EPCI MILA- A ASTI PLATFO

DAILY OPE

Date
October 11 th, 2015
Number
11/DOR-CNO/RPE/X/ASTI
Period
from 6.00 October 11 th, 2015 to 6.00 October 12 th, 2015
Location
ASTI-A, CNOOC area
1. WORKING PROGRESS
1.1.MAIN
No
1
1.1
1.2
2
2.1
2.2
2.3
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
4.3
4.4
5
5.1
5.2
5.3
5.4
5.5
5.6
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
7
7.1
7.2
7.3
7.4
7.5

Job Description
Anchor Job and Barge Setup
Anchor Job and Barge Setup at Asti A P/F
TRA-2 and Simop
Preparation
Transfer equipment to Asti - A P/F
Line Mapping (Mechanical and E & I)
Install Scaffolding
Mechanical Work
Install Support and Mechanical Equipment
Structure reinstatement
Install sum caisson
Install pump caisson
Install riser cable I-tube
Piping
Piping valve and fitting reinstatement
Piping Field weld
Riser and subsea spool installation
Painting and Touch-up
Installation Electrical
Continuity and insulation test cable
Install cable ladder, tray and support
Pulling cable
Glanding
Install electric Equipment
Termination
Installation Instrument
Continuity and insulation test cable
Install cable ladder, tray and support
Pulling cable
Glanding
Running tubing
Install Instrument equipment
Termination
Precomissioning
Piping
Hydrotest piping
Mechanical
Riser Pipeline
Electrical

7.6
7.7
8

Instrument
Precomissioning completed
Demob

8.1

Demob
TOTAL

Note:
1.2. ADDITIONAL WORK 1
No

1
2
3

Item

Qty

35%
25%
40%

Riser
Subsea Spool A (fixed)
Subsea Spool A (metrology)

1
1
1
Total

1.3 ADDITIONAL WORK 2


No

Item

Qty

Unit

3460-AST-61015 Telecomunication tower


modify ladder

38

Ea

3460-MLA-61015 Telecomunication
tower modify ladder

38

Ea

Total
1.4 ADDITIONAL WORK 3 (FABRICATION AND INSTALL SAFETY EQUIPMENT)
No
1
2
3
4
5
6
7
8

Description
Support for Carbon Dioxide Portable Extinguisher
Support for Dry Chemical Portable Extinguisher
Support for Wheelded Dry Chemical Extinguisher
Support for Self Contained Eye Wash Unit
Support for Safety Equipment Cabinet
Support for Emergency rescue kit
Support for Life Buoy
Support for Life Raft
Total

2. HSE RECORD
WP No.

Issue Date

Description of Work

10/11/15

PGF/HW/BC/15/208

Fabrication support at main deck BC

10/11/15
10/11/15
10/11/15
10/11/15
10/11/15
10/11/15

PGF/CW/BC/15/209
PGF/CW/AST/15/111
PGF/HW/AST/15/052
PGF/CW/AST/15/109
PGF/CW/AST/15/110
PGF/CW/AST/15/086

Lifting and transfer material


Install and dismantle scaffolding
Fabriction, fit-up, welding, pipe riser 10" and support
Pulling cable and termination
Hydrotest preparation and bolting
Radiography activity for line pipe 10"

Description
- Unsafe action / unsafe condition
- Near Miss
- Incident / Accident
- Medical Treatment

Previous
0
0
0
0

Today
0
0
0
0

3. MANHOURS
Safety Man-hours
RPE
Consortium RPE
TIMAS
Patra Dinamika
Bayu Maritim
TAU
Geoservices
Lekom Maras
Mesco
CNOOC Reps
Hydra Asia
Gardatama
Pageo
Other
Total

POB

Previous

67
7
0
22
22
17
21
3
7
1
1
1
2
0
171

29604
3924

Today
804
84
0
264
264
204
252
36
84
12
12
12
24
0
2052

2688
10404
18456
9300
3636
1008
1776
348
1224
588
1176
108

84240

4. PROJECT DOWNTIME ISSUE


Weather Down Time

Total

Prev.
2

(hours)

