.00
2.4
Remarks/
Input ref.
142.92
say
143.00
b)
Labour
Mate
day
0.018
151.44
2.73
L-12
day
0.450
136.69
61.51
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
14.05
d)
15.46
Page 5 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
170.02
136.02
say
2.4 (iii)
b)
Labour
Mate
day
0.016
151.44
2.42
L-12
day
0.400
136.69
54.68
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
13.34
14.67
161.38
129.11
say
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
day
0.500
136.69
68.35
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
14.76
16.24
178.66
142.92
say
(iv)
Mate
day
0.060
151.44
9.09
L-12
Carpenter
day
0.500
264.50
132.25
L-04
day
1.000
136.69
136.69
L-13
hour
0.270
282.50
76.28
P&M-053
Machinery
Tractor-trolley
c)
d)
35.43
38.97
428.70
342.96
say
(v)
143.00
b)
2.4
129.00
2.4
136.00
2.4 (iii)
Remarks/
Input ref.
343.00
Including dismembering
a)
Labour
Mate
day
0.140
151.44
21.20
L-12
Blacksmith
day
1.000
264.50
264.50
L-02
day
2.500
136.69
341.73
L-13
Add 2.5 per cent of cost of labour for gas cutting, ropes,
pulleys etc.
b) Machinery
Tractor-trolley
15.69
hour
c)
d)
0.170
282.50
69.11
76.03
836.28
say
2.4 (v)
48.03
Excluding dismembering.
Page 6 of 264
836.00
P&M-053
Sr No
Ref. to
MoRTH
Spec.
Description
a)
Unit
Quantity
Rate Rs
Cost Rs
Labour
Mate
day
0.220
151.44
33.32
L-12
day
2.000
136.69
273.38
L-13
Blacksmith
day
0.500
264.50
132.25
L-02
Add 2.5 per cent of cost of labour for gas cutting, ropes,
pulleys etc.
b) Machinery
Tractor-trolley
10.97
hour
c)
d)
0.170
282.50
P&M-053
54.77
602.51
say
48.03
49.79
Remarks/
Input ref.
603.00
Labour
Mate
day
0.010
151.44
1.51
L-12
Blacksmith
day
0.130
264.50
34.39
L-02
Mazdoor
day
0.130
136.69
17.77
L-13
b)
5.37
c)
5.90
64.94
6.49
say
2.4
(vi)
6.00
In lime/Cement mortar
a)
Labour
Mate
day
0.140
151.44
21.20
L-12
Mazdoor
day
3.500
136.69
478.42
L-13
b)
49.96
c)
54.96
604.54
say
2.4 (iv)
a)
Labour
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
1.250
136.69
170.86
L-13
b)
17.84
c)
19.63
215.91
say
2.4
(vii)
605.00
In mud mortar
216.00
Labour
Mate
day
0.060
151.44
9.09
L-12
Mazdoor
day
1.400
136.69
191.37
L-13
b)
20.05
c)
22.05
242.55
say
2.4 (vii)
In Mud mortar
Page 7 of 264
243.00
Sr No
Ref. to
MoRTH
Spec.
Description
a)
Unit
Quantity
Rate Rs
Cost Rs
Labour
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.300
136.69
41.01
L-13
b)
4.25
c)
4.68
51.45
say
2.4
(viii)
Remarks/
Input ref.
51.00
b)
Labour
Mate
day
0.160
151.44
24.23
L-12
day
4.000
136.69
546.76
L-13
hour
0.320
282.50
90.40
P&M-053
Machinery
Tractor-trolley
c)
d)
66.14
72.75
800.28
8.00
say
2.4
(ix)
8.00
Up to 600 mm dia
a)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.520
136.69
71.08
L-13
b)
7.41
c)
8.15
89.67
say
2.4 (ix)
a)
Labour
Mate
day
0.030
151.44
4.54
L-12
Mazdoor
day
0.700
136.69
95.68
L-13
b)
10.02
c)
11.02
121.27
say
2.4 (ix)
Labour
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
1.200
136.69
164.03
L-13
b)
c)
17.16
18.88
207.64
say
2.5
202
121.00
Above 900 mm
a)
Note
90.00
208.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = cum
Taking output = 1 cum
I
By Manual Means
Bituminous courses
a)
b)
Labour
Mate
day
0.060
151.44
9.09
L-12
day
1.500
136.69
205.04
L-13
hour
0.380
282.50
107.35
P&M-053
Machinery
Tractor-trolley
c)
d)
32.15
35.36
388.98
say
2.5 I
a)
b)
Labour
Mate
day
0.040
151.44
6.06
L-12
day
1.000
136.69
136.69
L-13
hour
0.330
282.50
93.23
P&M-053
Machinery
Tractor-trolley
c)
d)
23.60
25.96
285.53
say
2.5
II
By Mechanical Means
Bituminous course
a)
b)
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.300
136.69
41.01
L-13
Tractor-trolley
hour
0.380
282.50
107.35
P&M-053
hour
0.017
282.50
4.80
P&M-055
Machinery
c)
d)
15.47
17.01
187.16
say
202
286.00
Labour
389.00
Granular courses
187.00
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
day
0.500
230.00
115.00
L-14
day
0.500
136.69
68.35
L-13
hour
1.000
319.00
319.00
P&M-001
hour
0.400
282.50
113.00
P&M-053
hour
1.000
200.00
200.00
P&M-083
Machinery
c)
d)
81.99
90.19
992.06
say
Page 9 of 264
992.00
Sr No
Ref. to
MoRTH
Spec.
Description
Note
2.7
202
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.006
151.44
0.91
L-12
day
0.150
136.69
20.50
L-13
hour
0.050
282.50
14.13
P&M-053
Machinery
Tractor-trolley
c)
d)
3.55
3.91
43.00
say
2.8
202
43.00
b)
Labour
Mate
day
0.010
151.44
1.51
L-12
day
0.150
136.69
20.50
L-13
hour
0.200
282.50
56.50
P&M-053
Machinery
Tractor-trolley
c)
d)
7.85
8.64
95.01
9.50
say
2.9
202
10.00
b)
Labour
Mate
day
0.015
151.44
2.27
L-12
day
0.225
136.69
30.76
L-13
hour
0.300
282.50
84.75
P&M-053
Machinery
Tractor-trolley
c)
d)
11.78
12.96
142.51
14.25
say
2.10
202
5th KM stone
Page 10 of 264
14.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.130
151.44
19.69
L-12
Mazdoor
day
0.750
136.69
102.52
L-13
hour
0.150
282.50
42.38
P&M-053
Machinery
Tractor-trolley
c)
d)
16.46
18.10
199.14
say
199.00
Ordinary KM Stone
Quantity of cement concrete = 0.269 cum
a)
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.500
136.69
68.35
L-13
hour
0.100
282.50
28.25
P&M-053
Machinery
Tractor-trolley
c)
d)
9.96
10.96
120.54
say
121.00
Hectometre Stone
Quantity of cement concrete = 0.048 cum
a)
b)
Labour
Mate
day
0.004
151.44
0.61
L-12
Mazdoor
day
0.100
136.69
13.67
L-13
hour
0.020
282.50
5.65
P&M-053
Machinery
Tractor-trolley
c)
1.99
d)
2.19
24.11
say
2.11
202
24.00
Dismantling of Fencing
Dismantling of barbed wire fencing/ wire mesh fencing
including posts, foundation concrete, back filling of pit by
manual means including disposal of dismantled material with
all lifts and up to a lead of 1000 metres, stacking serviceable
material and unserviceable material separately.
Unit = running metre
Taking output = 30 metres
a)
b)
Labour
Mate
day
0.150
151.44
22.72
L-12
day
3.000
136.69
410.07
L-13
Blacksmith
day
0.750
264.50
198.38
L-02
hour
0.150
282.50
42.38
P&M-053
Machinery
Tractor-trolley
c)
d)
67.35
74.09
814.98
27.17
say
2.12
202
Page 11 of 264
27.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.090
151.44
13.63
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
Plumber
day
0.250
264.50
66.13
L-02
hour
0.250
315.27
78.82
P&M-057
hour
0.500
357.00
178.50
P&M-013
Machinery
c)
d)
61.05
67.15
738.65
73.86
say
Note
2.13
202
74.00
b)
Labour
Mate
day
0.100
151.44
15.14
L-12
Mazdoor
day
2.500
136.69
341.73
L-13
hour
0.300
116.53
34.96
P&M-070
hour
1.000
315.27
315.27
P&M-057
Machinery
c)
d)
70.71
77.78
855.59
85.56
say
Note
2.14
202
86.00
b)
Labour
Mate
day
0.480
151.44
72.69
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
Electrician/Lineman
day
2.000
264.50
529.00
L-02
hour
1.500
282.50
423.75
P&M-053
Machinery
Tractor-trolley
c)
d)
239.23
263.16
2894.73
96.49
Add 5% Premium
4.82
Page 12 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Total =
101.32
say
Page 13 of 264
101.00
Remarks/
Input ref.
CHAPTER - 3
EARTH WORK, EROSION CONTROL AND DRAINAGE
Sr No
Ref. to
MoRTH
Spec.
3.1
301
Description
Unit
Note
301
Remarks/
Input ref.
day
day
1.800
45.000
151.44
136.69
272.59
6151.05
L-12
L-13
hour
10.000
315.27
P&M-057
say
3152.70
957.63
1053.40
11587.37
96.56
97.00
Note
301
Cost Rs
Unit = cum
Taking output = 120 cum
a) Labour
Mate
Mazdoor
b) Machinery
Truck 5.5 cum capacity
c) Overhead charges @ 0.1 on (a+b)
d) Contractor's profit @ 0.1 on (a+b+c)
Cost for 120 cum = a+b+c+d
Rate per cum = (a+b+c+d)/120
3.3
Rate Rs
3.2
Quantity
day
day
2.800
70.000
151.44
136.69
424.03
9568.30
L-12
L-13
hour
10.000
315.27
P&M-057
say
3152.70
1314.50
1445.95
15905.49
132.55
133.00
day
day
0.080
2.000
151.44
136.69
12.12
273.38
hour
6.000
3720.00
22320.00
2260.55
2486.60
27352.65
151.96
152.00
say
Page 1 of 264
L-12
L-13
P&M-014
Sr No
Ref. to
MoRTH
Spec.
3.4
301
Description
Unit
Quantity
Rate Rs
Cost Rs
day
day
0.120
3.000
151.44
136.69
18.17
410.07
hour
6.000
3720.00
22320.00
2274.82
2502.31
27525.37
254.86
255.00
say
3.5
Remarks/
Input ref.
L-12
L-13
P&M-014
301
Unit = cum
Taking 0utput = 180 cum
a)
b)
c)
Labour
Mate
day
0.220
151.44
33.32
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Driller
day
2.000
264.50
529.00
L-06
Blaster
day
0.250
264.50
66.13
L-03
hour
6.000
3720.00
22320.00
P&M-014
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
806.00
4836.00
P&M-017
hour
11.250
339.00
3813.75
P&M-048
9198.00
M-104
Machinery
Materials
Gelatin 80 per cent
d)
e)
kg
63.000
146.00
each
252.000
14.56
cum
90.000
(37.00)
(3330.00)
4345.94
4780.53
52585.85
292.14
say
Note
Page 2 of 264
292.00
M-089
Sr No
Ref. to
MoRTH
Spec.
3.6
301
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
1302.00
7812.00
P&M-026
hour
16.000
339.00
5424.00
P&M-048
Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 60
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c)
d)
1352.15
1487.36
16361.01
45.45
say
3.7
45.00
301
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
1302.00
7812.00
P&M-026
hour
11.000
339.00
3729.00
P&M-048
Machinery
Hydraulic Excavator 0.90 cum bucket capacity @ 36
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c)
d)
1182.65
1300.91
14310.06
59.63
say
3.8
301
60.00
Mechanised
Unit = cum
Taking output = 36 cum
a)
Labour
Mate
day
0.400
151.44
60.58
L-12
day
10.000
136.69
1366.90
L-13
hour
6.000
1302.00
7812.00
P&M-026
hour
6.500
339.00
2203.50
P&M-048
cum
18.000
(37.00)
(666.00)
M-089
c)
d)
b)
1077.70
1185.47
13040.14
362.23
say
Note
Page 3 of 264
362.00
Sr No
Ref. to
MoRTH
Spec.
3.8
Description
B
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Manual Method
Unit = cum
Taking output = 16 cum
a)
Labour
Mate
day
1.640
151.44
248.36
L-12
day
16.000
136.69
2187.04
L-13
Chiseller
day
24.000
264.50
6348.00
L-05
Blacksmith
day
1.000
264.50
264.50
L-02
hour
2.900
339.00
983.10
P&M-048
cum
8.000
(37.00)
(296.00)
M-089
c)
d)
b)
Machinery
973.50
1070.85
11779.35
736.21
say
Note
736.00
3.9
301
b)
c)
Labour
Mate
day
0.220
151.44
33.32
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Driller
day
2.000
264.50
529.00
L-06
Blaster
day
0.500
264.50
132.25
L-03
hour
6.000
3720.00
22320.00
P&M-014
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
806.00
4836.00
P&M-017
hour
8.200
339.00
2779.80
P&M-048
9198.00
M-104
Machinery
Materials
Gelatin 80 per cent
Electric Detonators @ 1 detonator for1/2 gelatin stick
of 125 gms each
Credit for excavated rock found suitable for use @ 50
per cent quantity blasted
Add 5 per cent of cost of a+b+c towards muffling
arrangements to guard against any rock fly off during
blasting
d)
e)
kg
63.000
146.00
each
1008.000
14.56
cum
90.000
(37.00)
6197.44
68171.84
378.73
say
301
M-089
5634.04
3.10
(3330.00)
2841.45
Note
379.00
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
1302.00
7812.00
P&M-026
hour
13.640
339.00
4623.96
P&M-048
Machinery
Hydraulic excavator 0.90 cum bucket capacity @ 50
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c)
d)
1272.15
1399.36
15392.96
51.31
say
Page 4 of 264
51.00
Sr No
Ref. to
MoRTH
Spec.
3.11
301
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
1302.00
7812.00
P&M-026
hour
16.360
339.00
5546.04
P&M-048
Machinery
c)
d)
1364.35
1500.79
16508.68
45.86
say
Note
3.12
303
46.00
b)
c)
Labour
Mate
day
0.600
151.44
90.86
L-12
Mazdoor
day
15.000
136.69
2050.35
L-13
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
3720.00
22320.00
P&M-014
hour
6.000
806.00
4836.00
P&M-017
kg
42.000
146.00
6132.00
M-104
each
672.000
14.56
Machinery
Materials
Gelatin 80 per cent
d)
e)
4712.75
5184.03
57024.32
142.56
say
Note
3.13
304
143.00
(i)
Ordinary soil
Unit = cum
Taking output = 10 cum
Labour
Mate
day
0.320
151.44
48.46
L-12
Mazdoor
day
8.000
136.69
1093.52
L-13
b)
114.20
c)
125.62
1381.80
3.13 (i)
138.18
say
138.00
151.44
48.46
Labour
Mate
day
Page 5 of 264
0.320
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
b)
Quantity
Rate Rs
Cost Rs
day
8.000
136.69
1093.52
L-13
hour
6.000
1302.00
7812.00
P&M-026
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
d)
895.40
984.94
10834.32
36.11
say
Note
3.13
Remarks/
Input ref.
36.00
(ii)
Labour
Mate
day
0.400
151.44
60.58
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
b)
142.75
c)
157.02
1727.25
172.72
say
Note
3.13 (ii)
173.00
b)
Labour
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
6.000
1302.00
7812.00
P&M-026
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
d)
866.85
953.53
10488.87
48.56
say
Note
3.13
(iii)
A
49.00
Labour
i) Mate
day
0.530
151.44
80.26
L-12
ii) Driller
day
0.840
264.50
222.18
L-06
iii) Blaster
day
0.400
264.50
105.80
L-03
iv) Mazdoor
day
12.000
136.69
1640.28
L-13
hour
0.667
319.00
212.67
P&M-001
kg
3.500
146.00
511.00
M-104
each
14.000
14.56
b)
Machinery
c)
d)
e)
297.60
327.36
3601.00
360.10
say
Note
3.13
(iv)
360.00
Mechanical Means
a)
b)
Labour
Mate
day
0.200
151.44
30.29
L-12
Mazdoor
day
5.000
136.69
683.45
L-13
hour
10.000
319.00
3190.00
P&M-001
Machinery
Air Compressor 250 cfm with 2 leads of pneumatic
breaker @ 1 cum per hour
Page 6 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
d)
Quantity
Rate Rs
Cost Rs
390.37
429.41
4723.52
472.35
say
Note
3.13
(v)
Remarks/
Input ref.
472.00
b)
Labour
Mate/Supervisor
day
0.400
151.44
60.58
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
hour
2.670
282.50
754.28
P&M-053
cum
5.000
43.00
215.00
M-163
Machinery
Tractor-trolley
c)
Material
Selected earth for refilling
d)
e)
239.68
263.64
2900.07
290.01
say
Note
290.00
3.13 (v)
Mechanical Means
a)
b)
Labour
i) Mate
day
0.080
151.44
12.12
L-12
day
2.000
136.69
273.38
L-13
hour
0.170
1302.00
221.34
P&M-026
hour
0.450
339.00
152.55
P&M-048
cum
5.000
43.00
215.00
M-163
Machinery
Hydraulic excavator 1.0 cum bucket capacity @ 60
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c)
Material
Selected earth for refilling
d)
e)
87.44
96.18
1058.01
105.80
say
Note
3.14
106.00
305.4.3
Unit = sqm
Taking output = 100 sqm
a)
b)
Labour
Mate
day
0.200
151.44
30.29
L-12
day
5.000
136.69
683.45
L-13
hour
1.670
282.50
471.78
P&M-053
Machinery
Tractor-trolley
d)
e)
118.55
130.41
1434.47
14.34
say
Note
3.15
305.4.3
14.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.250
136.69
34.17
L-13
hour
0.080
282.50
22.60
P&M-055
hour
0.200
806.00
161.20
P&M-017
hour
0.230
339.00
77.97
P&M-048
Machinery
c)
d)
29.75
32.72
359.92
3.60
say
3.16
4.00
305
Unit = cum
Taking output = 100 cum
a)
b)
Labour
Mate
day
0.040
151.44
6.06
L-12
Mazdoor
day
1.000
136.69
136.69
L-13
hour
1.670
1302.00
2174.34
P&M-026
tonne.km
160 x L
2.46
7864.80
Lead =20
km & P&M058
Machinery
Hydraulic Excavator1 cum bucket capacity @ 60 cum
per hour
Tipper 10 tonne capacity
c)
786.48
hour
0.500
3720.00
1860.00
P&M-014
hour
1.000
2395.00
2395.00
P&M-032
hour
4.000
200.00
800.00
P&M-060
hour
1.000
1541.00
1541.00
P&M-059
KL
24.000
10.00
240.00
M-189
cum
100.000
28.00
2800.00
M-092
Material
Cost of water
Compensation for earth taken from private land
d)
e)
2060.44
2266.48
24931.28
249.31
say
Note
3.17
305
249.00
Compensation for earth will vary from place to place and will
have to be assessed realistically as per particular ground
situation. In case earth is available from Govt. land,
compensation for earth will not be required. The position is
required to be clearly stated in the cost estimate.
Construction of Embankment with Material Deposited
from Roadway Cutting
Construction of embankment with approved materials
deposited at site from roadway cutting and excavation from
drain and foundation of other structures graded and
compacted to meet requirement of table 300-2.
Unit = cum
Taking output = 100 cum
a)
b)
c)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.500
136.69
68.35
L-13
hour
0.500
3720.00
1860.00
P&M-014
hour
1.000
2395.00
2395.00
P&M-032
hour
4.000
200.00
800.00
P&M-060
hour
1.000
1541.00
1541.00
P&M-059
KL
24.000
10.00
240.00
M-189
Machinery
Material
Cost of water
d)
e)
690.74
759.81
8357.92
83.58
say
Note
3.18
305
Page 8 of 264
84.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.040
151.44
6.06
L-12
Mazdoor
day
1.000
136.69
136.69
L-13
hour
1.670
1302.00
2174.34
P&M-026
tonne.km
175xL
2.46
8602.13
Lead =20
km & P&M058
hour
0.500
3720.00
1860.00
P&M-014
hour
2.000
2395.00
4790.00
P&M-032
hour
4.000
200.00
800.00
P&M-060
hour
1.250
1541.00
1926.25
P&M-059
KL
24.000
10.00
240.00
M-189
cum
100.000
28.00
2800.00
M-092
Machinery
Hydraulic excavator1 cum bucket capacity @ 60 cum
per hour
Tipper 10 tonne capacity
c)
860.21
Material
Cost of water
Compensation for earth taken from private land
d)
e)
2419.57
2661.52
29276.77
292.77
say
3.19
305.3.4
293.00
b)
c)
Labour
Mate
day
0.120
151.44
18.17
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
hour
9.000
282.50
2542.50
P&M-055
hour
6.000
2395.00
14370.00
P&M-032
hour
4.000
200.00
800.00
P&M-060
hour
7.500
1541.00
11557.50
P&M-059
KL
24.000
10.00
Machinery
Material
Cost of water
d)
e)
M-189
3293.21
36225.27
60.38
say
3.19
240.00
2993.82
60.00
b)
c)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
282.50
1695.00
P&M-055
hour
7.500
1541.00
11557.50
P&M-059
hour
4.000
200.00
800.00
P&M-060
KL
24.000
10.00
240.00
M-189
Machinery
Material
Cost of water
d)
e)
1457.80
1603.58
17639.37
29.40
say
3.20
305
Page 9 of 264
29.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.200
151.44
30.29
L-12
Mazdoor
day
5.000
136.69
683.45
L-13
hour
0.100
3720.00
372.00
P&M-014
Machinery
Dozer 80 HP @ 100 cum per hour
c)
d)
108.57
119.43
1313.74
131.37
say
131.00
3.21
Unit = cum
Taking output = 300 cum
a)
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
6.000
3720.00
22320.00
Machinery
Dozer, 80 HP
c)
d)
2486.60
27352.65
91.18
say
3.22
307
P&M-014
2260.55
91.00
b)
c)
Labour
Mate
day
0.120
151.44
18.17
L-12
day
3.000
136.69
410.07
L-13
hour
2.000
200.00
400.00
P&M-060
Tractor-trolley
hour
1.000
282.50
282.50
P&M-053
cum
0.180
364.00
65.52
M-167
KL
12.000
10.00
120.00
M-189
Machinery
Material
Farm yard manure @ 0.18 cum per 100 sqm at site of
work
Cost of water
d)
e)
129.63
142.59
1568.48
15.68
say
3.23
308
16.00
b)
Labour
Mate
day
0.400
151.44
60.58
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
hour
14.000
200.00
2800.00
P&M-060
hour
2.400
282.50
678.00
P&M-053
Machinery
Water tanker 6 KL capacity including watering for 3
months
Tractor-trolley
c)
Material
Seeds
kg
3.600
243.00
874.80
M-162
cum
0.430
364.00
156.52
M-167
Bitumen Emulsion
litre
55.200
49.92
2755.31
M-077
sqm
264.000
61.00
16104.00
M-121
KL
84.000
10.00
840.00
M-189
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
e)
Quantity
Rate Rs
Cost Rs
2563.61
2819.97
31019.69
129.25
say
3.24
309
Remarks/
Input ref.
129.00
Mechanical means
a)
Labour
Mate
day
0.010
151.44
1.51
L-12
day
0.250
136.69
34.17
L-13
hour
0.330
1302.00
429.66
P&M-026
b)
Machinery
c)
d)
46.53
51.19
563.07
56.31
say
3.24
a)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
b)
28.55
c)
31.40
345.45
34.54
say
Note
3.25
309
56.00
Manual Means
35.00
Mechanical Means
a)
Labour
Mate
day
0.020
151.44
3.03
L-12
day
0.500
136.69
68.35
L-13
hour
0.670
1302.00
872.34
P&M-026
b)
Machinery
c)
d)
94.37
103.81
1141.89
114.19
say
3.25
a)
Labour
Mate
day
0.120
151.44
18.17
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
b)
42.82
c)
47.11
518.17
51.82
say
3.26
3.27
114.00
Manual Means
309
309
Page 11 of 264
52.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
c)
Labour
Mate
day
0.040
151.44
6.06
L-12
day
2.000
136.69
273.38
L-13
metre
10.000
243.00
2430.00
M-135
cum
2.400
894.00
2145.60
M-012
Material
Perforated pipe of cement concrete, internal dia 100
mm
Crushed stone as per table 300-3
d)
e)
485.50
534.05
5874.60
587.46
say
Note
3.28
309
587.00
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
day
1.500
136.69
205.04
L-13
cum
1.350
894.00
1206.90
M-012
Material
Crushed stone as per table 300-3
c)
d)
141.50
155.65
1712.11
171.21
say
3.29
309
171.00
cum
1.500
36.00
cum
0.495
4650.00
310
say
Item No.
3.13
2301.75 Item 12.8
(C) RCC
2355.75
54.00
2356.00
b)
c)
Labour
Mate
day
0.280
151.44
42.40
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mazdoor skilled
day
1.000
164.69
164.69
L-15
hour
3.000
460.00
1380.00
P&M-044
hour
3.000
200.00
600.00
P&M-060
KL
18.000
10.00
180.00
M-189
Machinery
Material
Cost of water
d)
e)
318.72
350.60
3856.55
1.10
say
3.31
313
Page 12 of 264
1.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.040
151.44
6.06
L-12
Mazdoor
day
1.500
136.69
205.04
L-13
hour
0.500
3720.00
1860.00
P&M-014
hour
1.000
1541.00
1541.00
P&M-059
hour
2.000
200.00
400.00
P&M-060
KL
12.000
10.00
120.00
M-189
Machinery
Material
Cost of water
d)
e)
413.21
454.53
4999.83
50.00
say
Note
50.00
3.32
301
b)
Labour
Mate
day
0.240
151.44
36.35
L-12
day
6.000
136.69
820.14
L-13
hour
6.000
3720.00
22320.00
P&M-014
hour
6.000
806.00
4836.00
P&M-017
hour
12.000
339.00
4068.00
P&M-048
c)
d)
3208.05
3528.85
38817.39
149.30
say
Note
3.33
149.00
301
Unit = cum
Taking output = 170 cum
a)
b)
Labour
Mate
day
0.320
151.44
48.46
L-12
Mazdoor
day
8.000
136.69
1093.52
L-13
hour
6.000
3720.00
22320.00
P&M-014
hour
7.000
806.00
5642.00
P&M-017
hour
7.000
339.00
2373.00
P&M-048
Machinery
c)
d)
3147.70
3462.47
38087.15
224.04
say
Note
3.34
301
Page 13 of 264
224.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.490
151.44
74.21
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
Driller
day
2.000
264.50
529.00
L-06
Blaster
day
0.250
264.50
66.13
L-03
hour
6.000
3720.00
22320.00
P&M-014
hour
5.000
319.00
1595.00
P&M-001
hour
7.000
806.00
5642.00
P&M-017
hour
7.000
339.00
2373.00
P&M-048
kg
35.000
146.00
5110.00
M-104
each
140.000
14.56
Machinery
Materials
Gelatine 80 per cent
d)
e)
4111.46
4522.61
49748.70
292.64
say
Note
293.00
3.35
3.36
Suggest
ive
b)
Labour
Mate
day
0.160
151.44
24.23
L-12
Mazdoor
day
4.000
136.69
546.76
L-13
hour
6.000
1302.00
7812.00
P&M-026
tonne.km
432 x L
2.46
56272.64
Lead =53
km & P&M058
Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60
cum/hour
Tipper 10Tcapacity flyash 360 x 1.2 = 432 tonnes
5627.26
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
hour
1.800
3720.00
6696.00
P&M-014
hour
3.600
2395.00
8622.00
P&M-032
hour
12.000
200.00
2400.00
P&M-060
hour
3.600
1541.00
5547.60
P&M-059
c)
d)
9354.85
10290.33
113193.68
314.43
say
Note
Remarks/
Input ref.
Page 15 of 264
314.00
CHAPTER - 4
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
Sr No
Ref. to
MoRTH
Spec.
4.1
401
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
4.1A
4.1A
4.1A
(i)
(ii)
(iii)
day
day
day
0.400
2.000
8.000
151.44
164.69
136.69
60.58
329.38
1093.52
L-12
L-15
L-13
hour
hour
hour
6.000
6.000
4.500
2195.03
652.00
200.00
13170.15
3912.00
900.00
P&M-093
P&M-018
P&M-060
hour
tonne.km
6.000
450 x L
806.00
2.46
4836.00
1105.99
P&M-017
Lead =1
km & P&M058
110.60
hour
hour
6.000
6.000
2395.00
1541.00
14370.00
9246.00
P&M-032
P&M-059
cum
cum
cum
KL
144.000
57.000
86.400
27.000
867.00
867.00
867.00
10.00
124848.00
49419.00
74908.80
270.00
M-013
M-017
M-020
M-189
cum
cum
cum
KL
100.800
72.000
115.200
27.000
867.00
867.00
867.00
10.00
87393.60
62424.00
99878.40
270.00
M-015
M-017
M-020
M-189
cum
cum
cum
KL
100.800
36.000
151.200
27.000
867.00
867.00
867.00
10.00
87393.60
31212.00
131090.40
270.00
M-016
M-018
M-020
M-189
say
29858.00
32843.80
361281.81
1605.70
1606.00
say
29910.02
32901.02
361911.26
1608.49
1608.00
say
29910.02
32901.02
361911.26
1608.49
1608.00
Page 1 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Note
Unit
Page 2 of 264
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Sr No
4.1
Ref. to
MoRTH
Spec.
Description
B
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.480
151.44
72.69
L-12
Mazdoor skilled
day
2.000
164.69
329.38
L-15
Mazdoor unskilled
day
10.000
136.69
1366.90
L-13
hour
6.000
2395.00
14370.00
P&M-032
hour
6.000
1541.00
9246.00
P&M-059
Tractor - Rotavator
hour
12.000
0.00
0.00
P&M-054
hour
3.000
200.00
600.00
P&M-060
cum
384.000
836.17
321089.28
M-013
cum
0.000
836.17
0.00
M-017
cum
0.000
836.17
0.00
M-020
KL
18.000
10.00
180.00
M-189
Machinery
Material
Cost of water
OR
4.1B
(i)
e)
34725.43
38197.97
420177.64
1400.59
14.01
1414.60
say
4.1B
(ii)
1414.60
e)
35139.78
38653.76
425191.34
1417.30
14.17
1431.48
say
4.1B
(iii)
1431.48
e)
35287.76
38816.54
426981.95
1423.27
14.23
1437.51
say
Note
Page 3 of 264
1437.51
Sr No
Ref. to
MoRTH
Spec.
4.2
401
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.400
151.44
60.58
L-12
Mazdoor skilled
day
2.000
164.69
329.38
L-15
Mazdoor
day
8.000
136.69
1093.52
L-13
hour
6.000
2395.00
14370.00
P&M-032
hour
6.000
1541.00
9246.00
P&M-059
hour
3.000
200.00
600.00
P&M-060
cum
134.400
867.00
116524.80
M-029
cum
172.800
867.00
149817.60
M-026
cum
76.800
992.30
76208.64
M-022
KL
18.000
10.00
180.00
M-189
cum
288.000
867.00
249696.00
M-026
cum
96.000
992.30
95260.80
M-022
KL
18.000
10.00
180.00
M-189
cum
255.000
867.00
221085.00
M-025
cum
129.000
992.30
128006.70
M-022
KL
18.000
10.00
180.00
M-189
Machinery
Material
Cost of water
OR
For Grading-II Material
Cost of water
OR
For Grading-III Material
Cost of water
4.2
(i)
e)
36843.05
40527.36
445800.92
1486.00
say
4.2
(ii)
d)
e)
37083.63
40791.99
448711.89
1495.71
say
4.2
(iii)
1496.00
e)
37497.12
41246.83
453715.12
1512.38
say
Note
1486.00
Page 4 of 264
1512.00
Sr No
Ref. to
MoRTH
Spec.
4.12
406
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.480
151.44
72.69
L-12
Mazdoor skilled
day
2.000
164.69
329.38
L-15
Mazdoor
day
10.000
136.69
1366.90
L-13
hour
9.000
2195.03
19755.23
P&M-094
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
Paver finisher
hour
6.000
975.00
5850.00
P&M-035
hour
6x0.65
1541.00
6009.90
P&M-059
hour
12.000
hour
3.000
200.00
600.00
P&M-060
tonne.km
495 x L
2.46
1216.59
Lead =1
km & P&M058
Machinery
or
Tipper
c)
121.66
cum
89.100
1007.77
89792.31
M-034
cum
118.800
1011.94
120218.47
M-031
cum
89.100
992.30
88413.93
M-022
KL
18.000
10.00
180.00
M-189
Cost of water
d)
e)
34267.51
37694.26
414636.81
1842.83
18.43
1861.26
say
Note
1861.26
4.13
407
b)
Labour
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
1.000
200.00
200.00
P&M-060
Machinery
Water tanker 6 KL with 5 km lead and 1 trip per hour
Page 5 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
hour
6.000
101.70
KL
6.000
10.00
d)
e)
60.00
M-189
189.94
2089.29
99.49
say
407
P&M-086
172.67
4.14
610.20
Material
Cost of water
Note
Remarks/
Input ref.
99.00
This analysis provides for median and island with earthen top.
In case the surface is required to be turfed or planted with
shrubs, the same is required to be provided separately as per
analysis given in the chapter on horticulture. In case granular
fill is required to be paved, quantities of paving are required to
be calculated as per approved design and paid separately.
Construction of Median and Island with Soil Taken from
Borrow Areas
Construction of median and Island above road level with
approved material brought from borrow pits, spread, sloped
and compacted as per clause 407
Unit = cum
Taking output = 21 cum
a)
b)
Labour
Mate
day
0.160
151.44
24.23
L-12
Mazdoor
day
4.000
136.69
546.76
L-13
hour
1.000
200.00
200.00
P&M-060
hour
6.000
101.70
610.20
P&M-086
hour
0.500
1302.00
651.00
P&M-026
tonne.km
52.5 x L
2.46
2580.64
Lead =20
km & P&M058
Machinery
258.06
KL
d)
e)
6.000
10.00
542.40
5966.38
284.11
say
Note
4.15
This analysis provides for median and island with earthen top.
