Documente Academic
Documente Profesional
Documente Cultură
GROUP OF COMPANIES
GEOGRAPHY OF CUSTOMERS
Kirov
Perm
Izhevsk
Nizhny
Novgorod
Moscow
Perm
Kazan
Ufa
Saransk
Ulyanovsk
Samara
Penza
Saratov
Orenburg
Voronezh
Kurakhovo
Volgograd
Atyrau
Aktau
Rostov-on-Don
Tyumen
Verkhny Tagil
Ekaterinburg
Chelyabinsk
Tomsk
Barnaul
Novosibirsk
Abakan
Aksu
Ekibastuz
UstKamenogorsk
Almaty
www.ker-eng.com
www.ker-eng.com
TABLE OF CONTENTS
CONCERNING THE COMPANY
Introduction ..........................................................................................................................................................7
Structure .................................................................................................................................................................8
Fields of activities..............................................................................................................................................9
Quality ................................................................................................................................................................... 10
Our customers ..................................................................................................................................................11
Partners .................................................................................................................................................................12
Training of Specialists .................................................................................................................................. 13
INDUSTRIAL AUTOMATION
Field of activities ............................................................................................................................................. 25
Standard solutions ......................................................................................................................................... 26
Leading projects in the field of industrial automation ..............................................................36
ELECTRICAL ENGINEERING
Competences of electrical direction ................................................................................................... 41
Leading projects in the electrical direction ..................................................................................... 42
ENERGOTECHNOLOGICAL AUDIT
Energotechnological audit ........................................................................................................................49
Leading projects ............................................................................................................................................58
Experience of international projects ..................................................................................................59
PRODUCTION
Production capacities ..................................................................................................................................63
REFERENCE LIST
CERTIFICATES AND PERMITS
71
83
CONCERNING
THE COMPANY
Branch office
in Turkmenistan
Management Company KER-Holding
Branch office in the
Hashemite Kingdom of Jordan
ENGINEERING SECTION
KER-Engineering
KER-Avtomatika
KER-Naladka
TatNIPIenergoprom
Engineering Centre Energoprogress
KER
KER-Montazh
Laying pipelines and oil pipelines
KER MEZ
APMK-23
Branch office
in Moscow
INTRODUCTION
Management Company
KER-Holding LLC
www.ker-holding.ru
KER-Engineering LLC
www.ker-eng.com
DEAR COLLEAGUES!
Let me bring to your attention a group of
companies KER-Engineering that is capable
of solving engineering problems of different
complexity. The main prole of the company
is integrated engineering services in power
and production sectors.
www.ker-eng.com
STRUCTURE
Electrical Plant EnergoInvest (Bosnia and HerzeTatNIPIenergoprom Branch performs design govina)
and survey works and engineering support services for construction.
KER-Avtomatika Branch is automation of technological processes and production, electrical engineering, production of equipment.
INTEGRATED ENGINEERING SERVICES
KER-Engineering top
management
TatNIPIenergoprom
Branch
Integrated designing in
in power and production
sectors
KER-Avtomatika Branch
Industrial automation.
Rehabilitation of electrical
equipment
Engineering Centre
Energoprogress Branch
KER-Naladka Branch
Industry examination.
Commissioning.
Performance adjustment.
Electrical Plant
EnergoInvest (Bosnia and
Herzegovina)
FIELDS OF ACTIVITIES
Integrated designing
Development of projects (thermal power
plants, combined heat and power plants,
boiler houses, heating networks, and power
supply of industrial enterprises, agricultural
facilities, public buildings and facilities) as
well as development of heat and power supply schemes for industrial facilities, cities and
towns.
Construction support
Preparation and processing of initial data
for designing and rehabilitation of facilities,
technical support of the project phase (supervise of development of design and estimate documentation, its coordination with
customers and in regulatory authorities), arrangement of technical supervision.
www.ker-eng.com
QUALITY
10
OUR CUSTOMERS
KER-Engineering has an extensive experience in development and implementation of
engineering projects in Russia as well as in CIS
and foreign countries: Kazakhstan, Belarus,
the Ukraine, Pakistan. Quality of works is conrmed by the positive reviews of customers.
Russia
Research and Production Enterprise Biotechprogress CJSC;
The Defense Ministry of the Russian Federation; Bashkirenergo OJSC; VNIPINEFT
OJSC; Kazancompressormash OJSC;
KAMAZ OJSC; Mosenergo OJSC;
Nizhnekamskshina OJSC;
Wholesale Generating Company-1 OJSC;
Wholesale Generating Company-2 OJSC;
Wholesale Generating Company-3 OJSC;
Oil and Gas Industry
Wholesale Generating Company-4 OJSC;
Oil Company Rosneft OJSC;
Lukoil
OZNA OJSC; RusGidro OJSC;
OJSC; Mid-Volga Transnefteprodukt OJSC;
Territorial Generating Company-1 OJSC;
Novosibirskneftegaz OJSC (TNK-VP);
Territorial Generating Company-4 OJSC;
Nizhnekamsktekhuglerod OJSC.
