8.1 Costs
The costs that will be incurred for implementing the proposed IS and IT solution will
be of two types one time and recurring. This section presents the build-up of one
time and recurring costs spread over time frame of the project. One time costs would
include the cost of servers, computers and peripherals, network components for LAN
and WAN, scanners, plotters, UPS, etc. The specifications of each of the component
is given in Appendix N. Recurring costs would include cost of operation and
maintenance of hardware and network components, charges payable to service
provider, cost of manpower for the IS organisation and outsourcing of services.
8.1.1
Mail server
Web server
?? PCs
- Workstations
-
Desktops
8-1
Version 1.0
Laptops
?? Peripherals
- Printers
??LaserJet printers (Small)
??Network printers which include LaserJet (Black) and LaserJet (Color)
??Line Printers (Black)
??Dot Matrix Printers
-
UPS
??1 KVA
??5 KVA
??10 KVA
??20 KVA
Scanners
??A0 Size
??A4 Size
Plotters
Digitisers
Item
Value
Remarks
This is an estimate based on current
understanding
of
UPID
processes.
However, re-estimation is to be done by
Application Development vendor.
8-2
Version 1.0
Item
Value
Remarks
Notes
Effort for Application 71290 person hours or Assuming 7 hours per day and 24 working
System Development
424.35 person months
days in a month
Productivity figures have been taken as 10
hours per function point for applications
developed on Oracle and 5 hours per
function point for applications developed
on Lotus Notes.
Cost of Development Rs. 424.35 Lac
of
Application
Systems
Actual Cost
fresh
~ Rs. 430.00 Lac Assuming
application
system.
(Rounded off to the
nearest tens)
development
of
?? RDBMS Package
It is assumed that enterprise version of RDBMS package for unlimited users will be
purchased and all authenticated users will have access to database.
?? GIS Software
GIS software with editing facilities at server side and viewing facilities at client side
will be procured. It is being assumed that changes, if any, in GIS data will be
incorporated at location housing server and end users can view them on their
desktops.
?? Modelling Software
Modelling Software will be purchased to facilitate organisation and management of
technical functions of UPID.
?? Mailing and Messaging Software
Enterprise server licenses will be purchased for mail servers and collaboration client
licenses will be purchased for clients. Clustering of server licenses will be done at
server.
?? Bandwidth Management Software
Bandwidth management software will be purchased to manage bandwidth and
improve performance of WAN. The cost includes cost of additional servers and
concurrent user licenses.
8-3
Version 1.0
Radio Links
??Microwave Radio Router
??Semi parabolic antenna
VSAT
??Outdoor unit
??Indoor unit
??Router
?? LAN
- Switches (24/12 ports)
-
Jack Panel
Ethernet cable
Version 1.0
?? Back-up Media
?? Video Conferencing Set-up
?? VoIP Set-up
?? Training
UPID officials will be given training depending upon their work spheres. Various
training areas and corresponding users have been identified in chapter 6.
The estimated one time costs exclude costs incurred on other works like site
preparation, building of data centre, acquisition of furniture, ACs, generators and
furnishing of buildings etc.
8.1.1.5 Build-up of the Total of one time costs
Phase 1 Hardware for mailing and messaging solution, Software for mailing and
messaging solution and costs for training
Phase 2 Remaining hardware, remaining software, WAN, LAN, Back-up media,
Video Conferencing equipment, VoIP, etc.
Table 8.1 and Table 8.2 give capital cost plan for centralised and distributed
architecture respectively. Capital cost plan has been prepared according to
Implementation Plan provided in chapter 7.
Table 8.1
Capital Cost Plan (Centralised Architecture)
Description
Costs for Hardware
Costs for Software
Costs for Communication
Infrastructure
Costs for Miscellaneous
Items
Total*
Phase 1
(In Rs. Lac)
Phase 2
(In Rs. Lac)
Total
(In Rs. Lac)
2310.00
97.00
2507.70
1410.00
2566.00
4817.70
1507.00
2566.00
165.00
498.50
663.50
2572.00
6982.20
9554.20
*Existing hardware will be accounted for at the time of preparation of bidding document.
Table 8.2
Capital Cost Plan (Distributed Architecture)
Description
Costs for Hardware
Costs for Software
Costs for Communication
Phase 1
(In Rs. Lac)
Phase 2
(In Rs. Lac)
Total
(In Rs. Lac)
2710.00
167.00
4807.70
2434.00
2566.00
7517.70
2601.00
2566.00
8-5
Description
Infrastructure
Costs for Miscellaneous
Items
Total*
Version 1.0
Phase 1
(In Rs. Lac)
Phase 2
(In Rs. Lac)
Total
(In Rs. Lac)
165.00
498.50
663.50
3042.00
10306.20
13348.20
*Existing hardware will be accounted for at the time of preparation of bidding document.
8.1.2
Recurring Costs
It is assumed that vendor will provide 11 support staff personnel for mailing and
messaging solution. One person month has been assumed to be equal to Rs. 25,000/-.