In case the surface is required to be turfed or planted with
shrubs, the same is required to be provided separately as per
analysis given in the chapter on horticulture. In case surface
finish is of hard type, the same may be provided separately as
per approved design.
Construction of Shoulders
A. Earthen Shoulders
The rate as applicable for sub-grade construction may be
adopted.
B. Hard Shoulders
Rate as applicable for sub-base and or base may be adopted
as per approved design.
C. Paved shoulders
The rate may be adopted as applicable for different layers of
pavement depending upon approved design of paved
shoulders.
4.16
409
60.00
493.09
Page 6 of 264
284.00
M-189
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
1.360
151.44
205.96
Mason
day
4.000
223.36
893.44
L-12
L-11
Mazdoor
day
30.000
136.69
4100.70
L-13
hour
0.750
1541.00
1155.75
P&M-059
hour
2.000
200.00
400.00
P&M-060
hour
6.000
233.00
1398.00
P&M-009
cum
20.790
867.00
18024.93
M-029
cum
26.730
867.00
23174.91
M-026
cum
11.880
867.00
10299.96
M-022
cum
6.750
1028.00
6939.00
M-052
cum
3.380
710.46
2401.35
M-005
tonne
1.880
5000.00
9400.00
M-081
Machinery
Material
Cement
iii) For cement plaster 1:3
Sand
Cement
cum
3.840
710.46
2728.17
M-005
tonne
1.830
5000.00
9150.00
M-081
each
3300.000
15.00
49500.00
M-184
metre
22.500
243.00
5467.50
M-137
KL
12.000
10.00
120.00
M-189
e)
14535.97
15989.56
175885.20
586.28
say
4.17
410
586.00
b)
c)
Labour
Mate
day
0.480
151.44
72.69
L-12
Mazdoor skilled
day
2.000
164.69
329.38
L-15
Mazdoor
day
10.000
136.69
1366.90
L-13
hour
12.000
282.50
3390.00
P&M-054
hour
6.000
2395.00
14370.00
P&M-032
hour
6.000
1541.00
9246.00
P&M-059
hour
6.000
200.00
1200.00
P&M-060
Machinery
Material
Aggregate at site
i) For 53 mm maximum size
Page 7 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
63 mm to 45 mm @ 33 per cent
cum
157.460
949.00
149429.54
M-038
cum
151.060
1000.67
151160.71
M-032
cum
166.680
1066.89
177829.23
M-030
KL
36.000
10.00
360.00
M-189
Cost of water
Or
ii) For 45 mm maximum size
45 mm to 22.5 mm@ 5 per cent
cum
24.120
920.50
22202.46
M-034
cum
237.600
1000.67
237758.40
M-032
cum
213.480
1066.89
227759.68
M-030
KL
36.000
10.00
360.00
M-189
Cost of water
4.17A
(i)
e)
50875.44
55962.99
615592.88
1709.98
or
4.17A
(ii)
say
d)
e)
51805.55
56986.11
626847.17
1741.24
say
Note
4.17
1710.00
1741.00
b)
Labour
Mate
day
0.280
151.44
42.40
L-12
Mazdoor skilled
day
1.000
164.69
164.69
L-15
Mazdoor
day
6.000
136.69
820.14
L-13
hour
6.000
2195.03
13170.15
P&M-093
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
2395.00
14370.00
P&M-032
hour
6.000
1541.00
9246.00
P&M-059
hour
3.000
200.00
600.00
P&M-060
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
Aggregate at site
i) For 53 mm maximum size
63 mm to 45 mm @ 33 per cent
cum
98.400
949.00
93381.60
M-038
cum
94.410
cum
104.180
1000.67
94472.94
M-032
1066.89
111148.60
M-030
Or
ii) For 45 mm maximum size
45 mm to 22.5 mm@ 5 per cent
cum
15.060
920.50
13862.73
M-034
cum
148.500
1000.67
148599.00
M-032
cum
133.430
1066.89
142355.13
M-030
KL
18.000
10.00
180.00
M-189
Cost of water
4.17 B
(i)
34738.11
e)
38211.92
Page 8 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
420331.14
1868.14
say
4.17 B
(ii)
d)
e)
35337.48
38871.23
427583.55
1187.73
say
Suggest
ive
1868.00
4.18
Remarks/
Input ref.
1188.00
b)
c)
Labour
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mazdoor (Skilled)
day
1.000
164.69
164.69
L-15
P&M-026
Machinery
Hydraulic Excavator 0.90 cum bucket capacity @
60cum/hr. for 360 cum soil
Tipper 10T capacity for carriage of soil 576 tonnes
hour
6.000
1302.00
7812.00
tonne.km
576 x L
2.46
28411.59
tonne.km
115 x L
2.46
hour
3.000
339.00
hour
6.000
282.50
1695.00
P&M-053
Motor Grader 110 HP @ 50 cum per hour for mixing inplace and grading
Vibratory roller 8 - 10 tonne
hour
9.600
2395.00
22992.00
P&M-032
hour
6.000
1541.00
9246.00
P&M-059
hour
12.000
200.00
2400.00
P&M-060
tonne
29.000
4500.00
130500.00
M-188
cum
360.000
28.00
10080.00
M-092
Lead =20
km & P&M058
14979.99 Lead =53
km & P&M058
1017.00
P&M-048
101.70
Material
Slaked Lime
Compensation for earth taken from private source
d)
e)
23025.65
25328.21
278610.31
Page 9 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
580.44
say
Note
1.Compensation for earth will vary from place to place and will
have to be assessed realistically as per particular ground
situation. In case earth is available from Govt. land,
compensation for earth will not be required. The position is
required to be clearly stated in the cost estimate.
2.Cost of Flyash has not been considered as same will be
available free of cost. Only carriage of Flyash has been
provided.
3.Lime + Flyash has been taken as 20 per cent of total mass
and ratio of lime and Flyash as 1:4 for estimating purposes.
Total quantities will be as per approved design.
Page 10 of 264
580.00
Remarks/
Input ref.
CHAPTER - 5
BASES AND SURFACE COURSES (BITUMINOUS)
Sr No
Ref. to
MoRTH
Spec.
5.1
502
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Prime Coat
Providing and applying primer coat with bitumen
emulsion on prepared surface of granular Base
including clearing of road surface and spraying primer
at the rate of 0.85 kg/sqm using mechanical means.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate
Mazdoor
b) Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Bitumen pressure distributor @ 1750 sqm per hour
Water tanker 6 KL capacity @ 1 trip per hour
c) Material
Bitumen emulsion @ 0.85 kg per sqm
Cost of water
d) Overhead charges @ 0.1 on (a+b+c)
e) Contractor's profit @ 0.1 on (a+b+c+d)
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Add 1 % labour Cess
day
day
0.080
2.000
151.44
136.69
12.12
273.38
L-12
L-13
hour
hour
hour
hour
2.800
2.800
2.000
1.000
357.00
319.00
1073.00
200.00
999.60
893.20
2146.00
200.00
P&M-031
P&M-001
P&M-004
P&M-060
tonne
KL
2.975
6.000
47937.00
10.00
142612.58
60.00
14719.69
16191.66
178108.21
50.89
0.51
51.40
51.40
say
Note
Page 1 of 264
M-077
M-189
Sr No
5.2
Ref. to
MoRTH
Spec.
Description
503
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Tack Coat
Providing and applying tack coat with bitumen emulsion
using emulsion pressure distributor at the rate of 0.20 kg per
sqm on the prepared bituminous/granular surface cleaned
with mechanical broom.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate
Mazdoor
b) Machinery
Mechanical broom @ 1250 sqm per hour
Air compressor 250 cfm
Bitumen pressure distributor @ 1750 sqm per hour
c) Material
Bitumen emulsion @ 0.25 kg per sqm
d) Overhead charges @ 0.1 on (a+b+c)
e) Contractor's profit @ 0.1 on (a+b+c+d)
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Add 1 % labour Cess
day
day
0.080
2.000
151.44
136.69
12.12
273.38
L-12
L-13
hour
hour
hour
2.800
2.800
2.000
357.00
319.00
1073.00
999.60
893.20
2146.00
P&M-031
P&M-001
P&M-004
tonne
0.875
49915.00
43675.63
4799.99
5279.99
58079.90
16.59
0.17
16.76
16.76
M-077
say
Note
Page 2 of 264
Sr No
5.3
Ref. to
MoRTH
Spec.
Description
504
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Bituminous Macadam
Providing and laying bituminous macadam with 100-120
TPH hot mix plant producing an average output of 75 tonnes
per hour using crushed aggregates of specified grading
premixed with bituminous binder, transported to site, laid
over a previously prepared surface with paver finisher to the
required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction
Unit = cum
Taking output = 205 cum (450 tonnes)
a) Labour
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
23405.00
140430.00
P&M-021
hour
2.200
357.00
785.40
P&M-031
hour
2.200
319.00
701.80
P&M-001
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
6.00x0.65*
1541.00
6009.90
P&M-059
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
14.850
55132.00
818710.20
M-074
cum
43.510
1011.94
44029.51
M-049
25 - 10 mm 45 per cent
cum
130.550
1103.60
144074.98
M-046
10 - 5 mm 25 per cent
cum
72.530
1078.94
78255.52
M-040
cum
43.510
992.30
43174.97
M-030
25 - 10 mm 40 per cent
cum
116.040
1103.60
128061.74
M-046
10 - 5 mm 40 per cent
cum
116.040
1078.94
125200.20
M-040
cum
58.020
992.30
57573.25
M-030
or
GradingII(19 mm nominal size)
(i)
e)
131910.34
145101.38
1596115.13
7785.93
77.86
7863.79
say
(ii)
7863.79
e)
132040.36
145244.40
1597688.38
Page 3 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
7793.60
77.94
7871.54
say
Page 4 of 264
7871.54
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Note
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
*1. Although the rollers are required only for 3 hours as per
norms of output, but the same have to be available at site for
six hours as the hot mix plant and paver will take six hours
for mixing and paving the output of 450 tonnes considered in
this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65.
2.Quantity of Bitumen has been taken for analysis purpose.
The actual quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other
miscellaneous duties at site including sundries have been
included in administrative overheads of the contractor.
4. In case BM is laid over freshly laid tack coat, provision of
Mechanical broom and 2 mazdoors for the same shall be
deleted as the same has been included in the cost of tack
coat.
5.4
505
50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)
a) Labour
b)
c)
Mate
day
0.320
151.44
48.46
L-12
day
6.000
136.69
820.14
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
2635.00
15810.00
P&M-025
hour
2.570
1073.00
2757.61
P&M-004
hour
10.000
339.00
3390.00
P&M-048
hour
6.000
1541.00
9246.00
P&M-059
hour
6.000
806.00
4836.00
P&M-017
tonne
22.500
55132.00
1240470.00
M-074
cum
270.000
968.60
261522.00
M-033
cum
67.500
1000.67
67545.00
M-031
Machinery
Material
Bitumen@ 5 kg per sqm
d)
Page 5 of 264
160677.46
Sr No
Ref. to
MoRTH
Spec.
Description
e)
Unit
Quantity
Rate Rs
Cost Rs
176745.20
1944197.25
432.04
say
Note
5.4
Remarks/
Input ref.
432.00
b)
c)
Mate
day
0.400
151.44
60.58
L-12
day
8.000
136.69
1093.52
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
2635.00
15810.00
P&M-025
hour
2.570
1073.00
2757.61
P&M-004
hour
10.000
339.00
3390.00
P&M-048
hour
6.000
1541.00
9246.00
P&M-059
hour
6.000
806.00
4836.00
P&M-017
tonne
30.600
55132.00
1687039.20
M-074
cum
405.000
982.00
397710.00
M-037
cum
81.000
867.00
70227.00
M-026
Machinery
Material
Bitumen@ 6.8 kg per sqm
d)
e)
219249.93
241174.92
2652924.14
589.54
say
Note
5.5
506
590.00
b)
c)
d)
Mate
day
0.400
151.44
60.58
L-12
day
8.000
136.69
1093.52
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
2635.00
15810.00
P&M-025
hour
3.430
1073.00
3680.39
P&M-004
hour
10.000
339.00
3390.00
P&M-048
hour
6.000
1541.00
9246.00
P&M-059
hour
6.000
806.00
4836.00
P&M-017
tonne
9.000
55132.00
496188.00
M-074
cum
300.000
990.25
297075.00
M-035
cum
39.000
1000.67
39026.00
M-031
Machinery
Material
Page 6 of 264
87073.49
Sr No
Ref. to
MoRTH
Spec.
Description
e)
Unit
Quantity
Rate Rs
Cost Rs
95780.84
1053589.19
351.20
say
Note
Page 7 of 264
351.00
Remarks/
Input ref.
Sr No
5.6
Ref. to
MoRTH
Spec.
Description
505
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
13842.00
83052.00
P&M-022
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
6.00x0.65*
1541.00
6009.90
P&M-059
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
20.250
56122.00
1136470.50
M-074
25 - 10 mm 30 per cent
cum
85.950
1103.60
94854.42
M-046
10 - 5 mm 28 per cent
cum
80.220
1078.94
86552.57
M-040
cum
114.600
992.30
113717.58
M-030
tonne
8.595
4500.00
38677.50
M-188
(i)
e)
159671.18
175638.30
1932021.27
9907.80
99.08
10006.88
say
(ii)
10006.88
e)
160226.56
176249.22
1938741.38
9942.26
99.42
10041.69
say
Page 8 of 264
10041.69
Sr No
Ref. to
MoRTH
Spec.
Description
Note
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
*1. Although the roller are required only for 3 hours as per
norms of output, but the same have to be available at site for
six hours as the hot mix plant and paver will take six hours
for mixing and paving the output of 450 tonnes considered in
this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65.
2.Quantity of Bitumen has been taken for analysis purpose.
The actual quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other
miscellaneous duties at site including sundries have been
included in administrative overheads of the contractor.
4. In case DBM is laid over freshly laid tack coat, provision of
mechanical broom and 2 mazdoors shall be deleted as the
same has been included in the cost of tack coat.
5. The individual density for each size of aggregates to be
used for construction I.e. 37.5-25 mm, 25-10 mm etc. should
be found in the laboratory and accordingly the quantities
should be ammended for use in field. The average density of
1.5 tonne/cum is only a reference density in this Data Book.
6. The individual percentage of aggregates should be
calculated from the total weight of dry aggregates i.e..
excluding the weight of bitumen. The weight of filler will also
be 2 per cent by weight of dry aggregates.
5.7
508
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
17309.00
103854.00
P&M-022
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
6.00x0.65*
1541.00
6009.90
P&M-059
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
20.250
55132.00
1116423.00
M-074
cum
57.300
1103.60
63236.28
M-044
10 - 5 mm 38 per cent
cum
108.870
1078.94
117464.20
M-040
Page 9 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
cum
114.600
992.30
113717.58
M-030
tonne
8.620
4500.00
38790.00
M-188
tonne
22.500
55132.00
1240470.00
M-074
cum
162.450
1078.94
175273.80
M-040
cum
116.850
992.30
115950.26
M-030
tonne
8.620
4500.00
38790.00
M-188
(i)
e)
160242.61
176266.87
1938935.57
9943.26
say
5.7
(ii)
d)
e)
172327.91
189560.70
2085167.70
10693.17
say
Note
9943.00
*1. Although the rollers are required only for 3 hours as per
norms of output, but the same have to be available at site for
six hours as the hot mix plant and paver will take six hours
for mixing and paving the output of 450 tonnes considered in
this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65
2.Quantity of Bitumen has been taken for analysis purpose.
The actual quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other
miscellaneous duties at site including sundries have been
included in administrative overheads of the contractor.
4. In case SDBC is laid over freshly laid tack coat, provision
of broom and 2 mazdoor shall be deleted as the same has
been included in the cost of tack coat.
5. The quantity of Bitumen to be adjusted as per job mix
formula.
Page 10 of 264
10693.00
Sr No
5.8
Ref. to
MoRTH
Spec.
Description
509 / 507
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Bituminous Concrete
Providing and laying bituminous concrete with 100-120 TPH
batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 5.4 to 5.6 per
cent of mix and filler, transporting the hot mix to work site,
laying with a hydrostatic paver finisher with sensor control to
the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH specification clause No. 507
complete in all respects
Unit = cum
Taking output = 191 cum (450 tonnes)
a) Labour
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
13842.00
83052.00
P&M-022
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
6.00x0.65*
1541.00
6009.90
P&M-059
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
24.300
56122.00
1363764.60
M-074
20 - 10 mm 35 per cent
cum
99.330
1103.60
109620.59
M-045
10 - 5 mm 23 per cent
cum
65.274
1078.94
70426.73
M-040
cum
113.520
992.30
112645.90
M-030
tonne
8.514
4500.00
38313.00
M-188
cum
85.500
1103.60
94357.80
M-044
10 - 5 mm 25 per cent
cum
71.250
1078.94
76874.48
M-040
cum
122.550
992.30
121606.37
M-030
tonne
8.620
4500.00
38790.00
M-188
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 24.30 tonnes
Weight of aggregate = 450 -24.30 = 425.70 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 283.80 cum
* Grading - 1-19 mm (Nominal Size) 50 mm
(i)
e)
182676.38
200944.02
2210384.26
11572.69
115.73
11688.42
say
5.8
(ii)
11688.42
e)
182738.63
201012.49
2211137.39
Page 11 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
11576.64
115.77
11692.40
say
Note
11692.40
*1. Although the rollers are required only for 3 hours as per
norms of output, but the same have to be available at site for
six hours as the hot mix plant and paver will take six hours
for mixing and paving the output of 450 tonnes considered in
this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65
2.Quantity of Bitumen has been taken for analysis purpose.
The actual quantity will depend upon job mix formula.
3. Labour for traffic control, watch and ward and other
miscellaneous duties at site including sundries have been
included in administrative overheads of the contractor.
4. In case BC is laid over freshly laid tack coat, provision of
mechanical broom and 2 mazdoors shall be deleted as the
same has been included in the cost of tack coat.
5. The individual density for each size of aggregates to be
used for construction i.e. 37.5-25 mm, 25-10 mm etc. should
be found in the laboratory and accordingly the quantities
should be ammended for use in field. The average density of
1.5 tonne/cum is only a reference density in this Data Book.
6. The individual percentage of aggregates should be
calculated from the total weight of dry aggregates i.e..
excluding the weight of bitumen. The weight of filler will also
be 2 per cent by weight of dry aggregates.
5.9
510
Surface Dressing
Providing and laying surface dressing as wearing course in
single coat using crushed stone aggregates of specified size
on a layer of bituminous binder laid on prepared surface and
rolling with 8-10 tonne smooth wheeled steel roller
Unit = sqm
Taking output = 9000 sqm
Case -1 :-19 mm nominal chipping size
a) Labour
b)
c)
Mate
day
0.440
151.44
66.63
L-12
Mazdoor
day
9.000
136.69
1230.21
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
7.200
357.00
2570.40
P&M-031
hour
7.200
319.00
2296.80
P&M-001
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
339.00
2034.00
P&M-048
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
460.00
2760.00
P&M-044
tonne
10.800
55132.00
595425.60
M-074
cum
135.000
1028.00
138780.00
M-053
Machinery
Material
Bitumen@ 1.20 kg per sqm
d)
e)
77257.70
84983.47
934818.20
103.87
say
5.9
104.00
b)
Mate
day
0.440
151.44
66.63
L-12
Mazdoor
day
9.000
136.69
1230.21
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
7.200
357.00
2570.40
P&M-031
hour
7.200
319.00
2296.80
P&M-001
Machinery
Page 12 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
c)
Unit
Quantity
Rate Rs
Cost Rs
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
339.00
2034.00
P&M-048
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
1541.00
9246.00
P&M-059
tonne
9.000
55132.00
496188.00
M-074
cum
90.000
1028.00
92520.00
M-052
Material
Bitumen@ 1.00 kg per sqm
d)
e)
63356.54
69692.20
766614.16
85.18
say
Note
5.10
Remarks/
Input ref.
85.00
511
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
23405.00
140430.00
P&M-021
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
1144.00
6864.00
P&M-045
tonne
14.970
55132.00
825326.04
M-074
cum
276.750
998.50
276334.88
M-043
Material
Bitumen@ 14.60 kg per 10 sqm
d)
e)
128563.05
141419.35
1555612.85
151.77
say
Page 13 of 264
152.00
Sr No
Ref. to
MoRTH
Spec.
5.10
Description
Unit
Note
(ii)
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Mate
day
0.800
151.44
121.15
L-12
Mazdoor
day
18.000
136.69
2460.42
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
233.00
1398.00
P&M-009
hour
6.000
460.00
2760.00
P&M-044
tonne
1.940
55145.00
106981.30
M-073
cum
24.300
998.50
24263.55
M-043
Machinery
Material
Cationic Bitumen Emulsion @ 21.50 kg per 10 sqm
d)
e)
13831.38
15214.52
167359.70
185.96
say
5.11
512
186.00
b)
Mate
day
0.840
151.44
127.21
L-12
day
16.000
136.69
2187.04
L-13
day
5.000
164.69
823.45
L-15
hour
6.000
23405.00
140430.00
P&M-021
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.000
460.00
2760.00
P&M-044
tonne
22.500
55132.00
1240470.00
M-074
cum
276.750
987.00
273152.25
M-041
Material
Type - A
* Bitumen@ 22 kg per 10 sqm
Stone crushed aggregates 11.2 mm to 0.09 @ 0.27
cum per 10 sqm
or
Type - B
Page 14 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
e)
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
tonne
19.480
55132.00
1073971.36
M-074
cum
276.750
1000.67
276934.50
M-042
169348.78
186283.66
2049120.22
199.91
say
200.00
513
Seal Coat
Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A and B seal coats
Unit = sqm
Taking output = 10250 sqm (92.25 cum)
(i)
Case - I : Type A
a) Labour
b)
c)
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
339.00
2034.00
P&M-048
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
460.00
2760.00
P&M-044
tonne
10.050
55132.00
554076.60
M-074
cum
92.250
969.00
89390.25
M-050
Machinery
Material
Bitumen@ 9.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as 100
per cent passing 11.2 mm sieve and retained on 2.36
mm sieve applied @ 0.09 cum per 10 sqm
d)
e)
67620.13
74382.15
818203.62
79.82
say
Note
5.12
(ii)
80.00
b)
Mate
day
0.160
151.44
24.23
L-12
Mazdoor
day
4.000
136.69
546.76
L-13
Machinery
HMP of 75 tonnes/hour.
hour
2.000
17309.00
34618.00
P&M-022
hour
2.000
1906.88
3813.75
P&M-081
hour
2.000
806.00
1612.00
P&M-017
tonne.km
104 x 'L'
2.46
255.61
Lead =1
km & P&M058
25.56
hour
2.000
2674.00
5348.00
P&M-034
hour
2.000
460.00
920.00
P&M-044
tonne
5.340
55132.00
294404.88
M-074
cum
47.160
969.00
45698.04
M-050
Material
Bitumen@ 6.80 kg per 10 sqm
Crushed stone chipping of 6.7 mm size defined as
passing 11.2 mm sieve and retained on 2.36 mm sieve
applied @ 0.06 cum per 10 sqm
d)
e)
38726.68
42599.35
468592.86
59.63
Page 15 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
say
Note
5.13
514
Remarks/
Input ref.
60.00
5.14
515
Mastic Asphalt
Providing and laying 25 mm thick mastic asphalt wearing
course with paving grade bitumen meeting the requirements
given in table 500-29, prepared by using mastic cooker and
laid to required level and slope after cleaning the surface,
including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at
the rate of 0.005cum per 10 sqm and at an approximate
spacing of 10 cm center to center in both directions, pressed
into surface when the temperature of surfaces is not less
than 1000C, protruding 1 mm to 4 mm over mastic surface,
all complete as per clause 515.
Unit = sqm
Taking output = 35.00 sqm (0.87 cum ) assuming a
density of 2.3 tonnes/cum.-2 tonnes
a) Labour
b)
c)
Mate
day
0.440
151.44
66.63
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
Mazdoor skilled
day
1.000
164.69
164.69
L-15
hour
0.060
357.00
21.42
P&M-031
hour
0.060
319.00
19.14
P&M-001
hour
6.000
62.00
372.00
P&M-030
hour
6.000
198.00
1188.00
P&M-005
hour
1.000
282.50
282.50
P&M-053
tonne
0.204
55132.00
11246.93
M-074
cum
0.390
476.80
185.95
M-021
tonne
0.360
4500.00
1620.00
M-188
cum
0.550
998.50
549.18
M-043
cum
0.018
1213.00
21.83
M-142
kg
0.500
55.00
27.50
M-074
Machinery
e)
1713.27
1884.59
20730.53
592.30
Page 16 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
say
Note
Page 17 of 264
592.00
Remarks/
Input ref.
Sr No
5.15
Ref. to
MoRTH
Spec.
Description
Unit
516
Slurry Seal
512
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
5 mm thickness
Unit = sqm
Taking output = 16000 sqm (80 cum)
Taking density of 2.2 tonnes per cum
weight of mix = 176 tonnes
a) Labour
b)
c)
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mechanical broom
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
1008.00
6048.00
P&M-033
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
339.00
2034.00
P&M-048
hour
6.000
1243.00
7458.00
P&M-037
hour
2.000
200.00
400.00
P&M-060
tonne
19.360
49915.00
966354.40
M-077
cum
102.080
1066.89
108908.13
M-030
tonne
3.520
5000.00
17600.00
M-188
KL
12.000
10.00
120.00
M-189
Machinery
Material
Residual Binder @ 11 per cent of mix 80 x 2.2 x 0.11
Fine aggregate 4.75 mm and below 87 per cent of
total mix,80 x 2.2 x 0.87 = 153.12 tonnes. Taking
density1.5, = 153.12/1.5 = 102.08 cum
Filler (ordinary Portland Cement) @ 2 per cent of total
mix = 80 x 2.2 x 0.02
Cost of water
d)
e)
111867.10
123053.81
1353591.93
84.60
0.85
85.45
say
Page 18 of 264
85.45
Sr No
5.15
Ref. to
MoRTH
Spec.
Description
(ii)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
3 mm thickness
Unit = sqm
Taking output = 20000 sqm (60 cum)
a) Labour
b)
c)
Mate
day
0.200
151.44
30.29
L-12
Mazdoor
day
5.000
136.69
683.45
L-13
Mechanical broom
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
1008.00
6048.00
P&M-033
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
339.00
2034.00
P&M-048
hour
2.000
200.00
400.00
P&M-060
tonne
17.160
49915.00
856541.40
M-077
cum
74.800
867.00
64851.60
M-022
tonne
2.640
4500.00
11880.00
M-188
KL
12.000
10.00
120.00
M-189
Machinery
Material
Cost of water
d)
e)
95148.07
104662.88
1151291.69
57.56
say
5.15
(iii)
58.00
1.5 mm thickness
Unit = sqm
Taking output = 24000 sqm (36 cum)
a) Labour
b)
c)
Mate
day
0.200
151.44
30.29
L-12
Mazdoor
day
5.000
136.69
683.45
L-13
Mechanical broom
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
1008.00
6048.00
P&M-033
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
339.00
2034.00
P&M-048
hour
2.000
200.00
400.00
P&M-060
tonne
12.670
49915.00
632423.05
M-077
cum
43.300
867.00
37541.10
M-022
tonne
1.580
4500.00
7110.00
M-188
KL
12.000
10.00
120.00
M-189
Machinery
Material
e)
69528.19
76481.01
841291.08
35.05
say
Note
Page 19 of 264
35.00
Sr No
5.16
Ref. to
MoRTH
Spec.
Description
517
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Mate
day
0.480
151.44
72.69
L-12
Mazdoor
day
10.000
136.69
1366.90
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
300.00
1800.00
P&M-069
hour
1.280
357.00
456.96
P&M-031
hour
1.280
319.00
408.32
P&M-001
hour
0.910
1073.00
976.43
P&M-004
hour
3.000
23405.00
70215.00
P&M-021
hour
3.000
1906.88
5720.63
P&M-081
hour
3.000
806.00
2418.00
P&M-017
hour
18.000
339.00
6102.00
P&M-048
hour
3.00x0.65*
460.00
897.00
P&M-044
hour
3.00x0.65*
1541.00
3004.95
P&M-059
hour
3.00x0.65*
1144.00
2230.80
P&M-045
tonne
1.987
55132.00
109558.31
M-074
tonne
7.728
55132.00
426060.10
M-074
cum
28.440
1011.94
28779.57
M-049
25 - 10 mm @ 15 per cent
cum
18.550
1103.60
20471.78
M-046
cum
24.730
1078.94
26682.19
M-040
cum
49.460
992.30
49079.16
M-030
tonne
5.520
5000.00
27600.00
M-081
Machinery
Material
i) Bitumen
A bitumen content is 4.5 per cent bitumen weight of mix. For
reclaimed material, fresh bitumen will be required to the
extent of 60 per cent of normal requirement.
In a mix of 276 tonnes, 82.8 tonne is reclaimed and balance
193.2 tonne is fresh mix.
Bitumen required for reclaimed mix of 82.8 tonne @ 60
per cent = 82.8 x 0.60 x0.04 = 1.99
Bitumen required for fresh mix of 193.2 tonnes = 193.2
x 0.04 = 7.73
ii) Aggregates
Percentage of mix requiring fresh aggregates - 70 per cent
Weight of fresh mix = 276 x 0.70 = 193.2 tonne
Weight of fresh aggregate in the mix = 193.2 x 0.96 = 185.47
tonne
Taking average density of 1.5 tonnes/cum, total volume
of aggregate = 123.65 cum.
Size wise requirement of fresh aggregates
e)
78423.02
86265.32
948918.49
7907.65
say
Note
5.17
518
7908.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = sqm
Taking output = 10500 sqm
a) Labour
b)
c)
Mate
day
0.120
151.44
18.17
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
tonne
6.000
1073.00
6438.00
P&M-004
tonne
7.880
49915.00
393330.20
Machinery
d)
e)
M-077
40425.24
44467.77
489145.46
46.59
say
47.00
b)
Mate
day
0.160
151.44
24.23
L-12
day
4.000
136.69
546.76
L-13
cum
26.250
867.00
22758.75
M-024
tonne
0.790
49915.00
39432.85
M-077
Material
Crushed stone grit 3 mm size @ 3.75 kg per sqm
Bitumen emulsion for precoating grit @ 2 per cent of
grit,39.38 x 0.02
62762.59
5.98
say
5.18
519
6.00
By weight
of total mix
b)
Mate
day
0.840
151.44
127.21
L-12
Mazdoor
day
16.000
136.69
2187.04
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
hour
6.000
3661.20
21967.20
P&M-077
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
36.000
49915.00
1796940.00
Material
Bitumen emulsion @ 8 per cent
Page 21 of 264
M-077
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
tonne
9.000
4500.00
40500.00
M-188
cum
75.000
1103.60
82770.00
M-045
cum
87.000
1078.94
93867.78
M-040
cum
108.000
992.30
107168.40
M-030
d)
e)
218166.90
239983.59
2639819.45
12877.17
say
12877.00
5.18
(ii)
b)
Mate
day
0.840
151.44
127.21
L-12
Mazdoor
day
16.000
136.69
2187.04
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
Drum mix plant for cold mixes 60-90 tonne per hour
producing average output of 75 tonnes per hour
Electric generator 125 KVA
hour
6.000
3661.20
21967.20
P&M-077
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
36.000
49915.00
1796940.00
M-077
tonne
9.000
4500.00
40500.00
M-188
cum
75.000
956.33
71725.00
M-048
cum
90.000
1000.67
90060.00
M-047
cum
105.000
992.30
104191.50
M-030
Material
d)
e)
216383.93
238022.32
2618245.54
12771.93
say
Note
5.18
(iii)
12772.00
Sr No
Ref. to
MoRTH
Spec.
Description
Composition of mix (450 tonne)
under:Cutback bitumen 5 per cent
Filler (lime)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
is assumed to be as
2 per cent
b)
Mate
day
0.840
151.44
127.21
L-12
Mazdoor
day
16.000
136.69
2187.04
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
Drum mix plant for cold mixes 60-90 tonne per hour
producing average output of 75 tonnes per hour
Electric generator 125 KVA
hour
6.000
3661.20
21967.20
P&M-077
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
22.500
47937.00
1078582.50
M-076
tonne
9.000
4500.00
40500.00
M-188
cum
78.000
1103.60
86080.80
M-045
cum
93.000
1078.94
100341.42
M-040
cum
108.000
992.30
107168.40
M-030
Material
d)
e)
147309.59
162040.55
1782446.05
8694.86
say
Note
8695.00
5.18
(iv)
b)
Mate
day
0.840
151.44
127.21
L-12
Mazdoor
day
16.000
136.69
2187.04
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
Drum mix plant for cold mixes 60-90 tonne per hour
producing output of 75 tonnes per hour
Electric generator 125 KVA
hour
6.000
3661.20
21967.20
P&M-077
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
Page 23 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
Quantity
Rate Rs
Cost Rs
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
1144.00
4461.60
P&M-045
tonne
22.500
47937.00
1078582.50
M-076
tonne
9.000
4500.00
40500.00
M-188
cum
75.000
956.33
71725.00
M-048
cum
90.000
1000.67
90060.00
M-047
cum
114.000
992.30
113122.20
M-030
Material
d)
e)
145441.25
159985.37
1759839.11
8584.58
say
Note
Remarks/
Input ref.