Territorial Generating Company-5 OJSC;
Kazanorgsintez OJSC;
Territorial Generating Company-6 OJSC;
Nizhnekamskneftekhim OJSC;
Territorial Generating Company-11 OJSC;
TAIF-NK OJSC; TANEKO OJSC;
Territorial Generating Company-16 OJSC;
Tatneft OJSC;
Generating Company OJSC;
Bashkir Generating Company LLC;
Housing and public utility sector
Yenisei Territorial Generating Company
Moscow United Energy Company OJSC;
OJSC (Territorial Generating Company-13);
Chelnyvodokanal CJSC;
Fortum OJSC; Orenburg Territorial GenerMunicipal Unitary Enterprise Yelabugaating Company OJSC; Grid Company OJSC;
Vodocanal;
FEZ Alabuga.
Naberezhnye Chelny Heat Distribution
Company OJSC;
CIS and foreign countries
Kazan Heat Distribution Company OJSC;
Ekibastuz SDPP-1 LLP (Kazakhstan);
Almetyevsk heating networks OJSC.
Ekibastuz SDPP-1 (Kazakhstan);
Eurasian Energy Corporation JSC,
Machine-building industry
Aksu TPP (Kazakhstan);
Sollers;
MAEK-Kazatomprom LLP, CHPs-1, 2, 3
Kazan Helicopter Plant OJSC;
(Kazakhstan, Aktau);
Central automobile repair factories.
Republican unitary enterprise Grodnoenergo, Lida CHP (Belarus);
Metallurgy
Vostokenergo LLC, Kurakhovo TPP (the
Novolipetsk Metallurgical Combine OJSC;
Ukraine); Najibia TPP (Iraque);
Metallurgical plant (Myanma-Burma UnMetallurgical Plant Pakstil (Pakistan);
ion)
Fria CHP (Guinea); CHP at the Oil
Renery Plant (Republic of Yemen);
United Power Company JSC (Kazakhstan);
Food processing industry;
AlES JSC (Kazakhstan);
Tatspirtprom OJSC;
AES Ust-Kamenogorsk CHP JSC (KaZainsk sugar OJSC;
Chelny-Broiler LLC.
zakhstan).
www.ker-eng.com
11
PARTNERS
12
Domestic manufacturers.
Krug Research and Production Company
Volmag CJSC
Vibrobit Scientic Production Association
Biotechprogress Research and Production
Enterprise CJSC;
EKRA Research and Production Enterprise
SOUTH-SYSTEM plus OJSC
ARGO Research and Development Centre
VZLYOT CJSC
ITV
In the eld of reconstruction of electrical
equipment:
Siemens;
EKRA Research and Production Enterprise
ABB;
Schneider Electric.
In the eld of energy process audit:
MP Diagnost CJSC (Moscow);
Pergam Company CJSC (Moscow);
Priborostroitel Plant CJSC (St. Petersburg);
Vector Scientic and Production Company
CJSC (Moscow);
ELNAP LLC (Moscow);
DIAKS LLC (Moscow);
Electrical Systems LLC (St. Petersburg) and
others.
Engineering companies (EPM, EPC-Contractors)
Management Company KER-Holding LLC
INVENT LLC
4-Sibkotes OJSC
Sealtek CJSC
Ural Power Engineering Centre OJSC
Design organizations
VNIPIenergoprom Association OJSC
VNIPIneft OJSC
TatNIPIenergoprom LLC
VNIIR OJSC
All-Russian Research Institute of Metrology
named after D.I.Mendeleyev FSUE
Engineering that creates advantages
Advanced training
Employees are trained in training centers of Siemens, Emerson. There is a training
center on the basis of KER-Engineering that
specializes in staff development. We have
experience of training specialists from Arabic
countries.
The Company provides training and certication of specialists in several areas:
Setting up automatic regulation systems
of thermal power processes;
Process protections and interlocks;
The principle and structure of TPP and others.
Cooperation with higher education institutions
Interaction with higher education institutions for target staff training is allocated to one
of the strategic directions of KER-Engineering.
The basic engineering staff of the Company
consists of graduates of leading Russian universities:
Moscow Power Engineering Institute (Technical Institute),
Kazan State Power Engineering University,
Kazan State Technical University named after A. N.Tupolev,
Kazan State Technological University,
Tomsk Polytechnic University,
Ivanovo Power Engineering University.