Today
0

Client Activities In
Cum.
2

Prev.
0

5. GENERAL ACTIVITY
Time
6:00 - 6:30

6:30 - 17:00

Location
BC

ASTI
ASTI
ASTI
ASTI

Toolbox meeting on main deck Bayu Construction

Piping, Structure and Mechanical


Complete joining Water sea line (GR
Continue touch-up painting at all are
Continue SAT ICS by vendor at mez
Continue setting Multi Phase Flow M

Electrical
ASTI

Install cable ladder cover, 16 lines a

Install cable ladder clamps, 28 sets


Install and modify cable cover elbow
Install tagging marker cable electica

ASTI
ASTI
ASTI
Instrument
ASTI
ASTI
ASTI
17:30 - 18:00
18:00 - 18:30

18:30 - 5.30

BC
BC

ASTI
BC
ASTI
ASTI

Modify additional support on pump i


Re-location MEG pump position at m
Install tagging marker cable instrum
Break and crew change
Toolbox meeting on main deck Bayu Construction

Piping, Structure and Mechanical


Assist diver bolt tighting riser guard
Prepare and arrange filling pumps in
Continue cleaning all area
Modifiy chemical sampling support

6. PLANNING NEXT 24 HOURS


Discipline
Piping

Description
- Continue spool preparation for hydrotesting
- Install subsea spool (metrology)

7. ACTUAL PROGRESS WORK FOR 24 HOURS


A. Mechanical Work

B. Piping Work

C. Electric work

8. MATERIAL AND GAS CONSUMABLE


MATERIAL
Consumable gas send From Bayu Construction to Petro Charlie:
Oxygen = 1 botl
Acetylene = 1 botl

10. MAN POWER BREAKDOWN


RPE
Position
Construction Manager
Superitendent
Doctor
Electrical & Instrument
Fitter
Grinder
HSE
Hydrotest Operator
Mechanic
NDT
Painter
Paramedic
Planner
QA/QC
Rigger
Scaffolder
Store man

CONSORTIUM RPE
Qty
1
0
1
16
4
5
3
1
2
0
0
1
1
4
6
6
2

Position
Piping Eng.
Electrical Eng.
Instrument Eng.
Material Man
Mechanical Eng.
Structure Eng.
QA/QC
Safety
Project Eng

Supervisor
Welder
Technician
Other
Total

2
6
3
3
67

Total

9. CONSTRAINT, HIGHLIGHT, AND ASK FOR HELP

A. CONS
Modification washdown pump connection
Modification Air compressor piping to get space for maintenance
Need to maintenance jib crane after 2 year storage (change oil, grease, ect)
Modification Corrosion inhibitor tubing line
Modification Chemical injection tubing line

B. HIGHLIGHT
Outstanding duplex spool 6" to Carbon steel flange that fabrication at Jakarta
(o/s 1 joint and Hydrotest)
Outstanding material for thermocouple that machining at Jakarta
Outstanding horn, swing limiter switch for Jib Crane
Outstanding enclosure seal for pig launcher

RPE GROUP - B.CON (CONSORTIUM)


Prepared by :

Didik Sudaryono
Construction Manager

Che

Rez
PT. R

A- A ASTI PLATFORM AND PIPELINE 2nd CAMPAIGN


DAILY OPERATION REPORT
Period
06.00
12.00
18.00
24.00

to
to
to
to

08.00
13.00
19.00
01.00

Weather

Wind

Sea

Picth

Clear
Clear
Clear
Clear

15 - 16
15 - 16
14 - 16
14 - 16

moderate
rought
rought
rought

0.5 - 1
1-2
1-2
1-2

Weight factor (%)

previous

today

to date

2.00%
1.00%
1.00%
4.00%
1.00%
1.00%

2.0%
100.0%
100.0%
3.97%
97.0%
100.0%

0.00%
0.0%
0.0%
0.00%
0.0%
0.0%

2.00%
100.0%
100.0%
3.97%
97.0%
100.0%

2.00%
25.00%
5.00%
8.00%
4.00%
4.00%
4.00%
20.00%
4.00%
8.00%
6.00%
2.00%
17.00%
1.00%
3.00%
5.00%
2.00%
4.00%
2.00%
19.00%
1.00%
3.00%
4.00%
2.00%
4.00%
4.00%
1.00%
11.00%
2.00%
1.00%
1.00%
2.00%
2.00%