8585.00
5.19
520
b)
Mate
day
0.840
151.44
127.21
L-12
Mazdoor
day
16.000
136.69
2187.04
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
hour
6.000
13842.00
83052.00
P&M-023
hour
6.000
1906.88
11441.25
P&M-081
hour
6.000
806.00
4836.00
P&M-017
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.000
2674.00
16044.00
P&M-034
hour
6.00x0.65
460.00
1794.00
P&M-044
hour
6.00x0.65
1541.00
6009.90
P&M-059
hour
6.00x0.65
1144.00
4461.60
P&M-045
tonne
22.500
55132.00
1240470.00
M-074
tonne
9.000
4500.00
40500.00
M-188
cum
288.620
828.00
238977.36
M-004
is assumed to be as
Weight450 tonne
Bitumen5 per cent
Filler2 per cent
Sand of size 4.75 to 0.075 mm 93 per cent
e)
165194.04
181713.44
1998847.88
9750.48
Page 24 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
say
Note
5.20
521
Modified Binder
Supply of modified binder produced by mixing bitumen with
modifier such as natural rubber or crumb rubber or any other
polymer found compatible with bitumen and which allows
properties given in clause 521.3 and IRC:SP: 53 blending of
modifier with bitumen to be done either at the refinery or at
central unit with all facilities by proper industrial process, is
essential.
Unit = tonne
The use of modified binder is expected to result in an
extended service life of bituminous pavements subject to
heavy traffic loads in extreme climatic conditions, thus
justifying the entire cost of adding modifiers/fibres. Other
advantages include lower temperature susceptibility, higher
resistance to aging, higher fatigue life, higher resistance to
cracking and better adhesion between aggregates and
binder.
Detailed information and inductive dose level on the use of
polymer modified binder is available in IRC : SP-53 / 2002. A
number of proprietary products are now available in the
market. For such proprietary products, test reports and cost
effectiveness should be the basis for their selection in road
works.
The modifier, in the required quantity shall be blended at the
refinery or at central unit with all facilities by proper industrial
process, is essential. If supplied in drums it shall be agitated
in melted condition with suitable device for achieving
homogeneity
Proposals to use glass fibre, polypropylene fibres or any
other similar material in a bituminous mixture should be
substantiated, complete with all details including test results,
manufacturer's recommendations for addition or means of
incorporating the fibres, homogeneously, without
segregation, into the mixture.
Before agreeing to the use of a fibre, it should have been
proved to be satisfactory in use under circumstances, similar
to the work, elsewhere or it would have under gone
appropriate performance trials. Documented evidence of use
and trials of the fibre, in any country having conditions
similar to Indian will be acceptable.
Note
5.21
522
9750.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = sqm
Taking output = 10500 sqm
a) Labour
b)
c)
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
460.00
2760.00
P&M-044
tonne
9.450
38740.00
366093.00
M-078
cum
105.000
969.00
101745.00
M-050
Machinery
Material
Modified binder
Crushed stone aggregates 5.6 mm size
d)
e)
49775.85
54753.43
602287.77
57.36
say
5.21
(ii)
57.00
b)
c)
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
460.00
2760.00
P&M-044
tonne
11.550
38740.00
447447.00
M-078
cum
105.000
1005.00
105525.00
M-051
Machinery
Material
Modified binder
Crushed stone chipping 11.2 mm size
d)
e)
58289.25
64118.17
705299.91
67.17
say
5.21
(iii)
67.00
b)
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
6.000
357.00
2142.00
P&M-031
hour
6.000
319.00
1914.00
P&M-001
Machinery
Page 26 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
c)
Unit
Quantity
Rate Rs
Cost Rs
hour
6.000
1073.00
6438.00
P&M-004
hour
6.000
2635.00
15810.00
P&M-025
hour
6.000
460.00
2760.00
P&M-044
tonne
15.750
38740.00
610155.00
M-078
cum
126.000
1005.00
126630.00
M-051
Material
Modified binder
Crushed stone aggregates 11.2 mm size
d)
e)
76703.49
84373.84
928112.19
88.39
say
Note
5.21
(iv)
Remarks/
Input ref.
88.00
b)
Mate
day
0.560
151.44
84.81
L-12
Mazdoor
day
12.000
136.69
1640.28
L-13
Mazdoor skilled
day
2.000
164.69
329.38
L-15
hour
2.800
357.00
999.60
P&M-031
hour
2.800
319.00
893.20
P&M-001
tonne
2.000
1073.00
2146.00
P&M-004
hour
2.000
1243.00
2486.00
P&M-037
tonne
3.680
56122.00
206528.96
M-075
sqm
3850.000
37.25
143412.50
M-108
Machinery
Material
Paving grade bitumen of 80 - 100 penetration @ 1.05
kg per sqm
Geotextile including 10 per cent for overlaps
d)
e)
35852.07
39437.28
433810.08
123.95
say
124.00
519.3
75 mm thickness
a) Labour
b)
Mate
day
1.000
151.44
151.44
L-12
Mazdoor
day
12.000
136.69
1640.28
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
hour
6.000
25594.50
153567.00
P&M-064
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
2674.00
16044.00
P&M-034
Machinery
Page 27 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
tonne.km
c)
Quantity
450 x L
Rate Rs
Cost Rs
2.46
Lead =1
km & P&M058
110.60
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
1.000
200.00
200.00
P&M-060
tonne
20.250
49915.00
1010778.75
M-077
cum
297.000
916.00
272052.00
M-055
KL
6.000
10.00
60.00
M-189
Material
Bitumen emulsion @ 45 litres per tonne
Crushed stone aggregates 40 mm nominal size
Cost of water
d)
e)
147192.32
161911.55
1781027.08
8687.94
say
Note
1105.99
Remarks/
Input ref.
8688.00
(Case I to III)
1. These mixes are considered suitable for minor repair work
and temporary road surface improvement.
2. In case concrete mixtures are required to be used for
mixing, a number of these will be needed to match the
capacity of road rollers.
3. Tack coat, where provided, will be measured and paid
separately.
*4.Both the rollers have to be available at site to match with
the output of batch mixing plant and paver finisher. A
multiplying factor of 0.65 has been adopted to cater for the
idling period of road rollers.
5.22
(ii)
40 mm thickness
a) Labour
b)
Mate
day
1.000
151.44
151.44
L-12
Mazdoor
day
12.000
136.69
1640.28
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
hour
6.000
25594.50
153567.00
P&M-064
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
hour
6.000
2674.00
16044.00
P&M-034
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
Machinery
c)
110.60
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
1.000
200.00
200.00
P&M-060
tonne
31.500
49915.00
1572322.50
M-077
cum
287.000
1028.00
295036.00
M-052
KL
6.000
10.00
60.00
M-189
Material
Bitumen emulsion @ 70 litres per tonne
Crushed stone aggregates 14 mm nominal size
Cost of water
d)
e)
205645.10
226209.61
2488305.66
12138.08
say
5.22
(iii)
12138.00
25 mm thickness
a) Labour
b)
Mate
day
1.000
151.44
151.44
L-12
Mazdoor
day
12.000
136.69
1640.28
L-13
Mazdoor skilled
day
5.000
164.69
823.45
L-15
hour
6.000
25594.50
153567.00
P&M-064
hour
6.000
652.00
3912.00
P&M-018
hour
6.000
806.00
4836.00
P&M-017
Machinery
Page 28 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
hour
6.000
2674.00
16044.00
P&M-034
tonne.km
450 x L
2.46
1105.99
Lead =1
km & P&M058
110.60
hour
6.00x0.65*
1243.00
4847.70
P&M-037
hour
6.00x0.65*
460.00
1794.00
P&M-044
hour
1.000
200.00
200.00
P&M-060
tonne
38.250
49915.00
1909248.75
M-077
cum
270.000
969.00
261630.00
M-050
KL
6.000
10.00
60.00
M-189
Material
Bitumen emulsion @ 85 litres per tonne
Crushed stone aggregates 6 mm nominal size
Cost of water
d)
e)
235997.12
259596.83
2855565.16
13929.59
say
Page 29 of 264
13930.00
CHAPTER-7
GEOSYNTHETICS AND REINFORCED EARTH
Sr No
Ref. to
MoRTH
Spec.
7.1
702
Description
Unit
Rate Rs
Cost Rs
Remarks/
Input ref.
7.2
Quantity
702.4
day
day
day
0.040
0.250
0.500
151.44
164.69
136.69
6.06
41.17
68.35
L-12
L-15
L-13
sqm
sqm
sqm
1.000
1.000
2.000
607.00
607.00
37.25
607.00
607.00
74.50
25.77
M-107
M-106
M-108
say
142.98
157.28
1730.11
1730.00
day
day
day
0.040
0.250
0.500
151.44
164.69
136.69
6.06
41.17
68.35
L-12
L-15
L-13
metre
sqm
1.000
1.250
182.00
37.25
182.00
46.56
4.57
M-134
M-109
say
Note
Page 1 of 264
34.87
38.36
421.94
422.00
Sr No
Ref. to
MoRTH
Spec.
7.3
703
Description
Unit
Quantity
Rate Rs
Cost Rs
day
day
0.800
20.000
151.44
136.69
121.15
2733.80
L-12
L-13
hour
hour
hour
2.240
1.400
1.680
357.00
1243.00
1073.00
799.68
1740.20
1802.64
P&M-031
P&M-037
P&M-004
sqm
tonne
2940.000
2.800
225.00
56122.00
661500.00
157141.60
82583.91
90842.30
999265.28
356.88
356.88
say
7.4
704
Remarks/
Input ref.
M-133
M-075
b)
Mate
day
0.060
151.44
9.09
L-12
Mazdoor skilled
day
0.500
164.69
82.35
L-15
Mazdoor
day
1.500
136.69
205.04
L-13
Geo grids
sqm
21.000
607.00
12747.00
M-105
Connectors/ Staples
each
50.000
61.00
3050.00
M-085
metre
20.000
364.00
7280.00
M-140
cum
3.450
494.68
1706.65
M-003
cum
0.450
921.00
414.45
M-008
Material
Polymer braids
c)
d)
2549.46
2804.40
30848.42
2372.96
say
7.5
3100
2373.00
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
c)
Assembling, joining with facing elements and laying of
the reinforcing elements.
d)
Earth fill with granular material which is to be retained
by the wall.
Each component is analysed separately as under:
considering Average height of wall = 8 m.
7.5
3102
(i)
b)
Labour
Mate
day
0.360
151.44
54.52
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mazdoor skilled
day
3.000
164.69
494.07
L-15
metre
450*1.1
364.00
180180.00
M-154
metre
450*1.1
364.00
180180.00
M-153
metre
450*1.1
364.00
180180.00
M-157
metre
450*1.1
364.00
180180.00
M-156
metre
450*1.1
364.00
180180.00
M-155
Material
d)
18154.87
18154.87
217858.47
484.13
say
Type 2
c)
d)
18154.87
18154.87
217858.47
484.13
say
Type 3
484.00
3.Aluminium Strips
c)
d)
18154.87
18154.87
217858.47
484.13
say
Type 4
484.00
2.Copper Strips
484.00
d)
18154.87
18154.87
217858.47
484.13
say
Page 3 of 264
484.00
Sr No
Ref. to
MoRTH
Spec.
Description
Type 5
Unit
Quantity
Rate Rs
Cost Rs
18154.87
18154.87
217858.47
484.13
say
7.5(i)
Remarks/
Input ref.
484.00
b)
Labour
Mate
day
0.360
151.44
54.52
L-12
Mazdoor
day
6.000
136.69
820.14
L-13
Mazdoor skilled
day
3.000
164.69
494.07
L-15
sqm
300.000
607.00
182100.00
Material
Synthetic Geogrids as per clause 3102.8 and approved
design and specifications.
Add 10 per cent of the cost of reinforcing elements
(synthetic geogrids) for accessories like tie-strips, nuts
and bolts and loops/lugs for joining reinforcing
elements with the facia pannels, overlaps and other
protective elements for synthetic geogrids.
18210.00
c)
d)
20167.87
22184.66
244031.26
813.44
say
7.5
3104
(ii)
M-181
813.00
b)
Labour
Mate
day
0.180
151.44
27.26
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Mazdoor skilled
day
1.500
164.69
247.04
L-15
hour
6.000
357.00
2142.00
P&M-013
cu.m
13.500
3952.00
53352.00
Item 12.8
(H)
tonnes
0.380
65101.00
Machinery
Light crane with lifting capacity upto 3 tonne
c)
Material
Pre-cast RCC M-35 facing elements of size as per
design and 18 cm thick for 75 sqm. (Refer Item 12.8
(H))
HYSD steel @ 5 kg / sqm (Refer Item 12.6)
e)
1561.81
282.64
310.90
83072.09
1107.63
say
Note
Page 4 of 264
1108.00
Ref. to
MoRTH
Spec.
Sr No
Description
Unit
Page 5 of 264
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
Sr No
8.1
Ref. to
MoRTH
Spec.
408
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
A.
day
day
day
0.720
2.000
16.000
151.44
223.36
136.69
109.04
446.72
2187.04
L-12
L-11
L-13
hour
hour
hour
6.000
12.000
5.000
310.00
233.00
200.00
1860.00
2796.00
1000.00
P&M-029
P&M-009
P&M-060
cum
21.790
1028.00
22400.12
M-053
cum
tonne
KL
10.900
5.700
30.000
710.46
5000.00
10.00
M-005
M-081
M-189
say
7744.01
28500.00
300.00
6734.29
7407.72
81484.95
226.35
226.00
day
day
day
0.120
1.000
2.000
151.44
223.36
136.69
18.17
223.36
273.38
L-12
L-11
L-13
hour
hour
hour
hour
6.000
1.600
5.000
6.000
310.00
1860.00
200.00
339.00
1860.00
2976.00
1000.00
2034.00
P&M-029
P&M-003
P&M-060
P&M-048
cum
21.790
1028.00
22400.12
M-053
cum
tonne
KL
10.900
5.700
30.000
828.00
5000.00
10.00
9025.20
28500.00
300.00
6861.02
7547.13
83018.38
230.61
231.00
M-004
M-081
M-189
say
8.2
408
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.720
151.44
109.04
Mason
day
2.000
223.36
446.72
L-11
Mazdoor
day
16.000
136.69
2187.04
L-13
Machinery
Kerb casting machine @ 50 metres/hour for laying kerb
and channel
Concrete mixer 0.48/0.28
hour
6.000
310.00
1860.00
P&M-029
hour
16.000
233.00
3728.00
P&M-009
hour
6.000
200.00
1200.00
P&M-060
Material
Crushed stone aggregate 20 mm nominal size 60 per
cent
Coarse sand 30 per cent
cum
36.590
1028.00
37614.52
M-053
cum
18.300
710.46
13001.42
M-005
tonne
9.010
5000.00
45050.00
M-081
KL
36.000
10.00
360.00
M-189
Cost of water
d)
e)
L-12
10555.67
11611.24
127723.65
425.75
4.26
430.00
say
8.2
430.00
b)
c)
Labour
Mate
day
0.120
151.44
18.17
Mason
day
1.000
223.36
223.36
L-11
Mazdoor
day
2.000
136.69
273.38
L-13
Machinery
Kerb casting machine @ 50 metres/hour for laying kerb
and channel
Concrete batching and mixing plant @ 15 cum/hr.
hour
6.000
310.00
1860.00
P&M-029
hour
2.700
1860.00
5022.00
P&M-003
hour
6.000
200.00
1200.00
P&M-060
hour
6.000
339.00
2034.00
P&M-048
Material
Crushed stone aggregate 20 mm nominal size 60 per
cent
Coarse sand 30 per cent
cum
36.590
1028.00
37614.52
M-053
cum
18.300
828.00
15152.40
M-004
tonne
9.010
5000.00
45050.00
M-081
KL
36.000
10.00
360.00
M-189
Cost of water
d)
e)
10880.78
11968.86
131657.48
438.86
say
8.3
801
Labour
Page 2 of 264
439.00
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
Cost Rs
Mate
day
0.120
151.44
18.17
L-12
Painter
day
2.000
223.36
446.72
L-18
Mazdoor
day
1.000
136.69
136.69
L-13
Litre
0.700
192.81
134.97
M-131
Material
Paint
c)
d)
73.65
81.02
891.23
0.56
say
8.3
(ii)
Remarks/
Input ref.
0.60
b)
Labour
Mate
day
0.070
151.44
10.60
L-12
day
1.250
223.36
279.20
L-18
Mazdoor
day
0.500
136.69
68.35
L-13
Litre
0.500
192.81
96.41
M-131
Material
Paint
c)
d)
45.46
50.00
550.01
801
0.34
say
0.30
a)
b)
i)
cum
0.216
138.00
29.81
ii)
cum
0.120
4228.00
507.36
iii)
sqm
0.430
46.00
19.78
Item No.
3.13
Item 12.8
(A)
Item 8.9
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.250
136.69
34.17
L-13
kg
19.000
45.00
855.00
M-179 /
1000
sqm
0.350
6064.00
2122.40
M-061
sqm
0.156
6064.00
945.98
M-061
sqm
0.283
6064.00
1716.11
M-061
sqm
0.480
6064.00
2910.72
M-061
sqm
0.270
6064.00
1637.28
M-061
sqm
0.360
6064.00
2183.04
M-061
Material
Mild steel angle iron 75 x 75 x 6 mm
(i)
( ii )
60 cm equilateral triangle
or
( iii )
60 cm circular
or
( iv )
80 mm x 60 mm rectangular
or
(v)
60 cm x 45 cm rectangular
or
(vi )
60 cm x 60 cm square
Page 3 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
or
( vii )
90 cm high octagon
c)
Tractor-trolley
(i)
sqm
0.672
6064.00
4075.01
hour
0.010
282.50
2.83
d)
e)
301.59
331.75
4206.20
say
d)
e)
183.95
202.34
2782.74
say
d)
e)
260.96
287.06
3714.59
say
d)
e)
380.42
418.47
5160.07
say
d)
e)
253.08
278.39
3619.21
say
d)
e)
307.66
338.42
4279.58
say
4280.00
90 cm high octagon
d)
e)
496.85
546.54
Note
3619.00
60 cm x 60 cm square
5160.00
60 cm x 45 cm rectangular
3715.00
80 mm x 60 mm rectangular
2783.00
60 cm circular
4206.00
60 cm equilateral triangle
P&M-053
90 cm equilateral triangle
M-061
Machinery
6568.86
say
6569.00
138.00
29.81
8.5
801
cum
Page 4 of 264
0.216
Item No.
3.13
Sr No
Ref. to
MoRTH
Spec.
Description
a)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
cum
0.120
4228.00
507.36
sqm
0.430
46.00
19.78
Item 12.8
(A)
Item 8.9
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.200
136.69
27.34
L-13
kg
19.000
45.00
855.00
sqm
0.900
6064.00
5457.60
M-179 /
1000
M-061
hour
0.020
282.50
5.65
P&M-053
b)
Material
Mild steel angle iron 75 mm x 75 mm x 6 mm,2.85
metres long
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting of size 0.9 sqm
Add 2 per cent of cost of materials for drilling holes, nuts,
bolts, fabrication etc.
c) Machinery
Tractor-trolley
d)
e)
634.71
698.18
Note
8.6
801
8236.94
9152.16
say
9152.00
a)
i)
cum
0.430
138.00
59.34
ii)
cum
0.240
4228.00
1014.72
iii)
sqm
0.860
46.00
39.56
Item No.
3.13
Item 12.8
(A)
Item 8.9
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.300
136.69
41.01
L-13
kg
38.000
45.00
1710.00
sqm
1.500
6064.00
9096.00
b)
Material
Mild steel angle iron 75 mm x 75 mm x 6 mm, 2.85
metres long, 2 nos
Aluminium sheeting fixed with encapsulated lens type
reflective sheeting
Add 2 per cent of cost of materials for drilling holes, nuts,
bolts, fabrication etc.
Page 5 of 264
M-179 /
1000
M-061
Sr No
Ref. to
MoRTH
Spec.
Description
c)
Unit
Quantity
Rate Rs
Cost Rs
Machinery
Tractor-trolley
hour
d)
e)
0.020
282.50
802
P&M-053
1193.53
14242.49
15824.99
say
8.7
5.65
1081.17
Note
Remarks/
Input ref.
15825.00
Labour
Mate
day
0.240
151.44
36.35
L-12
Blacksmith
day
2.000
264.50
529.00
L-02
day
4.000
136.69
546.76
L-13
tonne
1.050
54574.00
57302.70
b)
Material
Aluminium alloy/galvanised steel including 5 per cent
wastage
Add 1 per cent on cost of material for nuts, bolts and drilling
and welding consumables
Add 15 per cent on cost of material for fabrication of trusses
as per approved design
c) Machinery
573.03
8681.36
hour
3.000
357.00
1071.00
P&M-013
Truck
hour
0.500
315.27
157.64
P&M-057
d)
e)
6889.78
7578.76
83366.37
say
8.7
M-060
83366.00
Labour
Mate
day
0.020
151.44
3.03
L-12
Blacksmith
day
0.100
264.50
26.45
L-02
Mazdoor
day
0.150
136.69
20.50
L-13
sqm
1.000
425.00
425.00
M-059
b)
Material
Aluminium alloy plate,2 mm thick, fixed with high
intensity grade sheeting vide clause 801.3
Miscellaneous
Add 1 per cent of cost of labour for lifting arrangement, like
ladders, pulleys, ropes etc
c) Overhead charges @ 0.1 on (a+b)
d)
0.50
47.55
52.30
575.33
say
Note
Page 6 of 264
575.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Page 7 of 264
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
8.8
803
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.120
151.44
18.17
L-12
Painter
day
2.000
223.36
446.72
L-18
Mazdoor
day
1.000
136.69
136.69
L-13
Litre
6.000
117.16
702.96
M-132
Material
Paint conforming to requirement of clause 803.3.
Add for scaffolding @ 1 per cent of labour cost where
required
Add @ 5 per cent cost of labour and materials to
prepare the surface by filling minuts roughness on the
surface and priming the surface before laying 2 coats
of painting.
c)
d)
7.03
65.23
137.68
151.45
1665.93
41.65
say
8.9
803
42.00
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
Painter
day
0.450
223.36
100.51
L-18
Mazdoor
day
0.250
136.69
34.17
L-13
Litre
1.250
192.81
241.01
M-131
Material
Paint ready mixed approved brand.
Add @ 1 per cent on cost of material for scaffolding
2.41
19.01
c)
40.17
d)
44.18
486.01
48.60
say
8.10
803
49.00
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
Painter
day
0.500
223.36
111.68
L-18
Mazdoor
day
0.200
136.69
27.34
L-13
Litre
1.500
192.81
289.22
M-131
Material
Paint ready mixed of approved brand.
Add @ 1 per cent on cost of material for scaffolding
Add @ 5 per cent cost of labour and materials to
prepare the surface by filling minuts roughness on the
surface and priming the surface before laying 2 coats
of painting.
Page 8 of 264
2.89
21.64
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
d)
Quantity
Rate Rs
Cost Rs
45.73
50.30
553.34
55.33
say
8.11
Remarks/
Input ref.
55.00
803
Over 10 cm in width
Unit = sqm
Taking output = 10 sqm
a)
b)
Labour
Mate
day
0.090
151.44
13.63
L-12
Painter
day
0.550
223.36
122.85
L-18
Mazdoor
day
1.550
136.69
211.87
L-13
Litre
1.480
117.16
173.40
M-132
Material
Road marking Paint as per IS :164
c)
d)
52.17
57.39
631.31
(ii)
63.13
say
63.00
Up to 10 cm in width
Unit = sqm
Taking output = 10 sqm
a)
b)
Labour
Mate
day
0.070
151.44
10.60
L-12
Painter
day
0.350
223.36
78.18
L-18
Mazdoor
day
1.350
136.69
184.53
L-13
Litre
1.480
117.16
173.40
M-132
Material
Road marking paint
c)
d)
44.67
49.14
540.51
54.05
say
8.12
54.00
803
Over 10 cm in width
Unit = sqm
Taking output = 10 sqm
a)
b)
Labour
Mate
day
0.060
151.44
9.09
L-12
day
0.300
223.36
67.01
L-18
Mazdoor
day
1.250
136.69
170.86
L-13
Litre
0.900
117.16
105.44
M-132
Material
Road marking paint
c)
d)
35.24
38.76
426.41
42.64
say
8.12
(ii)
Up to 10 cm in width
Page 9 of 264
43.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = sqm
Taking output = 10 sqm
a)
b)
Labour
Mate
day
0.070
151.44
10.60
L-12
day
0.350
223.36
78.18
L-18
Mazdoor
day
1.350
136.69
184.53
L-13
Litre
0.900
117.16
105.44
M-132
Material
Road marking Paint
c)
d)
37.88
41.66
458.29
45.83
say
8.13
46.00
803
b)
c)
Labour
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
hour
8.000
93.00
744.00
P&M-043
Tractor-trolley
hour
8.000
282.50
2260.00
P&M-053
Litre
2000.000
150.00
300000.00
M-118
kg
200.000
75.00
15000.00
M-152
Machinery
Material
Hot applied thermoplastic compound
Reflectorising glass beads
d)
e)
31828.50
35011.34
385124.79
601.76
6.02
607.78
Note
8.14
say
607.78
9935.80
804
b)
c)
Item 12.8
(A)
1437.43 Item 13.6 /
1000
231.84 Item No.
3.13
394.00 Item 8.8
cum
2.350
4228.00
kg
22.080
65.10
cum
1.680
138.00
sqm
per cm per
letter
9.850
40.00
1800.000
0.30
540.00
Item 8.3
0.260
151.44
39.37
L-12
Labour
Mate
day
Page 10 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
g)
Unit
Cost Rs
Remarks/
Input ref.
day
0.600
223.36
134.02
L-11
day
6.000
136.69
820.14
L-13
hour
6.000
282.50
1695.00
P&M-053
Machinery
h)
i)
Rate Rs
Mason
Tractor-trolley
8.14
Quantity
268.85
295.74
15792.19
/
2632.03
say
2632.00
15939.56
b)
c)
g)
3.770
4228.00
kg
26.320
65.10
cum
2.770
138.00
sqm
per cm per
letter
11.410
40.00
1680.000
0.30
Item 8.3
L-12
day
0.320
151.44
48.46
Mason
day
1.000
223.36
223.36
L-11
Mazdoor
day
7.000
136.69
956.83
L-13
hour
6.000
282.50
1695.00
P&M-053
Machinery
Overhead charges @ 0.1 on (f+g)
292.37
321.60
22533.30
504.00
Mate
8.14
Item 12.8
(A)
1713.46 Item 13.6 /
1000
382.26 Item No.
3.13
456.40 Item 8.8
Labour
Tractor-trolley
h)
cum
1609.52
say
1610.00
6680.24
b)
c)
cum
1.580
4228.00
kg
66.000
65.10
cum
1.390
138.00
6.270
40.00
330.000
0.30
g)
Item 8.3
L-12
Mate
day
0.340
151.44
51.49
Mason
day
1.500
223.36
335.04
L-11
Mazdoor
day
7.000
136.69
956.83
L-13
hour
6.000
282.50
1695.00
P&M-053
Machinery
Overhead charges @ 0.1 on (f+g)
303.84
334.22
15194.94
460.45
say
Note
99.00
Labour
Tractor-trolley
h)
Item 12.8
(A)
4296.67 Item 13.6 /
1000
191.82 Item No.
3.13
250.80 Item 8.8
460.00
Sr No
Ref. to
MoRTH
Spec.
8.15
805
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Road Delineators
Supplying and installation of delineators (road way
indicators, hazard markers, object markers), 80-100 cm high
above ground level, painted black and white in 15 cm wide
strips, fitted with 80 x 100 mm rectangular or 75 mm dia
circular reflectorised panels at the top, buried or pressed into
the ground and conforming toIRC-79 and the drawings.
Unit = Each
Taking output= 30 Nos.
a)
Labour
Mate
day
0.040
151.44
6.06
L-12
day
1.000
136.69
136.69
L-13
each
30.000
834.40
25032.00
b)
Material
Cost of approved type of delineators from ISI certified
firm as per the standard drawing given in IRC - 79
Add 10 per cent cost of material for installation
c)
d)
2503.20
2767.79
3044.57
33490.32
Note
8.16
806
M-091
1116.34
say
1116.00
5285.00
b)
Steel reinforcement
c)
Excavation in soil
d)
cum
1.250
4228.00
kg
79.800
65.10
cum
10.720
138.00
per letter
per cm high
2280.000
0.30
Item 12.8
(A)
5195.06 Item 13.6 /
1000
1479.36 Item No.
3.13
684.00 Item 8.3
f)
Labour
Mate
day
0.570
151.44
86.32
L-12
Mazdoor
day
14.250
136.69
1947.83
L-13
hour
6.000
282.50
1695.00
P&M-053
cum
11.970
921.00
11024.37
M-008
Machinery
Tractor-trolley
g)
Material
Stone spall
h)
1475.35
1622.89
30495.18
535.00
say
Note
8.17
807
Page 12 of 264
535.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Labour
Mate
day
0.090
151.44
13.63
L-12
Blacksmith
day
0.250
264.50
66.13
L-02
Mazdoor
day
2.000
136.69
273.38
L-13
kg
31.420
65.56
2059.90
M-063
kg
80.500
45.00
3622.50
M-179 /
1000
b)
Material
Barbed wire 335 metres length @ 9.38 kg per 100
metres
MS angle iron 40 mm x 40mm x 6 mm, 23 metres in
length @ 3.5 kg per metre
Add for GI staple binding wire, drilling holes etc. @ 2 per
cent of the cost of material
c) Painting
Applying two coats of painting on exposed surface of
angle iron posts ( Rate as per item no. 8.9)
d) Overhead charges @ 0.1 on (a+b)
e)
113.65
sqm
2.110
46.00
676.41
7537.57
251.25
say
8.18
807
Item 8.9
614.92
Note
97.06
251.00
b)
Labour
Mate
day
0.120
151.44
18.17
L-12
Blacksmith
day
0.400
264.50
105.80
L-02
Mazdoor
day
2.500
136.69
341.73
L-13
kg
40.150
65.56
2632.23
M-063
kg
152.000
45.00
6840.00
M-179 /
1000
d)
Material
Barbed wire 428 metres length @ 9.38 kg per 100
metres
MS angle iron 50 mm x 50 mm x 6 mm,33.8 metres in
length @ 4.5 kg per metre
Add for GI staple, binding wire, drilling holes etc. @ 2
per cent of the cost of material
Painting
Applying two coats of painting on exposed surface of
angle iron posts
Overhead charges @ 0.1 on (a+b)
e)
c)
189.44
sqm
3.960
46.00
1012.74
1114.01
12436.29
414.54
say
Page 13 of 264
182.16
415.00
Item 8.9
Sr No
Ref. to
MoRTH
Spec.
Description
Note
8.19
Suggest
ive
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.120
151.44
18.17
L-12
Welder
day
1.000
264.50
264.50
L-02
Mazdoor
day
2.000
136.69
273.38
L-13
kg
106.000
45.00
4770.00
kg
26.000
45.00
1170.00
kg
151.000
61.00
9211.00
M-179 /
1000
M-179 /
1000
M-191
kg
293.000
28.25
P&M-053
368.00
Item 8.9
Material
Machinery
Tractor-trolley
d)
hour
0.100
282.50
sqm
8.000
46.00
Painting
Painting two coats including priming
e)
f)
1573.53
1730.88
19407.72
Note
8.20
808
646.92
say
647.00
b)
cum
1.296
138.00
178.85
cum
0.648
4228.00
2739.74
sqm
4.710
46.00
216.66
Item No.
3.13
Item 12.8
(A)
Item 8.9
sqm
2.160
46.00
99.36
Item 8.9
Mate
day
0.010
151.44
1.51
L-12
Mazdoor
day
0.250
136.69
34.17
L-13
Plumber
day
0.010
264.50
2.65
L-02
metre
30.000
364.00
10920.00
Material
Steel pipe 50 mm external dia as per IS:1239
Page 14 of 264
M-175
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
kg
Quantity
99.360
Rate Rs
Cost Rs
45.00
M-179 /
1000
89.42
Machinery
Tractor-trolley
hour
d)
e)
0.040
282.50
11.30
P&M-053
1875.36
2062.89
22703.12
4471.20
Remarks/
Input ref.
2270.31
say
2270.00
808
b)
cum
1.296
138.00
178.85
cum
0.648
4228.00
2739.74
cum
0.320
5317.00
1701.44
sqm
4.710
46.00
216.66
Mate
day
0.014
151.44
2.12
L-12
Mazdoor
day
0.350
136.69
47.84
L-13
Plumber
day
0.010
264.50
2.65
L-02
metre
30.000
364.00
10920.00
hour
0.250
282.50
Labour
Material
Steel pipe 50 mm dia as per IS:1239
c)
d)
e)
70.63
P&M-053
1104.32
1214.76
18199.00
M-175
Machinery
Tractor-trolley
8.22
Item No.
3.13
Item 12.8
(A)
Item
14.1(A)
Item 8.9
1819.90
say
1820.00
15951.00
a)
M 20 grade concrete
cum
3.000
5317.00
Mate
day
0.040
151.44
6.06
L-12
Mazdoor
day
1.000
136.69
136.69
L-13
tonne
0.280
45000.00
12600.00
M-082
sqm
0.320
425.00
136.00
M-144
M 20 grade concrete
b)
c)
Item
14.1(A)
Labour
Material
d)
e)
1287.87
1416.66
34687.71
Page 15 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
3468.77
say
Note
8.23
810
A
Remarks/
Input ref.