8-6
Version 1.0
Maintenance of WAN
maintenance
will
provide
Recurring Costs
for Centralised
Architecture
(In Rs. Lac)
Recurring Costs
for Distributed
Architecture
(In Rs. Lac)
385.4
601.4
256.6
256.6
132.0
132.0
33.0
33.0
8-7
Version 1.0
Description
Recurring Costs
for Centralised
Architecture
(In Rs. Lac)
Recurring Costs
for Distributed
Architecture
(In Rs. Lac)
218.0
218.0
62.0
133.3
66.0
66.0
120.0
120.0
1273.0
1560.3
Software
Infrastructure
Note: The calculation of estimated costs in this section and appendices are primarily
based upon prices, terms and conditions obtained from the Web and/or
discussions with the vendors cited or their authorised partners. The consultants
do not represent or warrant that the prices and terms and conditions mentioned
in this document are accurate, complete or current. However, the prices and
terms & conditions are open to negotiations with the respective vendors. The
calculations have been done on the basis of 2200 users. The numbers have been
estimated for the completeness of calculations.
?? UPID Expenditure
As part of cost-benefit analysis, the expenditure and the corresponding figures where
saving is envisaged, have been classified below from the BM13 document (20012002). All figures are in thousand rupees.
a. Travel Allowance
Expenses on Travel allowances are shown below:
Financial Year
2000-2001
62092
14084
76176
2001-2002
70579
17597
88176
8-8
Version 1.0
Financial Year
2000-2001
6380
1205
7585
2001-2002
6995
1545
8540
c. Telephone Expenditure
Telephone expenditure are shown below:
Financial Year
2000-2001
2726
386
3112
2001-2002
4501
643
5144
d. Publication Expenses
Publication expenses are shown below:
Financial Year
2000-2001
494
17
511
2001-2002
460
19
479
The assignment is in the formulation of strategy phase. Some of the cost items have
been identified in this report. The quantification of savings for UPID related to MIS
project will involve large effort. Hence, the quantification of savings on manpower,
travelling, telephone, water etc. will be dealt separately and will be submitted to UPID
in a different report. The inputs from institutional strengthening consultancy being
carried out by UPID will also be taken for preparing the report.
8-9
Version 1.0
8.2 Benefits
Information Technology facilitates improvement of operational efficiency by enabling
the availability of reliable, accurate and updated information. Further it reduces the
amount of time spent on manual exchange of information, which is most often a
critical bottleneck causing delay in operations. Some of the envisaged qualitative
benefits of implementing the proposed MIS solution in UPID are detailed below:
?? Effective Decision Support
Implementation of the proposed MIS solution in UPID will facilitate the timely
retrieval of accurate and up-to-date information. The facility to make on-line queries
will also reduce the delays involved in retrieving and compiling information
manually. An effective MIS will assist the management to make timely and effective
decisions based on data rather than on intuition and gut feeling.
?? Effective Planning and Analysis Based on the Factual Data and Trends
Data maintenance, a salient feature of the proposed MIS solution, will ensure that data
corresponding to various functional areas, is constantly updated, thereby providing
timely, accurate, reliable and updated information on various functions for effective
management, planning and control.
?? Performance Monitoring
The proposed MIS solution will enable monitoring of various activities of UPID
based on the information collected. The proposed MIS solution will provide for
automatic checks that generate warnings for abnormal conditions. This will enable
effective monitoring and control by providing quick means of detecting any
unacceptable variations or deviations early enough for corrective actions.
?? Increased Productivity
Automation of routine tasks will lead to increase in productivity of personnel, since
the personnel would be able to handle larger volume of work.
?? Reduced Documentation
The data-sharing feature in the proposed MIS solution will enable a significant
reduction in manual document generation and duplication in data entry. The single
point data entry feature of the proposed integrated systems will reduce data
redundancy.
?? Improved Job Satisfaction to Users
Total computerisation will result in better job satisfaction to users, as the computer
will perform routine computational and other repetitive tasks both efficiently and
quickly. This will result in an improved utilisation of manpower.
8-10
Version 1.0
?? Enhanced Transparency
Total computerisation will result in better transparency for the department, as majority
of the tasks will be computerised hence retrieval and verification of the data will be
faster.
?? Enhanced Communication
Establishment of network across UPID will enhance communication and decision
making in UPID. The solution will lead to improved workflow.
The other benefits of MIS solution will be lesser process time, lesser establishment
costs etc. Reduction in manual data retrieval and transfer would result in greater
employee satisfaction and higher manpower productivity. Thus the implementation of
the proposed MIS solution will result in several benefits to UPID in the performance
of its functions. Thereby, it will help UPID to achieve its objectives.
All these benefits would also enable UPID to perform its major role of water resource
management in a better manner and thus serve the people of the state.
8-11
Version 1.0
Costs............................................................................................................... 1
8.1.1
8.1.2
Recurring Costs...................................................................................... 6
8.2
Benefits ........................................................................................................ 10
8-12