Documente Academic
Documente Profesional
Documente Cultură
Km 13/300 - 13/520
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 13/520
Working Mailage 13/300 - 13/520
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 13/300 - 13/520
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 13/520 - 13/760
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 13/760
Working Mailage 13/520 - 13/760
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 13/520 - 13/760
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 13/760 - 13/990
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 13/990
Working Mailage 13/760 - 13/990
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 13/760 - 13/990
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 13/990 - 14/220
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 14/220
Working Mailage 13/900 - 14/220
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 13/990 - 14/220
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 14/220 - 14/420
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 14/420
Working Mailage 14/220 - 14/420
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 14/220 - 14/420
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 14/420 - 14/650
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 14/650
Working Mailage 14/420 - 14/650
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 14/420 - 14/650
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 14/650 - 14/900
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 14/900
Working Mailage 14/650 - 14/900
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 14/650 - 14/900
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 14/900 - 15/130
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 15/130
Working Mailage 14/900 - 15/130
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 14/900 - 15/130
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 15/130 - 15/350
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 15/350
Working Mailage 15/130 - 15/350
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 15/130 - 15/350
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 15/350 - 15/6
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 15/6
Working Mailage 15/350 - 15/6
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 15/350 - 15/6
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 15/6 - 15/8
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 15/8
Working Mailage 15/6 - 15/8
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 15/6 - 15/8
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 15/8 - 16/030
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 16/030
Working Mailage 15/8 - 16/030
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 15/8 - 16/030
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 16/030 - 16/250
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 16/250
Working Mailage 16/030 - 16/250
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 16/030 - 16/250
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 16/250 - 16/500
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 16/500
Working Mailage 16/250 - 16/500
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 16/250 - 16/500
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 16/500 - 16/700
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 16/700
Working Mailage 16/500 - 16/700
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 16/500 - 16/700
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 16/700 - 16/930
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 16/930
Working Mailage 16/700 - 16/930
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 16/700 - 16/930
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
Metal Lead
Km 16/930 - 17/100
Metal Lead
Cart Track 0/0 - 0/2
Kamanaichenpalaym - Annur Road 16/6 - 17/100
Working Mailage 16/930 - 17/100
TOTAL
(or)
TOTAL A
(or)
TOTAL
(or)
Km 16/930 - 17/100
CMP to Site Lead
Cart Track 0/0 - 0/2
Karaipudur VT Ayyankoil Road 6/4 - 9/8
Mangalam road to VT Ayyankoil Road 3/8 - 8/0
VT Ayyankoil Tempel Road 0/0 - 0/800
In plains
0.20 Km
3.08 Km
0.11 Km
3.39 Km
3.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
13.30 Km
0.11 Km
219.76 Km
220.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
6.08 Km
0.11 Km
17.39 Km
17.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.10 Km
0.11 Km
455.56 Km
456.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.10 Km
0.11 Km
494.16 Km
494.00 Km
-38.00
In plains
0.20 Km
2.84 Km
0.12 Km
3.16 Km
3.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
13.52 Km
0.12 Km
219.99 Km
220.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
5.84 Km
0.12 Km
17.16 Km
17.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.32 Km
0.12 Km
455.79 Km
456.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.32 Km
0.12 Km
494.39 Km
494.00 Km
-38.00
In plains
0.20 Km
2.61 Km
0.12 Km
2.93 Km
3.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
13.76 Km
0.12 Km
220.23 Km
220.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