3469.00
b)
Labour
Mate
day
0.060
151.44
9.09
L-12
Blacksmith
day
0.500
264.50
132.25
L-02
Mazdoor
day
1.000
136.69
136.69
L-13
hour
0.100
282.50
28.25
P&M-053
kg
41.210
45.00
1854.45
kg
88.560
45.00
3985.20
kg
16.240
45.00
730.80
kg
20.000
64.07
1281.40
M-179 /
1000
M-179 /
1000
M-179 /
1000
M-130
Machinery
Tractor-trolley
c)
Material
Corrugated sheet,3 mm thick, "W" beam section
railing,4.5 m in length
Channel post 150 x 75 x 5 mm,1.8 m long,3 Nos @
16.4 kg per metre
Spacer 150 x 75 x 5 mm channel 0.33 m long,3 Nos @
16.4 kg per metre
Nuts and bolts
Add 25 per cent of the cost of material for fabrication, nuts,
bolts and washers etc.)
d) Overhead charges @ 0.1 on (a+b+c)
e)
1962.96
1012.11
1113.32
12246.52
2721.45
say
8.23
2721.00
b)
Labour
Mate
day
0.060
151.44
9.09
L-12
Blacksmith
day
0.500
264.50
132.25
L-02
Mazdoor
day
1.000
136.69
136.69
L-13
hour
0.100
282.50
28.25
P&M-053
kg
72.940
49.00
3574.06
M-088
kg
98.400
45.00
4428.00
kg
26.860
45.00
1208.70
M-179 /
1000
M-179 /
1000
Machinery
Tractor-trolley
c)
Material
Corrugated sheet,3 mm thick, "Thrie" beam section
railing,4.5 m in length
Channel post 150 x 75 x 5 mm, 2 m long,3 Nos @ 16.4
kg per metre
Spacer 150 x 75 x 5 mm channel 0.546 m long,3 Nos
Page 16 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
kg
e)
Quantity
30.000
Rate Rs
Cost Rs
64.07
1310.91
1442.00
15861.97
3524.88
say
8.24
811
3525.00
Note
8.25
M-130
1669.93
Note
1922.10
Remarks/
Input ref.
Suggest
ive
b)
Mate
day
0.120
151.44
18.17
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
Blacksmith
day
1.000
264.50
264.50
L-02
kg
190.000
45.00
8550.00
kg
46.000
45.00
2070.00
kg
188.400
45.00
8478.00
kg
65.000
61.00
3965.00
M-179 /
1000
M-179 /
1000
M-179 /
1000
M-177
Material
i) RS Joist 100 x 75 mm - 16.5 m @ 11.5 kg per metre
1153.15
sqm
16.500
46.00
hour
0.250
282.50
Tractor-trolley
e)
f)
2054.59
P&M-053
2732.71
say
Suggest
ive
70.63
30818.82
8.26
Item 8.9
2484.28
Note
759.00
Machinery
Plantation
Page 17 of 264
2055.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.004
151.44
0.61
L-12
Mazdoor
day
0.100
136.69
13.67
L-13
metre
16.000
182.00
2912.00
M-174
kg
4.320
45.00
194.40
kg
4.800
45.00
216.00
M-179 /
1000
M-179 /
1000
Material
i) 25 mm steel pipe
ii) MS sheet for 600 x 300 x 3 mm rectangular vane,
one number @ 24kg/sqm
iii) MS sheet for 250 mm dia circular vane 3 mm thick,4
numbers @ 24 kg/sqm
Add 5 per cent cost of material for fabrication, welding,
bending, nuts, bolts etc
c) Painting
Applying 2 coats of painting on exposed surface
d)
e)
166.12
sqm
1.830
46.00
4322.56
say
8.26
Item 8.9
385.31
84.18
350.28
4323.00
b)
Labour
Mate
day
0.004
151.44
0.61
L-12
Mazdoor
day
0.100
136.69
13.67
L-13
kg
10.580
45.00
476.10
kg
9.000
45.00
405.00
M-179 /
1000
M-179 /
1000
Material
44.06
hour
0.100
282.50
28.25
P&M-053
sqm
0.850
46.00
39.10
Item 8.9
Painting
Applying 2 coats of painting
e)
f)
96.77
106.44
1209.99
Page 18 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
806.66
say
Note
8.27
Suggest
ive
Remarks/
Input ref.
807.00
b)
Labour
Mate
day
0.030
151.44
4.54
L-12
Mazdoor
day
0.500
136.69
68.35
L-13
Electrician
day
0.250
264.50
66.13
L-02
1820.00
1820.00
M-171
each
1.000
each
1.000
1213.00
1213.00
M-168
Material
i) Steel circular hollow pole of standard specification for
street lighting to mount light at 9 m height above road
level
(i)
151.65
sqm
5.750
46.00
264.50
Item 8.9
sqm
4.630
46.00
212.98
Item 8.9
d)
e)
332.37
365.60
4286.13
say
(ii)
4234.61
say
Note
8.28
Suggest
ive
4286.00
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.400
136.69
54.68
L-13
Electrician
day
0.200
264.50
52.90
L-02
1213.00
1213.00
M-170
each
1.000
each
1.000
1213.00
1213.00
M-168
Material
i) Steel circular hollow pole of standard specification for
street lighting to mount light at 5 m above deck level
Page 19 of 264
24.26
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
e)
sqm
Quantity
2.760
Rate Rs
Cost Rs
46.00
8.29
Suggest
ive
Item 8.9
256.09
281.70
Note
126.96
Remarks/
Input ref.
3225.61
say
3226.00
13239.60
(i)
c)
d)
cum
2.360
5610.00
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
1.000
136.69
136.69
L-13
Mazdoor skilled
day
0.250
164.69
41.17
L-15
metre
20.000
1149.00
22980.00
M-151
cum
7.200
727.79
5240.09
M-009
each
9.000
146.00
1314.00
cum
0.020
4152.00
83.04
Item 12.6
(B)
hour
0.500
282.50
141.25
P&M-053
Material
e)
f)
2994.38
3293.82
49471.61
M-083
Machinery
Tractor-trolley
8.29
Item 12.7
(Addl) B)
2473.58
say
2474.00
18905.70
c)
3.370
5610.00
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
Mazdoor skilled
day
0.250
164.69
41.17
L-15
metre
40.000
1149.00
45960.00
M-151
cum
14.400
727.79
10480.18
M-009
each
18.000
146.00
2628.00
M-083
cum
0.040
4152.00
166.08
Item 12.6
(B)
hour
1.000
282.50
282.50
P&M-053
Material
Reinforced Cement Concrete pipe 300 mm dia
Granular soil with PI less than 6 for bedding and sides
of pipe (0.6 x 0.6 x 40 m)
Collar for joints 300 mm dia
Cement mortar 1:2 for joints
d)
Machinery
Tractor-trolley
e)
Item 12.7
(Addl) B)
cum
5983.89
Sr No
Ref. to
MoRTH
Spec.
Description
f)
Unit
Quantity
Rate Rs
Cost Rs
6582.28
91310.75
(iii)
Remarks/
Input ref.
4565.54
say
4566.00
24571.80
c)
cum
4.380
5610.00
Mate
day
0.160
151.44
24.23
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Mazdoor skilled
day
1.000
164.69
164.69
L-15
metre
60.000
1149.00
68940.00
M-151
cum
21.600
727.79
15720.26
M-009
each
27.000
146.00
3942.00
M-083
cum
0.060
4152.00
249.12
Item 12.6
(B)
hour
1.500
282.50
423.75
P&M-053
Material
Reinforced Cement Concrete pipe 300 mm dia
Granular soil with PI less than 6 for bedding and sides
of pipe (0.6 x 0.6 x 60 m)
Collar for joints 300 mm dia
Cement mortar 1:2 for joints
d)
Machinery
Tractor-trolley
e)
f)
8987.41
9886.15
133319.49
6665.97
say
Note
8.30
8.31
Suggest
ive
Suggest
ive
8.32
Suggest
ive
8.33
Suggest
ive
Item 12.7
(Addl) B)
Page 21 of 264
6666.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Labour
Mate
day
0.120
151.44
18.17
L-12
Mazdoor
day
2.000
136.69
273.38
L-13
Blacksmith
day
1.000
264.50
264.50
L-02
tonne
1.050
54574.00
57302.70
Material
Alluminium alloy/galvanised steel including 5 per cent
wastage
Add 15 per cent of cost of material for fabrication and
erection.
Add 1 per cent of cost of material for nuts, bolts and
welding
Machinery
Truck 10 tonne
8595.41
573.03
hour
d)
e)
1.000
315.27
P&M-057
7407.67
81484.37
say
(ii)
315.27
6734.25
M-060
81484.00
Message Display
Message display board 6 sqm electronically operated with
complete electronic fitments for flashing the pre-determined
messages.
This is a specilised commercial product and the lumpsum
rate including erection at site is required to be as certained
from the market and including in the rate analysis. The size
of the board will vary depending upon specific location.
The rate for the gantry mounted variable sign would be the
addition of cost of gantry support system as per approved
design determined at (i) above and the cost of message
display board as certained from the market at (ii) above
8.34
Suggest
ive
b)
Labour
Mate
day
0.080
151.44
12.12
L-12
Mazdoor
day
1.500
136.69
205.04
L-13
Blacksmith
day
0.250
264.50
66.13
L-02
each
80.000
364.00
29120.00
M-161
kg
150.000
61.00
9150.00
M-176
Material
Scrap tyres of size 900 x 20
20 mm steel wire rope
91.50
Machinery
Tractor-trolley
hour
d)
e)
3.000
282.50
4344.15
47785.65
2389.28
say
8.34
847.50
3949.23
2389.00
P&M-053
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.130
151.44
19.69
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Blacksmith
day
0.250
264.50
66.13
L-02
each
50.000
Steel barrels
each
50.000
79.00
3950.00
M-172
Sand
cum
8.000
828.00
6624.00
M-004
kg
15.000
61.00
915.00
M-176
Material
Plastic barrels
or
9.15
Machinery
Tractor-trolley
hour
d)
e)
2.000
282.50
15196.43
759.82
say
P&M-053
1381.49
8.34
565.00
1255.90
760.00
b)
Labour
Mate
day
0.100
151.44
15.14
L-12
Mazdoor
day
2.500
136.69
341.73
L-13
Material
Plastic tubes 50 cm dia,1.2 m high
each
40.000
3639.00
145560.00
M-139
Cost of water
KL
12.000
10.00
120.00
M-189
kg
100.000
61.00
6100.00
M-176
61.00
Machinery
Tractor-trolley
hour
2.000
282.50
565.00
P&M-053
hour
2.000
200.00
400.00
P&M-060
d)
e)
15316.29
16847.92
185327.07
8.35
Suggest
ive
18532.71
say
18533.00
151.44
6.06
Labour
Mate
day
Page 23 of 264
0.040
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
b)
Material
Aluminium studs 100 x 100 mm fitted with lense
reflectors
Quantity
Rate Rs
Cost Rs
day
1.000
136.69
136.69
each
50.000
546.00
27300.00
2730.00
c)
3017.27
d)
M-062
36509.02
730.18
say
8.36
L-13
3319.00
Suggest
ive
Remarks/
Input ref.
730.00
Traffic Cone
Provision of red fluorescent with white reflective sleeve traffic
cone made of low density polyethylene (LDPE)
material
with a square base of 390 x 390 x 35 mm and a height of
770 mm, 4 kg in weight, placed at 1.5 m interval, all as per
BS 873
Unit = Running metre
Taking output = 68 Nos.
a)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.500
136.69
68.35
L-13
each
68.000
243.00
16524.00
hour
0.100
282.50
b)
Material
Traffic cones with 150 mm reflective sleeve
c)
Tractor-trolley
d)
e)
1828.60
20114.58
295.80
say
Suggest
ive
Roadside Amenities
A
Rest areas
Providing plainly furnished accommodation for rest rooms,
dormitories, restaurants, stalls, shops, petrol pump,
telephone booth, first aid room, traffic aid post, police
assistance booth, including electricity, toilet and sewerage
system
Pricing may be done based on current plinth area rates
approved by PWD/CPWD/MES for a particular zone. Area is
required to be assessed for specific location as per actual
site conditions
8.38
Suggest
ive
28.25
1662.36
8.37
M-186
Machinery
Rumble Strips
Provision of 15 nos rumble strips covered with premix
bituminous carpet, 15-20 mm high at center, 250 mm wide
placed at 1 m center to center at approved locations to
control speed, marked with white strips of road marking
paint.
Unit = sqm
Taking output = 100 sqm (including gaps)
The rate per sqm of premix carpet and road marking may be
adopted from chapter 5 & 8 respectively for the quantities
calculated from approved drawings
Page 24 of 264
296.00
P&M-053
Sr No
8.39
Ref. to
MoRTH
Spec.
Suggest
ive
Description
Unit
Quantity
Policeman Umbrella
Provision of a 2 m high (floor to roof) umbrella for traffic
policeman at road crossings, where necessary, installed on a
raised platform, built on a central support of a steel pipe 100
mm dia, roof made of 25 mm dia steel pipe to provide
covered area of 3 sqm, roofed with CGI sheets, all steel
parts to be given 2 coats of paint
Unit = each
Taking output = one number
Earthwork
Cement Concrete
brick masonry or
stone masonry
b)
cum
cum
cum
Painting
a)
cum
sqm
2.500
Mate
day
0.090
Mazdoor
day
1.000
Blacksmith
day
1.000
Welder
day
0.250
Labour
Material
Steel pipe 100 mm dia
metre
3.500
metre
10.000
kg
8.000
hour
0.500
CGI sheets
Add 25 per cent of cost of material for fabrication
Add 2 per cent of cost of material for welding consumables,
J-hooks, washers etc.
c) Machinery
Tractor-trolley
d)
e)
suggesti
ve
8.41
Toll Plaza
The construction, operation and maintenance of Toll Plaza
can be broken into separate items of work as under based
on the approved design and drawings:a)
Provision of toll collection service lane to separate
different categories of vehicles for purpose of toll collection.
This involves considerable increase in carriage way width
b)
Provision of 2.5 m wide separators for different toll
collection service lanes for safety
c) Toll booths with integrated roof cover
d) Barrier gates for individual lanes
e)
Provision of building to provide facility to toll plaza
personnel
Page 25 of 264
Rate Rs
Cost Rs
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
d)
Men at work
e)
Road narrow
f)
g)
h)
i)
Overtaking prohibited
Speed limit
bb)
Weight limit
cc)
dd)
No stopping or standing
Page 26 of 264
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
ee)
Any other warning or regulatory safety sign as per
site requirement and consistent with IRC:SP:55-2001 and
IRC:67
The rate for traffic signs are already worked out and given
elsewhere in this chapter. The same may be adopted.
8.43
suggesti
ve
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.250
136.69
34.17
L-13
Painter
day
0.500
223.36
111.68
L-18
Welder
day
0.250
264.50
66.13
L-02
Angle iron 45 x 45 x 5 mm
kg
25.000
45.00
1125.00
kg
15.000
45.00
675.00
litre
0.500
192.81
96.41
Material
Paint
Add 2 per cent of cost of steel for welding consumables,
nuts & bolts and drilling holes
c) Overhead charges @ 0.1 on (a+b)
d)
36.00
214.74
236.22
2598.37
say
8.44
suggesti
ve
M-179 /
1000
M-179 /
1000
M-131
2598.00
b)
Labour
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
0.300
136.69
41.01
L-13
Painter
day
0.600
223.36
134.02
L-18
Welder
day
0.300
264.50
79.35
L-02
kg
15.000
45.00
675.00
kg
50.000
45.00
2250.00
litre
1.000
192.81
192.81
M-179 /
1000
M-179 /
1000
M-131
Material
Angle iron 50 x 50 x 5 mm,2 m long,2 Nos.
58.50
343.83
378.21
4160.29
say
8.44
Page 27 of 264
4160.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.050
151.44
7.57
L-12
Mazdoor
day
0.300
136.69
41.01
L-13
Painter
day
0.600
223.36
134.02
L-18
Carpenter
day
0.600
264.50
158.70
L-04
cum
0.180
24255.00
4365.90
M-185
Material
Timber
Add 1 per cent of cost of timber for nuts & bolts, nails, etc.
c)
d)
43.66
475.09
522.59
5748.53
say
8.44
5749.00
With bricks
Construction of a permanent type barricade made with brick
work in mud mortar, 1.5 m high, 4 m long, 600 mm thick,
plastered with cement mortar 1:6, painted with yellow and
white strips
Unit = each
Taking output = one barricade
a)
b)
Labour
Mate
day
0.240
151.44
36.35
L-12
Mazdoor
day
3.000
136.69
410.07
L-13
Painter
day
1.000
223.36
223.36
L-18
Mason
day
2.000
223.36
446.72
L-11
each
1800.000
4.42
7952.72
M-079
110.00
Material
Brick
kg
22.000
5.00
Sand
cum
0.090
710.46
63.94
M-081 /
1000
M-005
Paint
litre
1.250
192.81
241.01
M-131
Cement
c)
d)
948.42
1043.26
11475.85
say
8.45
suggesti
ve
11476.00
b)
Labour
Mate
day
0.020
151.44
3.03
L-12
Mazdoor
day
0.250
136.69
34.17
L-13
Painter
day
0.250
223.36
55.84
L-18
Material
Steel drum 300 mm dia 1.2 m high/empty bitumen
drum
Paint
each
1.000
79.00
79.00
M-172
litre
0.500
192.81
96.41
M-131
c)
d)
26.84
29.53
324.82
say
Page 28 of 264
325.00
Sr No
8.46
Ref. to
MoRTH
Spec.
suggesti
ve
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Flagman
Positioning of a smart flagman with a yellow vest and a
yellow cap and a red flag 600 x 600 mm securely fastened to
a staff 1 m in length for guiding the traffic
Unit = each
Taking output = one flagman
a)
Labour
Mate
day
0.040
151.44
6.06
L-12
Mazdoor
day
1.000
136.69
136.69
L-13
each
1.000
91.00
91.00
M-099
1.000
122.00
122.00
M-196
b)
Material
c)
d)
each
35.57
39.13
430.45
say
Page 29 of 264
430.00
CHAPTER-9
PIPE CULVERTS
Sr No
Ref. to
MoRTH
Spec.
9.1
408
Description
Unit
Rate Rs
Cost Rs
Remarks/
Input ref.
9.2
Quantity
2900
day
day
day
0.640
1.000
15.000
151.44
223.36
136.69
96.92
223.36
2050.35
L-12
L-11
L-13
cum
cum
tonne
KL
13.800
6.900
3.300
18.000
916.00
710.46
5000.00
10.00
12640.80
4902.17
16500.00
180.00
M-055
M-005
M-081
M-189
hour
hour
hour
6.000
6.000
3.000
233.00
406.80
200.00
P&M-009
P&M-079
P&M-060
say
1398.00
2440.80
600.00
4103.24
4513.56
49649.21
3309.95
3310.00
Unit = metre
Taking output = 12.5 metres ( 5 pipes of 2.5 m length
each )
1000 mm dia
a)
Labour
Mate
Mason
Mazdoor
b) Material
Sand at site
Cement at site
RCC pipe NP-4 /prestressed concrete pipe including
collar at site
Granular material passing 5.6 mm sieve for bedding
c) Overhead charges @ 0.1 on (a+b)
d) Contractor's profit @ 0.1 on (a+b+c)
Cost for 12.5 metres = a+b+c+d
Rate per metre = (a+b+c+d)/12.5
Note
day
day
day
0.180
0.500
4.000
151.44
223.36
136.69
27.26
111.68
546.76
L-12
L-11
L-13
cum
tonne
metre
0.070
0.050
12.500
710.46
5000.00
5000.00
49.73
250.00
62500.00
M-005
M-081
M-149
cum
4.500
727.79
M-009
say
3275.06
6676.05
7343.65
80780.19
6462.42
6462.42
151.44
223.36
42.40
223.36
9.2
1200 mm dia
a) Labour
Mate
Mason
day
day
Page 1 of 264
0.280
1.000
L-12
L-11
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
Material
Sand at site
Cement at site
RCC pipe NP-4/prestressed concrete pipe including
collar at site
Granular material passing 5-6 mm sieve for class
bedding
c) Overhead charges @ 0.1 on (a+b)
d) Contractor's profit @ 0.1 on (a+b+c)
Cost for 12.5 metres = a+b+c+d
Rate per metre= (a+b+c+d)/12.5
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
day
6.000
136.69
820.14
L-13
cum
tonne
metre
0.090
0.070
12.500
710.46
5000.00
4452.00
63.94
350.00
55650.00
M-005
M-081
M-150
cum
5.000
727.79
3638.95
M-009
say
6078.88
6686.77
73554.44
5884.36
5884.00
b)
Note
9.3
2900
b)
Labour
Mate
day
0.360
151.44
54.52
Mason
day
1.000
223.36
223.36
L-11
Mazdoor
day
8.000
136.69
1093.52
L-13
Material
Sand at site
cum
0.140
710.46
99.46
M-005
Cement at site
tonne
0.100
5000.00
500.00
M-081
metre
25.000
5000.00
125000.00
M-149
cum
12.500
727.79
9097.38
M-009
c)
d)
13606.82
14967.51
164642.57
9.3
L-12
13171.41
say
13171.00
1200 mm dia
a)
b)
Labour
Mate
day
0.560
151.44
84.81
Mason
day
2.000
223.36
446.72
L-12
L-11
Mazdoor
day
12.000
136.69
1640.28
L-13
cum
0.180
710.46
127.88
M-005
tonne
0.140
5000.00
700.00
M-081
Material
Sand at site
Cement at site
Page 2 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
c)
d)
Quantity
Rate Rs
Cost Rs
metre
25.000
4452.00
111300.00
M-150
cum
13.750
727.79
10007.11
M-009
12430.68
13673.75
150411.23
12032.90
Page 3 of 264
Remarks/
Input ref.
say
12033.00
CHAPTER-12
FOUNDATIONS
Sr No
Ref. to
MoRTH
Spec.
12.1
304
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Ordinary soil
Unit = cum
Taking output = 10 cum
A
(i)
Manual Means
Depth upto 3 m
a) Labour
Mate
Mazdoor
b) Overhead charges @ 0.2 on (a)
c) Contractor's profit @ 0.1 on (a+b)
Cost for 10 cum = a+b+c
Rate per cum = (a+b+c)/10
day
day
0.14
3.50
151.44
136.69
21.20
478.42
99.92
59.95
659.49
65.95
66.00
L-12
L-13
27.26
615.11
128.47
77.08
847.92
84.79
85.00
L-12
L-13
L-12
L-13
say
36.35
820.14
171.30
102.78
1130.56
113.06
113.00
say
Note
12.1 (I) A
(ii)
day
day
0.18
4.50
151.44
136.69
say
12.1 (I) A
Note
(iii)
Depth above 6 m
a) Labour
Mate/Supervisor
Mazdoor
b) Overhead charges @ 0.2 on (a)
c) Contractor's profit @ 0.1 on (a+b)
Cost for 10 cum = a+b+c
Rate per cum = (a+b+c)/10
Note
12.1 (I)
B
(i)
day
day
0.24
6.00
151.44
136.69
day
day
0.32
8.00
151.44
136.69
48.46
1093.52
L-12
L-13
hour
6.00
1302.00
7812.00
1790.80
1074.48
11819.25
49.25
P&M-026
Sr No
Ref. to
MoRTH
Spec.
Description
Note
12.1 (I) B
(ii)
Unit
Quantity
Rate Rs
say
49.00
Remarks/
Input ref.
d)
day
day
0.32
8.00
151.44
136.69
48.46
1093.52
L-12
L-13
hour
6.00
1302.00
7812.00
P&M-026
1790.80
1074.48
11819.25
56.28
say
12.1 (I) B
Cost Rs
Note
(iii)
Depth above 6m
56.00
Unit = cum
Taking output = 180 cum
a)
b)
Labour
Mate
day
0.40
151.44
60.58
L-12
Mazdoor
day
10.00
136.69
1366.90
L-13
hour
6.00
1302.00
7812.00
P&M-026
Machinery
Hydraulic excavator 1.0 cum bucket capacity
c)
d)
1847.90
1108.74
12196.11
67.76
say
Note
12.1
68.00
II
Manual Means
(i)
Depth upto 3 m
Unit = cum
Taking output = 10 cum
a)
Labour
Mate
day
0.20
151.44
30.29
L-12
Mazdoor
day
5.00
136.69
683.45
L-13
b)
c)
142.75
85.65
942.13
94.21
say
Note
12.1(II)
Labour
Page 2 of 264
94.00
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
day
0.24
151.44
36.35
L-12
Mazdoor
day
6.00
136.69
820.14
L-13
hour
6.00
1302.00
7812.00
P&M-026
Machinery
c)
d)
1733.70
1040.22
11442.40
63.57
say
12.1
Remarks/
Input ref.
Mate
Note
Cost Rs
III
Manual Means
64.00
Unit = cum
Taking output = 10 cum
a)
b)
Labour
Mate
day
0.35
151.44
53.00
L-12
Driller
day
0.50
264.50
132.25
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
8.00
136.69
1093.52
L-13
hour
1.00
319.00
319.00
P&M-001
511.00
M-104
Machinery
Air Compressor 250 cfm with 2 jack hammer for drilling.
c)
Material
Blasting Material
kg
3.50
146.00
Detonator electric
each
14.00
14.56
d)
e)
475.75
285.45
3139.94
313.99
say
Note
12.1
IV
203.84 M-094/100
314.00
Mechanical Means
a)
Labour
Mate
day
0.20
151.44
30.29
L-12
Mazdoor
day
5.00
136.69
683.45
L-13
hour
6.00
319.00
1914.00
P&M-001
b)
Machinery
c)
d)
525.55
315.33
3468.61
346.86
say
Note
12.1
Page 3 of 264
347.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Manual means
a)
b)
Labour
Mate/Supervisor
day
0.40
151.44
60.58
L-12
Mazdoor
day
10.00
136.69
1366.90
L-13
hour
2.67
282.50
754.28
P&M-053
Machinery
Tractor-trolley for removal.
c)
d)
436.35
261.81
2879.91
287.99
say
Note
12.1 (V)
b)
Labour
Mate
day
0.08
151.44
12.12
L-12
day
2.00
136.69
273.38
L-13
hour
0.17
1302.00
221.34
P&M-026
hour
0.45
0.00
P&M-048
Machinery
Hydraulic excavator 1.0 cum bucket capacity @ 60
cum per hour
Tipper 5.5 cum capacity, 4 trips per hour.
c)
d)
101.37
60.82
669.02
66.90
say
Note
VI
288.00
67.00
b)
Labour
Mate
day
0.12
151.44
18.17
L-12
day
3.00
136.69
410.07
L-13
hour
2.00
282.50
565.00
P&M-053
Machinery
Tractor-trolley for transportation
c)
d)
198.65
119.19
1311.08
218.51
say
12.2
304
Page 4 of 264
219.00
Sr No
12.3
Ref. to
MoRTH
Spec.
Description
304
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.01
151.44
1.51
L-12
Mazdoor
day
0.30
136.69
41.01
L-13
cum
1.20
476.80
572.16
M-006
Material
Sand (assuming 20 per cent voids)
c)
d)
122.94
73.76
811.38
say
12.4
2100
811.00
b)
255.94
Labour
Mate
day
0.64
151.44
96.92
Mason
day
1.00
223.36
223.36
L-11
Mazdoor
day
15.00
136.69
2050.35
L-13
40 mm Aggregate
cum
13.50
916.00
12366.00
M-055
coarse Sand
cum
6.75
710.46
4795.61
M-005
cement
tonne
3.45
5000.00
17250.00
M-081
KL
18.00
10.00
180.00
M-189
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
hour
2.00
200.00
400.00
P&M-060
Material
Cost of water
c)
Machinery
d)
e)
8240.21
4944.12
54385.37
1300
L-12
3625.69
say
3626.00
b)
Material
Bricks Ist class
each
2500.00
4.42
11045.45
M-079
cum
1.20
3425.00
4110.00
Item 12.6
(A)
Mate
day
0.48
151.44
72.69
Mason
day
4.00
223.36
893.44
L-11
Mazdoor
day
8.00
136.69
1093.52
L-13
c)
d)
3443.02
2065.81
22723.93
4544.79
say
Page 5 of 264
4545.00
L-12
Sr No
12.6
Ref. to
MoRTH
Spec.
Subanalysis
Description
(A)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = 1 cum
Taking output = 1 cum
a)
b)
Materials
Cement
tonne
0.51
5000.00
2550.00
M-081
Sand
cum
1.05
710.46
745.98
M-005
Mate
day
0.04
151.44
6.06
L-12
Mazdoor
day
0.90
136.69
123.02
L-13
say
3425.00
Labour
(B)
Unit = 1 cum
Taking output = 1 cum
a)
b)
Materials
Cement
tonne
0.67
5000.00
3360.00
M-081
Sand
cum
0.93
710.46
660.73
M-005
Mate
day
0.04
151.44
6.06
L-12
Mazdoor
day
0.90
136.69
123.02
L-13
say
4150.00
Labour
(C)
Unit = 1 cum
Taking output = 1 cum
a)
b)
Materials
Cement
tonne
0.40
5000.00
2016.00
M-081
Sand
cum
1.12
710.46
795.72
M-005
Mate
day
0.04
151.44
6.06
L-12
Mazdoor
day
0.90
136.69
123.02
L-13
say
2941.00
Labour
(D)
Unit = 1 cum
Taking output = 1 cum
a)
b)
Materials
Cement
tonne
0.29
5000.00
1440.00
M-081
Sand
cum
1.34
710.46
949.99
M-005
Mate
day
0.04
151.44
6.06
L-12
Mazdoor
day
0.90
136.69
123.02
L-13
say
2519.00
2705.04
14877.72
Labour
1400
1405.4
(A)
Material
Stone
cum
Page 6 of 264
5.50
M-169
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
each
35.00
14.45
505.86
M-182
cum
1.50
3425.00
5137.50
Item 12.6
(A)
Mate
day
0.66
151.44
99.95
Mason
day
7.50
223.36
1675.20
L-11
Mazdoor
day
9.00
136.69
1230.21
L-13
b)
c)
d)
4705.29
2823.17
31054.89
(B)
L-12
6210.98
say
6211.00
Material
Stone
cum
5.50
2604.51
14324.81
M-148
each
35.00
14.45
505.86
M-182
cum
1.55
3425.00
5308.75
Item 12.6
(A)
Mate
day
0.62
151.44
93.89
L-12
Mason
day
6.00
223.36
1340.16
L-11
Mazdoor
day
9.00
136.69
1230.21
L-13
b)
c)
d)
4560.73
2736.44
30100.85
12.8
1500,
1700 &
2100
A
6020.17
say
6020.00
b)
c)
Material
Cement
tonne
4.13
5000.00
20650.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
8.10
916.00
7419.60
M-055
20 mm Aggregate
cum
4.05
1028.00
4163.40
M-053
10 mm Aggregate
cum
1.35
1005.00
1356.75
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 63 KVA
hour
6.00
535.00
3210.00
P&M-019
Labour
Machinery
Page 7 of 264
3080.00
1847.70
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
e)
f)
Quantity
Rate Rs
5764.82
63412.97
12.8
Remarks/
Input ref.
9608.03
Note
Cost Rs
4227.53
say
4228.00
b)
c)
Material
Cement
tonne
5.16
5000.00
25800.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
3390.00
2033.78
10575.67
6345.40
69799.44
C
Case I
4653.30
say
4653.00
b)
c)
Material
Cement
tonne
5.21
5000.00
26050.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
f)
3443.00
2065.49
10740.55
6444.33
70887.66
4725.84
say
Page 8 of 264
4726.00
Sr No
12.8 C
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Cement
tonne
41.66
5000.00
208300.00
M-081
Coarse Sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
256.00
1536.00
P&M-050
Lead= 1
km
P&M-007
Labour
Machinery
Concrete Pump
hour
3388.00
16260.23
84553.21
50731.93
558051.18
D
Case I
L-12
4650.43
say
4650.00
b)
c)
Material
Cement
tonne
5.99
5000.00
29950.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
f)
3667.00
2062.30
11411.38
6846.83
75315.08
5021.01
say
12.8 D
5021.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Material
Cement
tonne
47.95
5000.00
239750.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
40 mm Aggregate
cum
43.20
916.00
39571.20
M-055
20 mm Aggregate
cum
43.20
1028.00
44409.60
M-053
10 mm Aggregate
cum
21.60
1005.00
21708.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
256.00
1536.00
P&M-050
Lead= 1
km
P&M-007
Labour
Machinery
hour
3614.00
16260.53
89974.95
53984.97
593834.66
E
Case I
L-12
4948.62
say
4949.00
b)
c)
Material
Cement
tonne
6.05
5000.00
30250.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
f)
3723.00
2093.90
11586.24
6951.74
76469.16
5097.94
say
12.8 E
Material
Page 10 of 264
5098.00
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Rate Rs
tonne
48.38
5000.00
241900.00
M-081
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
6.00
256.00
1536.00
P&M-007
Labour
hour
3668.00
16503.97
91321.96
54793.17
602724.91
Case I
L-12
Machinery
Concrete Pump
Remarks/
Input ref.
Coarse sand
12.8
Cost Rs
Cement
f)
Quantity
5022.71
say
5023.00
b)
c)
Material
Cement
tonne
6.08
5000.00
30400.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
3697.00
1940.56
11477.03
6886.22
75748.39
5049.89
say
5050.00
Material
Cement
tonne
48.60
5000.00
243000.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
Page 11 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Rate Rs
cum
43.20
916.00
39571.20
M-055
cum
43.20
1028.00
44409.60
M-053
10 mm Aggregate
cum
21.60
1005.00
21708.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
6.00
256.00
1536.00
P&M-007
Labour
hour
3641.00
15290.25
90430.89
54258.53
596843.88
Case I
L-12
Machinery
Concrete Pump
Remarks/
Input ref.
20 mm Aggregate
12.8
Cost Rs
40 mm Aggregate
f)
Quantity
4973.70
say
4974.00
b)
c)
Material
Cement
tonne
6.10
5000.00
30500.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
3740.00
1963.05
11610.07
6966.04
76626.45
Case II
5108.43
say
5108.00
Material
Cement
tonne
48.80
5000.00
244000.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Page 12 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Rate Rs
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
6.00
256.00
1536.00
P&M-050
Lead= 1
km
P&M-007
hour
3686.00
15477.20
91536.60
54921.96
604141.58
Case I
L-12
Machinery
Concrete Pump
Remarks/
Input ref.
Labour
12.8
Cost Rs
Mate
f)
Quantity
5034.51
say
5035.00
b)
c)
Material
Cement
tonne
6.33
5000.00
31650.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
f)
3816.00
1717.12
11790.88
7074.53
77819.81
5187.99
say
5188.00
b)
Material
Cement
tonne
50.64
5000.00
253200.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
L-12
Mason
day
3.00
223.36
670.08
L-11
Labour
Page 13 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
c)
Rate Rs
Remarks/
Input ref.