Our main partners are:
Kazan State Power Engineering University
Annually, students of this University undertake an internship at the enterprises KER-Avtomatika, Engineering Centre Energoprogress,
TatNIPIenergoprom. Upon completion of the
practice, most part of students remain in the
Company and successfully perform engineering tasks. The contract of target preparation of
specialists was signed with Kazan State Power
Engineering University.
KER-Avtomatika Company takes an active part in technical equipping of training and
laboratory facilities of Process and Production Automation Department of the Kazan
www.ker-eng.com
TRAINING OF SPECIALISTS
13
t
a
h
t
g
n
i
r
e
e
n
i
g
n
E
s
e
g
a
t
n
a
v
d
a
s
e
t
a
cre
DESIGNING
AND SUPPORT
OF CONSTRUCTION
16
17
FIELD OF ACTIVITIES
18
www.ker-eng.com
Engineering staff
The following departments were created
to solve tasks of design and engineering support of construction:
Department of Integrated Design for
large-scale facilities;
Department of Integrated Design for
small-scale facilities;
Department of Integrated Design for
backbone electric grids;
Technical Department provides general
technical records, as well as activities aimed at
improving quality of the developed design and
estimate documentation and productivity of
designers in accordance with the quality management system (ISO 9001-2001).
A staff of experts is represented by the
following specialties:
Chief Project Engineers;
Chief Technicians;
Leading experts in the directions:
Heat supply;
Power supply;
Construction and architecture;
Development of environment
impact assessment and environmental protection sections;
Design of re and alarm systems;
Development of water supply
and sewerage sections;
Design of gas distribution and gas
consumption systems;
Design of primary chemistry sections;
Design of DCS;
Engineering and survey work experts;
Estimators.
Engineering capability
Using modern software products in designers work signicantly reduces the time for design work, ensures high quality of work, enables the unication of nodal solutions, allows
to choose the best process solutions.
Currently, the following are successfully
used: Compas 10, RastrWin 2.25.1.1, AUTOCAD
2007, Start 4.6, SCAD 11.1 (S128max), Fundament 12.3, Grand smeta 3, Astra-Nova2007.
Department for registration and documentation support is equipped with professional
equipment (printers, copiers, scanners) for
solving problems concerning production and
reproduction of design and estimate documentation, create backup documentation.
The geological and survey group is
equipped with a multipurpose rig MBU-5-01, as
well as all necessary materials for drilling works
in various ways.
19
LEADING PROJECTS
20
www.ker-eng.com
Upgrading and rehabilitation of water treatment and circulation water supply systems
Projects with participation of our specialists:
Full-scale DCS for chemistry departments
at Kazan CHP-1, Kazan CHP-2, Kazan CHP3, Zainsk SDPP, Nizhnekamsk CHP-1, Nizhnekamsk CHP-2;
Upgrading of 3rd stage of water demineralization at Zainsk SDPP;
A project of enforcement and replacement
of cooling tower building structure, ceiling, roof
covering of the main building of Nizhnekamsk
CHP-1.
21
INDUSTRIAL
AUTOMATION
INDUSTRIAL AUTOMATION
24
FIELD OF ACTIVITIES
INDUSTRIAL AUTOMATION
Automation services:
Designing.
Supply of equipment.
Installation and commissioning.
Technical and service maintenance, repair.
DCS for heat and hydraulic power industry:
DCS of main equipment at TPP (power units,
boiler units, turbine generating units) and HPP (hydroelectric sets);
DCS of auxiliary equipment at TPP (chemical
water treatment, feedwater installations, technical water supply, etc.);
DCS of fuel handling facilities at TPP (fuel
DCS for conveyer systems.
oil handling facilities, gas distribution plants, fuel
handling);
DCS for various industries:
DCS of small-scale systems and heat supply
Operative-information packages (MESsys(steam and hot-water boilers, boiler houses).
tems, SCADA, operative-information packages);
Automated Systems for Commercial and
Technical Metering (Automatic Systems for ComDCS for electric power industry:
Automated Control Systems for electric mercial Metering of Electric Energy, Automatic
equipment of stations and substations (remote Systems for Commercial Metering of Heat, Autocontrol, Automatic system for Commercial Me- matic Systems for Commercial Metering of Gas).
tering of Electric Energy, monitoring of relay proCommunications systems (ber optic lines,
tection, automation and emergency automation Ethernet, radio-Ethernet, radio modem comdevices, monitoring of power equipment);
munication, dedicated and dial-up lines, highAutomation of control centres of all levels frequency communication);
(a substation, the distribution zone, Electric NetVariable frequency electric drive (high frework Enterprise, Energosystems Grid Control quency converters, low-voltage frequency conCentre).
verters, DC converters, electric motors, generators);
DCS for housing and public utilities:
Microprocessor relay protection; Facility remote control systems: re alarm systems, CCTV
DCS for booster pumping stations;
and others;
DCS for sewage pumping stations;
DCS for treatment facilities;
Metrological calibration of ow meters and
DCS for pump stations of heat distribution heat meters.