100.0%
24.2%
84.6%
100.0%
100.0%
100.0%
100.0%
17.75%
98.8%
98.1%
92.6%
19.8%
16.44%
100.0%
99.1%
98.4%
91.6%
100.0%
85.9%
17.66%
84.0%
98.8%
97.6%
91.5%
90.1%
91.6%
85.4%
5.8%
74.1%
92.1%
20.0%
100.0%
52.0%

0.0%
0.75%
15.0%
0.0%
0.0%
0.0%
0.0%
0.00%
0.0%
0.0%
0.0%
0.0%
0.00%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.06%
0.0%
0.0%
0.0%
0.0%
0.0%
1.5%
0.0%
1.22%
0.0%
0.0%
0.0%
0.0%
34.0%

100.0%
24.98%
99.6%
100.0%
100.0%
100.0%
100.0%
17.75%
98.8%
98.1%
92.6%
19.8%
16.44%
100.0%
99.1%
98.4%
91.6%
100.0%
85.9%
17.72%
84.0%
98.8%
97.6%
91.5%
90.1%
93.1%
85.4%
7.05%
74.1%
92.1%
20.0%
100.0%
86.0%

2.00%
1.00%
2.00%
2.00%
100%

9.8%
0.0%
0.0%
0.0%
87.89%

2.7%
48.1%
0.00%
0.0%
2.03%

12.5%
48.1%
0.00%
0.0%
89.92%

Lifting &
positioning

Fit-up & welding


or Bolting

NDT

Precomm

Progress

20%

70%

5%

5%

EA
EA
EA

100%
100%
100%

100%
100%
95%

none
none
100%

100%
0%
0%

95.5%
90.0%
91.5%
92.6%

Cut bevel

Fit Up
20%

Welding
50%

NDT
5%

Lift - Install
15%

Progress

100%

100%

100%

100%

100%

100.0%

100%

100%

100%

100%

0%

85.0%

Unit

93%

Total
4
7
2
1
1
1
12
2
30

Qty
EA
EA
EA
EA
EA
EA
EA
EA

Cut & Fit-up

Welding

Painting

Installation

25%

55%

10%

10%

0.0%
0.0%
0.0%
none
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
none
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
none
100.0%
100.0%
100.0%
100.0%

0.0%
0.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%

11/DOR-CNO/RPE/X/ASTI

of Work

Location

iser 10" and support

To date
0
0
0
0

Permit authority

Open

Bayu Construction

Yudi

6:00

Bayu Construction
ASTI-A
ASTI-A
ASTI-A
ASTI-A
ASTI-A

Parlindungan

6:00
8:05
8:05
7:05
7:05
7:05

Description
- Safety Induction
- Inspection
- Toolbox meeting
- General safety meeting

Today

Overtime

Previous
0
0
38
4

Cumulative

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

30408
4008
2688
10668
18720
9504
3888
1044
1860
360
1236
600
1200
108
86292

Client Activities Insertion


Today
0

Baharudin
Yusran
Wahsidin
Yudi
Yudi

Prev.
0

Job Description

ayu Construction

g Water sea line (GRE) at subcellar deck, 2 joint


up painting at all area
CS by vendor at mezzanine deck
g Multi Phase Flow Meter by vendor at cellar deck

der cover, 16 lines at mezzanine deck

Today
0

Today
0
0
2
1

Lost Time Acciden


0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Equipment Downtime
Cum.
0

Close

Cum.
0

Total Downtime
2

der clamps, 28 sets


fy cable cover elbow, 2 ea
marker cable electical JB and equipment field at all area

al support on pump injection MEG inside MEG skid at mezzanine


G pump position at mezanine deck
marker cable instrument at all area

ayu Construction

tighting riser guard


ange filling pumps in preperation for pipline hydrotest
ng all area
l sampling support