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
6.00
256.00
1536.00
P&M-007
Concrete Pump
hour
3762.00
13542.17
92989.60
55793.76
613731.34
Cost Rs
Machinery
f)
Quantity
5114.43
say
5114.00
WELL FOUNDATION
12.9
1200
b)
c)
Material
Earth (compacted)
cum
251.20
28.0
7033.60
M-092
Sand bags
each
750.00
7.00
5250.00
M-159
Labour
Mate
day
0.40
151.44
60.58
L-12
day
15.00
136.69
2050.35
L-13
hour
20.00
853.00
17060.00
P&M-012
Machinery
Crane with grab 1 cum capacity
e)
426.50
6376.21
3825.72
42082.95
say
42083.00
b)
Material
Earth (compacted)
cum
904.32
28.00
25320.96
M-092
Sand bags
each
6000.00
7.00
42000.00
M-159
each
95.00
91.00
8645.00
M-194
metre
190.00
61.00
11590.00
M-193
Labour
Mate
day
5.60
151.44
848.06
L-12
Mazdoor for piling 8" dia ballies for piling 8" dia ballies
day
18.00
136.69
2460.42
L-13
day
12.00
136.69
1640.28
L-13
Page 14 of 264
Sr No
Ref. to
MoRTH
Spec.
c)
Quantity
Rate Rs
Unit
day
110.00
136.69
15035.90
L-13
hour
50.00
853.00
42650.00
P&M-012
Machinery
Crane with grab 1 cum capacity
3754.77
30789.08
18473.45
12.9
Cost Rs
Remarks/
Input ref.
Description
203207.91
say
203208.00
For other well diameters rate can be worked out on the basis
of cross-sectional area of well. The diameter of the island
shall be in the conformity with clause 1203.2 of MoRTH
specifications.
Providing and constructing one span service road to
reach island location from one pier location to another
pier location
Assuming span length 30 m, width of service road 10m and
depth of water 1m
Unit = 1 meter
Taking output = 30 metre
a)
b)
c)
Material
Earth
cum
450.00
28.00
12600.00
M-092
Sand bags
each
300.00
7.00
2100.00
M-159
Mate
day
0.24
151.44
36.35
L-12
day
6.00
136.69
820.14
L-13
hour
27.00
806.00
21762.00
P&M-017
hour
28.00
339.00
9492.00
P&M-048
Labour
Machinery
d)
e)
9362.10
5617.26
61789.84
1200 &
1900
2059.66
say
2060.00
Material
Structural steel in plates, angles, etc including 5 per
cent wastage
Nuts & bolts
b)
tonne
1.05
45000.00
47250.00
M-179
Kg
20.00
64.07
1281.40
M-130
day
1.32
151.44
199.90
L-12
Fitter
day
5.50
230.00
1265.00
L-08
Blacksmith
day
5.50
264.50
1454.75
L-02
Welder
day
5.50
264.50
1454.75
L-02
Mazdoor
day
16.50
136.69
2255.39
L-13
Labour
4853.14
12002.87
7201.72
79218.91
say
12.11
1200,
1500 &
1700
Page 15 of 264
79219.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Unit = 1 cum
Taking output = 1 cum
A
Well curb
(i)
Case I
f)
3443.00
688.60
826.32
495.79
5453.71
say
12.11 A (i)
3388.00
677.60
e)
813.12
f)
487.87
5366.59
say
12.11 A
5454.00
(ii)
5367.00
Case I
f)
3723.00
744.60
893.52
536.11
5897.23
say
12.11 A
(ii)
f)
3740.00
748.00
897.60
538.56
5924.16
say
12.11 A
5897.00
(iii)
5924.00
Case I
f)
3816.00
763.20
915.84
549.50
6044.54
say
12.11 A
(iii)
6045.00
3838.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
d)
767.60
e)
921.12
f)
552.67
6079.39
say
Note.
12.11
Cost Rs
6079.00
Well steining
(I)
Case I
f)
3080.00
308.00
677.60
406.56
4472.16
say
12.11 B
(ii)
4472.00
Case I
f)
3390.00
339.00
745.80
447.48
4922.28
say
12.11 B
(iii)
4922.00
Case I
3443.00
344.30
e)
757.46
f)
454.48
4999.24
say
12.11 B
(iii)
f)
3388.00
338.80
745.36
447.22
4919.38
say
12.11 B
4999.00
(iv)
4919.00
Case I
3667.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
d)
366.70
e)
806.74
f)
484.04
5324.48
say
12.11 B
(iv)
5324.00
f)
3614.00
361.40
795.08
477.05
5247.53
say
'12.11 B
Cost Rs
(v)
5248.00
Case I
f)
3723.00
372.30
819.06
491.44
5405.80
say
12.11 B
(v)
f)
3740.00
374.00
822.80
493.68
5430.48
say
'12.11 B
5406.00
(vi)
5430.00
Case I
f)
3697.00
369.70
813.34
488.00
5368.04
say
12.11 B
(vi)
f)
3641.00
364.10
801.02
480.61
5286.73
say
'12.11 B
5368.00
(vii)
Case I
5287.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
f)
374.00
822.80
493.68
5430.48
say
5430.00
f)
3686.00
368.60
810.92
486.55
5352.07
say
'12.11 B
Remarks/
Input ref.
3740.00
Cost Rs
(viii)
5352.00
Case I
f)
3816.00
381.60
839.52
503.71
5540.83
say
12.11 B
(viii)
f)
3838.00
383.80
844.36
506.62
5541.00
(ix)
5572.78
say
5573.00
Material
Cement
tonne
51.60
5000.00
258000.00
M-081
Coarse Sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
kg
206.00
44.70
9208.20
M-180
Mate
day
0.84
151.44
127.21
L-12
Meson
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
Admixture
b)
c)
Labour
Machinery
Batching Plant
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300xL
2.03
610.20
hour
6.00
256.00
1536.00
Lead= 1 ,
P&M-050
P&M-007
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
46541.40
102391.08
61434.65
675781.14
Remarks/
Input ref.
31028.00
12.11 C
Cost Rs
5631.51
say
5632.00
Bottom Plug
Concrete to be placed using tremie pipe
(i)
Case I
b)
c)
Material
Cement
tonne
5.55
5000.00
27750.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Admixture
Kg
18.60
44.70
831.42
M-180
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
hour
6.00
357.00
2142.00
P&M-013
Labour
Machinery
e)
3719.00
2489.66
11652.74
6991.65
76908.12
5127.21
say
5127.00
b)
c)
Material
Cement
tonne
44.40
5000.00
222000.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Admixture
Kg
148.80
44.70
6651.36
M-180
Mate
day
0.88
151.44
133.27
L-12
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
Labour
Machinery
Page 20 of 264
Sr No
Ref. to
MoRTH
Spec.
Unit
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
6.00
256.00
1536.00
P&M-050
Lead= 1
km
P&M-007
hour
e)
Quantity
Rate Rs
3558.00
19332.88
89239.22
53543.53
588978.86
(ii)
Case I
Cost Rs
Remarks/
Input ref.
Description
4908.16
say
4908.00
b)
c)
Material
Cement
tonne
5.99
5000.00
29950.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Admixture
Kg
21.60
44.70
965.52
M-180
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
hour
6.00
357.00
2142.00
P&M-013
Labour
Machinery
e)
3874.00
2606.37
12142.91
7285.74
80143.18
5342.88
say
5343.00
Material
Cement
tonne
47.88
5000.00
239400.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Admixture
Kg
172.80
44.70
7724.16
M-180
Page 21 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Quantity
Rate Rs
Labour
day
0.88
151.44
133.27
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
6.00
256.00
1536.00
P&M-050
Lead= 1
km
P&M-007
Concrete Pump
hour
d)
e)
3712.00
20256.52
93118.51
55871.11
614582.16
Case I
L-12
Machinery
(iii)
Remarks/
Input ref.
Mate
'12.11 C
Cost Rs
5121.52
say
5122.00
b)
c)
Material
Cement
tonne
6.08
5000.00
30400.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Admixture
Kg
21.60
44.70
965.52
M-180
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
hour
6.00
357.00
2142.00
P&M-013
Labour
Machinery
e)
3904.00
2628.87
12237.41
7342.44
80766.88
5384.46
say
12.11 C
(iii)
Material
Page 22 of 264
5384.00
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Quantity
Rate Rs
tonne
48.64
5000.00
243200.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Admixture
Kg
172.80
44.70
7724.16
M-180
Mate
day
0.88
151.44
133.27
L-12
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
6.00
256.00
1536.00
P&M-007
Labour
Machinery
Concrete Pump
hour
e)
3743.00
20446.52
93916.51
56349.91
619848.96
Remarks/
Input ref.
Cement
'12.11 C
Cost Rs
5165.41
say
5165.00
b)
c)
Material
Cement
tonne
6.29
5000.00
31450.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm Aggregate
cum
5.40
916.00
4946.40
M-055
20 mm Aggregate
cum
5.40
1028.00
5551.20
M-053
10 mm Aggregate
cum
2.70
1005.00
2713.50
M-051
Admixture
Kg
21.60
44.70
965.52
M-180
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
hour
6.00
357.00
2142.00
P&M-013
Labour
Machinery
e)
3974.00
2681.37
12457.91
7474.74
82222.18
5481.48
Page 23 of 264
Sr No
12.11 C
(iv)
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
say
5481.00
Remarks/
Input ref.
b)
c)
Material
Cement
tonne
50.28
5000.00
251400.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Admixture
Kg
172.80
44.70
7724.16
M-180
Mate
day
0.88
151.44
133.27
L-12
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
6.00
256.00
1536.00
P&M-007
Labour
Machinery
hour
e)
3812.00
20856.52
95638.51
57383.11
631214.16
5260.12
say
12.11
Intermediate plug
(i)
Case I
3719.00
743.80
446.28
4909.08
say
12.11 D
(i)
711.60
426.96
4696.56
say
(ii)
Case I
4909.00
3558.00
5260.00
4697.00
3874.00
774.80
Sr No
Ref. to
MoRTH
Spec.
Description
e)
Unit
Quantity
Rate Rs
464.88
5113.68
say
12.11 D
(ii)
742.40
445.44
4899.84
say
(iii)
Case I
e)
3904.00
780.80
468.48
5153.28
say
748.60
449.16
4940.76
say
Top plug
(i)
5153.00
3743.00
4900.00
12.11 D
(iii)
5114.00
3712.00
Cost Rs
4941.00
3080.00
616.00
369.60
4065.60
say
'12.11 E
(ii)
4066.00
Case I
3390.00
678.00
406.80
4474.80
say
'12.11 E
(iii)
excluding formwork
3667.00
733.40
440.04
4840.44
say
12.11 E
(iii)
4475.00
Page 25 of 264
4840.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
722.80
433.68
4770.48
say
(iv)
Remarks/
Input ref.
3614.00
Cost Rs
4770.00
Case I
3697.00
739.40
443.64
4880.04
say
12.11 E
(iv)
3641.00
728.20
436.92
F
(i)
Case I
4880.00
4806.12
say
4806.00
Well cap
RCC Grade M20
Using Concrete Mixer
Unit = cum
Taking output = 15 cum
a)
b)
c)
Material
Cement
tonne
5.12
5000.00
25600.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
e)
2047.49
10646.95
6388.17
70269.90
4684.66
say
4685.00
b)
Material
Cement
tonne
40.92
5000.00
204600.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
L-12
Mason
day
3.00
223.36
670.08
L-11
Labour
Page 26 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
c)
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
Machinery
Concrete Pump
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
hour
6.00
256.00
1536.00
P&M-007
16112.23
d)
83783.61
e)
50270.17
552971.82
(ii)
Case I
4608.10
say
4608.00
b)
c)
Material
Cement
tonne
6.05
5000.00
30250.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
2093.90
d)
11586.24
e)
6951.74
76469.16
5097.94
say
5098.00
b)
c)
Material
Cement
tonne
48.40
5000.00
242000.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
Labour
L-12
Machinery
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Concrete Pump
Quantity
Rate Rs
hour
15.00
1017.00
15255.00
P&M-049
300L
2.03
610.20
P&M-050
Lead= 1
km
hour
6.00
256.00
1536.00
P&M-007
16507.72
d)
91342.71
e)
54805.62
602861.86
Remarks/
Input ref.
tonne.km
12.11 F
Cost Rs
5023.85
say
5024.00
b)
c)
Material
Cement
tonne
6.10
5000.00
30500.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
1963.05
d)
11610.07
e)
6966.04
76626.45
5108.43
say
5108.00
b)
c)
Material
Cement
tonne
48.79
5000.00
243950.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
Labour
L-12
Machinery
Concrete Pump
d)
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
hour
6.00
256.00
1536.00
P&M-007
15475.45
91526.25
Page 28 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
e)
Unit
Quantity
Rate Rs
604073.27
Remarks/
Input ref.
54915.75
12.11 F
Cost Rs
5033.94
say
5034.00
b)
c)
Material
Cement
tonne
6.33
5000.00
31650.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
e)
1717.12
11790.88
7074.53
77819.81
5187.99
say
5188.00
b)
c)
Material
Cement
tonne
50.64
5000.00
253200.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
Labour
L-12
Machinery
Concrete Pump
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
P&M-050
Lead= 1
km
hour
6.00
256.00
1536.00
P&M-007
13542.17
d)
92989.60
e)
55793.76
613731.34
5114.43
say
Page 29 of 264
5114.00
Sr No
Ref. to
MoRTH
Spec.
Description
Note
'12.11 F
(v)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Material
Cement
tonne
52.20
5000.00
261000.00
M-081
Coarse Sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
kg
206.00
44.70
9208.20
M-180
Mate
day
0.84
151.44
127.21
L-12
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
Admixture
b)
c)
Labour
Machinery
Batching Plant
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300.L
2.03
610.20
hour
6.00
256.00
P&M-050
Lead= 1
km
P&M-007
Concrete Pump
d)
e)
96493.29
57895.97
636855.69
5307.13
say
12.12
Section
1200
1536.00
14052.42
5307.00
Sandy Soil
Depth below bed level upto 3.0 M
Rate of sinking = 0.50 m per hour.
a)
b)
Labour
Mate
day
0.12
151.44
18.17
L-12
Sinker ( skilled )
day
1.00
164.69
164.69
L-15
day
2.00
230.00
460.00
L-14
hour
2.00
1073.50
2147.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
214.70
600.91
360.55
3966.02
say
12.12 A
(ii)
3966.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.15
151.44
22.72
L-12
Sinker
day
1.25
164.69
205.86
L-15
day
2.50
230.00
575.00
L-14
hour
3.00
1073.50
3220.50
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories
Consumables in sinking @10 per cent of (b)
c)
d)
322.05
869.23
521.54
5736.89
say
12.12 A
(iii)
a
5%
6024.00
12th m
5%
6325.00
13th m
5%
6641.00
14th m
5%
6973.00
15th m
5%
7322.00
16th m
5%
7688.00
17th m
5%
8072.00
18th m
5%
8476.00
19th m
5%
8900.00
20th m
5%
9345.00
75766.00
(iv)
a
b
7577.00
7.5%
10046.00
Including 20%
for Kentledge
12055.00
22nd m
7.5%
10799.00
12959.00
23rd m
7.5%
11609.00
13931.00
24th m
7.5%
12480.00
14976.00
25th m
7.5%
13416.00
16099.00
26th m
7.5%
14422.00
17306.00
27th m
7.5%
15504.00
18605.00
28th m
7.5%
16667.00
20000.00
29th m
7.5%
17917.00
21500.00
30th m
7.5%
19261.00
23113.00
142121.00
170544.00
14212.00
17054.00
(v)
10%
21187.00
Including 20%
for Kentledge
25424.00
32nd
10%
23306.00
27967.00
33rd m
10%
25637.00
30764.00
34th m
10%
28201.00
33841.00
35th m
10%
31021.00
37225.00
36th m
10%
34123.00
40948.00
37th m
10%
37535.00
45042.00
38th m
10%
41289.00
49547.00
39th m
10%
45418.00
54502.00
Page 31 of 264
5737.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
40th m
10%
Quantity
Rate Rs
49960.00
59952.00
337677.00
405212.00
33768.00
40521.00
Cost Rs
Remarks/
Input ref.
(i)
b)
Labour
Mate
day
0.15
151.44
22.72
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
2.25
230.00
517.50
L-14
hour
3.00
1073.50
3220.50
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories
Consumables in sinking @ 10 per cent of (b)
c)
d)
322.05
865.96
519.58
5715.34
say
12.12 B
(ii)
5715.00
b)
Labour
Mate
day
0.30
151.44
45.43
L-12
Sinker
day
3.00
164.69
494.07
L-15
day
4.50
230.00
1035.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
hour
2.00
740.15
1480.30
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay.
Consumables in sinking @ 10 per cent of (b)
c)
d)
792.13
2057.59
1234.55
13580.07
say
12.12 B
(iii)
a
b
Beyond 10 m upto 20 m
Add 5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add for dewatering @ 5 per cent of cost, if required.
11th m
5%
14259.00
14972.00
12th m
5%
14972.00
15721.00
13th m
5%
15721.00
16507.00
14th m
5%
16507.00
17332.00
15th m
5%
17332.00
18199.00
16th m
5%
18199.00
19109.00
17th m
5%
19109.00
20064.00
18th m
5%
20064.00
21067.00
19th m
5%
21067.00
22120.00
20th m
5%
22120.00
23226.00
179350.00
188317.00
17935.00
18832.00
(iv)
a
Including for
dewatering @
5% of cost, if
required
Page 32 of 264
13580.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
7.5%
23779.00
29724.00
31210.00
22nd m
7.5%
25562.00
31953.00
33551.00
23rd m
7.5%
27479.00
34349.00
36066.00
24th m
7.5%
29540.00
36925.00
38771.00
25th m
7.5%
31756.00
39695.00
41680.00
26th m
7.5%
34138.00
42673.00
44807.00
27th m
7.5%
36698.00
45873.00
48167.00
28th m
7.5%
39450.00
49313.00
51779.00
29th m
7.5%
42409.00
53011.00
55662.00
30th m
7.5%
45590.00
56988.00
59837.00
336401.00
420504.00
441530.00
33640.00
42050.00
44153.00
31st m
10%
50149.00
60179.00
63188.00
32nd
10%
55164.00
66197.00
69507.00
33rd m
10%
60680.00
72816.00
76457.00
34th m
10%
66748.00
80098.00
84103.00
35th m
10%
73423.00
88108.00
92513.00
36th m
10%
80765.00
96918.00
101764.00
37th m
10%
88842.00
106610.00
111941.00
38th m
10%
97726.00
117271.00
123135.00
39th m
10%
107499.00
128999.00
135449.00
40th m
10%
118249.00
141899.00
148994.00
799245.00
959095.00
1007051.00
79925.00
95910.00
100705.00
Remarks/
Input ref.
Cost Rs
21st m
(v)
Rate Rs
Quantity
b)
Labour
Mate
day
0.92
151.44
139.32
L-12
Sinker ( skilled )
day
3.00
164.69
494.07
L-15
day
20.00
230.00
4600.00
L-14
Diver
day
0.50
264.50
132.25
L-07
hour
4.00
1073.50
4294.00
P&M-075
hour
3.50
740.15
2590.53
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
688.45
646.93
c)
2717.11
d)
1630.27
17932.93
say
Page 33 of 264
17933.00
Sr No
Ref. to
MoRTH
Spec.
12.12
Description
D
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Material
Gelatine 80 per cent
Kg
4.00
146.00
Electric Detonators
each
18.00
14.56
Mate
day
1.56
151.44
236.25
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
12.00
136.69
1640.28
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
hour
6.00
1073.50
6441.00
P&M-075
hour
2.00
740.15
1480.30
P&M-063
Machinery
552.59
e)
792.13
2648.50
1589.10
17480.11
say
Section
1200
M-104
262.08 M-094/100
Labour
12.13
584.00
17480.00
Sandy Soil
Depth below bed level upto 3.0 M
Rate of sinking = 0.30 m per hour.
a)
b)
Labour
Mate
day
0.15
151.44
22.72
L-12
Sinker ( skilled )
day
1.25
164.69
205.86
L-15
day
2.50
230.00
575.00
L-14
hour
3.25
1073.50
3488.88
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
348.89
c)
928.27
d)
464.13
(ii)
6033.74
12067.49
b)
say
Mate
day
0.18
151.44
27.26
L-12
Sinker
day
1.50
164.69
247.04
L-15
day
3.00
230.00
690.00
L-14
hour
4.50
1073.50
4830.75
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
12067.00
Labour
483.08
1255.62
Sr No
Ref. to
MoRTH
Spec.
Description
d)
Unit
Quantity
Rate Rs
753.37
8287.12
say
12.13 A
(iii)
a
0.165
5%
8701.00
12th m
5%
9136.00
13th m
5%
9593.00
14th m
5%
10073.00
15th m
5%
10577.00
16th m
5%
11106.00
17th m
5%
11661.00
18th m
5%
12244.00
19th m
5%
12856.00
20th m
5%
10945.00
7.5%
14511.00
Including 20%
for Kentledge
17413.00
22nd m
7.5%
15599.00
18719.00
23rd m
7.5%
16769.00
20123.00
24th m
7.5%
18027.00
21632.00
25th m
7.5%
19379.00
23255.00
26th m
7.5%
20832.00
24998.00
27th m
7.5%
22394.00
26873.00
28th m
7.5%
24074.00
28889.00
29th m
7.5%
25880.00
31056.00
30th m
7.5%
27821.00
33385.00
205286.00
246343.00
20529.00
24634.00
(v)
10%
30603.00
Including 20%
for Kentledge
36724.00
32nd
10%
33663.00
40396.00
33rd m
10%
37029.00
44435.00
34th m
10%
40732.00
48878.00
35th m
10%
44805.00
53766.00
36th m
10%
49286.00
59143.00
37th m
10%
54215.00
65058.00
38th m
10%
59637.00
71564.00
39th m
10%
65601.00
78721.00
40th m
10%
72161.00
86593.00
487732.00
585278.00
48773.00
58528.00
(I)
13499.00
109446.00
Cost Rs
Labour
Page 35 of 264
8287.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
day
0.18
151.44
27.26
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
3.00
230.00
690.00
L-14
hour
4.50
1073.50
4830.75
P&M-075
Machinery
d)
e)
483.08
1255.62
753.37
8287.12
say
(ii)
Remarks/
Input ref.
Mate
12.13 B
Cost Rs
8287.00
b)
Labour
Mate
day
0.26
151.44
39.37
L-12
Sinker
day
2.00
164.69
329.38
L-15
day
4.00
230.00
920.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
hour
3.25
740.15
644.10
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay.
Consumables in sinking @ 10 per cent of (b)
c)
d)
708.51
1816.47
1089.88
11988.72
say
12.13 B
(iii)
a
b
Including for
dewatering @
5% of cost, if
required
11th m
5%
12588.00
13217.00
12th m
5%
13217.00
13878.00
13th m
5%
13878.00
14572.00
14th m
5%
14572.00
15301.00
15th m
5%
15301.00
16066.00
16th m
5%
16066.00
16869.00
17th m
5%
16869.00
17712.00
18th m
5%
17712.00
18598.00
19th m
5%
18598.00
19528.00
20th m
5%
19528.00
20504.00
158329.00
166245.00
15833.00
16625.00
(iv)
a
b
c
11989.00
Beyond 10 m upto 20 m
31st m
7.5%
20993.00
26241.00
27553.00
32nd
7.5%
22567.00
28209.00
29619.00
33rd m
7.5%
24260.00
30325.00
31841.00
34th m
7.5%
26080.00
32600.00
34230.00
35th m
7.5%
28036.00
35045.00
36797.00
Page 36 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
7.5%
30139.00
37674.00
39558.00
7.5%
32399.00
40499.00
42524.00
38th m
7.5%
34829.00
43536.00
45713.00
39th m
7.5%
37441.00
46801.00
49141.00
40th m
7.5%
40249.00
50311.00
52827.00
296993.00
371241.00
389803.00
29699.00
37124.00
38980.00
31st m
10%
44274.00
53129.00
55785.00
32nd
10%
48701.00
58441.00
61363.00
33rd m
10%
53571.00
64285.00
67499.00
34th m
10%
58928.00
70714.00
74250.00
35th m
10%
64821.00
77785.00
81674.00
36th m
10%
71303.00
85564.00
89842.00
37th m
10%
78433.00
94120.00
98826.00
38th m
10%
86276.00
103531.00
108708.00
39th m
10%
94904.00
113885.00
119579.00
40th m
10%
104394.00
125273.00
131537.00
705605.00
846727.00
889063.00
70561.00
84673.00
88906.00
Remarks/
Input ref.
Cost Rs
37th m
(v)
Rate Rs
36th m
Quantity
b)
Labour
Mate
day
0.58
151.44
87.84
L-12
Sinker ( skilled )
day
4.00
164.69
658.76
L-15
day
10.00
230.00
2300.00
L-14
Diver
day
0.75
264.50
198.38
L-07
hour
4.50
1073.50
4830.75
P&M-075
hour
3.75
740.15
2775.56
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
760.63
542.56
c)
d)
2430.90
1458.54
16043.91
say
16044.00
1022.00
b)
Material
Gelatine 80 per cent
Kg
7.00
146.00
Electric Detonators
each
30.00
14.56
day
1.60
151.44
M-104
436.80 M-094/100
Labour
Mate
Page 37 of 264
242.30
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
c)
Unit
Quantity
Rate Rs
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
18.00
136.69
2460.42
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
Diver
day
0.50
264.50
132.25
L-07
hour
6.00
1073.50
6441.00
P&M-075
hour
2.00
740.15
1480.30
P&M-063
Machinery
600.51
e)
852.18
2984.33
1790.60
19696.58
say
Section
1200
Remarks/
Input ref.
Driller
12.14
Cost Rs
19697.00
Sandy Soil
Depth below bed level upto 3.0 M
Rate of sinking @ 0.25 m/hour
a)
b)
Labour
Mate
day
0.18
151.44
27.26
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
3.00
230.00
690.00
L-14
hour
4.00
1073.50
4294.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
429.40
1137.54
682.52
7507.76
say
12.14 A
(ii)
7508.00
b)
Labour
Mate
day
0.25
151.44
37.86
L-12
Sinker
day
1.75
164.69
288.21
L-15
day
3.50
230.00
805.00
L-14
hour
5.00
1073.50
5367.50
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
536.75
1407.06
844.24
9286.62
say
12.14 A
(iii)
a
5%
9751.00
5%
10239.00
9287.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
13th m
5%
10751.00
14th m
5%
11289.00
15th m
5%
11853.00
16th m
5%
12446.00
17th m
5%
13068.00
18th m
5%
13721.00
19th m
5%
14407.00
20th m
5%
Add 7.5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add 20 per cent of cost for Kentledge including supports,
loading arrangement and Labour.
21st m
7.5%
16262.00
22nd m
7.5%
17482.00
20978.00
23rd m
7.5%
18793.00
22552.00
24th m
7.5%
20202.00
24242.00
25th m
7.5%
21717.00
26060.00
26th m
7.5%
23346.00
28015.00
27th m
7.5%
25097.00
30116.00
28th m
7.5%
26979.00
32375.00
29th m
7.5%
29002.00
34802.00
30th m
7.5%
31177.00
37412.00
230057.00
276066.00
23006.00
27607.00
10%
34295.00
Including 20%
for Kentledge
41154.00
32nd
10%
37725.00
45270.00
33rd m
10%
41498.00
49798.00
34th m
10%
45648.00
54778.00
35th m
10%
50213.00
60256.00
36th m
10%
55234.00
66281.00
37th m
10%
60757.00
72908.00
38th m
10%
66833.00
80200.00
39th m
10%
73516.00
88219.00
40th m
10%
80868.00
97042.00
80868.00
97042.00
8087.00
9704.00
15127.00
Including 20%
for Kentledge
19514.00
12.14
Remarks/
Input ref.
12265.00
(v)
Cost Rs
Rate Rs
122652.00
Quantity
(i)
b)
Labour
Mate
day
0.22
151.44
33.32
L-12
Sinker ( skilled )
day
2.00
164.69
329.38
L-15
hour
3.50
230.00
805.00
L-14
5.50
1073.50
5904.25
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
590.43
1532.47
Sr No
Ref. to
MoRTH
Spec.
Description
d)
Unit
Quantity
Rate Rs
10114.33
say
(ii)
Remarks/
Input ref.
919.48
Cost Rs
10114.00
b)
Labour
Mate
day
0.32
151.44
48.46
L-12
Sinker
day
2.50
164.69
411.73
L-15
day
4.50
230.00
1035.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
hour
3.50
740.15
2590.53
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay.
Consumables in sinking @ 10 per cent of (b)
c)
d)
903.15
2285.97
1371.58
15087.42
say
12.14 B
(iii)
a
b
Including for
dewatering @
5% of cost, if
required
11th m
5%
15842.00
16634.00
12th m
5%
16634.00
17466.00
13th m
5%
17466.00
18339.00
14th m
5%
18339.00
19256.00
15th m
5%
19256.00
20219.00
16th m
5%
20219.00
21230.00
17th m
5%
21230.00
22292.00
18th m
5%
22292.00
23407.00
19th m
5%
23407.00
24577.00
20th m
5%
24577.00
25806.00
199262.00
209226.00
19926.00
20923.00
(iv)
a
b
c
7.5%
26420.00
33025.00
34676.00
32nd
7.5%
28402.00
35503.00
37278.00
33rd m
7.5%
30532.00
38165.00
40073.00
34th m
7.5%
32822.00
41028.00
43079.00
35th m
7.5%
35284.00
44105.00
46310.00
36th m
7.5%
37930.00
47413.00
49784.00
37th m
7.5%
40775.00
50969.00
53517.00
38th m
7.5%
43833.00
54791.00
57531.00
39th m
7.5%
47120.00
58900.00
61845.00
40th m
7.5%
50654.00
63318.00
66484.00
373772.00
467217.00
490577.00
37377.00
46722.00
49058.00
31st m
15087.00
Beyond 10 m upto 20 m
Sr No
Ref. to
MoRTH
Spec.
Description
a
b
c
Unit
Cost Rs
Remarks/
Input ref.
31st m
10%
55719.00
66863.00
70206.00
32nd
10%
61291.00
73549.00
77226.00
33rd m
10%
67420.00
80904.00
84949.00
34th m
10%
74162.00
88994.00
93444.00
35th m
10%
81578.00
97894.00
102789.00
36th m
10%
89736.00
107683.00
113067.00
37th m
10%
98710.00
118452.00
124375.00
38th m
10%
108581.00
130297.00
136812.00
39th m
10%
119439.00
143327.00
150493.00
40th m
10%
131383.00
157660.00
165543.00
888019.00
1065623.00
1118904.00
88802.00
106562.00
111890.00
Rate Rs
Quantity
b)
Labour
Mate
day
0.68
151.44
102.98
L-12
Sinker ( skilled )
day
4.00
164.69
658.76
L-15
day
12.00
230.00
2760.00
L-14
Diver
day
1.00
264.50
264.50
L-07
hour
5.00
1073.50
5367.50
P&M-075
hour
3.75
740.15
2775.56
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
814.31
637.18
c)
d)
2676.16
1605.69
17662.64
say
17663.00
1168.00
b)
c)
Material
Gelatine 80 per cent
Kg
8.00
146.00
Electric Detonators
each
32.00
14.56
M-104
Mate
day
1.09
151.44
165.07
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
20.00
136.69
2733.80
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
hour
6.00
1073.50
6441.00
P&M-075
hour
2.00
740.15
1480.30
P&M-063
465.92 M-094/100
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer for drilling.
Page 41 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
e)
415.28
2945.39
1767.23
19439.58
say
12.15
Section
1200
Remarks/
Input ref.
603.70
Cost Rs
19440.00
Sandy Soil
Depth below bed level upto 3.0 M
Rate of sinking @ 0.25 m/hour
a)
b)
Labour
Mate
day
0.19
151.44
28.77
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
3.25
230.00
747.50
L-14
hour
4.00
1073.50
4294.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
429.40
1149.34
689.61
7585.66
say
12.15 A
(ii)
7586.00
b)
Labour
Mate
day
0.27
151.44
40.89
L-12
Sinker
day
1.75
164.69
288.21
L-15
day
4.00
230.00
920.00
L-14
hour
5.50
1073.50
5904.25
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
590.43
1548.75
929.25
10221.78
say
12.15 A
(iii)
a
5%
10733.00
12th m
5%
11270.00
13th m
5%
11834.00
14th m
5%
12426.00
15th m
5%
13047.00
16th m
5%
13699.00
17th m
5%
14384.00
18th m
5%
15103.00
19th m
5%
15858.00
20th m
5%
16651.00
135005.00
13501.00
Page 42 of 264
10222.00
Sr No
12.15 A
Ref. to
MoRTH
Spec.
Description
(iv)
a
b
Unit
Add 7.5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add 20 per cent of cost for Kentledge including supports,
loading arrangement and Labour.
21st m
7.5%
17899.83
Including 20%
for Kentledge
21480.00
22nd m
7.5%
19242.00
23090.00
23rd m
7.5%
20685.00
24822.00
24th m
7.5%
22236.00
26683.00
25th m
7.5%
23904.00
28685.00
26th m
7.5%
25697.00
30836.00
27th m
7.5%
27624.00
33149.00
28th m
7.5%
29696.00
35635.00
29th m
7.5%
31923.00
38308.00
30th m
7.5%
34317.00
41180.00
253223.83
303868.00
25322.00
30387.00
10%
37748.70
Including 20%
for Kentledge
45298.00
32nd
10%
41524.00
49829.00
33rd m
10%
45676.00
54811.00
34th m
10%
50244.00
60293.00
35th m
10%
55268.00
66322.00
36th m
10%
60795.00
72954.00
37th m
10%
66875.00
80250.00
38th m
10%
73563.00
88276.00
39th m
10%
80919.00
97103.00
40th m
10%
89011.00
106813.00
601623.70
721949.00
60162.00
72195.00
Rate Rs
Cost Rs
Remarks/
Input ref.
