ILM Bearing
Method of functioning

mageba Incremental Launching Bearing ILM


1) General description
a) Typical cross section

During launching sliding plates have to


be rigidly supported at the protruding
ends to avoid bending of sliding plates

b) Typical top view


Bottom plate

Top plate

Brackets (for launching)


O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen fr Webpage\2 Produkte&Dienstleistungen\3 Brckenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc

ILM Bearing
Method of functioning

Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Approved: GM Page: 2/5

c) Brackets, to hold the top plate during launching


Bolts item 28 and plate item 25 to be
Removed after finishing of launching

d) Fixing bolts for transportation and presetting of top plate

To be cut before
operation of bearing

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen fr Webpage\2 Produkte&Dienstleistungen\3 Brckenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc

ILM Bearing
Method of functioning

Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Approved: GM Page: 3/5

2) ILM bearing during launching procedure


Elastomeric pad

Stainless steel sheet


(temporarely)

Concrete superstructure
Launching direction

Pad

Fixation during launching


(temporarely)

3) Proposals for fixation after launching procedure


Proposal 1: Connection with dowels

Mortar filled through separate


channels

Dowels provisionally placed into the


recess and bolted to top plate

Bolts

Fixation to be dismount

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen fr Webpage\2 Produkte&Dienstleistungen\3 Brckenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc

ILM Bearing
Method of functioning

Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Approved: GM Page: 4/5

Proposal 2: Connection to top plate previously mounted with bolts


Top plate premounted in such a way that
it is exactly above the bearing at final position
Top plate previously mounted to
superstructure
Studs

Bolts

Gap filled with


epoxy resin

Fixation to be dismount

Proposal 3: Connection to previously mounted top plate by welding

Top plate premounted in such a way that it is


above the bearing at final position
Studs

Gap filled with


epoxy resin

Sliding plate
welded to top plate

Fixation to be dismount

O:\Marketing\03 HOMEPAGE\mageba-Homepage 2004 (V. II)\6 Unterlagen fr Webpage\2 Produkte&Dienstleistungen\3 Brckenlager\2 kartei Lager\03 Downloads\04 Taktschiebelager\02 EN\1
Produkteinformationen\Alte Dokumente\ILM_Bearing_2003_10_Specification.doc

ILM Bearing
Method of functioning

Prepared: KC Revision: 01
Revised: KC Date: 28.10.2003
Approved: GM Page: 5/5

Proposal 4: Connection to previously mounted top plate by using transversal fixation


bars

Bolts

Studs

Fixation bars

* Distance measured after launching and fixation


bars manufactured accordingly

Fixation dismounted