11/DOR-CNO/RPE/X/ASTI

Discipline
E&I

Description
- Continue cable termination
- Continue glanding cable

D. Instrument Work

E. Precomissioning

F. Comissioning

11/DOR-CNO/RPE/X/ASTI

Content

Total
16
6
8
10
25

Oxygen
Acetylene
LPG
Nitrogen
Argon UHP 99.999%

UM RPE

TIMAS
Qty
1
1
1
1
1
0
1
1
0

Position
Tecnician
QC
QC Supervisor
Engineer
Tech/Hydrotest
FE

Empty
10
3
2
8
13

PATRA DINAMIKA
Qty
0
0
0
0
0
0

Position
Supervisor
Ass. Supervisor
Diver
Mechanic
Opt tensioning

Total

Total

A. CONSTRAINT

C. ASK FOR HELP

TIUM)
Checked by :

CNOOC
Approved by:

Reza Ajiputra
PT. RPE Engineer

Alexander Sutrisno
Company Representative
11/DOR-CNO/RPE/X/ASTI

Roll
0.5 - 1
1-2
1-2
1-2

Progress

0.0%
0.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
61.0%
page 1 of 3

Continue

To date
0
0
40
5

Lost Time Accident

Total Downtime
2

page 2 of 3

Description

D. Instrument Work

E. Precomissioning

F. Comissioning

page 2 of 3

Full
6
3
6
2
12

PATRA DINAMIKA
Qty
2
2
15
1
2

22

C. ASK FOR HELP

CNOOC
Approved by:

Alexander Sutrisno
Company Representative
page 3 of 3

1.FABRICATION
1.1 Piping
No
1
2
3
4
5

Item

Qty

Carbon Steel (CS)


Galvanize
Stainless Stell (SS)
Duplex
GRE
Total

149
583 1/4
4
97 1/4
34
867 1/2

1.2 Structure
No
1
2
3
4
5

Item

Qty

Main deck Flooring


Subcellar deck Framing
Cellar deck Flooring
SUMP CAISSON (AST-80001)
PUMP CAISSON

58
42
27
8
2
Total

137

2. PRECOMM
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Item
TP-AST-001
TP-AST-002
TP-AST-003
TP-AST-004
TP-AST-005
TP-AST-006
TP-AST-007
TP-AST-008
TP-AST-008A
TP-AST-009
TP-AST-010
TP-AST-010A
TP-AST-011
TP-AST-012
TP-AST-013
TP-AST-014
TP-AST-015

Qty
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

TP-AST-016
TP-AST-017
TP-AST-018
TP-AST-019
TP-AST-019A
TP-AST-020
TP-AST-021
TP-AST-022
TP-AST-023
TP-AST-024
TP-AST-025
TP-AST-026
TP-AST-027
TP-AST-028
TP-AST-029
TP-AST-029A
TP-AST-030
TP-AST-031
TP-AST-032

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total

36

3. INSTALLATION
No

1
2
3

Item

Qty

Riser
Spool A
Spool B (Metrology)

1
1
1
Total

4. HOOK-UP PIPING
No
1
2
3

Item

Qty

Wellhead piping.
Pipeline from riser to SDV
Sump caisson, pump caisson, cable i-tube

3
20
3
TOTAL

5. TOUCH-UP PAINTING

No

1
2
3

Item

Qty

Riser above water


Piping
Structure
Total

0.58
8.91
95.5
104.99

October 11 th, 2015

Unit
DB
DB
DB
DB
DB

Unit
jts
jts
jts
jts
jts

Fit-up
30%
100%
100%
100%
100%
100%

Welding
60%
100%
100%
100%
94%
100%

NDT
5%
100%
100%
100%
92%
none

Precomm

Fit-up
25%
100%
100%
100%
100%
100%

Welding
70%
100%
100%
100%
100%
100%

NDT
5%
100%
100%
100%
100%
100%

Precomm

5%
74.1%
74.1%
74.1%
74.1%
0.0%

none
none
none
none
none

Progress
98.7%
98.7%
98.7%
94.6%
95.0%
98.1%

Progress
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%

Unit

Progress

TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP

88.5%
84.0%
88.5%
88.5%
88.5%
88.5%
88.5%
88.5%
88.5%
75.0%
88.5%
20.0%
88.5%
88.5%
88.5%
88.5%
88.5%

TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP

88.5%
75.0%
75.0%
90.0%
75.0%
88.5%
88.5%
88.5%
88.5%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
15.0%
90.0%
74.1%

Lifting &
positioning

Fit-up &
welding or
Bolting

NDT

Precomm

20%

70%

5%

5%

EA
EA
EA

100%
100%
100%

100%
100%
95%

none
none
100%

10%
0%
0%

Unit

Fit-up
30%

Welding
60%

NDT
5%

Precomm

well
DB
EA

50.00%
100.00%
100.00%

50.00%
100.00%
100.00%

0.00%
100.00%

0.00%
100.00%

Unit

5%

Progress

95.5%
90.0%
91.5%
92.6%

Progress
45.00%
100.00%
100.00%
59.95%

Unit

m2
m2
m2

Blasting

Primer coat

Second coat

Top coat

40%

20%

20%

20%

100.0%
4.0%
30.0%

100.0%
4.0%
30.0%

100.0%
4.0%
7.0%

100.0%
4.0%
7.0%

Progress

100.00%
4.00%
20.80%
19.8%

ELECTRICAL WORK
October 11 th, 2015

Support tray, Cable Tray and Cable Ladder

No

Item

Cabble tray support

2
3

Cable Tray
Cable Ladder

Cable Work

TOTAL

No

Description

1
2
3

Pulling
Glanding
Termination

Electrical Equipment

TOTAL

No
1
2
3
4
5

Item
Navigation Aids Lantern (NAL)
Obstruction Light
Radar Beacon
Lighting
Trafo Lighting (TR)
Total

Qty

Unit

WF

Install

Progress

20
25

EA
Line

10%
45%

20
24.5

100.0%

52
97

Line

45%
100%

52

100.0%
99.1%

Qty

Unit

WF

Install

Progress

31
262
262
555

Pull
EA
Point

50.0%
20.0%
30.0%
100%

30.5
240
225

98.4%
91.6%
85.9%
93.3%

Qty

Unit

WF

Install

Progress

2
1
1
36
1
41.0

EA
EA
EA
EA
EA

10.0%
10.0%
10.0%
60.0%
10.0%
100.0%

2
1
1
36
1

100.0%
100.0%
100.0%
100.0%
100.0%
100.0%

Qty

Unit

WF

Install

Progress

50
25
28
103

EA
Line
Line

20%
40%
40%
100%

49
24.5
28
101.5

98.00%
98.00%
100.00%
98.8%

Qty

Unit

WF

Installed

Progress

82
164
164
410

Pull
EA
Point

50.0%
20.0%
30.0%
100%

80
150
140
370

97.6%
91.5%
85.4%
92.7%

98.0%

INSTRUMENT WORK
1

Support tray, Cable Tray and Cable Ladder

No
1
2
3

Item
Cabble tray support
Cable Tray
Cable Ladder
TOTAL

Cable Work

No
1
2
3

Description
Pulling
Glanding
Termination
TOTAL

Description
3/8"
1/4"
1/2"
TOTAL

4
No
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17

15

Tubing Work

No
1
2
3

82

Qty

Unit

WF

Installed

Progress

220
119
1050
1389

feet
feet
feet

16%
9%
76%
100%

220
119
912
1251

100.0%
100.0%
86.9%
90.1%

Qty

Unit

WF

Installed

Progress

6
14
1
1
2
14
3
2
1
8
1
5
8
10
6
3
85

EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA

5.0%
5.0%
5.0%
10.0%
5.0%
5.0%
5.0%
5.0%
5.0%
5.0%
10.0%
5.0%
5.0%
5.0%
5.0%
15.0%
100.0%

