Sunteți pe pagina 1din 13

JOB CARD

IAC - A318/A319/A320/A321

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text
CARD:
SKILL:

MPD-TASK: 281100-01

ZONE: 190, 500, 600


ACCESS: 195BB, 196BB

INTERVAL:

MECH. INSP.

** ON A/C ALL
TASK 12-32-28-281-001-A
Drain Water Content
WARNING:

1.

PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR
CAN CAUSE DAMAGE TO THE EQUIPMENT.

Reason for the Job


Refer to the MPD TASK: 281100-01
DRAIN WATER CONTENT
NOTE: This task can be done together with TASK 12-32-28-281-003-A (Sample Fuel for
Microbiological Contamination Analysis) and TASK 12-32-28-281-80200 (Sample Fuel
for Hydraulic-Oil Contamination Analysis). If you do the Microbiological/Hydraulic-Oil
Contamination Analysis, the applicable drain tool and the container must be cleaned as given in
the AMM tasks.
NOTE: If possible, do the water drain procedure before the flight or the refuel procedure. If you do this
procedure after the flight or the refuel procedure, you must:
- Wait for one hour for the separation of the water and the fuel.
NOTE: It is permitted to do this procedure when the APU is in operation only if the fuel tank pumps are
set to OFF.
NOTE: For the gravity procedure AIRBUS recommends that there must be more than 10% content of
fuel in each tank. If you have less than 10% content of fuel, then the indirect water drain valves
will have a decreased flow. It is recommended that you use the suction procedure when you
have less than 10% content of fuel.

Job Set-up Information


A.

Fixtures, Tools, Test and Support Equipment


REFERENCE
No specific
No specific
No specific

JCP Title: temporary job card package


JCP Ref: reference

QTY DESIGNATION
AR CONTAINER 10 L(2 1/2 USGAL)
1
CONTAINER-CLEAN, STERILIZED, TRANSPARENT GLASS
1
CONTAINER-FUEL RESISTANT, TRANSPARENT PLASTIC
CERTIFICATE OF TASK / INSPECTION COMPLETION:
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 1 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

REFERENCE
No specific
No specific
No specific
No specific
(97A28002117002)
(98A28101000000)
(98A28104000000)
(98A28104000002)
(98D28104000000)
B.

QTY DESIGNATION
AR HYDROKIT
1
PUMP - SUCTION
AR SAFETY BARRIER(S)
AR WARNING NOTICE(S)
1
TOOL-PURGING
1
ADAPTING PIPE - WATER DRAINING FROM FUEL
1
PURGER - WATER DRAIN
1
TOOL - PURGING
1
PIPE ADAPTING-WATER DRAINING

Work Zones and Access Panels


ZONE/ACCESS
190
500
600
195BB, 196BB

ZONE DESCRIPTION
BELLY FAIR, AIR CONDITONING & HYD COMPT
LEFT WING
RIGHT WING

C. Referenced Information
REFERENCE
(Ref. 12-31-28-660-001-A).
(Ref. 28-00-00-910-001-A).
(Ref. 32-00-00-481-001-A).
SIL 28-079

DESIGNATION
Cold Weather Maintenance - Fuel
Fuel Safety Procedures
Installation of the Safety Devices on the Landing Gears

** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999


Fuel Sampling For Analysis
** ON A/C 101-199
Fuel Sampling For Analysis
** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999
Fuel Sampling For Analysis - Suction Procedure SHEET 1
** ON A/C 101-199
Fuel Sampling For Analysis - Suction Procedure SHEET 1
3.

Job Set-up

** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999


(Ref. Fig. Fuel Sampling For Analysis)
** ON A/C 101-199
(Ref. Fig. Fuel Sampling For Analysis)
** ON A/C ALL
JCP Title: temporary job card package
JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 2 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

Subtask 12-32-28-941-054-B
A.