(district heat stations, booster pumping stations,
central heating units, etc.);
DCS for oil production:
Automated Systems for Commercial and
Control system for booster pump stations;
Technical Metering (Automatic Systems for ComGroup metering pump station control sysmercial Metering of Electric Energy, Automatic tem;
Systems for Commercial Metering of Heat, AutoGroup pumping station control system;
matic Systems for Commercial Metering of Gas).
Balanced pumping unit control system;
Drilling rig control system;
DCS for machine building and automotive
Automation of oil depots and storage tanks.
industry:
CNC systems;
Test stands of equipment; DCS of crane facilities;
DCS for pressure machines;
www.ker-eng.com
25
STANDARD SOLUTIONS
The hardware and software package is implemented on the base of Ovation (Emerson).
Introduced at: Zainsk SDPP, 10 power units
per 200 MW (st. No.2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12).
26
INDUSTRIAL AUTOMATION
STANDARD SOLUTIONS
Introduced at:
Nizhnekamsk CHP;
Kazan CHP-2;
Kazan CHP-3;
Naberezhnye Chelny CHP;
Zainsk SDPP;
Urussu SDPP.
DCS for the hydraulic unit provides
reliable, economic and safe operation of
hydraulic units.
The system provides:
In relation to main process equipment:
improvement of operational quality of
hydraulic units (ensuring process modes of
operation, increasing plant availability factor, etc.)
reducing operational costs.
Introduced at:
Nizhnekamsk HPP, hydraulic units
Nos.9, 10, 11, 12.
27
STANDARD SOLUTIONS
28
DCS for the boiler unit increasing efciency, reliability and safety of the boiler
unit under all operating conditions. DCS is
performed as a single system for the whole
boiler unit and its auxiliary equipment.
The system provides:
reliable, efficient and safe operation of
the boiler unit;
improvement of operational quality of
th boiler unit (ensuring process modes of
operation, increasing plant availability factor, etc.)
reducing operational costs.
The hardware and software package is
implemented on the base of PCS (Siemens),
Ovation (Emerson), Krug-2000 (Krug).
Introduced at:
Kazan CHP-1, the boiler unit st. No.11;
Kazan CHP-2, the boiler units st. Nos.7,
11;
Kazan CHP-3, the boiler unit st. No.5;
CHP-1, Aktau (Kazakhstan), the boiler
units st. No. 4, 5;
CHP-2, . (Kazakhstan), the boiler
units st. No.1, 10, 11, 12, 13;
Lida CHP (Belarus), the boiler unit No.2;
www.ker-eng.com
INDUSTRIAL AUTOMATION
STANDARD SOLUTIONS
29
STANDARD SOLUTIONS
DCS for water treatment installations automatic and manual control of chemical water
treatment processes.
The system provides:
automatic regulation of process parameters in
controlled processes under the specied settings;
automatic functional group control;
manual (local) control of equipment from local
control rooms;
manual (remote) control of equipment from
panels of control cabinet operators and a control
center;
process interlocks, protections and alarms;
visualization and process control using operators automated workplace (AWP) in the control room;
alarm (visual and sound) system of equipment
fault conditions and overanging of process parameters.
The hardware and software package is designed
on the base of Siemens equipment and software.
Introduced at:
Kazan CHP-1;
Kazan CHP-2;
Kazan CHP-3;
Nizhnekamsk CHP;
Zainsk SDPP;
Tomsk CHP-3.
DCS for the gas distribution plant automatic,
remote and local manual control of the gas distribution plant.
The system provides:
high reliability of gas supply to consumers;
30
INDUSTRIAL AUTOMATION
STANDARD SOLUTIONS
31
STANDARD SOLUTIONS
32
Main functions:
liquid level measurement in tanks;
level alarm in each of tanks (top emergency
level, upper level, lower level); automatic regulation of oil level within the specied limits; voltage
availability control;
monitoring of security alarm for the groupmetering pump station rooms;
Monitoring of re alarm for the group-metering pump station, etc.
Control system for cluster pump stations
Process management and control of cluster
pump stations.
Main functions:
Startup and shutdown control of the main
pump which raises water pressure in the manual
and automatic mode;
Emergency and process parameter control within the specied limits and, if necessary,
emergency shutdown;
Communication with the dispatching system for telemetry and remote control, etc.
Introduced at: Tatneft OJSC.