4
10
1
0
1
14
3
2
1
1
1
5
8
10
5
3
69

100%
100%
100%
100%
50%
100%
100%
100%
100%
13%
100%
100%
100%
100%
100%
100%
93.1%

Instrument Equipment
Item
Temprature indicator (TI)
Pressure Indicator (PI)
Level Gauge (LG)
MPFM cw Accessories
Pig Signaller (ZIS-120), (ZIS-121)
Pressure Indicator Transmitter (PIT)
Level Indicator Transmitter (LIT)
Temperature Indicator Transmitter (TIT)
Flow Transmitter & Orifice Plate (FIT)
Restriction Orifice
WHCP
PSV
Gas Detector (GD)
ESP Push Button
Regulator (PCV)
SDV - BDV - XV
Total

120 - ok (at BC), 121 flange change to #600 (at jakarta)

at Jakarta,

MECHANICAL EQUIPMENT ASTI-A


No

Description

Qty

Unit

1
2
3
4
5

Chemical Injection Set (U-715, T-175, P-715 A/B)


Chemical Injection Set (U-725, T-725, P-725 A/B)
Wash Down Pump P-615
Closed Drain Pump P-415
Open Drain Pump P-510

1
1
1
1
1

Set
Set
Pcs
Pcs
Pcs

Jib Crane Equipment Y-905 E&I Cable

Pcs

Jib Crane Equipment Y-905 Lighting Lamp

Pcs

TOTAL
October 11 th, 2015

Installed

Progress

100.0%
100.0%
100.0%
100.0%
100.0%

100.0%
100.0%
100.0%
100.0%
100.0%

95.0%

95.0%

100.0%

100.0%
99.63%

Remark
installed
installed
installed
installed
installed
need scaffolding, prerequirement: comissioning
trafo/FLBS/SWGR
need scaffolding, prerequirement: comissioning
trafo/FLBS/SWGR

Planning to install
23 sept (tentative)
23 sept (tentative)
installed
20-Sep
22-Sep

PRECOMISSIONING PIPING ASTI-A PLATFORM

TEST PACKAGE

QTY LINE PER


TEST
LINE CHECK
PAGKAGE

TP-AST-001
TP-AST-002
TP-AST-003
TP-AST-004
TP-AST-005
TP-AST-006
TP-AST-007
TP-AST-008
TP-AST-008A
TP-AST-009
TP-AST-010
TP-AST-010A
TP-AST-011
TP-AST-012
TP-AST-013
TP-AST-014
TP-AST-015
TP-AST-016
TP-AST-017
TP-AST-018
TP-AST-019
TP-AST-019A
TP-AST-020
TP-AST-021
TP-AST-022
TP-AST-023
TP-AST-024
TP-AST-025
TP-AST-026
TP-AST-027
TP-AST-028
TP-AST-029
TP-AST-029A
TP-AST-030
TP-AST-031
TP-AST-032

9
10
12
3
4
1
1
3
1
1
3
3
9
2
5
1
5
17
4
33
1
2
2
4
8
11
2
1
1
1
1
1
4
8
6
1

36
Hydrotest complete
Progress Precomm at B-con

181
33
30%

MATR' TRACE
AND NDE
CLEARENCE

10%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%

5%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
50.0%
100.0%

100.0%

97.6%

of

PRECOMISSIONING ELECTRIC ASTI-A PLATFORM (INTERNAL)

36

NO
1
2
3
4
5
6
7
8
9
10
11
12

TEST SHEET
Low Voltage Switchgear and Motor Control Center
Power Transformer
Navigation Aid and Radar Beacon
Battery charger
Power, Control and Earthing Cable
Low Voltage Induction Motor
Lighting and Small Power Transformer
High Resistance Grounding (HRG) Panel and Resistor
Medium Voltage Fused Load Break Switch (FLBS)
Distribution Board (DB)
Continuity and Megger Test
Earhting Cable Resistance Test