Quantity
(i)
b)
Labour
Mate
day
0.24
151.44
36.35
L-12
Sinker ( skilled )
day
2.25
164.69
370.55
L-15
day
3.75
230.00
862.50
L-14
hour
5.75
1073.50
6172.63
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
d)
617.26
1611.86
967.11
10638.26
say
12.15 B
(ii)
10638.00
b)
Labour
Mate
day
0.34
151.44
51.49
L-12
Sinker
day
2.50
164.69
411.73
L-15
day
5.00
230.00
1150.00
L-14
Machinery
Page 43 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
Quantity
Rate Rs
6.50
1073.50
6977.75
P&M-075
hour
3.75
740.15
2775.56
P&M-063
975.33
2468.37
1481.02
16291.25
say
(iii)
a
b
Including for
dewatering @
5% of cost, if
required
11th m
5%
17106.00
17961.00
12th m
5%
17961.00
18859.00
13th m
5%
18859.00
19802.00
14th m
5%
19802.00
20792.00
15th m
5%
20792.00
21832.00
16th m
5%
21832.00
22924.00
17th m
5%
22924.00
24070.00
18th m
5%
24070.00
25274.00
19th m
5%
25274.00
26538.00
20th m
5%
26538.00
27865.00
215158.00
225917.00
21516.00
22592.00
31st m
7.5%
28528.00
35660.00
37443.00
32nd
7.5%
30668.00
38335.00
40252.00
33rd m
7.5%
32968.00
41210.00
43271.00
34th m
7.5%
35441.00
44301.00
46516.00
35th m
7.5%
38099.00
47624.00
50005.00
36th m
7.5%
40956.00
51195.00
53755.00
37th m
7.5%
44028.00
55035.00
57787.00
38th m
7.5%
47330.00
59163.00
62121.00
39th m
7.5%
50880.00
63600.00
66780.00
40th m
7.5%
54696.00
68370.00
71789.00
403594.00
504493.00
529719.00
40359.00
50449.00
52972.00
(v)
a
b
c
16291.00
Beyond 10 m upto 20 m
31st m
10%
60166.00
72199.00
75809.00
32nd
10%
66183.00
79420.00
83391.00
33rd m
10%
72801.00
87361.00
91729.00
34th m
10%
80081.00
96097.00
100902.00
Page 44 of 264
Remarks/
Input ref.
hour
Cost Rs
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Cost Rs
Remarks/
Input ref.
10%
88089.00
105707.00
110992.00
36th m
10%
96898.00
116278.00
122092.00
37th m
10%
106588.00
127906.00
134301.00
38th m
10%
117247.00
140696.00
147731.00
39th m
10%
128972.00
154766.00
162504.00
40th m
10%
141869.00
170243.00
178755.00
958894.00
1150673.00
1208206.00
95889.00
115067.00
120821.00
0.76
151.44
115.09
L-12
Rate Rs
35th m
Quantity
b)
Labour
Mate
day
Sinker ( skilled )
day
4.00
164.69
658.76
L-15
day
14.00
230.00
3220.00
L-14
Diver
day
1.20
264.50
317.40
L-07
hour
6.50
1073.50
6977.75
P&M-075
hour
4.00
740.15
2960.60
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
993.84
1524.34
c)
d)
3353.56
2012.13
22133.47
say
22133.00
1460.00
b)
c)
Material
Gelatine 80 per cent
Kg
10.00
146.00
Electric Detonators
each
40.00
14.56
M-104
Mate
day
1.17
151.44
177.18
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
22.00
136.69
3007.18
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
Diver
day
1.00
264.50
264.50
L-07
hour
7.00
1073.50
7514.50
P&M-075
hour
2.50
740.15
1850.38
P&M-063
582.40 M-094/100
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer for drilling.
Dewatering @ 5 per cent of cost of (b+c), if required.
703.38
e)
470.27
3456.74
2074.04
22814.46
say
Page 45 of 264
22814.00
Sr No
Ref. to
MoRTH
Spec.
12.16
1200
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Sandy Soil
(i)
b)
Labour
Mate
day
0.20
151.44
30.29
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
3.50
230.00
805.00
L-14
hour
5.00
1073.50
5367.50
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
536.75
1397.31
838.39
9222.28
say
12.16 A
(ii)
9222.00
b)
Labour
Mate
day
0.31
151.44
46.95
L-12
Sinker
day
2.00
164.69
329.38
L-15
day
4.25
230.00
977.50
L-14
hour
5.75
1073.50
6172.63
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
617.26
1628.74
977.25
10749.70
say
12.16 A
(iii)
a
5%
5%
11851.00
13th m
5%
12444.00
14th m
5%
13066.00
15th m
5%
13719.00
16th m
5%
14405.00
17th m
5%
15125.00
18th m
5%
15881.00
19th m
5%
16675.00
20th m
5%
17509.00
141962.00
11287.00
12th m
14196.00
7.5%
18822.00
Including 20%
for Kentledge
22586.00
10750.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
7.5%
20234.00
24281.00
23rd m
7.5%
21752.00
26102.00
24th m
7.5%
23383.00
28060.00
25th m
7.5%
25137.00
30164.00
26th m
7.5%
27022.00
32426.00
27th m
7.5%
29049.00
34859.00
28th m
7.5%
31228.00
37474.00
29th m
7.5%
33570.00
40284.00
30th m
7.5%
36088.00
43306.00
266285.00
319542.00
26629.00
31954.00
10%
39697.00
Including 20%
for Kentledge
47636.00
32nd
10%
43667.00
52400.00
33rd m
10%
48034.00
57641.00
34th m
10%
52837.00
63404.00
35th m
10%
58121.00
69745.00
36th m
10%
63933.00
76720.00
37th m
10%
70326.00
84391.00
38th m
10%
77359.00
92831.00
39th m
10%
85095.00
102114.00
40th m
10%
93605.00
112326.00
632674.00
759208.00
63267.00
75921.00
Rate Rs
22nd m
Quantity
Cost Rs
Remarks/
Input ref.
(i)
b)
Labour
Mate
day
0.25
151.44
37.86
L-12
Sinker ( skilled )
day
2.50
164.69
411.73
L-15
day
5.50
230.00
1265.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
d)
644.10
1759.94
1055.96
11615.58
say
12.16 B
(ii)
11616.00
b)
Labour
Mate
day
0.40
151.44
60.58
L-12
Sinker
day
3.00
164.69
494.07
L-15
day
5.50
230.00
1265.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
hour
4.00
740.15
2960.60
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay
Consumables in sinking @ 10 per cent of (b)
c)
940.16
2432.28
Sr No
Ref. to
MoRTH
Spec.
Description
d)
Unit
Quantity
Rate Rs
1459.37
16053.06
say
12.16 B
(iii)
a
b
Including for
dewatering @
5% of cost, if
required
11th m
5%
16856.00
17699.00
12th m
5%
17699.00
18584.00
13th m
5%
18584.00
19513.00
14th m
5%
19513.00
20489.00
15th m
5%
20489.00
21513.00
16th m
5%
21513.00
22589.00
17th m
5%
22589.00
23718.00
18th m
5%
23718.00
24904.00
19th m
5%
24904.00
26149.00
20th m
5%
26149.00
27456.00
212014.00
222614.00
21201.00
22261.00
31st m
7.5%
28110.00
35138.00
36895.00
32nd
7.5%
30218.00
37773.00
39662.00
33rd m
7.5%
32484.00
40605.00
42635.00
34th m
7.5%
34920.00
43650.00
45833.00
35th m
7.5%
37539.00
46924.00
49270.00
36th m
7.5%
40354.00
50443.00
52965.00
37th m
7.5%
43381.00
54226.00
56937.00
38th m
7.5%
46635.00
58294.00
61209.00
39th m
7.5%
50133.00
62666.00
65799.00
40th m
7.5%
53893.00
67366.00
70734.00
397667.00
497085.00
521939.00
39767.00
49709.00
52194.00
(v)
a
b
c
16053.00
Beyond 10 m upto 20 m
Cost Rs
31st m
10%
59282.00
71138.00
74695.00
32nd
10%
65210.00
78252.00
82165.00
33rd m
10%
71731.00
86077.00
90380.85
34th m
10%
78904.00
94685.00
99419.25
35th m
10%
86794.00
104153.00
109360.65
36th m
10%
95473.00
114568.00
120296.40
37th m
10%
105020.00
126024.00
132325.20
38th m
10%
115522.00
138626.00
145557.30
39th m
10%
127074.00
152489.00
160113.45
Page 48 of 264
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
40th m
Unit
Quantity
10%
139781.00
167737.00
176123.85
944791.00
1133749.00
1190436.95
94479.00
113375.00
119044.00
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.86
151.44
130.24
L-12
Sinker ( skilled )
day
4.00
164.69
658.76
L-15
day
16.00
230.00
3680.00
L-14
Diver
day
1.40
264.50
370.30
L-07
hour
7.00
1073.50
7514.50
P&M-075
hour
4.25
740.15
3145.64
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
1066.01
586.31
c)
3430.35
d)
2058.21
22640.32
say
22640.00
1606.00
b)
c)
Material
Gelatine 80 per cent
Kg
11.00
146.00
Electric Detonators
each.
44.00
14.56
Mate
day
1.27
151.44
192.33
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
24.00
136.69
3280.56
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
hour
8.50
1073.50
9124.75
P&M-075
hour
3.00
740.15
2220.45
P&M-063
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer or drill
Dewatering @ 5 per cent of cost (c), if required.
d)
e)
567.26
1663.92
4109.96
2465.98
27125.73
say
12.17
1200
M-104
640.64 M-094/100
Sandy Soil
Page 49 of 264
27126.00
Sr No
Ref. to
MoRTH
Spec.
Description
(i)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.21
151.44
31.80
L-12
Sinker ( skilled )
day
1.50
164.69
247.04
L-15
day
3.30
230.00
759.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
d)
e)
644.10
1624.59
974.75
10722.28
21444.55
say
12.17 A
(ii)
21445.00
b)
Labour
Mate
day
0.32
151.44
48.46
L-12
Sinker
day
2.00
164.69
329.38
L-15
day
4.50
230.00
1035.00
L-14
hour
4.00
1073.50
4294.00
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
429.40
1227.25
736.35
8099.84
16199.68
say
12.17 A
(iii)
a
5%
17010.00
12th m
5%
17861.00
13th m
5%
18754.00
14th m
5%
19692.00
15th m
5%
20677.00
16th m
5%
21711.00
17th m
5%
22797.00
18th m
5%
23937.00
19th m
5%
25134.00
20th m
5%
(iv)
a
b
26391.00
213964.00
21396.00
7.5%
28370.00
Including 20%
for Kentledge
34044.00
22nd m
7.5%
30498.00
36598.00
23rd m
7.5%
32785.00
39342.00
24th m
7.5%
35244.00
42293.00
25th m
7.5%
37887.00
45464.00
26th m
7.5%
40729.00
48875.00
27th m
7.5%
43784.00
52541.00
28th m
7.5%
47068.00
56482.00
Page 50 of 264
16200.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
7.5%
50598.00
30th m
7.5%
54393.00
65272.00
401356.00
481629.00
40136.00
48163.00
10%
59832.00
32nd
10%
65815.00
78978.00
33rd m
10%
72397.00
86876.00
34th m
10%
79637.00
95564.00
35th m
10%
87601.00
105121.00
36th m
10%
96361.00
115633.00
37th m
10%
105997.00
127196.00
38th m
10%
116597.00
139916.00
39th m
10%
128257.00
153908.00
40th m
10%
141083.00
169300.00
953577.00
1144290.00
95358.00
114429.00
Cost Rs
Remarks/
Input ref.
60718.00
Including 20%
for Kentledge
71798.00
Rate Rs
29th m
Total Cost from 20m upto 30m
12.17 A
Quantity
(i)
b)
Labour
Mate
day
0.26
151.44
39.37
L-12
Sinker ( skilled )
day
2.50
164.69
411.73
L-15
day
4.00
230.00
920.00
L-14
hour
5.00
1073.50
5367.50
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
d)
536.75
1455.07
873.04
9603.46
19206.92
say
12.17 B
(ii)
19207.00
b)
Labour
Mate
day
0.43
151.44
65.12
L-12
Sinker
day
3.50
164.69
576.42
L-15
day
5.75
230.00
1322.50
L-14
hour
6.00
1073.50
6441.00
P&M-075
hour
4.25
740.15
3145.64
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay
Consumables in sinking @ 10 per cent of (b)
c)
d)
958.66
2501.87
1501.12
16512.32
33024.65
say
12.17 B
(iii)
a
Beyond 10 m upto 20 m
Add 5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Page 51 of 264
33025.00
Sr No
Ref. to
MoRTH
Spec.
Description
b
Unit
11th m
5%
34676.00
36410.00
12th m
5%
36410.00
38231.00
13th m
5%
38231.00
40143.00
14th m
5%
40143.00
42150.00
15th m
5%
42150.00
44258.00
16th m
5%
44258.00
46471.00
17th m
5%
46471.00
48795.00
18th m
5%
48795.00
51235.00
19th m
5%
51235.00
53797.00
20th m
5%
53797.00
56487.00
436166.00
457974.00
43617.00
45797.00
Add 7.5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add 5 per cent of cost for dewatering on the cost, if required
Add 25 per cent of cost for Kentledge including supports,
loading arrangement and Labour ).
31st m
7.5%
57832.00
72290.00
75905.00
32nd
7.5%
62169.00
77711.00
81597.00
33rd m
7.5%
66832.00
83540.00
87717.00
34th m
7.5%
71844.00
89805.00
94295.00
35th m
7.5%
77232.00
96540.00
101367.00
36th m
7.5%
83024.00
103780.00
108969.00
37th m
7.5%
89251.00
111564.00
117142.00
38th m
7.5%
95945.00
119931.00
125928.00
39th m
7.5%
103141.00
128926.00
135372.00
40th m
7.5%
110877.00
138596.00
145526.00
818147.00
1022683.00
1073817.00
81815.00
102268.00
107382.00
10%
121965.00
146358.00
153676.00
32nd
10%
134162.00
160994.00
169044.00
33rd m
10%
147578.00
177094.00
185949.00
34th m
10%
162336.00
194803.00
204543.00
35th m
10%
178570.00
214284.00
224998.00
36th m
10%
196427.00
235712.00
247498.00
37th m
10%
216070.00
259284.00
272248.00
38th m
10%
237677.00
285212.00
299473.00
39th m
10%
261445.00
313734.00
329421.00
40th m
10%
287590.00
345108.00
362363.00
1943820
2332583
2449213
194382.00
233258.00
244921.00
31st m
Cost Rs
Rate Rs
Including for
dewatering @
5% of cost, if
required
Quantity
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.95
151.44
143.87
L-12
Sinker ( skilled )
day
4.25
164.69
699.93
L-15
day
18.00
230.00
4140.00
L-14
Diver
day
1.50
264.50
396.75
L-07
hour
8.00
1073.50
8588.00
P&M-075
hour
4.50
740.15
3330.68
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @ 10 per cent of (b)
1191.87
d)
655.53
3829.32
2297.59
25273.54
50547.08
say
50547.00
1752.00
b)
c)
Material
Gelatine 80 per cent
Kg
12.00
146.00
Electric Detonators
each.
48.00
14.56
Mate
day
1.35
151.44
204.44
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
26.00
136.69
3553.94
L-13
Mazdoor (Skilled)
day
4.00
164.69
658.76
L-15
hour
10.00
1073.50
10735.00
P&M-075
hour
3.50
740.15
2590.53
P&M-063
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer or drill
Dewatering @ 5 per cent of cost (c), if required.
d)
e)
666.28
1833.78
4657.75
2794.65
30741.12
1200
M-104
698.88 M-094/100
61482.25
say
61482.00
151.44
33.32
Sandy Soil
(i)
Labour
Mate
day
Page 53 of 264
0.22
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
day
1.75
164.69
288.21
L-15
day
4.00
230.00
920.00
L-14
hour
6.00
1073.50
6441.00
P&M-075
Machinery
c)
d)
644.10
1665.32
999.19
10991.14
43964.58
say
(ii)
Remarks/
Input ref.
Sinker ( skilled )
12.18 A
Cost Rs
43965.00
b)
Labour
Mate
day
0.37
151.44
56.03
L-12
Sinker
day
2.50
164.69
411.73
L-15
day
4.75
230.00
1092.50
L-14
hour
6.50
1073.50
6977.75
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
697.78
1847.16
1108.29
12191.23
48764.93
say
12.18 A
(iii)
a
5%
51203.00
12th m
5%
53763.00
13th m
5%
56451.15
14th m
5%
59273.71
15th m
5%
62237.39
16th m
5%
65349.26
17th m
5%
68616.73
18th m
5%
72047.56
19th m
5%
75649.94
20th m
5%
(iv)
a
b
79432.44
644024.18
64402.00
7.5%
85390.00
Including 20%
for Kentledge
102468.00
22nd m
7.5%
91794.00
110153.00
23rd m
7.5%
98679.00
118415.00
24th m
7.5%
106080.00
127296.00
25th m
7.5%
114036.00
136843.00
26th m
7.5%
122589.00
147107.00
27th m
7.5%
131783.00
158140.00
28th m
7.5%
141667.00
170000.00
29th m
7.5%
152292.00
182750.00
30th m
7.5%
163714.00
196457.00
1208024.00
1449629.00
120802.00
144963.00
48765.00
Sr No
12.18 A
Ref. to
MoRTH
Spec.
Description
Unit
(v)
10%
180085.00
32nd
10%
198094.00
237713.00
33rd m
10%
217903.00
261484.00
34th m
10%
239693.00
287632.00
35th m
10%
263662.00
316394.00
36th m
10%
290028.00
348034.00
37th m
10%
319031.00
382837.00
38th m
10%
350934.00
421121.00
39th m
10%
386027.00
463232.00
40th m
10%
424630.00
509556.00
Rate Rs
Including 20%
for Kentledge
216102.00
Quantity
2870087
3444105
287009.00
344411.00
Cost Rs
Remarks/
Input ref.
(i)
b)
Labour
Mate
day
0.30
151.44
45.43
L-12
Sinker ( skilled )
day
3.00
164.69
494.07
L-15
day
4.50
230.00
1035.00
L-14
hour
6.25
1073.50
6709.38
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
d)
670.94
1790.96
1074.58
11820.36
47281.42
say
12.18 B
(ii)
47281.00
b)
Labour
Mate
day
0.48
151.44
72.69
L-12
Sinker
day
3.75
164.69
617.59
L-15
day
6.00
230.00
1380.00
L-14
hour
8.33
1073.50
8942.26
P&M-075
hour
4.50
740.15
3330.68
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay.
Consumables in sinking @ 10 per cent of (b)
1227.29
c)
3114.10
d)
1868.46
20553.06
82212.25
say
12.18 B
(iii)
a
b
Beyond 10 m upto 20 m
Add 5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add for dewatering @ 5 per cent of cost, if required.
Page 55 of 264
Including for
dewatering @
5% of cost, if
required
82212.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
5%
86323.00
90639.00
12th m
5%
90639.00
95171.00
13th m
5%
95171.00
99930.00
14th m
5%
99930.00
104927.00
15th m
5%
104927.00
110173.00
16th m
5%
110173.00
115682.00
17th m
5%
115682.00
121466.00
18th m
5%
121466.00
127539.00
19th m
5%
127539.00
133916.00
20th m
5%
133916.00
140612.00
1085766.00
1140055.00
108577.00
114006.00
Add 7.5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add 5 per cent of cost for dewatering on the cost, if required
Add 25 per cent of cost for Kentledge including supports,
loading arrangement and Labour ).
31st m
7.5%
143960.00
179950.00
32nd
7.5%
154757.00
193446.00
203118.00
33rd m
7.5%
166364.00
207955.00
218353.00
34th m
7.5%
178841.00
223551.00
234729.00
35th m
7.5%
192254.00
240318.00
252334.00
36th m
7.5%
206673.00
258341.00
271258.00
37th m
7.5%
222173.00
277716.00
291602.00
38th m
7.5%
238836.00
298545.00
313472.00
39th m
7.5%
256749.00
320936.00
336983.00
40th m
7.5%
276005.00
345006.00
362256.00
2036612
2545764
2673053
203661.00
254576.00
267305.00
10%
303606.00
364327.00
382543.00
32nd
10%
333967.00
400760.00
420798.00
33rd m
10%
367364.00
440837.00
462879.00
34th m
10%
404100.00
484920.00
509166.00
35th m
10%
444510.00
533412.00
560083.00
36th m
10%
488961.00
586753.00
616091.00
37th m
10%
537857.00
645428.00
677699.00
38th m
10%
591643.00
709972.00
745471.00
39th m
10%
650807.00
780968.00
820016.00
40th m
10%
715888.00
859066.00
902019.00
4838703
5806443
6096765
483870.00
580644.00
609677.00
31st m
188948.00
Cost Rs
Rate Rs
11th m
Quantity
Labour
Page 56 of 264
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
Quantity
Rate Rs
day
1.06
151.44
160.53
L-12
Sinker ( skilled )
day
4.50
164.69
741.11
L-15
day
20.00
230.00
4600.00
L-14
Diver
day
1.75
264.50
462.88
L-07
hour
10.00
1073.50
10735.00
P&M-075
hour
4.75
740.15
3515.71
P&M-063
Machinery
1425.07
d)
783.79
4484.82
2690.89
29599.78
Remarks/
Input ref.
Mate
12.18
Cost Rs
118399.14
say
118399.00
2044.00
(i)
Material
Gelatine80 per cent
Kg
14.00
146.00
each.
56.00
14.56
Mate
day
1.44
151.44
218.07
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
28.00
136.69
3827.32
L-13
Mazdoor (Skilled)
day
4.50
164.69
741.11
L-15
hour
12.50
1073.50
13418.75
P&M-075
hour
4.00
740.15
2960.60
P&M-063
Electric detonator
b)
c)
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer or drill
Dewatering @ 5 per cent, if required.
818.97
1719.83
d)
5431.83
e)
3259.10
35850.06
143400.22
say
12.19
1200
M-104
815.36 M-094/100
143400.00
Sandy Soil
(i)
Labour
Mate
day
0.20
151.44
30.29
L-12
Sinker ( skilled )
day
1.25
164.69
205.86
L-15
Page 57 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
day
3.75
230.00
862.50
L-14
hour
5.50
1073.50
5904.25
P&M-075
c)
d)
590.43
1518.67
911.20
10023.19
say
(ii)
Remarks/
Input ref.
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
12.19 A
Cost Rs
10023.00
b)
Labour
Mate
day
0.30
151.44
45.43
L-12
Sinker
day
1.50
164.69
247.04
L-15
day
4.00
230.00
920.00
L-14
hour
5.88
1073.50
6312.18
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @10 per cent of (b)
c)
d)
631.22
1631.17
978.70
10765.74
say
12.19 A
(iii)
a
5%
5%
11869.00
13th m
5%
12462.00
14th m
5%
13085.00
15th m
5%
13739.00
16th m
5%
14426.00
17th m
5%
15147.00
18th m
5%
15904.00
19th m
5%
16699.00
20th m
5%
14217.00
7.5%
18849.00
Including 20%
for Kentledge
22619.00
22nd m
7.5%
20263.00
24316.00
23rd m
7.5%
21783.00
26140.00
24th m
7.5%
23417.00
28100.00
25th m
7.5%
25173.00
30208.00
26th m
7.5%
27061.00
32473.00
27th m
7.5%
29091.00
34909.00
28th m
7.5%
31273.00
37528.00
29th m
7.5%
33618.00
40342.00
30th m
7.5%
36139.00
43367.00
266667.00
320002.00
26667.00
32000.00
17534.00
142169.00
11304.00
12th m
(v)
Page 58 of 264
10766.00
Sr No
Ref. to
MoRTH
Spec.
Description
b
Unit
10%
39753.00
32nd
10%
43728.00
52474.00
33rd m
10%
48101.00
57721.00
34th m
10%
52911.00
63493.00
35th m
10%
58202.00
69842.00
36th m
10%
64022.00
76826.00
37th m
10%
70424.00
84509.00
38th m
10%
77466.00
92959.00
39th m
10%
85213.00
102256.00
40th m
10%
Rate Rs
Including 20%
for Kentledge
47704.00
Quantity
93734.00
112481.00
633554.00
760265.00
63355.00
76027.00
Cost Rs
Remarks/
Input ref.
(i)
b)
Labour
Mate
day
0.26
151.44
39.37
L-12
Sinker ( skilled )
day
2.50
day
4.00
164.69
411.73
L-15
230.00
920.00
L-14
hour
6.25
1073.50
6709.38
P&M-075
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Consumables in sinking @ 10 per cent of (b)
c)
d)
670.94
1750.28
1050.17
11551.86
say
12.19 B
(ii)
11552.00
b)
Labour
Mate
day
0.45
151.44
68.15
L-12
Sinker
day
3.25
164.69
535.24
L-15
day
6.00
230.00
1380.00
L-14
hour
6.67
1073.50
7160.25
P&M-075
hour
4.50
740.15
3330.68
P&M-063
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for
cutting hard clay.
Consumables in sinking @ 10 per cent of (b)
c)
d)
1049.09
2704.68
1622.81
17850.89
say
12.19 B
(iii)
a
b
Beyond 10 m upto 20 m
Add 5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add for dewatering @ 5 per cent of cost, if required.
Including for
dewatering @
5% of cost, if
required
11th m
5%
18743.00
19680.00
12th m
5%
19680.00
20664.00
13th m
5%
20664.00
21697.00
14th m
5%
21697.00
22782.00
15th m
5%
22782.00
23921.00
Page 59 of 264
17851.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
5%
23921.00
25117.00
17th m
5%
25117.00
26373.00
18th m
5%
26373.00
27692.00
19th m
5%
27692.00
29077.00
20th m
5%
29077.00
30531.00
235746.00
247534.00
23575.00
24753.00
a
b
c
31st m
7.5%
31258.00
39073.00
41027.00
32nd
7.5%
33602.00
42003.00
44103.00
33rd m
7.5%
36122.00
45153.00
47411.00
34th m
7.5%
38831.00
48539.00
50966.00
35th m
7.5%
41743.00
52179.00
54788.00
36th m
7.5%
44874.00
56093.00
58898.00
37th m
7.5%
48240.00
60300.00
63315.00
38th m
7.5%
51858.00
64823.00
68064.00
39th m
7.5%
55747.00
69684.00
73168.00
40th m
7.5%
59928.00
74910.00
78656.00
442203.00
552757.00
580396.00
44220.00
55276.00
58040.00
31st m
10%
65921.00
79105.00
32nd
10%
72513.00
87016.00
91367.00
33rd m
10%
79764.00
95717.00
100503.00
34th m
10%
87740.00
105288.00
110552.00
35th m
10%
96514.00
115817.00
121608.00
36th m
10%
106165.00
127398.00
133768.00
37th m
10%
116782.00
140138.00
147145.00
38th m
10%
128460.00
154152.00
161860.00
39th m
10%
141306.00
169567.00
178045.00
40th m
10%
155437.00
186524.00
195850.00
1050602.00
1260722.00
1323758.00
105060.00
126072.00
132376.00
Remarks/
Input ref.
Add 7.5 per cent for every additional meter depth of sinking
over the rate of sinking for the previous meter
Add 5 per cent of cost for dewatering on the cost, if required
Cost Rs
Rate Rs
16th m
Quantity
83060.00
b)
Labour
Mate
day
0.86
151.44
130.24
L-12
Sinker ( skilled )
day
4.50
164.69
741.11
L-15
day
15.00
230.00
3450.00
L-14
Diver
day
1.50
264.50
396.75
L-07
Machinery
Page 60 of 264
Sr No
Ref. to
MoRTH
Spec.
Quantity
Rate Rs
Unit
hour
8.33
1073.50
8942.26
P&M-075
hour
6.00
740.15
4440.90
P&M-063
1338.32
d)
736.07
4035.13
2421.08
Cost Rs
Remarks/
Input ref.
Description
26631.84
say
26632.00
1460.00
b)
c)
Material
Geletine80 per cent
Kg
10.00
146.00
Electric detonators
each.
40.00
14.56
Mate
day
1.34
151.44
202.93
L-12
Driller
day
2.00
264.50
529.00
L-06
Blaster
day
0.25
264.50
66.13
L-03
Mazdoor
day
25.00
136.69
3417.25
L-13
Mazdoor (Skilled)
day
4.25
164.69
699.93
L-15
hour
10.00
1073.50
10735.00
P&M-075
hour
3.00
740.15
2220.45
P&M-063
Labour
Machinery
Hire & running charges of crane with grab bucket of
0.75 cum capacity and accessories.
Hire & running charges of compressor with pneumatic
breaker/Jack hammer or drill
Dewatering @ 5 per cent of cost of (b+c), if required.
893.53
1384.90
d)
4438.30
e)
2662.98
1200
M-104
582.40 M-094/100
29292.81
say
29293.00
Unit - 1 cum
Taking output = 5 cum
a)
Material
M35 grade RCC corbel provided for supporting of
equipment (Dimensions as per ground conditions).
Rate may be adopted vide Item 12.8 (H)
Cum
8.00
5217.00
41736.00
Item 12.8
(H)
tonne
0.48
45000.00
21600.00
M-082
Kg
1.50
146.00
219.00
M-104
Electric detonators
each
6.00
14.56
Blasting material
Page 61 of 264
87.36 M-094/100
Sr No
Ref. to
MoRTH
Spec.
Description
b)
c)
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Labour
Medical Officer
day
0.50
304.20
152.10
L-16
day
1.00
264.50
264.50
L-19
Mate
day
1.86
151.44
281.68
L-12
Driller
day
1.00
264.50
264.50
L-06
Blaster
day
0.50
264.50
132.25
L-03
day
30.00
136.69
4100.70
L-13
day
10.00
164.69
1646.90
L-15
Diver
day
4.00
264.50
1058.00
L-07
hour
6.00
1000.00
6000.00
P&M-082
L.S
L.S
hour
Machinery
100000.00
150000.00
6.00
4170.00
25020.00
P&M-038
hour
2x6
319.00
3828.00
P&M-001
hour
6.00
349.59
2097.56
P&M-072
hour
6.00
100.00
600.00
P&M-066
hour
6.00
100.00
600.00
P&M-066
hour
6.00
406.80
2440.80
P&M-079
hour
6.00
339.00
2034.00
P&M-048
d)
64485.47
e)
38691.28
12.21
1207
Material
Sand (assuming 20 per cent voids )
b)
c)
cum
1.20
476.80
572.16
M-006
Mate
day
0.01
151.44
1.51
L-12
Mazdoor
day
0.30
136.69
41.01
L-13
Labour
122.94
Sr No
Ref. to
MoRTH
Spec.
Description
d)
Unit
Quantity
Rate Rs
1200 &
1900
Remarks/
Input ref.
73.76
Cost Rs
811.38
say
811.00
47250.00
Material
i) Structural steel including 5 per cent wastage
b)
tonne
1.05
45000.00
Mate
day
1.24
151.44
187.79
L-12
Fitter
day
6.00
230.00
1380.00
L-08
Blacksmith
day
5.00
230.00
1150.00
L-01
Welder
day
5.00
264.50
1322.50
L-02
Mazdoor
day
10.00
136.69
1366.90
L-13
c)
d)
2362.50
11003.94
6602.36
72625.98
say
12.23
1100 &
1700
M-179
Labour
72626.00
Materials
PCC Grade M35
cum
6.62
5260.00
hour
6.00
5464.00
32784.00
P&M-036
hour
0.50
357.00
178.50
P&M-013
hour
hour
241.80
P&M-017
hour
0.30
339.00
101.70
P&M-048
kg
300.00
4.10
1230.00
M-071
Mate/Supervisor
day
0.14
151.44
21.20
L-12
Mazdoor
day
3.50
136.69
478.42
L-13
c)
Labour
d)
e)
7007.12
4204.27
81068.21
5404.55
say
12.24
1100,160
0 & 1700
Page 63 of 264
5405.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Unit = meter
Taking output = 10 m
a)
Materials
PCC Grade M35
cum
7.85
5260.00
hour
6.00
5464.00
32784.00
P&M-036
hour
0.50
357.00
178.50
P&M-013
hour
hour
322.40
P&M-017
hour
0.40
339.00
135.60
P&M-048
kg
350.00
4.10
1435.00
M-071
Mate/Supervisor
day
0.16
151.44
24.23
L-12
Mazdoor
day
4.00
136.69
546.76
L-13
c)
Labour
d)
e)
7085.30
4251.18
88053.97
8805.40
say
12.25
1100 &
1700
8805.00
Materials
PCC Grade M35
cum
10.17
5260.00
hour
6.00
5464.00
32784.00
P&M-036
hour
0.50
357.00
178.50
P&M-013
hour
hour
403.00
P&M-017
hour
0.50
339.00
169.50
P&M-048
kg
385.00
4.10
1578.50
M-071
Mate/Supervisor
day
0.18
151.44
27.26
L-12
Mazdoor
day
4.50
136.69
615.11
L-13
c)
Labour
d)
e)
7151.17
4290.70
100691.94
11187.99
say
Page 64 of 264
11188.00
Sr No
12.26
Ref. to
MoRTH
Spec.
Description
1100 &
1700
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Materials
PCC Grade M35
cum
17.66
5260.00
Kg
160.00
59.60
9536.00
M-080
Kg
70.00
52.15
3650.50
M-124
Kg
50.00
61.00
3050.00
M-173
hour
6.00
5974.88
35849.25
P&M-085
hour
0.50
825.00
412.50
P&M-070
Mate/Supervisor
day
0.12
151.44
18.17
L-12
Mazdoor
day
3.00
136.69
410.07
L-13
c)
Labour
e)
f)
10585.30
6351.18
162754.57
4068.86
say
Note
12.27
1100 &
1700
4069.00
Materials
PCC Grade M35
cum
23.55
5260.00
Kg
160.00
59.60
9536.00
M-080
Kg
70.00
52.15
3650.50
M-124
Kg
50.00
61.00
3050.00
M-173
hour
6.00
5974.88
35849.25
P&M-085
hour
0.50
116.53
58.27
P&M-070
c)
Page 65 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
d)
Unit
Quantity
Rate Rs
hour
0.50
357.00
Mate/Supervisor
day
0.16
Mazdoor
day
4.00
e)
f)
P&M-013
151.44
24.23
L-12
136.69
546.76
L-13
10578.70
6347.22
193692.43
6456.41
say
12.28
1100 &
1700
Remarks/
Input ref.