DCS for power supply (remote control, relay protection and automatics and
emergency control schemes monitoring,
DCS, Automated Dispatch Control Systems) operational dispatching management and data exchange with the automated system with the system operator.
The system provides:
high reliability of facility operation;
operational dispatching management;
process data exchange with the automated system with the system operator;
high reliability of the substation by
monitoring the internal state of the facility
(definition of equipment performance capability, management of equipment critical parameters, fire alarm, security alarm
systems);
parameter accuracy.
Introduced at:
Zainsk SDPP;
Nizhnekamsk HPP;
Naberezhnye Chelny CHP;
Urussu SDPP;
Kazan CHP 1, 2, 3;
Kazan electrical networks;
Bugulma electrical networks;
TANEKO OJSC.
INDUSTRIAL AUTOMATION
STANDARD SOLUTIONS
DCS for substation electric equipment substation process control. Facility control from the unified control center
is performed due to subsystem incorporawww.ker-eng.com
33
STANDARD SOLUTIONS
34
INDUSTRIAL AUTOMATION
STANDARD SOLUTIONS
Introduced at:
A bridge crossing over the Volga river, Volgograd city;
A bridge crossing over the Vyatka river,
Mamadysh city;
A perimeter security alarm and CCTV system
The system is designed for:
registering attempts of trespassing of the
protected area and generating relevant information about such trespassing to the officials
www.ker-eng.com
35
LEADING PROJECTS
IN THE FIELD OF INDUSTRIAL AUTOMATION
POWER SECTOR
DCS for 220 MW CCGT at Kazan CHP-2
The project is implemented within the framework of 220 MW CCGT construction at Kazan
CHP-2. Construction period: 2011 - 2014.
Management Company KER-Holding LLC is
the General Contractor (EPC-contractor).
KER-Engineering Company is the General Designer, it is also responsible for turnkey DCS implementation and a full range of services regarding
electric equipment. The Vendor of the software
and hardware package for DCS was competitively selected together with the Customer and
the General Contractor. Congifuration of the software and hardware package was determined.
Contracts were signed with GE Company for the
software and hardware package supply and engineering support of the Project. Designers of KEREngineering were trained to use 6000 System
in GE Center of Automation System Development
and Production (Shanghai, China).
DCS for a new power unit at Abakan CHP
The Contract was signed with SiberiaEnergoEngineering OJSC for turnkey creation of DCS for
a new power unit st. No.5 at Abakan CHP (Yenisey
Territorial Generating Company-13 OJSC.)
A branch of KER-Engineering, KER-Avtomatika Company acts as a contractor to design DCS
upper level, installation of eld instrumentation
and commissioning. The Vendor of the hardware
and software package for a new power unit is
Metso Corporation, a contract was signed for
36
INDUSTRIAL AUTOMATION
37
Development and introduction of internal combustion engine test stands in KAMAZ OJSC
Kontur-Sid software and hardware package
PULP AND PAPER INDUSTRY
developed by KER-Avtomatika specialists is intended for automatic control of test stand and
automatic line equipment. Kontur-Sid package is
Upgrading of gas pipelines and DCS of steam
based on a variable frequency drive with a recovboilers at Employee-owned Enterprise Naery function (energy return for reuse in the same
berezhnye Chelny Cardboard and Paper Mill
process). Result: increase of accuracy and reliCJSC
ability of control systems due to introduction of
At Naberezhnye Chelny Cardboard and Panew and high technology equipment; improving per Mill upgrading of steam pipelines and DCS of
of technical and economic indicators.
steam boilers -160-24-250 GM st. Nos.1, 2 and
PTVM-ZOM (r) as well as auxiliary equipment has
been performed on the base of PCS 7 hardware
Upgrading of the main assembly line at the
and software package (Siemens).
automobile plant (KAMAZ OJSC)
Due to introduction, management efficiency
The control system and electric part have
been replaced. The following modern Siemens and boiler reliability has been increased, techniequipment has been installed: Simatic S7-300 cal and economic indicators have been improved.
38
ELECTRICAL
ENGINEERING
ELECTRICAL ENGINEERING
40
www.ker-eng.com
ELECTRICAL ENGINEERING
41
42
ELECTRICAL ENGINEERING
43
44
INDUSTRIAL AUTOMATION
45
46
ENERGOTECHNOLOGICAL
AUDIT
48
www.ker-eng.com
ENERGOTECHNOLOGICAL AUDIT
49
50
ENERGOTECHNOLOGICAL AUDIT
trestle cranes,
fully mobile cranes,
hoisting devices,
skylifts,
loader cranes;
technical diagnostics and expert examination of crane tracks including determination of industrial safety on the possibility and
conditions of their operation;
non-destruction inspection of metal
and welded joints of hoisting machines;
drawing up datasheets for:
crane runways;
hoisting cranes, not registered
in bodies of Rostekhnadzor (Federal Service
for Environmental, Technological, and Nuclear Supervision) of Russia;
cross arms;
commissioning work on protection systems and security devices for traditional and
microprocessor type hoisting machines;
installation, maintenance and repair of
security devices and protective equipment
hoisting machines;
commissioning work on protection systems and security devices for loader cranes;
maintenance of security devices and
protection equipment for loader cranes.