5.61 Km
0.12 Km
16.93 Km
17.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.56 Km
0.12 Km
456.03 Km
456.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.56 Km
0.12 Km
494.63 Km
495.00 Km
-39.00
In plains
0.20 Km
2.38 Km
0.12 Km
2.70 Km
3.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
13.90 Km
0.12 Km
220.37 Km
220.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
5.38 Km
0.12 Km
16.70 Km
17.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.70 Km
0.12 Km
456.17 Km
456.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
0.70 Km
0.12 Km
494.77 Km
495.00 Km
-39.00
In plains
0.20 Km
2.18 Km
0.10 Km
2.48 Km
2.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
14.22 Km
0.10 Km
220.67 Km
221.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
5.18 Km
0.10 Km
16.48 Km
16.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.02 Km
0.10 Km
456.47 Km
456.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.02 Km
0.10 Km
495.07 Km
495.00 Km
-39.00
In plains
0.20 Km
1.95 Km
0.12 Km
2.27 Km
2.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
14.42 Km
0.12 Km
220.89 Km
221.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
4.95 Km
0.12 Km
16.27 Km
16.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.22 Km
0.12 Km
456.69 Km
457.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.22 Km
0.12 Km
495.29 Km
495.00 Km
-38.00
In plains
0.20 Km
1.70 Km
0.13 Km
2.03 Km
2.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
14.65 Km
0.13 Km
221.13 Km
221.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
4.70 Km
0.13 Km
16.03 Km
16.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.45 Km
0.13 Km
456.93 Km
457.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.45 Km
0.13 Km
495.53 Km
496.00 Km
-39.00
In plains
0.20 Km
1.47 Km
0.12 Km
1.79 Km
2.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
14.90 Km
0.12 Km
221.37 Km
221.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
4.47 Km
0.12 Km
15.79 Km
16.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.70 Km
0.12 Km
457.17 Km
457.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.70 Km
0.12 Km
495.77 Km
496.00 Km
-39.00
In plains
0.20 Km
1.25 Km
0.11 Km
1.56 Km
2.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
15.13 Km
0.11 Km
221.59 Km
222.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
4.25 Km
0.11 Km
15.56 Km
16.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.93 Km
0.11 Km
457.39 Km
457.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
1.93 Km
0.11 Km
495.99 Km
496.00 Km
-39.00
In plains
0.20 Km
1.00 Km
0.13 Km
1.33 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
15.35 Km
0.13 Km
221.83 Km
222.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
4.00 Km
0.13 Km
15.33 Km
15.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.15 Km
0.13 Km
457.63 Km
458.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.15 Km
0.13 Km
496.23 Km
496.00 Km
-38.00
In plains
0.20 Km
0.80 Km
0.10 Km
1.10 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
15.60 Km
0.10 Km
222.05 Km
222.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
3.80 Km
0.10 Km
15.10 Km
15.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.40 Km
0.10 Km
457.85 Km
458.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.40 Km
0.10 Km
496.45 Km
496.00 Km
-38.00
In plains
0.20 Km
0.57 Km
0.12 Km
0.89 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
15.80 Km
0.12 Km
222.27 Km
222.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
3.57 Km
0.12 Km
14.89 Km
15.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.60 Km
0.12 Km
458.07 Km
458.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.60 Km
0.12 Km
496.67 Km
497.00 Km
-39.00
In plains
0.20 Km
0.35 Km
0.11 Km
0.66 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
16.03 Km
0.11 Km
222.49 Km
222.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
3.35 Km
0.11 Km
14.66 Km
15.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.83 Km
0.11 Km
458.29 Km
458.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
2.83 Km
0.11 Km
496.89 Km
497.00 Km
-39.00
In plains
0.20 Km
0.10 Km
0.13 Km
0.43 Km
0.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
16.25 Km
0.13 Km
222.73 Km
223.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
3.10 Km
0.13 Km
14.43 Km
14.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.05 Km
0.13 Km
458.53 Km
459.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.05 Km
0.13 Km
497.13 Km
497.00 Km
-38.00
In plains
0.20 Km
0.10 Km
0.10 Km
0.40 Km
0.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
16.50 Km
0.10 Km
222.95 Km
223.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
2.90 Km
0.10 Km
14.20 Km
14.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.30 Km
0.10 Km
458.75 Km
459.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.30 Km
0.10 Km
497.35 Km
497.00 Km
-38.00
In plains
0.20 Km
0.33 Km
0.12 Km
0.64 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
16.70 Km
0.12 Km
223.17 Km
223.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
2.67 Km
0.12 Km
13.99 Km