Safety Precautions
WARNING: OBEY THE FUEL SAFETY PROCEDURES.
(1) You must obey the fuel safety procedures when you do work on the fuel system
(Ref. AMM TASK 28-00-00-910-001) .
(2) Put the safety barriers in position.
(3) Make sure that the ground safety locks are installed on the landing gear
(Ref. AMM TASK 32-00-00-481-001) .
(4) On the panel 400VU:
Make sure that the landing-gear control-lever 6GA is in the DOWN position
Put a warning notice in position to tell persons not to operate the landing gear.
(5) Put a WARNING NOTICE(S) in position to tell persons not to operate the landing gear doors.
(6) If the fuel temperature is less than 0 DEG.C (32.00 DEG.F) and/or the water drain valves are
frozen, to keep the flight turnaround times, either:
Do the cold weather maintenance procedure to warm the water drain valve
(Ref. AMM TASK 12-31-28-660-001)
or
Remove the fuel samples 30 minutes after the refuel procedure.
NOTE: Removal of the fuel samples after 30 minutes will not remove the water content as
satisfactorily as samples removed one hour after the refuel procedure.
NOTE: Do not apply unusually high force to open the water drain valve.
(7) If the APU is in operation during this procedure, you must make sure the fuel tank pumps are
set to OFF.

Subtask 12-32-28-010-050-B
B.

Get Access
(1) For access to the center tank water drain valves, open the applicable access panels:
For water drain valve 94QM, open access panel 195BB
For water drain valve 95QM, open access panel 196BB.

Subtask 12-32-28-480-050-A
C.

Preparation of the Equipment


(1) To get access to the high water drain valves from the ground, attach the:
ADAPTING PIPE - WATER DRAINING FROM FUEL (98A28101000000)
or the
PIPE ADAPTING-WATER DRAINING (98D28104000000)
to the bottle and funnel of the PURGER - WATER
DRAIN (98A28104000000) .

4.

Procedure

** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999


JCP Title: temporary job card package
JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 3 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

(Ref. Fig. Fuel Sampling For Analysis) (Ref. Fig. Fuel Sampling For Analysis - Suction
Procedure SHEET 1)
** ON A/C 101-199
(Ref. Fig. Fuel Sampling For Analysis) (Ref. Fig. Fuel Sampling For Analysis - Suction
Procedure SHEET 1)
** ON A/C ALL
Subtask 12-32-28-281-050-B
A.

Fuel Sampling for Water Contamination


(1) Gravity Procedure
NOTE: Make sure that the fuel tanks are filled to a minimum of 10% of capacity. This is
necessary to cover the water drain valve outlet, so that the water drain valves can
operate satisfactorily. Refer to SIL for data SIL 28-079.
(a) For the wing-tank water drain valves:
CAUTION: MAKE SURE THAT THE PLUNGER OF THE TOOL ALIGNS CORRECTLY
WITH THE WATER DRAIN VALVE. INCORRECT ALIGNMENT OF THE
TOOL CAN CAUSE:
- THE WATER DRAIN VALVE TO STAY IN THE OPEN POSITION AFTER
THE TOOL IS REMOVED
- A FUEL LEAK.
1

Push the center of the applicable water drain valve with the PURGER - WATER
DRAIN (98A28104000000) . Drain approximately 1.0 l (0.26 USgal) of fuel from the
water drain valve.
NOTE: A rubber shield prevents fuel leakage.

Remove the PURGER - WATER DRAIN (98A28104000000) from the water drain
valve.

Examine the water drain valve for leakage. If the valve does leak, use the PURGER
- WATER DRAIN (98A28104000000) to push (in) and release (out) the center of the
valve three or four times. No leaks are permitted.

(b) For the center-tank water drain valves:


1

Push the center of the applicable water drain valve with the TOOL PURGING (98A28104000002) . Drain approximately 1.0 l (0.26 USgal) of fuel from
the water drain valve.
NOTE: A rubber shield prevents fuel leakage.

Remove the TOOL - PURGING (98A28104000002) from the water drain valve.

Examine the water drain valve for leakage. If the valve does leak, use the TOOL PURGING (98A28104000002) to push (in) and release (out) the center of the valve
three or four times. No leaks are permitted.