178.50
Note
Cost Rs
6456.00
Materials
PCC Grade M35
cum
22.61
5260.00
Kg
160.00
59.60
9536.00
M-080
Kg
70.00
52.15
3650.50
M-124
Kg
50.00
61.00
3050.00
M-173
hour
6.00
5974.88
35849.25
P&M-085
hour
0.50
116.53
58.27
P&M-070
Mate/Supervisor
day
0.18
151.44
27.26
L-12
Mazdoor
day
4.50
136.69
615.11
L-13
c)
d)
Machinery
e)
f)
10557.28
6334.37
188606.62
9430.33
say
Note
12.29
1100 &
1700
9430.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Taking output = 60 m
a)
Materials
RCC Grade M35
cum
11.78
5114.00
a) C.I Shoes
Kg
240.00
59.60
14304.00
M-080
b) M.S. shoes
Kg
105.00
37.00
3885.00
M-125
Kg
30.00
61.00
1830.00
M-173
c)
hour
6.00
466.13
2796.75
P&M-073
hour
6.00
1000.00
6000.00
P&M-092
d)
day
0.12
151.44
18.17
L-12
Mazdoor
day
3.00
136.69
410.07
L-13
e)
f)
894.87
6027.77
3616.66
100026.22
1667.10
say
Note
12.30
1100 &
1700
1667.00
Materials
RCC Grade M35
cum
22.08
5114.00
a) C.I. shoes
Kg
160.00
59.60
9536.00
M-080
b) M.S. shoes
Kg
70.00
37.00
2590.00
M-125
Kg
40.00
61.00
2440.00
M-173
c)
hour
6.00
932.25
5593.50
P&M-074
hour
6.00
1000.00
6000.00
P&M-092
d)
day
0.16
151.44
24.23
L-12
Mazdoor
day
4.00
136.69
546.76
L-13
1396.48
e)
5625.39
f)
3375.24
150044.72
3000.89
say
Page 67 of 264
3001.00
Sr No
Ref. to
MoRTH
Spec.
Description
Note
12.31
1100 &
1700
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Materials
RCC Grade M35
cum
31.40
5114.00
Kg
160.00
59.60
9536.00
M-080
Kg
70.00
37.00
2590.00
M-125
Kg
50.00
61.00
3050.00
M-173
c)
hour
6.00
1279.00
7674.00
P&M-011
hour
6.00
1000.00
6000.00
P&M-092
d)
day
0.20
151.44
30.29
L-12
Mazdoor
day
5.00
136.69
683.45
L-13
e)
f)
1901.43
6293.03
3775.82
202113.63
5052.84
say
Note
12.32
1100&17
00
5053.00
Materials
c)
cum
5.40
5114.00
a) C I shoes
kg
240.00
59.60
14304.00
M-080
b) M. S shoes
kg
105.00
37.00
3885.00
M-125
Kg
30.00
61.00
1830.00
M-173
hour
6.00
1237.50
7425.00
P&M-071
hour
6.00
1000.00
6000.00
P&M-092
Mate/Supervisor
day
0.12
151.44
18.17
L-12
Mazdoor
day
3.00
136.69
410.07
L-13
614.88
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
e)
f)
Quantity
Rate Rs
4138.45
73138.60
1218.98
say
12.33
1100
&1700
Remarks/
Input ref.
6897.42
Note
Cost Rs
1219.00
Materials
c)
cum
12.50
5114.00
a) C I shoes
kg
160.00
59.60
9536.00
M-080
b) M. S shoes
kg
70.00
37.00
2590.00
M-125
Kg
30.00
61.00
1830.00
M-173
hour
6.00
466.13
2796.75
P&M-073
hour
6.00
1000.00
6000.00
P&M-092
Mate/Supervisor
day
0.16
151.44
24.23
L-12
Mazdoor
day
4.00
136.69
546.76
L-13
f)
872.49
4839.25
2903.55
95864.02
1917.28
say
Note
12.34
1100
&1700
1917.00
Materials
cum
22.50
5114.00
a) C I shoes
kg
160.00
59.60
9536.00
M-080
b) M. S shoes
kg
70.00
37.00
2590.00
M-125
Kg
30.00
61.00
1830.00
M-173
hour
6.00
466.13
2796.75
P&M-073
hour
6.00
1000.00
6000.00
P&M-092
Pile shoes
c)
Page 69 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
d ) Labour
Mate/Supervisor
day
0.18
151.44
27.26
L-12
Mazdoor
day
4.50
136.69
615.11
L-13
e)
f)
1384.60
4955.94
2973.57
147774.22
12.35
1100,
1900
3694.36
say
3694.00
45000.00
271800.00
Materials
b)
c)
tonnes
6.04
Crane 10 T capacity
hour
6.00
233.06
1398.38
P&M-071
hour
6.00
1000.00
6000.00
P&M-092
Mate/Supervisor
day
0.12
151.44
18.17
L-12
Mazdoor
day
3.00
136.69
410.07
L-13
e)
1398.13
56204.95
33722.97
370952.67
1100
&1900
M-179
5299.32
say
5299.00
45000.00
262350.00
Materials
b)
c)
tonnes
5.83
Crane 10 T capacity
hour
6.00
233.06
1398.38
P&M-071
hour
6.00
1000.00
6000.00
P&M-092
Mate/Supervisor
day
0.14
151.44
21.20
L-12
Mazdoor
day
3.50
136.69
478.42
L-13
1351.24
d)
54319.85
e)
32591.91
Page 70 of 264
M-179
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
5975.18
say
1100
Remarks/
Input ref.
358510.99
Cost Rs
5975.00
Note
12.38
1100,
1500
&1700
tonne
1.00
300.00
tonne
1.00
5000.00
Cement
tonne
5.12
5000.00
25600.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
230.00
345.00
L-10
day
20.00
136.69
2733.80
L-13
day
1.00
136.69
136.69
L-13
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
(i)
b)
c)
Material
Labour
d)
e)
2053.60
10678.72
6407.23
70479.54
(ii)
4698.64
say
4699.00
b)
c)
Material
Cement
tonne
5.12
5000.00
25600.00
M-081
Coarse sand
cum
6.75
828.00
5589.00
M-004
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.16
151.44
24.23
L-12
Mason
day
0.38
230.00
87.40
L-10
day
2.50
136.69
341.73
L-13
day
1.00
136.69
136.69
L-13
hour
0.75
2232.00
1674.00
P&M-002
hour
0.75
762.75
572.06
P&M-080
hour
0.75
806.00
604.50
P&M-017
hour
2.00
1017.00
2034.00
P&M-049
Labour
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Concrete Pump
d)
e)
Quantity
Rate Rs
tonne.km
37.5L
2.03
hour
0.75
256.00
76.28
Lead =1
km & P&M050
192.00
P&M-007
10542.62
6325.57
69581.31
12.38
Remarks/
Input ref.
2027.43
Note
Cost Rs
4638.75
say
4639.00
(i)
b)
c)
Material
Cement
tonne
5.99
5000.00
29950.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
230.00
345.00
L-10
day
20.00
136.69
2733.80
L-13
day
1.00
136.69
136.69
L-13
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Labour
d)
e)
2227.60
11583.52
6950.11
76451.22
(ii)
5096.75
say
5097.00
b)
c)
Material
Cement
tonne
5.99
5000.00
29950.00
M-081
Coarse sand
cum
6.75
828.00
5589.00
M-004
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.16
151.44
24.23
L-12
Mason
day
0.38
230.00
87.40
L-10
day
2.50
136.69
341.73
L-13
day
1.00
136.69
136.69
L-13
hour
0.75
2232.00
1674.00
P&M-002
hour
0.75
652.00
489.00
P&M-018
hour
0.75
806.00
604.50
P&M-017
hour
2.00
1017.00
2034.00
P&M-049
tonne.km
37.5L
2.03
76.28
Labour
Page 72 of 264
Lead =1
km & P&M050
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Concrete Pump
hour
d)
e)
Quantity
0.75
Rate Rs
256.00
P&M-007
11430.15
6858.09
75438.96
12.38
192.00
Remarks/
Input ref.
2198.10
Note
Cost Rs
5029.26
say
5029.00
(i)
b)
c)
Material
Cement
tonne
6.10
5000.00
30500.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
230.00
345.00
L-10
day
20.00
136.69
2733.80
L-13
day
1.00
136.69
136.69
L-13
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Labour
d)
e)
2249.60
11697.92
7018.75
77206.26
(ii)
5147.08
say
5147.00
b)
c)
Material
Cement
tonne
6.10
5000.00
30500.00
M-081
Coarse sand
cum
6.75
828.00
5589.00
M-004
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.16
151.44
24.23
L-12
Mason
day
0.38
230.00
87.40
L-10
day
2.50
136.69
341.73
L-13
day
1.00
136.69
136.69
L-13
hour
0.75
2232.00
1674.00
P&M-002
hour
0.75
762.75
572.06
P&M-080
hour
0.75
806.00
604.50
P&M-017
P&M-049
Labour
Concrete Pump
Page 73 of 264
hour
2.00
1017.00
2034.00
tonne.km
37.5L
2.03
76.28
Lead =1
km & P&M050
hour
0.75
256.00
192.00
P&M-007
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
e)
Quantity
Rate Rs
11561.82
6937.09
76308.03
12.38
Remarks/
Input ref.
2223.43
Note
Cost Rs
5087.20
say
5087.00
(i)
b)
c)
Material
Cement
tonne
6.33
5000.00
31650.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.90
151.44
136.30
L-12
Mason
day
1.50
230.00
345.00
L-10
Mazdoor
day
20.00
136.69
2733.80
L-13
day
1.00
136.69
136.69
L-13
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Labour
d)
e)
2295.60
11937.12
7162.27
78784.98
(ii)
5252.33
say
5252.00
b)
c)
Material
Cement
tonne
6.33
5000.00
31650.00
M-081
Coarse sand
cum
6.75
828.00
5589.00
M-004
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.16
151.44
24.23
L-12
Mason
day
0.38
230.00
87.40
L-10
day
2.50
136.69
341.73
L-13
day
1.00
136.69
136.69
L-13
hour
0.75
2232.00
1674.00
P&M-002
hour
0.75
652.00
489.00
P&M-018
hour
0.75
806.00
604.50
P&M-017
P&M-049
Labour
Concrete Pump
Formwork @ 4 per cent on cost of concrete i.e. cost
of a) Material, b) Labour and c) Machinery
Page 74 of 264
hour
2.00
1017.00
2034.00
tonne.km
37.5L
2.03
76.28
Lead =1
km & P&M050
hour
0.75
256.00
192.00
P&M-007
2266.10
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
d)
e)
Quantity
Rate Rs
7070.25
77772.72
Remarks/
Input ref.
11783.75
12.39
Cost Rs
5184.85
say
5185.00
b)
c)
Material
Cement
tonne
4.13
5000.00
20650.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
40 mm aggregate
cum
8.10
916.00
7419.60
M-055
20 mm Aggregate
cum
4.05
1028.00
4163.40
M-053
10 mm Aggregate
cum
1.35
1005.00
1356.75
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
230.00
345.00
L-10
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
d)
9086.64
e)
5451.98
59971.82
1600
3998.12
say
3998.00
Material
HYSD bars including5 per cent overlaps and wastage
Binding wire
b)
Labour for cutting, bending, shifting to site, tying
and placing in position
Mate
tonne
1.05
45000.00
47250.00
M-082
Kg
6.00
100.00
600.00
M-072
day
0.40
151.44
60.58
L-12
Blacksmith
day
2.00
264.50
529.00
L-02
Mazdoor
day
6.00
136.69
820.14
L-13
9851.94
5911.17
65022.83
12.41
1600
say
65023.00
Material
MS bars including 5 per cent overlaps and wastage
Binding wire
b)
Labour for straightening, cutting, bending, shifting
to site, tying and placing in position
Mate
Blacksmith
Page 75 of 264
tonne
1.05
47307.50
49672.88
M-126
Kg
6.00
100.00
600.00
M-072
day
0.43
151.44
65.12
L-12
day
2.25
264.50
595.13
L-02
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
day
c)
d)
Quantity
6.50
Rate Rs
136.69
Cost Rs
888.49
10364.32
6218.59
68404.52
say
Page 76 of 264
68405.00
Remarks/
Input ref.
L-13
CHAPTER-13
SUB-STRUCTURE
Sr No
13.1
13.2
Ref. to
MoRTH
Spec.
Description
1300 &
2200
Unit
1300 &
2200
each
cum
day
day
day
Quantity
Rate Rs
Cost Rs
500.00
0.24
4.42
3425.00
2209.09
822.00
M-079
Item 12.6
(A)
0.06
0.80
0.80
151.44
9.09
0.00
109.35
157.48
L-12
L-11
L-13
136.69
say
661.40
396.84
4365.25
4365.00
cum
0.03
3425.00
102.75
Item 12.6
(A)
day
day
day
0.04
0.50
0.50
151.44
223.36
136.69
L-12
L-11
L-13
say
6.06
111.68
68.35
57.77
34.66
381.26
381.00
b)
13.3
Note
1300 &
2200
Remarks/
Input ref.
cum
0.144
3425.00
493.20
Item 12.6
(A)
day
day
day
0.04
0.50
0.50
151.44
223.36
136.69
L-12
L-11
L-13
say
6.06
111.68
68.35
135.86
81.51
896.65
897.00
b)
13.4
Note
1400 &
2200
Page 1 of 264
cum
No
1.00
7.00
2604.51
14.45
2604.51
101.17
M-148
M-182
cum
0.33
3425.00
1130.25
Item 12.6
(A)
Sr No
Ref. to
MoRTH
Spec.
Description
b)
Unit
c)
Labour
Mate
Mason
Mazdoor
Add for scaffolding @ 5 per cent of cost of a)
Material and b) Labour
Overhead charges @ 0.2 on (a+b)
d)
day
day
day
Quantity
0.10
1.20
1.20
Rate Rs
Cost Rs
151.44
223.36
136.69
L-12
L-11
L-13
899.46
539.68
15.14
268.03
164.03
214.16
Remarks/
Input ref.
5936.43
say
5936.00
cum
1.10
2604.51
2864.96
M-148
each
7.00
14.45
101.17
M-182
cum
0.30
3425.00
1027.50
Item 12.6
(A)
Mate
day
0.12
151.44
18.17
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
1.50
136.69
205.04
L-13
Labour
c)
d)
227.59
955.89
573.54
L-12
6308.91
say
6309.00
cum
1.11
2705.04
3002.59
M-169
each
7.00
14.45
101.17
M-182
cum
0.33
3425.00
1130.25
Item 12.6
(A)
Mate
day
0.20
151.44
30.29
Mason
day
2.50
223.36
558.40
L-11
Mazdoor
day
2.50
136.69
341.73
L-13
c)
d)
258.22
1084.53
650.72
7157.90
say
Note
13.5
1500,
1700 &
2200
Unit = cum
Taking output = 1 cum
A
Page 2 of 264
7158.00
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
e)
f)
10.00
308.00
677.60
406.56
4472.16
say
13.5
4472.00
e)
f)
10.00
339.00
745.80
447.48
4922.28
say
13.5
4922.00
e)
f)
10.00
366.70
806.74
484.04
5324.48
say
13.5 C
(p)
e)
f)
10.00
361.40
795.08
477.05
5247.53
say
13.5 C
5324.00
5248.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
d) formwork
e)
f)
12.00
440.04
2.00
73.34
836.08
501.65
5518.10
say
13.5 C
(q)
e)
f)
3614.00
12.00
433.68
2.00
72.28
823.99
494.40
5438.35
say
13.5 C
(r)
5518.00
5438.00
e)
f)
15.00
550.05
4.00
146.68
872.75
523.65
5760.12
say
13.5 C
(r)
e)
f)
15.00
542.10
4.00
144.56
860.13
516.08
5676.87
say
13.5
5760.00
5677.00
3697.00
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
d) formwork
e)
f)
10.00
369.70
813.34
488.00
5368.04
say
13.5 D
(p)
e)
f)
3641.00
10.00
364.10
801.02
480.61
5286.73
say
13.5 D
5368.00
5287.00
e)
f)
3697.00
12.00
443.64
2.00
73.94
842.92
505.75
5563.25
say
13.5 D
(q)
e)
f)
3641.00
12.00
436.92
2.00
72.82
830.15
498.09
5478.98
say
13.5 D
(r)
5563.00
5479.00
Page 5 of 264
3697.00
15.00
554.55
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
e)
f)
Quantity
Rate Rs
Cost Rs
4.00
147.88
879.89
527.93
5807.25
say
13.5 D
(r)
e)
f)
3641.00
15.00
546.15
4.00
145.64
866.56
519.93
5719.28
say
13.5
5807.00
5719.00
e)
f)
3443.00
10.00
344.30
757.46
454.48
4999.24
say
13.5 E
(p)
e)
f)
3388.00
10.00
338.80
745.36
447.22
4919.38
say
13.5 E
4999.00
4919.00
e)
f)
3443.00
12.00
413.16
2.00
68.86
785.00
471.00
5181.03
Page 6 of 264
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
say
13.5 E
(q)
e)
f)
3388.00
12.00
406.56
2.00
67.76
772.46
463.48
5098.26
say
13.5 E
(r)
5181.00
5098.00
e)
f)
3443.00
15.00
516.45
4.00
137.72
819.43
491.66
5408.26
say
13.5 E
(r)
e)
f)
3388.00
15.00
508.20
4.00
135.52
806.34
483.81
5321.87
say
13.5
5408.00
5322.00
e)
f)
3723.00
10.00
372.30
819.06
491.44
5405.80
say
13.5 F
(p)
5406.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
e)
f)
3740.00
10.00
374.00
822.80
493.68
5430.48
say
13.5 F
For height, upto 10m, add 1.8 per cent of cost as above
excluding formwork. For cost of formwork add 11.8 per cent
of cost of material, labour and machinery
Case Using concrete Mixer
I
Per Cum Basic Cost of Labour, Material & Machinery
(a+b+c) of Item 12.8 (E) Case I
d) formwork
e)
f)
3723.00
11.80
439.31
1.80
67.01
845.87
507.52
5582.71
say
13.5 F
(q)
e)
f)
11.80
441.32
1.80
67.32
849.73
509.84
5608.20
say
(r)
5583.00
3740.00
5430.00
5608.00
e)
f)
3723.00
15.00
558.45
4.00
148.92
886.07
531.64
5848.09
say
13.5 F
(r)
Page 8 of 264
5848.00
3740.00
15.00
561.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
e)
f)
Quantity
Rate Rs
Cost Rs
4.00
149.60
890.12
534.07
5874.79
say
13.5
5875.00
e)
f)
3740.00
10.00
374.00
822.80
493.68
5430.48
say
13.5 G
(p)
e)
f)
3686.00
10.00
368.60
810.92
486.55
5352.07
say
13.5 G
5352.00
e)
f)
3740.00
11.50
430.10
1.60
59.84
845.99
507.59
5583.52
say
13.5 G
(q)
5430.00
e)
f)
5584.00
3686.00
11.50
423.89
1.60
58.98
833.77
500.26
5502.90
say
Page 9 of 264
5503.00
Remarks/
Input ref.
Sr No
13.5 G
Ref. to
MoRTH
Spec.
Description
(r)
Unit
Quantity
Rate Rs
Cost Rs
e)
f)
3740.00
14.00
523.60
3.50
130.90
878.90
527.34
5800.74
say
13.5 G
(r)
e)
f)
3686.00
14.00
516.04
3.50
129.01
866.21
519.73
5716.99
say
13.5
5801.00
5717.00
e)
f)
3816.00
10.00
381.60
839.52
503.71
5540.83
say
13.5 H
(p)
e)
f)
3838.00
10.00
383.80
844.36
506.62
5572.78
say
13.5 H
5541.00
Page 10 of 264
5573.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
e)
f)
3816.00
11.00
419.76
1.40
53.42
857.84
514.70
5661.72
say
13.5 H
(q)
e)
f)
3838.00
11.00
422.18
1.40
53.73
862.78
517.67
5694.36
say
13.5 H
(r)
5662.00
5694.00
e)
f)
3816.00
13.00
496.08
3.00
114.48
885.31
531.19
5843.06
say
13.5 H
(r)
e)
f)
3838.00
13.00
498.94
3.00
115.14
890.42
534.25
5876.75
say
Note
5843.00
Page 11 of 264
5877.00
Remarks/
Input ref.
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Section
1600 &
2200
tonne
1.05
45000.00
47250.00
M-082
kg
6.00
100.00
600.00
M-072
day
0.34
151.44
51.49
L-12
Blacksmith
day
2.00
264.50
529.00
L-02
Mazdoor
day
6.50
136.69
888.49
L-13
c)
d)
9863.79
5918.28
1600 &
2200
65101.05
say
65101.00
tonne
1.05
47307.50
49672.88
M-126
kg
6.00
100.00
600.00
M-072
day
0.28
151.44
42.40
L-12
Blacksmith
day
1.50
264.50
396.75
L-02
Mazdoor
day
5.50
136.69
751.80
L-13
c)
d)
10292.76
6175.66
2706 &
2200
67932.25
say
67932.00
metre
31.50
65.00
2047.50
each.
30.00
13.00
390.00
M-123
each.
10.00
6.50
65.00
M-056/10
cum
0.05
3425.00
171.25
Item 12.6
(A)
Mate
day
0.03
151.44
4.54
L-12
Mason
day
0.50
223.36
111.68
L-11
M-056
Labour
Page 12 of 264
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Mazdoor
day
c)
d)
Quantity
0.25
Rate Rs
Cost Rs
136.69
338.90
3727.87
124.26
say
13.9
L-13
564.83
Note
34.17
Remarks/
Input ref.
124.00
710.1.4.
of
IRC:78
& 2200
Unit = cum
Taking output = 10 cum
A
Granular material
a)
b)
Labour
Mate
day
0.28
151.44
42.40
L-12
Mazdoor
day
7.00
136.69
956.83
L-13
cum
12.00
727.79
8733.48
M-009
hour
2.50
101.70
254.25
P&M-086
Water Tanker
hour
0.05
200.00
10.00
P&M-060
Material
Granular material
c)
Machinery
d)
e)
1999.39
1199.64
13195.99
1319.60
say
13.9
a)
b)
Labour
Mate
day
0.28
151.44
42.40
L-12
day
7.00
136.69
956.83
L-13
cum
12.00
476.80
5721.60
M-006
hour
2.50
101.70
254.25
P&M-086
Water Tanker
hour
0.06
200.00
12.00
P&M-060
Material
Sand
c)
Machinery
d)
1397.42
e)
838.45
9222.95
710.1.4.
of
IRC:78
and
2200
1320.00
Sandy material
922.29
say
922.00
151.44
48.46
day
Page 13 of 264
0.32
L-12
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
day
7.00
136.69
956.83
L-13
Mazdoor (Skilled)
day
1.00
164.69
164.69
L-15
10728.00
b)
Material
cum
12.00
894.00
c)
hour
0.06
200.00
d)
e)
P&M-060
1429.20
15721.17
1572.12
say
2000,
1000 &
2200
12.00
M-012
2382.00
13.11
Remarks/
Input ref.
1572.00
b)
Labour
Mate
day
0.06
151.44
9.09
L-12
Mazdoor (Skilled)
day
0.50
164.69
82.35
L-15
Mazdoor
day
1.00
136.69
136.69
L-13
each.
1.00
50000.00
50000.00
Material
Cast steel rocker bearing assembly of 250 tonne
design load capacity duly painted complete with all its
components as per drawing and specifications
Add 1 per cent of cost of bearing assembly for
foundation anchorage bolts, lifting arrangements,
grease and other consumables.
c)
d)
500.00
10145.62
6087.37
66961.12
267.84
say
13.12
2000 ,
1000 &
2200
M-065
268.00
b)
Labour
Mate
day
0.06
151.44
9.09
L-12
Mazdoor
day
1.00
136.69
136.69
L-13
Mazdoor (Skilled)
day
0.50
164.69
82.35
L-15
each.
1.00
41309.00
41309.00
Material
Forged steel roller bearing of 250 tonne design load
capacity duly painted complete with all its components
as per drawing and specifications
Add 1 per cent of cost of bearing assembly for
foundation anchorage bolts, lifting arrangements,
grease and other consumables.
c)
d)
413.09
8390.04
5034.03
55374.28
221.50
say
Page 14 of 264
221.00
M-067
Sr No
13.13
Ref. to
MoRTH
Spec.
2000 &
2200
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
Labour
Mate
day
0.06
151.44
9.09
L-12
Mazdoor
day
1.00
136.69
136.69
L-13
Mazdoor (Skilled)
day
0.50
164.69
82.35
L-15
each.
1.00
16378.00
16378.00
Material
PTFE sliding plate bearing assembly of 80 tonnes
design load capacity duly painted complete with all its
components as per drawing and Technical
Specifications
c)
d)
163.78
3353.98
2012.39
22136.27
276.70
say
13.14
2000 &
2200
M-069
277.00
b)
Labour
Mate
day
0.06
151.44
9.09
L-12
Mazdoor
day
1.00
136.69
136.69
L-13
Mazdoor (Skilled)
day
0.50
164.69
82.35
L-15
each.
1.00
15000.00
15000.00
Material
Elastomeric bearing assembly consisting of 7 layers of
elastomer bonded to 6 nos. internal reinforcing steel
laminates by the process of vulcanisation, complete
with all components as per drawing and Technical
Specifications.
c)
150.00
d)
1845.37
20299.12
3075.62
1.06
say
13.15
2000 &
2200
1.00
M-066
Sr No
Ref. to
MoRTH
Spec.
Description
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
Mate
day
0.04
151.44
6.06
L-12
Mazdoor
day
0.75
136.69
102.52
L-13
Mazdoor (Skilled)
day
0.35
164.69
57.64
L-15
each.
1.00
16378.00
16378.00
b)
Material
c)
d)
2004.96
22054.56
M-070
163.78
3341.60
275.68
say
13.16
2000 &
2200
276.00
387.20
b)
Mate
day
0.08
151.44
12.12
L-12
Mazdoor
day
1.50
136.69
205.04
L-13
Mazdoor (Skilled)
day
0.50
164.69
82.35
L-15
each.
1.00
41309.00
41309.00
Material
Pot type bearing assembly consisting of a metal piston
supported by a disc, PTFE pads providing sliding
surfaces against stainless steel mating together with
cast steel assemblies/fabricated structural steel
assemblies duly painted with all components as per
clause 2006 and complete as per drawings and
Technical Specifications.
c)
d)
413.09
8404.32
5042.59
55468.49
221.87
say
Page 16 of 264
222.00
M-068
CHAPTER-14
SUPER-STRUCTURE
Sr No
14.1
Ref. to
MoRTH
Spec.
Description
1500
&1600
1700
Unit
Quantity
Rate Rs
Cost Rs
Remarks/
Input ref.
b)
c)
Material
Cement
tonne
5.12
5000.00
25600.00
M-081
Coarse sand
cum
6.75
710.46
4795.61
M-005
20 mm Aggregate
cum
8.10
1028.00
8326.80
M-053
10 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
Mate
day
0.86
151.44
130.24
L-12
Mason
day
1.50
223.36
335.04
L-11
Mazdoor
day
20.00
136.69
2733.80
L-13
hour
6.00
233.00
1398.00
P&M-009
Generator 33 KVA
hour
6.00
406.80
2440.80
P&M-079
Labour
Machinery
(i)
(p)
Height upto 5m
Basic Cost of Labour, Material & Machinery (a+b+c)
for
15 cum
d) Formwork and staging 20 per cent of (a+b+c)
e)
f)
51188.00
51188.00
20.00
10237.60
12285.12
7371.07
81081.79
5405.45
say
14.1A
Case I (i)
(q)
f)
51188.00
25.00
12797.00
12797.00
7678.20
84460.20
5630.68
say
14.1A
Case I (i)
(r)
5631.00
f)
51188.00
30.00
15356.40
13308.88
7985.33
87838.61
5855.91
say
14.1A
Case I
5405.00
Height 5m to 10m
Height upto 5m
Page 1 of 264
5856.00
f)
51188.00
25.00
12797.00
12797.00
7678.20
84460.20
5630.68
say
14.1A
Case I
(ii)
(q)
f)
51188.00
30.00
15356.40
13308.88
7985.33
87838.61
5855.91
say
14.1A
Case I
(ii)
(r)
5856.00
f)
51188.00
35.00
17915.80
13820.76
8292.46
91217.02
5631.00
Height 5m to 10m
6081.13
say
6081.00
b)
c)
Material
Cement
tonne
40.92
5000.00
204600.00
M-081
Coarse sand
cum
54.00
828.00
44712.00
M-004
20 mm Aggregate
cum
64.80
1028.00
66614.40
M-053
10 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
Mate
day
0.84
151.44
127.21
Mason
day
3.00
223.36
670.08
L-11
Mazdoor
day
18.00
136.69
2460.42
L-13
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
Loader
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Labour
L-12
Machinery
Concrete Pump
hour
(i)
(p)
Height upto 5m
Basic Cost of Labour, Material & Machinery (a+b+c)
for
120 cum
d) Formwork and staging 20 per cent of (a+b+c)
e)
402806.00
402806.00
20.00
80561.20
96673.44
f)
58004.06
638044.70
5317.04
say
14.1A
Case II
(i)
(q)
f)
402806.00
25.00
100701.50
100701.50
60420.90
664629.90
5538.58
say
14.1A
Case II
(i)
(r)
e)
f)
402806.00
30.00
120841.80
104729.56
62837.74
691215.10
5760.13
say
Height upto 5m
Basic Cost of Labour, Material & Machinery (a+b+c)
for
120 cum
d) Formwork and staging 25 per cent of (a+b+c)
e)
f)
402806.00
25.00
100701.50
100701.50
60420.90
664629.90
5538.58
say
(q)
e)
f)
402806.00
30.00
120841.80
104729.56
62837.74
691215.10
5760.13
say
5760.00
(r)
402806.00
35.00
140982.10
108757.62
e)
65254.57
f)
717800.29
5981.67
5539.00
Height 5m to 10m
14.1A
Case II
(ii)
5760.00
14.1A
Case II
(ii)
5539.00
14.1A
Case II
5317.00
Height 5m to 10m
say
B
Case I RCC Grade M25
Using Concrete Mixer
Unit = 1 cum
Page 3 of 264
5982.00
Material
tonne
5.99
5000.00
29950.00
M-081
Cement
cum
6.75
710.46
4795.61
M-005
Coarse sand
cum
8.10
1028.00
8326.80
M-053
20 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
L-12
10 mm Aggregate
b)
Labour
day
0.86
151.44
130.24
Mate
day
1.50
223.36
335.04
L-11
Mason
day
20.00
136.69
2733.80
L-13
Machinery
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Mazdoor
c)
Generator 33 KVA
14.1B
Case I
55538.00
(i)
(p)
55538.00
20.00
11107.60
13329.12
e)
7997.47
f)
87972.19
5864.81
say
Height 5m to 10m
55538.00
25.00
13884.50
13884.50
e)
8330.70
f)
91637.70
6109.18
say
55538.00
30.00
16661.40
14439.88
e)
8663.93
f)
95303.21
6353.55
say
6354.00
(ii)
(p)
55538.00
25.00
13884.50
13884.50
e)
8330.70
f)
91637.70
6109.18
6109.00
(r)
14.1B
Case I
5865.00
(q)
say
(q)
Page 4 of 264
6109.00
Height 5m to 10m
55538.00
30.00
16661.40
14439.88
e)
8663.93
f)
95303.21
6353.55
say
55538.00
35.00
19438.30
14995.26
e)
8997.16
f)
98968.72
6597.91
6354.00
(r)
say
6598.00
Case II
Using Batching Plant, Transit Mixer and Concrete Pump
Unit = cum
Taking output = 120 cum
a)
Material
tonne
47.95
5000.00
239750.00
M-081
Cement
cum
54.20
828.00
44877.60
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
b)
Labour
day
0.84
151.44
127.21
Mate
day
3.00
223.36
670.08
L-12
L-11
Mason
day
18.00
136.69
2460.42
L-13
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Mazdoor
c)
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
hour
Concrete Pump
14.1B
Case II
438122.00
(i)
(p)
438122.00
20.00
87624.40
105149.28
e)
63089.57
f)
693985.25
5783.21
say
5783.00
(q)
Height 5m to 10m
438122.00
for
25.00
109530.50
d)
e)
109530.50
65718.30
f)
722901.30
6024.18
say
438122.00
30.00
131436.60
113911.72
e)
68347.03
f)
751817.35
6265.14
say
438122.00
25.00
109530.50
109530.50
e)
65718.30
f)
722901.30
6024.18
say
438122.00
30.00
131436.60
113911.72
e)
68347.03
f)
751817.35
6265.14
say
6265.00
(r)
438122.00
35.00
153342.70
118292.94
e)
70975.76
f)
780733.40
6506.11
6024.00
(q)
Height 5m to 10m
14.1B
Case II
(ii)
6265.00
(ii)
(p)
14.1B
Case II
(ii)
6024.00
(r)
say
6506.00
C
Case I RCC Grade M 30
Using Concrete Mixer
Unit = 1 cum
Taking output = 15 cum
a)
Material
tonne
6.10
5000.00
30500.00
M-081
Cement
cum
6.75
710.46
4795.61
M-005
Coarse sand
cum
8.10
1028.00
8326.80
M-053
20 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
10 mm Aggregate
b)
Labour
day
0.90
151.44
136.30
L-12
Mate
day
1.50
223.36
335.04
L-11
Mason
day
21.00
136.69
2870.49
L-13
Page 6 of 264
Mazdoor
c)
Machinery
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Generator 33 KVA
14.1C
Case I
56231.00
(i)
(p)
56231.00
20.00
11246.20
13495.44
e)
8097.26
f)
89069.90
5937.99
say
Height 5m to 10m
56231.00
25.00
14057.75
14057.75
e)
8434.65
f)
92781.15
6185.41
say
56231.00
30.00
16869.30
14620.06
e)
8772.04
f)
96492.40
6432.83
say
6433.00
(ii)
(p)
56231.00
25.00
14057.75
14057.75
e)
8434.65
f)
92781.15
6185.41
6185.00
(r)
14.1C
Case I
5938.00
(q)
say
6185.00
(q)
Height 5m to 10m
56231.00
30.00
16869.30
14620.06
e)
8772.04
f)
96492.40
6432.83
say
Page 7 of 264
6433.00
14.1C
Case I
(ii)
(r)
56231.00
f)
35.00
19680.85
15182.37
9109.42
100203.64
6680.24
say
6680.00
Case II
Using Batching Plant, Transit Mixer and Concrete Pump.