14.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.50 Km
0.12 Km
458.97 Km
459.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.50 Km
0.12 Km
497.57 Km
498.00 Km
-39.00
In plains
0.20 Km
0.50 Km
0.09 Km
0.79 Km
1.00 Km
Mid Point
In plains
146.75 Km
59.60 Km
16.93 Km
0.09 Km
223.37 Km
223.00 Km
ad
In plains
146.75 Km
71.20 Km
0.60 Km
8.00 Km
0.20 Km
226.75 Km
227.00 Km
In plains
0.20
3.40
4.20
0.80
Km
Km
Km
Km
2.60 Km
2.50 Km
0.09 Km
13.79 Km
14.00 Km
In plains
2.00
77.60
96.20
124.80
2.80
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.73 Km
0.09 Km
459.17 Km
459.00 Km
In plains
1.00 Km
5.70 Km
4.60 Km
0.50 Km
32.20 Km
44.00 Km
169.40
128.60
8.20
2.40
77.00
7.10
4.80
24.60
Km
Km
Km
Km
Km
Km
Km
Km
15.10 Km
12.75 Km
3.73 Km
0.09 Km
497.77 Km
498.00 Km
-39.00
13/300 - 13/520
13/520 - 13/760
13/760 - 13/990
13/990 - 14/220
14/220 - 14/420
14/420 - 14/650
14/650 - 14/900
14/900 - 15/130
15/130 - 15/350
15/350 - 15/6
15/6 - 15/8
15/8 - 16/030
16/030 - 16/250
16/250 - 16/500
16/500 - 16/700
16/700 - 16/930
16/930 - 17/100
SI
Name of Work
Est Amount
Reach1
13/8
17/100
GSB
WMM
PC
TCWMM
TC BT
220
225.21
1155.35
1353.32
61.68
11.93
14.52
240
225.21
1155.35
1353.32
61.68
11.93
14.52
230
225.21
1155.35
1353.32
61.68
11.93
14.52
230
225.21
1155.35
1353.32
61.68
11.93
14.52
200
225.21
1150.95
1353.32
61.68
11.93
14.52
230
225.21
1150.95
1353.32
61.68
11.93
14.52
250
225.21
1150.95
1353.32
61.68
11.93
14.52
230
225.21
1150.95
1353.32
61.68
11.93
14.52
220
225.21
1150.95
1353.32
61.68
11.93
14.52
250
225.21
1146.55
1353.32
61.68
11.93
14.52
200
225.21
1146.55
1353.32
61.68
11.93
14.52
230
225.21
1146.55
1353.32
61.68
11.93
14.52
220
225.21
1146.55
1353.32
61.68
11.93
14.52
250
225.21
1142.15
1353.32
61.68
11.93
14.52
200
225.21
1142.15
1353.32
61.68
11.93
14.52
230
225.21
1142.15
1353.32
61.68
11.93
14.52
170
225.21
1142.15
1353.32
61.68
11.93
14.52
DBM
BC
5910.54
6673.78
5910.54
6673.78
5910.54
6673.78
5910.54
6673.78
5898.28
6673.78
5898.28
6673.78
5898.28
6673.78
5898.28
6673.78
5898.56
6673.78
5886.06
6673.78
5886.06
6673.78
5886.06
6673.78
5886.06
6673.78
5873.80
6673.78
5873.80
6673.78
5886.32
6673.78
5886.32
6673.78
#REF!
SI.
No.
1
Description
No.
Length
(m)
Width
(m)
Excavation for Roadway and drainage Excavation including removal and satisfactory
of all materias necessary for the construction of roadway and side drains in accordanc
specifications and the lines, grades and cross sections shown in the drawings or as ind
the Engineer, as per MORTH Specification. Disposal of cut earth to a lead of 2Km
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
2.00
#REF!
Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 3Km
#REF! 1
x 1
#REF! ### ######
3
#REF!
#REF!
2.00
#REF!
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
2.00
#REF!
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.
#REF! 1
x 1
#REF! ### ######
5
#REF!
#REF!
2.00
#REF!
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
#REF! 1
x 1
#REF! ### ######
2.00
#REF!
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over
#REF! 1
x 1
#REF! ### ######
6
#REF!
#REF!
#REF!
#REF!
2.00
#REF!
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
3.00
#REF!
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using
of 26.50-13.20mm, 0.21cum of 13.20-2.36mm and 0.14cum of 2.36mm & below with
Filling materials and with 49.50 Kgs of VG30 bitumen for premixing per 10sqm inc
and conveyance of all materials to work site, heating the bitumen and aggregate
temperature and mixing them in required temperature in mini hot mix plant, spreadi
to uniform thickness of 50mm to the specified grades and cross sections and consolid
10 tonne power roller to the required density etc., including all labour for laying, spre
including hire charges and fuel charges for mini hot mix plant with bitumen bo
rollers and all other tools and plant required, including all other incidental charges etc
as per specification using mini hot mix plant clause 505 of MORTH. (Mix-in-place met
#REF! 1
x 1
#REF! ### ######
TOTAL
9
#REF!
#REF!
2.00
#REF!
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
5.00
#REF!
#REF!
Depth
(m)
Quantity
1.05
#REF!
#REF!
#REF!
0.50
#REF!
#REF!
#REF!
#REF!
#REF!
0.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.05
#REF!
(or)
#REF!
#REF!
#REF!
0.04
#REF!
#REF!
#REF!
#REF!
ABSTRACT ESTIMATE
SI.
Description of Work
No
1 Excavation for Roadway and drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.
Quantity
#REF! m3
#REF!
m3
Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material
#REF!
m3
SI.
No
Description of Work
Quantity
#REF!
m3
#REF!
m2
#REF!
m2
#REF!
m2
SI.
No
Description of Work
Quantity
SI.
No
Description of Work
Quantity
#REF!
m3
#REF!
m3
SI.
No
Description of Work
Quantity
Total
SI.
No
Description of Work
Quantity
Control
Charges
amd
Contingencies
GRAND TOTAL
#REF!
ABSTRACT ESTIMATE
Rate
Amount
50.60/m3
#REF!
#REF!
#REF!
#REF!
#REF!
C/O
#REF!
Rate
Amount
B/F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Amount
C/O
#REF!
Rate
Amount
B/F
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Amount
C/O
#REF!