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 4 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

NOTE: This step is very important at the center tank water drain valves 94QM and
95QM, where access is not easy.
(c) Put the fuel sample into a CONTAINER-CLEAN, STERILIZED, TRANSPARENT GLASS
or CONTAINER-FUEL RESISTANT, TRANSPARENT PLASTIC. If you do not do the
analysis immediately, seal the container.
(d) Do the sample removal procedure at all of the water drain valves.
(2) Suction Procedure
(a) You must use an approved type of PUMP - SUCTION for use on a fuel system. You must
obey the applicable safety precautions.
(b) On the TOOL-PURGING (97A28002117002) fully retract the nut (5), the screw (4) and
the plunger assembly (1).
CAUTION: MAKE SURE THAT THE PLUNGER OF THE TOOL ALIGNS CORRECTLY
WITH THE WATER DRAIN VALVE. INCORRECT ALIGNMENT OF THE TOOL
CAN CAUSE:
- THE WATER DRAIN VALVE TO STAY IN THE OPEN POSITION AFTER THE
TOOL IS REMOVED
- A FUEL LEAK.
(c) Put the hexagonal end of the bush (2) into the bottom of the water drain valve.
(d) Turn the bush (2) through 30 DEG.
(e) Turn the nut (5) until it touches and seals against the bottom skin.
(f)

Attach the PUMP - SUCTION to the hose (3).

(g) Put the outlet of the PUMP - SUCTION to the CONTAINER 10 L(2 1/2 USGAL).
(h) Hold the bush (2) and turn the screw (4) clockwise to its stop. This causes the plunger (1)
to open the drain valve. Fuel can now flow into the PUMP - SUCTION.
(i)

Start the PUMP - SUCTION.

(j)

Continuously monitor the fuel flow into the CONTAINER 10 L(2 1/2 USGAL).

(k) Drain approximately 1.0 l (0.26 USgal) of fuel (as a sample) from the drain valve.
(l)

When sufficient sample is drained, turn the screw (4) counter-clockwise to its stop.

(m) Stop the PUMP - SUCTION.


(n) Remove the PUMP - SUCTION from the hose (3).
(o) Turn the nut (5) until it does not touch the bottom skin.
(p) Turn the hexagonal end of the bush (2) 30 DEG and remove the TOOLPURGING (97A28002117002) .
(q) Examine the drain valve for leaks.
(r)

Do this procedure at all of the water drain valves.

Subtask 12-32-28-750-050-A
B.

Water Contamination Test

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 5 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

(1) Let the sample become stable.


(a) If the sample moves into two layers it contains water. Continue to drain from the water
drain valve until it has no water.
WARNING: DO THE TEST ONLY IN AN APPROVED AREA. THIS WILL HELP TO
PREVENT CONTAMINATION AND EXPLOSIONS.
(b) If the sample stays in one layer, it can be all fuel or all water. To find if the sample is fuel
or water, do the test that follows:
ACTION
1.If you have a HYDROKIT available put
the contents into the sample.

2.If you do not have a HYDROKIT


available, add water to the sample.

RESULT
If the powder stays white, the sample is
fuel and the test is complete.
or
If the white powder changes color to
purple, the sample is water. Continue to
take samples and test until all the water
has been removed.
If the sample moves into two layers,
then the sample is all fuel and the test is
complete.
or
If the sample stays in one layer, then the
sample is water. Continue to take samples
until all the water has been removed.

You can use the same procedure


to do an analysis on a sample from
a fuel tanker. Remove the sample
from the supply connector of the
NOTE: fuel tanker.

5.

Close-up
Subtask 12-32-28-410-050-B
A.

Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the applicable access panels:
For water drain valve 94QM, close access panel 195BB
For water drain valve 95QM, close access panel 196BB.

Subtask 12-32-28-942-050-A
B.

Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
NOTE: To discard the water samples, refer to the local regulations.

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 6 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

JOB CARD
IAC - A318/A319/A320/A321

A/C Reg.:
applicability_text

MPD-TASK: 281100-01
AMM TASK : 12-32-28-281-001-A
12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content
MECH. INSP.

(2) Remove the safety barriers.