51
52
www.ker-eng.com
ENERGOTECHNOLOGICAL AUDIT
53
54
www.ker-eng.com
ENERGOTECHNOLOGICAL AUDIT
55
56
guidance and counseling services (preparation for certification and accreditation) for
waster water laboratories.
We develop new techniques for quantitative chemical analysis.
Development of ecological permission
documentation for industrial enterprises
Development and approval of:
projects of maximum (temporarily) atmosphere discharge standards;
projects of maximum (temporarily) terrain relief discharge standards;
projects of permissible water body discharge standards;
materials justifying the planned activities
of the enterprise for management of hazardous waste to obtain licenses; calculation of
damage for fishing industry caused by intake
of water from water bodies, the project of
waste generation and disposal limits; hazardous waste production and consumption data
sheets;
environmental impact assessment with
regard to economic and other activities during
development of pre-design including the preinvestment and design documentation;
training and support materials to obtain a
license for handling hazardous waste;
drawing up and approval of the environmental management declaration.
ENERGOTECHNOLOGICAL AUDIT
LEADING PROJECTS
57
LEADING PROJECTS
Calculation technology has been developed and agreed in All-Union Electric Power
Research Institute.
An electronic simulator for calculation of
technical losses for each enterprise within
Generation Company OJSC has been developed and implemented.
Technical examination of equipment at
Nizhny Novgorod SDPP named after Winter
(Territorial Generating Company-6, Balakhna,
Nizhny Novgorod Region).
Customer: Ost West Capital LLC
1. Integrated evaluation of technical condition has been carried out including evaluation
of power equipment, buildings and structures,
integrated operation of the equipment as a
whole.
2. A forecasted investment program, including planned implementation activities has
been provided;
3. A possibility of upgrading the plant including installation of additional PT-80 steam
turbine, or on the basis of Siemens gas turbine
plant and required investment scope has been
estimated.
58
www.ker-eng.com
ENERGOTECHNOLOGICAL AUDIT
59
y
t
i
l
a
u
q
,
y
t
i
l
i
b
Efficiency, relia
PRODUCTION
62
PRODUCTION
PRODUCTION CAPACITIES
www.ker-eng.com
63
Area of application:
DS III series pressure transmitters can be
used in industries with high chemical and mechanical loads. EMC in the range of 10 kHz ... 1
GHz allows to use DS III pressure transmitters in
areas with high electromagnetic emissions.
Pressure transmitters with protection type
Intrinsic safety and Flameproof casing can
Advantages
be installed in potentially explosive atmosHigh quality and long service life
High reliability even under strong chemical pheres (zone 1) or in zone 0. The transmitters
have EC type inspection certicate and comply
and mechanical inuences
For aggressive and non-aggressive gases, with the relevant harmonized European standards (ATEX).
vapors and liquids
Pressure transmitters with protection type
Extensive diagnosis and simulation funcIntrinsic safety for use in zone 0 can be operattions
Separate replacement of a measuring cell ed with power supplies of ia and ib category.
Pressure transmitters can be equipped with
and electronics without recalibration
various designs of the separation membrane for
Minor deviation from the characteristics
specic applications, for example, for measuring
Low long-term drift
Parts in contact with the medium are made substances with high viscosity.
64
PRODUCTION
A pressure transmitter can be controlled
locally with 3 control keys, or programmed
externally via HART-communication or
PROFIBUS PA or FOUNDATION Fieldbus interface.
Approval documents:
Certicate of Compliance No.
RU.11. 00239 in the Certication System GOST R of the Federal Agency for Technical Regulation and Metrology;
Type approval certicate of measuring instruments RU.C.30.065.A 44518 registered in the Federal Agency for Technical
Regulation and Metrology under No.4831911;
Certicate of Compliance for explosion-proof equipment No. RU C
RU.08..00008, series RU No.0018916.
Meets the requirements of the Technical
www.ker-eng.com
65
66
PRODUCTION
RODNIK HARDWARE AND SOFTWARE
PACKAGE
Rodnik hardware and software package
is designed to automate processes of chemical water treatment.
The control system is a multifunction
system with a block and modular architecture adaptable to the requirements of a particular facility.