#REF!
Rate
Amount
B/F
#REF!
#REF!
#REF!
#REF!
GRAND TOTAL
#REF!
#REF!
SI.
No.
1
Description
No.
#REF!
#REF!
2.00
14.00
Gravel Filling including cost and conveyance including labour charges for fillin
watering tamping under opumum moisture content to get the maximum density all
charges etc., complete With a lead of 3Km
#REF! 1
x 1
#REF! ### ######
Width
(m)
Excavation for Roadway and drainage Excavation including removal and satisfactory
of all materias necessary for the construction of roadway and side drains in accordanc
specifications and the lines, grades and cross sections shown in the drawings or as ind
the Engineer, as per MORTH Specification. Disposal of cut earth to a lead of 2Km
#REF! 1
x 1
#REF! ### ######
2
Length
(m)
#REF!
#REF!
2.00
14.00
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Cons
granular sub-base by providing close graded Material, mixing in a mechanical mix pla
carriage of mixed Material to work site, spreading in uniform layers with motor
prepared surface and compacting with vibratory power roller to achieve the desir
complete as per clause 401 of MORTH Specification- for grading- V Material
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
2.00
14.00
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting gr
aggregate to wet mix macadam specification including premixing the Material with wa
in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
paver in sub- base / base course on well prepared surface and compacting with vibrato
achieve the desired density, Complete as per clause 406 of MORTH Specification.
#REF! 1
x 1
#REF! ### ######
5
#REF!
#REF!
2.00
14.00
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.25 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification- over granular surfaces treated with primer
#REF! 1
x 1
#REF! ### ######
2.00
14.00
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) o
surface of granular Base including clearing of road surface and spraying primer at
0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over
#REF! 1
x 1
#REF! ### ######
6
#REF!
#REF!
#REF!
#REF!
2.00
14.00
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I t
emulsion pressure distributor at the rate of 0.20 kg per sqm on the
bituminous/granular surface cleaned with mechanical broom as per clause 503
Specification - over bituminous surfaces
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
3.00
14.00
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using
of 26.50-13.20mm, 0.21cum of 13.20-2.36mm and 0.14cum of 2.36mm & below with
Filling materials and with 49.50 Kgs of VG30 bitumen for premixing per 10sqm inc
and conveyance of all materials to work site, heating the bitumen and aggregate
temperature and mixing them in required temperature in mini hot mix plant, spreadi
to uniform thickness of 50mm to the specified grades and cross sections and consolid
10 tonne power roller to the required density etc., including all labour for laying, spre
including hire charges and fuel charges for mini hot mix plant with bitumen bo
rollers and all other tools and plant required, including all other incidental charges etc
as per specification using mini hot mix plant clause 505 of MORTH. (Mix-in-place met
#REF! 1
x 1
#REF! ### ######
TOTAL
9
#REF!
#REF!
2.00
14.00
#REF! 1
x 1
#REF! ### ######
#REF!
#REF!
5.00
14.00
#REF!
Depth
(m)
Quantity
1.05
#REF!
#REF!
#REF!
0.50
#REF!
#REF!
#REF!
#REF!
#REF!
0.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.05
#REF!
(or)
#REF!
#REF!
#REF!
0.04
#REF!
#REF!
#REF!
#REF!
ABSTRACT ESTIMATE
SI.
Description of Work
No
1 Excavation for Roadway and drainage
Excavation including removal and satisfactory
disposal of all materias necessary for the
construction of roadway and side drains in
accordance with the specifications and the lines,
grades and cross sections shown in the drawings
or as indicated by the Engineer, as per MORTH
Specification.
Quantity
#REF! m3
#REF!
m3
Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method Construction of
granular sub-base by providing close graded
Material, mixing in a mechanical mix plant at
OMC, carriage of mixed Material to work site,
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
power roller to achieve the desired density,
complete as per clause 401 of MORTH
Specification- for grading- V Material
#REF!
m3
SI.
No
Description of Work
Quantity
#REF!
m3
#REF!
m2
#REF!
m2
#REF!
m2
SI.
No
Description of Work
Quantity
SI.
No
Description of Work
Quantity
#REF!
m3
#REF!
m3
SI.
No
Description of Work
Quantity
Total
SI.
No
Description of Work
Quantity
Control
Charges
amd
Contingencies
GRAND TOTAL
#REF!
ABSTRACT ESTIMATE
Rate
Amount
50.60/m3
#REF!
#REF!
#REF!
#REF!
#REF!
C/O
#REF!
Rate
Amount
B/F
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Amount
C/O
#REF!
Rate
Amount
B/F
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Amount
C/O
#REF!
#REF!
Rate
Amount
B/F
#REF!
#REF!
8630
#REF!
GRAND TOTAL
#REF!