(3) Remove the warning notice(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and
all other items.

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 7 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD
IAC - A318/A319/A320/A321

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

25QM

RIB2

(26QM)

C
23QM
(24QM)
21QM
(22QM)

A
A

95QM

94QM
RIB15
RIB16

RIB22
RIB23

WATER
DRAIN VALVE

FUEL TANK
BOTTOM-SKIN

PLUNGER

PURGING TOOL
98A28104000000

N_MM_123228_3_ACM0_01_01

Figure 12-32-28-991-00100-B / SHEET 1/2 - Fuel Sampling For Analysis


** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 8 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD
IAC - A318/A319/A320/A321

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

FUEL TANK
BOTTOM-SKIN

WATER
DRAIN VALVE

PLUNGER

PURGING TOOL
98A28104000002

NOTE:
1

CORRECT ALIGNMENT OF THE PLUNGER


WITH THE WATER DRAIN VALVE.
N_MM_123228_3_ACM0_02_00

Figure 12-32-28-991-00100-B / SHEET 2/2 - Fuel Sampling For Analysis


** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 9 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD
IAC - A318/A319/A320/A321

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

RIB2

25QM
(26QM)

21QM

(22QM)

A
95QM

94QM

RIB22

RIB23

WATER
DRAIN VALVE

FUEL TANK
BOTTOM-SKIN

PLUNGER

PURGING TOOL
98A28104000000

N_MM_123228_3_SAM0_01_01

Figure 12-32-28-991-00100-C / SHEET 1/2 - Fuel Sampling For Analysis


** ON A/C 101-199

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 10 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD
IAC - A318/A319/A320/A321

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

FUEL TANK
BOTTOM-SKIN

WATER
DRAIN VALVE

PLUNGER

PURGING TOOL
98A28104000002

NOTE:
1

CORRECT ALIGNMENT OF THE PLUNGER


WITH THE WATER DRAIN VALVE.
N_MM_123228_3_SAM0_02_00

Figure 12-32-28-991-00100-C / SHEET 2/2 - Fuel Sampling For Analysis


** ON A/C 101-199

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 11 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

IAC - A318/A319/A320/A321

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

25QM

RIB2

(26QM)

A
23QM
(24QM)

21QM
(22QM)

A
A

95QM

94QM
RIB15
RIB16
RIB22

RIB23

01

TYPICAL
WATER
DRAIN VALVE

FUEL TANK
BOTTOM SKIN

1
5

PURGING
TOOL

NOTE:
01

CORRECT ALIGNMENT OF THE PLUNGER


WITH THE WATER DRAIN VALVE.

N_MM_123228_3_ANM0_01_02

Figure 12-32-28-991-00700-B / SHEET 1/1 - Fuel Sampling For Analysis - Suction Procedure
** ON A/C 001-002, 005-012, 018-018, 020-099, 201-300, 901-999

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 12 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

MPD-TASK: 281100-01

JOB CARD

AMM TASK : 12-32-28-281-001-A


12-32-28 PB 301

IAC - A318/A319/A320/A321

TITLE:
12-32-28-281-001-A - Drain Water Content

A/C Reg.:
applicability_text

MECH. INSP.

25QM

RIB2

(26QM)

21QM

(22QM)

A
95QM

94QM

RIB22

RIB23

01

TYPICAL
WATER
DRAIN VALVE

FUEL TANK
BOTTOM SKIN

1
5

PURGING
TOOL

NOTE:
01

CORRECT ALIGNMENT OF THE PLUNGER


WITH THE WATER DRAIN VALVE.

N_MM_123228_3_AQM0_01_02

Figure 12-32-28-991-00700-C / SHEET 1/1 - Fuel Sampling For Analysis - Suction Procedure
** ON A/C 101-199

*** END OF CARD ***

JCP Title: temporary job card package


JCP Ref: reference

CERTIFICATE OF TASK / INSPECTION COMPLETION:


CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Page 13 of 13
DATABASE REV DATE: Aug 01/2015
PRINT DATE: Jan 08/2016 14:28

S-ar putea să vă placă și