Unit = cum
Taking output = 120 cum
a)
Material
tonne
48.79
5000.00
243950.00
M-081
Cement
cum
54.60
828.00
45208.80
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
b)
Labour
day
0.88
151.44
133.27
Mate
day
3.00
223.36
670.08
L-12
L-11
Mason
day
19.00
136.69
2597.11
L-13
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
14.1C
Case II
hour
442796.00
(i)
(p)
442796.00
20.00
88559.20
106271.04
e)
63762.62
f)
701388.86
5844.91
say
Height 5m to 10m
442796.00
25.00
110699.00
110699.00
e)
66419.40
f)
730613.40
6088.45
5845.00
(q)
say
6088.00
(r)
442796.00
Page 8 of 264
30.00
132838.80
115126.96
e)
69076.18
f)
759837.94
6331.98
say
(p)
442796.00
25.00
110699.00
110699.00
e)
66419.40
f)
730613.40
6088.45
say
442796.00
30.00
132838.80
115126.96
e)
69076.18
f)
759837.94
6331.98
say
6332.00
(r)
442796.00
35.00
154978.60
119554.92
e)
71732.95
f)
789062.47
6575.52
6088.00
(q)
Height 5m to 10m
14.1C
Case II
(ii)
6332.00
(ii)
say
6576.00
D
Case I
Material
tonne
6.33
5000.00
31650.00
M-081
Cement
cum
6.75
710.46
4795.61
M-005
Coarse sand
cum
8.10
1028.00
8326.80
M-053
20 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
L-12
10 mm Aggregate
b)
Labour
day
0.90
151.44
136.30
Mate
day
1.50
223.36
335.04
L-11
Mason
day
21.00
136.69
2870.49
L-13
Machinery
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Mazdoor
c)
Generator 33 KVA
14.1D
Case I
57381.00
(i)
(p)
Page 9 of 264
Height upto 5m
57381.00
18.00
10328.58
13541.92
e)
8125.15
f)
89376.65
5958.44
say
Height 5m to 10m
57381.00
23.00
13197.63
14115.73
e)
8469.44
f)
93163.79
6210.92
say
57381.00
28.00
16066.68
14689.54
e)
8813.72
f)
96950.94
6463.40
say
57381.00
23.00
13197.63
14115.73
e)
8469.44
f)
93163.79
6210.92
say
6211.00
(q)
Height 5m to 10m
57381.00
28.00
16066.68
14689.54
e)
8813.72
f)
96950.94
6463.40
6463.00
(ii)
(p)
14.1D
Case I
(ii)
6211.00
(r)
14.1D
Case I
5958.00
(q)
say
6463.00
(r)
57381.00
f)
33.00
18935.73
15263.35
9158.01
100738.08
6715.87
say
Page 10 of 264
6716.00
14.1D
Case I
(iii)
(p)
57381.00
f)
38.00
21804.78
15837.16
9502.29
104525.23
6968.35
say
Height 5m to 10m
57381.00
48.00
27542.88
16984.78
e)
10190.87
f)
112099.52
7473.30
6968.00
(q)
say
7473.00
(r)
57381.00
58.00
33280.98
18132.40
e)
10879.44
f)
119673.81
7978.25
say
7978.00
Case II
Using Batching Plant, Transit Mixer and Concrete Pump
Unit = cum
Taking output = 120 cum
a)
Material
tonne
50.64
5000.00
253200.00
M-081
Cement
cum
54.00
828.00
44712.00
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
b)
Labour
day
0.88
151.44
133.27
Mate
day
3.00
223.36
670.08
L-12
L-11
Mason
day
19.00
136.69
2597.11
L-13
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
14.1D
Case II
hour
451549.00
(i)
(p)
Page 11 of 264
Height upto 5m
451549.00
18.00
81278.82
106565.56
e)
63939.34
f)
703332.72
5861.11
say
(q)
Height 5m to 10m
451549.00
23.00
103856.27
111081.05
e)
66648.63
f)
733134.96
6109.46
say
451549.00
28.00
126433.72
115596.54
e)
69357.93
f)
762937.19
6357.81
say
451549.00
23.00
103856.27
111081.05
e)
66648.63
f)
733134.96
6109.46
say
6109.00
(q)
Height 5m to 10m
451549.00
28.00
126433.72
115596.54
e)
69357.93
f)
762937.19
6357.81
6358.00
(ii)
(p)
14.1D
Case II
(ii)
6109.00
(r)
14.1D
Case II
5861.00
say
6358.00
(r)
451549.00
33.00
149011.17
120112.03
e)
72067.22
f)
792739.42
6606.16
say
Page 12 of 264
6606.00
14.1D
Case II
(iii)
(p)
451549.00
38.00
171588.62
124627.52
e)
74776.51
f)
822541.66
6854.51
say
Height 5m to 10m
451549.00
48.00
216743.52
133658.50
e)
80195.10
f)
882146.13
7351.22
say
7351.00
(r)
451549.00
58.00
261898.42
142689.48
e)
85613.69
f)
941750.59
7847.92
6855.00
(q)
say
7848.00
E
Case 1 PSC Grade M-40
Using concrete mixer.
Unit = 1 cum
Taking output = 15 cum
a)
Material
tonne
6.45
5000.00
32250.00
M-081
Cement
cum
6.75
710.46
4795.61
M-005
Coarse sand
cum
8.10
1028.00
8326.80
M-053
20 mm Aggregate
cum
5.40
1005.00
5427.00
M-051
10 mm Aggregate
kg
25.80
44.70
1153.26
M-180
L-12
Labour
day
0.96
151.44
145.38
Mate
day
2.00
223.36
446.72
L-11
Mason
day
22.00
136.69
3007.18
L-13
Machinery
hour
6.00
233.00
1398.00
P&M-009
hour
6.00
406.80
2440.80
P&M-079
Mazdoor
c)
Generator 33 KVA
14.1E
Case I
59391.00
(i)
(p)
59391.00
20.00
11878.20
14253.84
8552.30
f)
94075.34
6271.69
say
Height 5m to 10m
59391.00
25.00
14847.75
14847.75
e)
8908.65
f)
97995.15
6533.01
say
59391.00
f)
30.00
17817.30
15441.66
9265.00
101914.96
6794.33
say
59391.00
25.00
14847.75
14847.75
e)
8908.65
f)
97995.15
6533.01
say
59391.00
f)
30.00
17817.30
15441.66
9265.00
101914.96
6794.33
say
6794.00
(r)
59391.00
f)
35.00
20786.85
16035.57
9621.34
105834.76
7055.65
6533.00
(q)
Height 5m to 10m
14.1E
Case I
(ii)
6794.00
(ii)
(p)
14.1E
Case I
(ii)
6533.00
(r)
14.1E
Case I
6272.00
(q)
say
7056.00
5000.00
258000.00
Case II
Using Batching Plant, Transit Mixer and Concrete Pump
Unit = cum
Taking output = 120 cum
a)
Material
tonne
Page 14 of 264
51.60
M-081
Cement
cum
54.00
828.00
44712.00
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
kg
206.40
44.70
9226.08
M-180
L-12
Labour
day
0.94
151.44
142.35
Mate
day
3.50
223.36
781.76
L-11
Mason
day
20.00
136.69
2733.80
L-13
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
P&M-049
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
14.1E
Case II
(i)
(p)
hour
15.00
1017.00
15255.00
tonne.km
300L
2.03
610.20
hour
6.00
256.00
465833.00
465833.00
18.00
83849.94
109936.59
e)
65961.95
f)
725581.48
6046.51
say
465833.00
23.00
107141.59
114594.92
e)
68756.95
f)
756326.46
6302.72
say
6303.00
(r)
465833.00
28.00
130433.24
119253.25
e)
71551.95
f)
787071.44
6558.93
6047.00
(q)
Height 5m to 10m
14.1E
Case II
(i)
Lead =1
km & P&M050
1536.00 P&M-007
say
6559.00
(ii)
(p)
465833.00
Page 15 of 264
23.00
107141.59
114594.92
68756.95
f)
756326.46
6302.72
say
Height 5m to 10m
465833.00
28.00
130433.24
119253.25
e)
71551.95
f)
787071.44
6558.93
say
465833.00
33.00
153724.89
123911.58
e)
74346.95
f)
817816.41
6815.14
say
465833.00
38.00
177016.54
128569.91
e)
77141.94
f)
848561.39
7071.34
say
465833.00
48.00
223599.84
137886.57
e)
82731.94
f)
910051.35
7583.76
say
7584.00
(r)
465833.00
58.00
270183.14
147203.23
e)
88321.94
f)
971541.30
8096.18
7071.00
(q)
Height 5m to 10m
14.1E
Case II
(iii)
6815.00
(iii)
(p)
14.1E
Case II
(iii)
6559.00
(r)
14.1E
Case II
6303.00
(q)
say
F
PSC Grade M-45
Unit = 1 cum
Taking output = 120 cum
Page 16 of 264
8096.00
a)
Material
tonne
55.80
5000.00
279000.00
M-081
Cement
cum
54.00
828.00
44712.00
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
kg
223.20
44.70
9977.04
M-180
L-12
Labour
day
0.94
151.44
142.35
Mate
day
3.50
223.36
781.76
L-11
Mason
day
20.00
136.69
2733.80
L-13
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
14.1F
(i)
(p)
hour
487584.00
487584.00
16.00
78013.44
113119.49
e)
67871.69
f)
746588.62
6221.57
say
Height 5m to 10m
487584.00
21.00
102392.64
117995.33
e)
70797.20
f)
778769.16
6489.74
say
6490.00
(r)
Height above 10m
487584.00
26.00
126771.84
122871.17
e)
73722.70
f)
810949.71
6757.91
6222.00
(q)
say
6758.00
(ii)
(p)
487584.00
21.00
102392.64
117995.33
e)
70797.20
f)
778769.16
Page 17 of 264
6489.74
say
Height 5m to 10m
487584.00
26.00
126771.84
122871.17
e)
73722.70
f)
810949.71
6757.91
say
487584.00
31.00
151151.04
127747.01
e)
76648.20
f)
843130.25
7026.09
say
487584.00
36.00
175530.24
132622.85
e)
79573.71
f)
875310.80
7294.26
say
487584.00
46.00
224288.64
142374.53
e)
85424.72
f)
939671.88
7830.60
say
7831.00
(r)
Height above 10m
487584.00
f)
56.00
273047.04
152126.21
91275.72
1004032.97
8366.94
7294.00
(q)
Height 5m to 10m
14.1F
(iii)
7026.00
(iii)
(p)
14.1F
(iii)
6758.00
(r)
Height above 10m
14.1F
6490.00
(q)
say
8367.00
G
PSC Grade M-50
Unit = 1 cum
Taking output = 120 cum
a)
Material
tonne
58.80
5000.00
294000.00
M-081
Cement
cum
54.00
828.00
44712.00
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
kg
235.20
44.70
10513.44
M-180
Page 18 of 264
Labour
day
0.94
151.44
142.35
Mate
day
3.50
223.36
781.76
L-12
L-11
Mason
day
20.00
136.69
2733.80
L-13
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
Lead =1
km & P&M050
6.00
256.00
1536.00
P&M-007
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
hour
Concrete Pump
14.1G
(i)
(p)
503120.00
503120.00
35.00
176092.00
135842.40
e)
81505.44
f)
896559.84
7471.33
say
Height 5m to 10m
503120.00
45.00
226404.00
145904.80
e)
87542.88
f)
962971.68
8024.76
say
8025.00
(r)
Height above 10m
503120.00
f)
55.00
276716.00
155967.20
93580.32
1029383.52
8578.20
7471.00
(q)
say
8578.00
H
PSC Grade M- 55
Unit = 1 cum
Taking output = 120 cum
a)
Material
tonne
63.50
5000.00
317500.00
M-081
Cement
cum
54.00
828.00
44712.00
M-004
Coarse sand
cum
64.80
1028.00
66614.40
M-053
20 mm Aggregate
cum
43.20
1005.00
43416.00
M-051
10 mm Aggregate
kg
254.00
44.70
11353.80
M-180
Labour
day
0.94
151.44
142.35
Mate
day
3.50
223.36
781.76
L-11
Mason
day
20.00
136.69
2733.80
L-13
Page 19 of 264
L-12
Mazdoor
c)
Machinery
hour
6.00
2232.00
13392.00
P&M-002
hour
6.00
762.75
4576.50
P&M-080
hour
6.00
806.00
4836.00
P&M-017
hour
15.00
1017.00
15255.00
P&M-049
tonne.km
300L
2.03
610.20
6.00
256.00
Loader
Transit Mixer ( capacity 4.0 cu.m )
Transit Mixer 4 cum capacity lead upto1 Km
14.1H
(i)
(p)
hour
527460.00
527460.00
35.00
184611.00
142414.20
e)
85448.52
f)
939933.72
7832.78
say
7833.00
(q)
Height 5m to 10m
527460.00
f)
45.00
237357.00
152963.40
91778.04
1009558.44
8412.99
say
8413.00
(r)
Height above 10m
527460.00
f)
55.00
290103.00
163512.60
98107.56
1079183.16
8993.19
say
Note
1.Where ever concrete is carried out using batching plant,
transit mixer, concrete pump, admixers conforming IS: 9103
@ 0.4 per cent of weight of cement may be added for
achieving desired slump of concrete.
2. Cement provided for various components of the super
structure is for estimating purpose only. Actual quantity of
cement will be as per approved mix design. Similarly, the
provision for coarse and fine aggregates is for estimating
purpose and the exact quantity shall be as per the mix
design.
14.2
Lead =1
km & P&M050
1536.00 P&M-007
1600
8993.00
a)
Material
HYSD bars including 5 per cent for laps and wastage
tonne
1.05
45000.00
47250.00
M-082
Kg
8.00
100.00
800.00
M-072
day
0.44
151.44
66.63
L-12
day
3.00
264.50
793.50
L-02
day
8.00
136.69
1093.52
L-13
Binding wire
b)
Labour for cutting, bending, tying and placing in
position
Mate
Blacksmith
Mazdoor
50004.00
Basic Cost of Labour & Material (a+b)
c)
d)
10000.73
6000.44
66004.82
say
66005.00
1800
High tensile steel wires/strands including all
accessories for stressing, stressing operations and
grouting complete as per drawing and Technical
Specifications
Unit = 1 MT
Taking output = 0.377 MT
Details of cost for 12T13 strand 40 m long cable (weight =
0.377 MT)
a) Material
H.T. Strand @ 9.42 kg/m including 2 per cent for
wastage and extra length for jacking
Sheathing duct ID 66 mm along with 5 per cent extra
length 40 x 1.05 = 42 m.
Tube anchorage set complete with bearing plate,
permanent wedges etc
Cement for grouting including 3 per cent wastage @
3.00 kg/m = 3 x 1.03 x 40 = 123.60 kg (say, = 125 kg)
b)
tonne
0.39
57453.00
22119.41
M-119
metre
42.00
304.00
12768.00
M-165
each
2.00
6064.00
12128.00
M-187
tonne
0.125
5000.00
625.00
M-081
2382.02
day
0.16
151.44
24.23
L-12
Mate
day
1.00
264.50
264.50
L-02
Blacksmith
day
3.00
136.69
410.07
L-13
Mazdoor
ii) For prestressing
day
0.05
151.44
7.57
L-12
Mate/Supervisor
day
0.25
230.00
57.50
L-08
day
1.00
136.69
136.69
L-13
L-12
Mazdoor
iii) For grouting
day
0.05
151.44
7.57
Mate/Supervisor
day
0.25
223.36
55.84
L-11
Mason
day
1.00
136.69
136.69
L-13
P&M-040
Mazdoor
c)
Machinery
hour
2.50
129.00
322.50
hour
1.00
304.00
304.00
M-111
hour
3.50
406.80
1423.80
P&M-079
Generator 33 KVA.
630.19
d)
e)
378.12
54181.70
143718.03
say
Note
14.4
2702
Page 21 of 264
143718.00
a)
Material
cum
1.00
3690.00
tonne
0.075
50004.00
b)
day
0.15
136.69
d)
Item
14.1(C)
3750.30 Item 14.2 A
20.50
L-13
1492.16
895.30
9848.26
3690.00
say
9848.00
515 &
2702
Mastic Asphalt
Providing and laying 12 mm thick mastic asphalt
wearing course on top of deck slab excluding prime
coat with paving grade bitumen meeting the
requirements given in table 500-29, prepared by using
mastic cooker and laid to required level and slope after
cleaning the surface, including providing antiskid
surface with bitumen precoated fine grained hard stone
chipping of 9.5 mm nominal size at the rate of 0.005cum
per 10 sqm and at an approximate spacing of 10 cm
center to center in both directions, pressed into surface
when the temperature of surfaces not less than 100 deg.
C, protruding 1 mm to 4 mm over mastic surface, all
complete as per clause 515.
Unit = sqm
Taking output = 72.46 sqm (2 tonnes)(0.869 cum)
assuming a density of 2.3 tonnes/cum.
a) Labour
day
0.49
151.44
74.21
L-12
Mate
day
11.00
136.69
1503.59
L-13
Mazdoor
day
1.25
164.69
205.86
L-15
Machinery
hour
0.06
357.00
21.42
P&M-031
hour
0.06
319.00
19.14
P&M-001
hour
6.00
62.00
372.00
P&M-030
hour
6.00
198.00
1188.00
P&M-005
hour
1.00
282.50
282.50
P&M-053
tonne
0.204
55132.00
11246.93
M-074
cum
0.39
476.80
185.95
M-021
tonne
0.36
4500.00
1620.00
M-188
cum
0.55
1005.00
552.75
M-051
cum
0.036
1213.00
43.67
M-142
kg
1.05
55.13
57.89
M074/1000
Mazdoor (Skilled)
b)
c)
e)
3474.78
2084.87
22933.55
316.50
Page 22 of 264
say
316.00
3690.00
15099.48
Note
1.The rates for 6 mm or any other thickness may be worked
out on pro-rata basis.
2. Where tack coat is required to be provided before laying
mastic asphalt, the same is required to be measured and
paid separately.
14.6
2703,
1500,
1600 &
1700
Material
cum
4.09
Item
14.1(C)
754.97
tonne
0.87
50004.00
2955.40
12412.66
b)
c)
81923.57
7447.60
1706.74
say
1707.00
3690.00
15099.48
Note
14.7
2703,
1500,
1600 &
1700
Material
cum
Page 23 of 264
4.092
Item
14.1(C)
1811.94
tonne
0.87
50004.00
c)
12032.98
7219.79
79417.64
1654.53
say
1655.00
Note
14.8
2703.2 &
1900
b)
Material:
tonne
2.95
45000.00
132570.00
M-179
tonne
1.01
45000.00
45540.00
M-179
tonne
0.18
45000.00
8100.00
M-179
tonne
0.15
64070.00
9610.50
M130*1000
9791.03
1958.21
1958.21
day
2.80
151.44
424.03
L-12
Mate
day
30.00
164.69
4940.70
L-15
Mazdoor (Skilled)
day
40.00
136.69
5467.60
L-13
Mazdoor
44072.05
c)
d)
26443.23
290875.55
2908.76
say
2909.00
2705
Drainage Spouts complete as per drawing and Technical
specification
Unit = 1 No.
Taking output = 1 No.
a)
Material
Kg
4.00
46.53
186.10
M087/1000
M-056
metre
6.00
65.00
390.00
each
6.00
13.00
78.00
M-110
GI bolt 10 mm Dia
each
2.00
25.00
50.00
M-101
day
0.02
151.44
3.03
L-12
Labour
For fabrication
Page 24 of 264
Mate
day
0.02
264.50
5.29
L-02
day
0.02
136.69
2.73
L-13
L-12
Mazdoor
For fixing in position
day
0.01
151.44
1.51
Mate
day
0.01
223.36
2.23
L-11
Mason
day
0.20
136.69
27.34
L-13
Mazdoor
37.31
c)
d)
156.71
94.03
1034.29
say
1034.00
4066.00
4066.00
say
4066.00
3686.00
3686.00
Note
1. In case of viaducts in urban areas, the drainage spouts
should be connected with suitably located pipelines to
discharge the surface run-off to drains provided at ground
level.
14.10
2700
14.11
cum
1.00
1500,16
00,1700
& 2704
Item 12.8
(A)
Material
cum
1.00
50004.00
c)
8263.09
751.19
say
0.05
b)
1600
tonne
1251.98
73.72
Note
Page 25 of 264
Item 12.8
(G)
8263.00
14.13
1800 &
2300
Material
tonne
0.47
5000.00
2350.00
M-081
Cement
cum
0.45
828.00
372.60
M-004
Coarse sand
cum
0.54
1028.00
555.12
M-053
20 mm Aggregate
cum
0.36
1005.00
361.80
M-051
10 mm Aggregate
Kg
1.88
44.70
84.04
M-180
tonne
0.10
45000.00
4500.00
M-082
HYSD steel .
tonne
0.06
57453.00
3447.18
M-119
Litre
37.00
43.00
1591.00
M-122
132.62
Labour
day
0.06
151.44
9.09
L-12
day
0.35
day
1.40
164.69
57.64
L-15
136.69
191.37
L-13
Mazdoor
(ii) Cable cutting and threading in position including
binding by insulation tape with HDPE pipes etc.,
prestessing and cutting of extra length of HT strand
after de-stressing.
Taking quantity of HT strand 60 Kg/cum
day
0.02
151.44
3.03
L-12
Mate
day
0.14
164.69
23.06
L-15
Mazdoor (Skilled)
day
0.50
136.69
68.35
L-13
Mazdoor
(iii) Erection and dismantling of shuttering
Taking shuttering area 10 sqm/cum of concrete
day
0.12
151.44
18.17
L-12
Mate
day
1.00
164.69
164.69
L-15
Mazdoor (Skilled)
day
2.00
136.69
273.38
L-13
day
0.03
151.44
4.54
L-12
day
0.05
164.69
8.23
L-15
day
0.60
136.69
82.01
L-13
day
0.01
151.44
1.51
L-12
day
0.35
136.69
47.84
L-13
day
0.01
151.44
1.51
L-12
day
0.25
136.69
34.17
L-13
day
0.01
151.44
1.51
L-12
Mazdoor
(iv) Concreting by Batching plant and stationary
concrete pump
Mate
Mazdoor (Skilled)
Mazdoor
(v) Steam curing and manual curing
Mate
Mazdoor
(vi) Handling of precast girder, stacking in stockyard
and again loading in trailor
Mate
Mazdoor
(vii) Placement of girders in position over pier caps
including placement of sand jacks, channel, levelling
etc.
Page 26 of 264
Mate
day
0.06
164.69
9.88
L-15
Mazdoor (Skilled)
day
0.24
136.69
32.81
L-13
Mazdoor
c)
Machinery
i) At casting yard
hour
0.05
762.75
38.14
P&M-080
hour
0.05
2232.00
111.60
P&M-002
hour
0.10
1017.00
101.70
P&M-049
hour
0.05
256.00
12.80
P&M-007
hour
0.10
853.00
85.30
P&M-012
hour
0.10
847.50
84.75
P&M-089
hour
0.05
806.00
40.30
P&M-017
P&M-012
Loader
ii) For transportation and placement at site
Crane 35 tonne capacity
hour
0.15
853.00
127.95
tonne.km
2.5xL
0.68
1.70
hour
0.15
847.50
127.13
Lead =1
km & P&M090
d)
e)
745.09
3180.72
1908.43
20992.75
P&M-089
say
20993.00
1700 &
1800
Providing and fixing Helical pipes in voided concrete
slabs
Unit = 1 RM
Taking output = 1 RM
a)
Material
metre
1.00
2426.00
2426.00
M-117
each
1.00
49.00
49.00
M-183
123.75
day
0.01
151.44
1.51
L-12
Mate
day
0.05
230.00
11.50
L-08
Fitter
day
0.20
136.69
27.34
L-13
Mazdoor
527.82
c)
d)
316.69
3483.62
800
14.16
800
say
3484.00
Crash Barriers
The rate analysis for rigid crash barrier in reinforced cement
concrete, semi-rigid crash barrier with metal beam and
flexible crash barrier with wire ropes have been made and
included in chapter-8 on Traffic and Transportation.
Painting on concrete surface
Providing and applying 2 coats of water based cement
paint to unplastered concrete surface after cleaning the
surface of dirt, dust, oil, grease, efflorescence and
applying paint @ of 1 litre for 2 sqm.
Unit = sqm
Taking output = 10 sqm
a)
Labour
day
0.01
151.44
1.51
L-12
Mate
day
0.25
223.36
55.84
L-18
Painter
day
0.25
164.69
41.17
L-15
Litres
5.00
31.00
155.00
M-190
Mazdoor (Skilled)
b)
Material
Page 27 of 264
c)
d)
50.71
30.42
334.66
33.47
say
33.00
2604
Burried Joint
Providing and laying a burried expansion joint,
expansion gap being 20 mm, covered with 12 mm thick,
200 mm wide galvanised weldable structural steel plate
as per IS: 2062, placed symmetrical to centre line of the
joint, resting freely over the top surface of the deck
concrete, welding of 8 mm dia. 100 mm long galvanised
nails spaced 300 mm c/c along the centre line of the
plate, all as specified in clause 2604.
Unit = Running meter
Taking output = 12 m
a)
Labour
day
0.02
151.44
3.03
L-12
Mate
day
0.40
136.69
54.68
L-13
Mazdoor
day
0.20
164.69
32.94
L-15
kg
237.50
54.57
12961.33
Mazdoor (Skilled)
b)
Material
c)
d)
M060/1000
129.61
2636.32
1581.79
17399.69
1449.97
say
1450.00
Note
14.18
Guidelines laid down vide the MoRTH circular No. RW/NH34059/1/96-S&R dated 30.11.2000 and subsequent
corrigendum dated 25.01.2001 may be reffered for
expansion joints.
2605
(i)
Filler joint
Providing & fixing 2 mm thick corrugated copper plate in
expansion joint complete as per drawing & Technical
Specification.
Unit = Running meter
Taking output = 12 m
a)
Labour
day
0.04
151.44
6.06
L-12
Mate
day
0.50
136.69
68.35
L-13
Mazdoor
day
0.50
164.69
82.35
L-15
kg
55.00
290.55
15980.25
Mazdoor (Skilled)
b)
Material
Copper plate - 12m long x 250 mm wide
d)
3227.40
1936.44
21300.84
1775.07
say
(ii)
Providing & fixing 20 mm thick compressible fibre board
in expansion joint complete as per drawing & Technical
Specification.
Unit = Running meter
Taking output = 12 m
Page 28 of 264
1775.00
M-086
a)
Labour
day
0.008
151.44
1.21
L-12
Mate
day
0.10
136.69
13.67
L-13
Mazdoor
day
0.10
164.69
16.47
L-15
sqm
3.00
486.00
1458.00
Mazdoor (Skilled)
b)
Material
d)
297.87
178.72
1965.94
163.83
M-084
say
164.00
(iii)
Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for fixed ends
of simply supported spans not exceeding 10 m to cater
for a horizontal movement upto 20 mm, covered with
sealant complete as per drawing and technical
specifications.
Unit = Running meter
Taking output = 12 m
a)
Labour
day
0.01
151.44
1.51
L-12
Mate
day
0.20
136.69
27.34
L-13
Mazdoor
day
0.10
164.69
16.47
L-15
sqm
3.60
965.00
3474.00
Mazdoor (Skilled)
b)
Material
c)
d)
422.32
4645.50
387.13
M-141
703.86
say
387.00
(iv)
Providing and filling joint sealing compound as per
drawings and technical specifications with coarse sand
and 6 per cent bitumen by weight
Unit = Running meter
Taking output = 12 m
12m long x 100 mm wide x 10mm deep recess
a)
Labour
day
0.02
151.44
3.03
L-12
Mate
day
0.50
136.69
68.35
L-13
Mazdoor
day
0.10
164.69
16.47
L-15
cum
0.012
710.46
8.53
M-005
cum
0.001
55132.00
55.13
M-074
Mazdoor (Skilled)
b)
Material
Sand
30.30
c)
d)
18.18
199.98
16.67
say
Note
For arriving at the final rate of filler joints per m
length and per cm depth of joint filling compound,
14.19
2600
the rates at Sl. No. i), ii), iii) & iv) shall be added
Asphaltic Plug joint
Page 29 of 264
17.00
Labour
day
0.052
151.44
7.87
L-12
Mate
day
1.00
136.69
136.69
L-13
Mazdoor
day
0.30
164.69
49.41
L-15
Mazdoor (Skilled)
b)
2.4
Material
cum
0.75
1028.00
771.00
M-052
kg
77.50
38.74
3002.35
kg
113.00
61.00
6893.00
M-078/
1000
M-103
c)
108.60
hour
1.00
62.00
62.00
P&M-030
hour
0.50
460.00
230.00
P&M-044
e)
2252.19
1351.31
14864.42
1238.70
say
1239.00
Note
14.20
2606
Labour
day
0.06
151.44
9.09
L-12
Mate
day
1.00
136.69
136.69
L-13
Mazdoor
day
0.50
164.69
82.35
L-15
metre
12.00
6064.00
72768.00
Mazdoor (Skilled)
b)
Material
Supply of elastomeric slab seal expansion joint
assembly manufactured by using chloroprene,
elastomer for elastomeric slab unit conforming to
clause 915.1 of IRC: 83 (part II), complete as per
approved drawings and standard specification
conforming to clause 2606 of MoRT&H Specification
c)
d)
3638.40
15326.90
9196.14
101157.57
M-093
8429.80
say
8430.00
2600
Compression Seal Joint
Providing and laying of compression seal joint
consisting of steel armoured nosing at two edges of the
joint gap suitably anchored to the deck concrete and a
preformed chloroprene elastomer or closed cell foam
joint sealer compressed and fixed into the joint gap with
special adhesive binder to cater for a horizontal
movement upto 40 mm and vertical movement of 3 mm.
Unit = Running meter
Taking output = 12 m
a)
Labour
day
0.036
151.44
5.45
L-12
Mate
day
0.60
136.69
82.01
L-13
Mazdoor
day
0.30
164.69
49.41
L-15
kg
446.00
61.00
27206.00
Mazdoor (Skilled)
b)
Material
1. Galvanised angle sections 100mm x 100mm of
12mm thickness weldable structural steel as per IS:
2062, 2 nos. of 12 m length each @ 17.7 kg/m and 5
per cent wastage.
Add 5 per cent of cost of above for structural steel for
anchorage, welding and other incidentals.
Preformed continuous chloroprene elastomer or closed
cell foam sealing element with high tear strength,
vulcanised in a single operation for the full length of a
joint to ensure water tightness.
c)
Add 1 per cent of cost of sealing element for lubricantcum-adhesive and other consumables.
Overhead charges @ 0.2 on (a+b)
d)
M-103
1367.14
metre
12.00
668.00
8016.00
M-143
80.16
7361.24
4416.74
48584.15
4048.68
say
4049.00
Note
1. The installation shall be done by the manufacturer or his
authorised representative to the satisfaction of the Engineer.
14.22
2607
Labour
day
0.05
151.44
7.57
L-12
Mate
day
1.00
136.69
136.69
L-13
Mazdoor
day
0.25
164.69
41.17
L-15
metre
12.00
7500.00
90000.00
Mazdoor (Skilled)
b)
Material
Supply of complete assembly of strip seal expansion
joint comprising of edge beams, anchorage, strip seal
element and complete accessories as per approved
specifications and drawings.
c)
Page 31 of 264
4509.27
18938.94
11363.36
M-178
d)
124997.01
10416.42
say
10416.00
Note
1. The installation shall be done by the manufacturer or his
authorised representative to the satisfaction of the Engineer.
14.23
2600
Labour
day
0.056
151.44
8.48
L-12
Mate
day
1.00
136.69
136.69
L-13
Mazdoor
day
0.40
164.69
65.88
L-15
metre
12.00
1820.00
21840.00
Mazdoor (Skilled)
b)
Material
Supply of a modular strip/box seal joint assembly
comprising of edge beams, central beam,2 modules
chloroprene seal, anchorage elements, support and
control system, all steel sections protected against
corrosion and installed by the manufacturer or his
authorised representative.
c)
d)
M-127
4410.21
2646.13
29107.38
2425.62
say
2426.00
Note
1. The installation shall be done by the manufacturer or his
authorised representative to the satisfaction of the Engineer.
14.24
2600
Labour
day
0.07
151.44
10.60
L-12
Mate
day
1.25
136.69
170.86
L-13
Mazdoor
day
0.50
164.69
82.35
L-15
metre
12.00
1820.00
21840.00
Mazdoor (Skilled)
b)
Material
Supply of a modular box/box seal joint assembly
containing 3 modules/cells and comprising of edge
beams, two central beams, chloroprene seal,
anchorage elements, support and control system, all
steel sections protected against corrosion and installed
by the manufacturer or his authorised representative.
Page 32 of 264
4420.76
M-128
c)
d)
2652.46
29177.03
2431.42
say
Note
1. The installation shall be done by the manufacturer or his
authorised representative to the satisfaction of the Engineer.
2. The concreting for joining the expansion joint assembly
with the deck has not been included in this analysis as the
same is catered in the quantities of RCC deck.
Page 33 of 264
2431.00