Data Date: 21-Jan-16

PROJECT SCHEDULE
Activity ID

Activity Name

Actual Actual
Duration Start

Actual Week 15

198

Architectural Works
Arch
AB10
AB12
AB13
AB14
AB16
AB17
AB19
AB20
AB21
AB22
AB23
AB24
AB26
AB27
AB28
AB30
AB31
AB32
AB33
AB34
AB35
AB36
AB37
AB38
AB39
AB41
AB42

Isolation Works for Bathrooms & Kitchen


Aluminum & glass curtain wall works
Masonry works Closing gaps on walls between block
Stone Cladding Steel Support
Plastering works of Toilets & Walls (interior)
Ceramic works for Toilets,Walls & Kitchen
Marble Works for Walls
Isolation works for Roof
Stone Cladding Installation
Porcelain Works for toilets (All Floors)
Plastering Works (Exterior)
Marble Works Flooring
Painting Works (Exterior)
Wood Cladding
Finishing External Sorrounding works of the building
Gypsum Board for Wall Partitions
Tiling Roof Floor
Marble Works Entrance & Stairs
Finishing Basement & Car Parking Area
Gypsum board for Ceiling
Painting for walls & ceiling (Interior)
Stainless Steel Handrails for stairs
Finishing Glass Works & Automatic Sliding Door
Glass Partitions and Glass Doors Installation
Wooden Doors Installation
Finishing Steel Grills for AC Outdoor unit maintenanc
General Cleaning Works (Whole Building)

MEP Works
AB11
AB15
AB18
AB25
AB29
AB40

Completing Electrical Roughing-ins (All Floors)


HVAC works
Plumbing & Drainage for AC unit
Elevator Works
Plumbing Fixtures Installation
Finalizing Electrical Works

Project Baseline Bar


Actual Work
Remaining Work
Critical Remaining Work
Float Bar

Actual
Finish

Total
Float

28-May-16

-75

198

10-Oct-15
A
10-Oct-15

28-May-16

-75

5
20
20
25
20
18
27
30
24
24
12
24
6
30
24
18
5
22
32
30
34
20
18
18
18
12
6
190

10-Oct-15
10-Oct-15
10-Oct-15
10-Oct-15
27-Oct-15
30-Dec-15
04-Feb-16
21-Jan-16
25-Oct-15
28-Jan-16
31-Oct-15
29-Feb-16
24-Dec-15
18-Feb-16
26-Jan-16
25-Feb-16
25-Feb-16
28-Mar-16
28-Dec-15
28-Mar-16
09-Apr-16
23-Apr-16
23-Apr-16
18-Apr-16
18-Apr-16
07-May-16
21-May-16
10-Oct-15

26-Jan-16
21-Jan-16
27-Jan-16
31-Dec-15
31-Jan-16
31-Jan-16
07-Mar-16
24-Feb-16
26-Jan-16
24-Feb-16
01-Feb-16
28-Mar-16
03-Feb-16
23-Mar-16
23-Feb-16
16-Mar-16
01-Mar-16
23-Apr-16
27-Apr-16
02-May-16
18-May-16
16-May-16
14-May-16
09-May-16
09-May-16
21-May-16
28-May-16*
18-May-16

-63
-8
-66

20
30
6
40
12
12

10-Oct-15
26-Oct-15
29-Oct-15
10-Nov-15
25-Feb-16
04-May-16

04-Feb-16
24-Jan-16
21-Jan-16
21-Feb-16
09-Mar-16
18-May-16

-75
-58
-54
-10
-14
-73

Project Name: Administration Building


Client: Arif Fahad Altweirqi
Consultant: FAST Engineering Consultancy
Contractor: West Gate

-63
-63
-75
-49
-1
-66
-17
-75
-17
-66
-1
-66
-49
-71
-55
-75
-73
-71
-69
-75
-65
-75
-75
-73

Activity % tober 2015


N
D
January 2016
F
March 2016
April 2016
May 2016 une 2016
Complete
4 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12

0%
99.5%
70%
100%
81.5%
79.8%
0%
0%
80.6%
0%
89.79%
0%
81.6%
0%
0%
0%
0%
0%
17.4%
0%
0%
0%
0%
0%
0%
0%
0%

Isolation Works for Bathrooms & Kitchen


Aluminum & glass curtain wall works
Masonry works Closing gaps on walls between blocks.
Stone Cladding Steel Support
Plastering works of Toilets & Walls (interior)
Ceramic works for Toilets,Walls & Kitchen
Marble Works for Walls
Isolation works for Roof
Stone Cladding Installation
Porcelain Works for toilets (All Floors)
Plastering Works (Exterior)
Marble Works Flooring
Painting Works (Exterior)
Wood Cladding
Finishing External Sorrounding works of the building
Gypsum Board for Wall Partitions
Tiling Roof Floor
Marble Works Entrance &
Finishing Basement & C
Gypsum board for Ce
Painting for w
Stainless Steel
Finishing Glass
Glass Partitions an
Wooden Doors Ins
Finishing Ste
General

39.7%
92%
85%
59.5%
0%
0%

Completing Electrical Roughing-ins (All Floors)


HVAC works
Plumbing & Drainage for AC unit
Elevator Works
Plumbing Fixtures Installation
Finalizing Ele
Prepared by:

Noted and Checked by:

Approved by:

___________________

___________________

____________________