The package provides:
Automatic regulation of process parameters in controlled processes under the
specied settings;
Automatic control of equipment functional group control;
Manual (local) control of equipment
from local control rooms;
Manual (remote) control of equipment
from panels of control cabinet operators and
a control centre;
Process protection, alarms and interlocks;
Visualization and process control using
operators automated workstation (AWP) in
the control room;
The basis of the whole automation
package of water treatment plants includes
the following subsystems:
www.ker-eng.com
DCS for:
the chemical injection package;
the clarication agent;
the solvents recovery unit;
the mechanical lters;
the H-cation and anion lters;
the sorption lters;
the reverse osmosis plant;
the microltration plant;
the ultraltration plant;
the bioreactors.
Automated Control System for pump
stations.
The hardware and software package is
designed on the base of Siemens equipment
and software.
Certicate of Conformity No.POCC RU.
54.13155 of the State Committee for the
Russian Federation for Standardization and
Metrology.
67
68
www.ker-eng.com
PRODUCTION
69
70
REFERENCE LIST
KEY REFERENCES
(Find detailed references on the CD-ROM attached to
the booklet or at website www.ker-eng.com)
ENTERPRISES
TAIF-NK OJSC
2013
2013
Kazan GIPRONIIaviaprom
CJSC
KamaKristall-Technology
LLC
2013
NIIK OJSC
2012
2012
Quartz-Western Siberia
CJSC
2011
REP-Engineering
2011
Kamgesenergostroy
Company
2011
www.ker-eng.com
DATE
2013
2010
2010
71
PROJECTS
Upgrading of PTVM-100 boiler, st. No.2 including
installation of new type heating surfaces
Design work under the project for rehabilitation
of 110 kV Kirovskaya Substation
Design work under the project Rehabilitation of
220/110/35/6 kV Pismyanka open switchgear,
construction of 2-circuit overhead transmission
line (split of 220 kV Uzlovaya-AbdrakhmanovoBugulma overhead transmission line with overhang to Pismyanka Substation) for power supply
of Electric Metallurgical Plant (TatSteel CJSC).
Technical and economic calculation for CCGT at
Kazan CHP-2
Implementation of the detailed design Upgrading
of gas distribution plants (1, 2) of Orenburg gas
Rehabilitation of 110 kV overhead transmission
line at Yuzhnaya - Kovali-1, 2 Substation
Development of the external power supply
scheme at Ammonia OJSC facility (Mendeleyevsk)
External heat supply. 2nd stage. Heating networks
from the gate valve switching station before the
heat point at Nizhnekamsk CHP working site up
to 140 at main steam pipeline and the turbine
generating unit No.5 in the main building of
Nizhnekamsk CHP (the hardware and software
package-2)
ENTERPRISES
Naberezhnye Chelny CHP
2010
2010
Bugulma electrical
networks
2010
Kazan CHP-2
2010
Zainsk SDPP
2010
2009
Ammonia OJSC
2009
2009
72
DATE
2009
TatSteel CJSC
2009
2009
2008
2008
2008
ENTERPRISES
DATE
2008
Design stage. 110-220/6 kV power transmission lines with 220-110 kV feeding lines of the
Renery and
Complex external power supply scheme including TANEKO
Petrochemical Plant
development of the design stage for special
Complex
transition of 220 kV power transmission lines
Kama-Complex over the Kama river
2008
2008
2008
Nizhnekamsk CHP
2008
2008
2008
Kazan CHP-3
2008
www.ker-eng.com
REFERENCE LIST
PROJECTS
73
AUTOMATION
OF PROCESSES AND PRODUCTION
Projects
DCS for a new power unit at Abakan CHP
Upgrading of gas pipelines and DCS for -160-24250 GM steam boiler, st. No.1
DCS for 6 power units per 500 MW each, st. No.3, 4,
5, 6,7, 8 based on Ovation hardware and software
(Emerson)
Upgrading of the voltage regulator system for hydraulic generators No.1-16 based on SIMATIC PCS 7
hardware and software package (SIEMENS)
DCS for the gas turbine power plant
Corporate customer
Yenisei Territorial Generating Company OJSC
(Territorial Generating
Company-13)
Kazan CHP-2
Kazan CHP -1
Kazan CHP -2
Kazan CHP -3
Naberezhnye Chelny CHP
Zainsk SDPP
Yelabuga CHP
Nizhnekamsk HPP
Nizhnekamsk CHP LLC
Nizhnekamsk CHP,
Territorial Generating
Company-16 OJSC
Naberezhnye Chelny
Cardboard and Paper Mill
SDPP-1, Ekibastuz