PRECOMISSIONING ISTRUMENT ASTI-A PLATFORM


NO.
CI-00
CI-01
CI-02
CI-03
CI-04
CI-05
CI-06
CI-07
CI-08
CI-09
CI-10
CI-11
CI-12
CI-13
CI-14
CI-15
CI-16
CI-17
CI-18
TI-01
TI-02
TI-03
TI-04
TI-05
TI-06
TI-07
TI-08
TI-09

TEST SHEET
Miscellaneaous
Thermowell
Local Gauge (LG PG TG)
Transmitter (LT PT TT)
Orifice Plate and Restriction Orifice
Analyzer Indicating Transmitter (AIT)
Pressure Safety/Relief Valve (PSV/PRV)
On/Off Valve Pneumatic Type (SDV BDV XV)
Self Actuated Pressure Regulator Valve (PCV)
Pig Signal
Instrument Tubing
Fusible Loop
Gas Detectors
ESD Push Button
Junction Box (JB)
Choke Valve
Instrument Cable
Multivariable Flow Transmitter
Multiphase Flow Meter (MPFM)
General Purpose
Actuated On/Off Valve (XV, BDV,SDV)
Relief Valve
Instrument Analog O/P
Instrument Switched O/P
Instrument Tube/Pipe
Oriface Plate
Instrument Cable
Multipair Instrument Cable
TOTAL

PRECOMISSIONING MECHANICAL ASTI-A PLATFORM


No
1
2
3
4
5
6
7
8
9
10
11
12

Categories
Chemical Injection Skid (U-715)
Chemical Injection Tank (T-175)
Chemical Injection (P-175)
Chemical Injection Skid (U-725)
Chemical Injection Tank (T-725)
Chemical Injection Tank (T-725)
Submersible Pump/Wash down pump
Closed Drain Pump
Closed Drain Vessel
Open Drain Pump
Air instrument Vessel
Jib Crane Equipment Y-905 (Cable)

13

Jib Crane Equipment Y-905 (Lighting)


Total

PRECOMISSIONING COMPLETED
No
1
2
3
4

Categories
PIPING
ELECTRIC
INSTRUMENT
MECHANICAL
TOTAL

PUNCHLIS
CATEGORY A

FLUSHING

PRESSURE TEST

DRYNG

5%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
50.0%
100.0%

10%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%

40%
100.0%
90.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%

5%
100.0%
90.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%

15%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
0.0%
90.0%
0.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
0.0%
0.0%
100.0%
0.0%
90.0%
90.0%
90.0%
90.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
100.0%

10%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%

97.6%

92.9%

92.1%

92.1%

66.8%

0.0%

TP

REBOLT
INSTATEMENT TIGHTENING

ELECTRICAL
TEST

WF

VISUAL TEST
20%

30%

50%

6.0%
6.0%
5.0%
5.0%
8.0%
6.0%
6.0%
8.0%
8.0%
8.0%
20.0%
14.0%
100.0%

100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%

100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%

100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%

PHISYCAL TEST

PROGRESS

100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
0.0%
86.0%

PROGRESS

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
100.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
50.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
100.0%
100.0%
12.5%

PROGRESS

0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
60.0%
0.0%
50.0%
75.0%

75.0%
20.0%

PROGRESS

74.1%
86.0%
12.5%
20.0%
48.1%

October 11 th, 2015

WF

PROGRESS

100%
5.0%
5.5%
6.6%
1.7%
2.2%
0.6%
0.6%
1.7%
0.6%
0.6%
1.7%
1.7%
5.0%
1.1%
2.8%
0.6%
2.8%
9.4%
2.2%
18.2%
0.6%
1.1%
1.1%
2.2%
4.4%
6.1%
1.1%
0.6%
0.6%
0.6%
0.6%
0.6%
2.2%
4.4%
3.3%
0.6%

88.5%
84.0%
88.5%
88.5%
88.5%
88.5%
88.5%
88.5%
88.5%
75.0%
88.5%
20.0%
88.5%
88.5%
88.5%
88.5%
88.5%
88.5%
75.0%
75.0%
90.0%
75.0%
88.5%
88.5%
88.5%
88.5%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
90.0%
15.0%
90.0%

100.0%

74.1%

o/s flange

vendor