(Kazakhstan)
2013
2012-2013
2002-2013
2013
2005-2012
Nizhnekamsk HPP
2010-2012
GTRR-24 MW
at Dvurechenskiy oil eld
Automatic Control System of -205 turbine generat- Verkhniy Tagil SDPP
ing unit, st. No.10 based on Ovation hardware and
software package
Introduction of automated control, regulation and
Novo-Kemerovo CHP
protection system for R-3,15-1.28/0.2P drive turbine
on the base of PCS 7 hardware and software package (Siemens)
Upgrading of TGM-84 B boiler unit, st. No.10 includ- Kazan CHP-1
ing installation of new AMAKS gas blocks
DCS for the boiler unit based on the hardware and
Tatneft Neftekhimservis
software package (Siemens)
OJSC
Introduction of the frequency-regulated drive
Chelnyvodokanal CJSC
system at water supply pumping units in the southwestern and north-eastern parts (Naberezhnye
Chelny)
Automatic Frequency and Active Power Regulation Zainsk SDPP
System for 11 power units per 200 MW st. no. 2, 3,
4, 5, 6, 7, 8, 9, 10, 11,12 based on Ovation hardware
and software package (Emerson)
74
Date
2012
2012
2012
2012
2012
2011
2004-2011
www.ker-eng.com
Corporate customer
Novo-Sterlitamack CHP
Kumertau CHP
Salavat CHP
Sterlitamack CHP
Naberezhnye Chelny
Electrical Networks
Date
REFERENCE LIST
Projects
Installation of variable frequency drives for pumps
network
2011
2011
Kazan CHP
2011
KAMAZ OJSC
2011
2010
Nizhnekamsk HPP
2010
Aktau, CHP-2
(Kazakhstan)
2010
2009-2010
Zainsk SDPP
2009
Begishevo Airport
2009
110 kV Leninskaya
Substation
110 kV Severnaya
Substation
110 kV Vostochnaya
Substation
2008-2009
75
Projects
Automated System for Electric Energy Accounting for Renery and Petrochemical Plant Complex
(project) based on SIEMENS equipment
Kazan CHP-1
Kazan CHP-3
Nizhnekamsk CHP
Zainsk SDPP
Naberezhnye Chelny CHP
Automated data acquisition for calculation of technical and economic indicators of the power plant
(14 power boiler units, 11 turbine generating units,
balance-of-plant equipment) based on equipment
by Krug Scientic and Production Company, Volmag
CJSC
Development and installation of the Automated
system for Accounting of power resources.
Introduction of heat energy and hot water metering
stations in apartment buildings based on equipment
by Vzlyot CJSC
Analysis of equipment operational modes, development of project documentation for a frequencyregulated electrical drive installation
The automatic re alarm and re extinguishing
system
The automatic regulation system for the power
plant with cross links (3 energy boiler units BKZ420 and 3 turbine generating unit PT-60, PT-80)
based on Ovation hardware and software package
(Emerson)
The automated system of the supervisory control of
the poultry processing plant
The automation system for gas distribution plants
based on SIEMENS and KER-Avtomatika equipment
DCS for 50 MW gas turbine unit based on OVATION
hardware and software package (EMERSON)
76
Corporate customer
Date
2008
2007-2008
2007-2008
2007-2008
2007-2008
2007-2008
Chelny-Broiler LLC
Naberezhnye Chelny
Kazan CHP-3
Nizhnekamsk CHP
Zainsk SDPP
Kazan CHP-1
2007-2008
2007
2005
Corporate customer
Yenisei Territorial Generating Company OJSC
(Territorial Generating
Company-13)
Kazan CHP-2
Kazan CHP -1
Kazan CHP -2
Kazan CHP -3
Naberezhnye Chelny CHP
Zainsk SDPP
Yelabuga CHP
Nizhnekamsk HPP
Nizhnekamsk CHP LLC
Nizhnekamsk CHP,
Territorial Generating
Company-16 OJSC
Upgrading of gas pipelines and DCS for -160-24Naberezhnye Chelny
250 GM steam boiler, st. No.1
Cardboard and Paper Mill
DCS for 6 power units per 500 MW st. no. 3, 4, 5, 6,7, SDPP-1, Ekibastuz
8 based on Ovation hardware and software pack(Kazakhstan)
age (Emerson)
Upgrading of the voltage regulator system for hyNizhnekamsk HPP
draulic generators No.1-16 based on SIMATIC PCS 7
hardware and software package (SIEMENS)
DCS for 24 MW gas turbine power plant
Dvurechenskiy oil eld
Automatic Control System of -205 turbine generat- Verkhniy Tagil SDPP
ing unit, st. No.10 based on Ovation hardware and
software package
Introduction of automated control, regulation and
Novo-Kemerovo CHP
protection system for R-3,15-1.28/0.2P drive turbine
on the base of PCS 7 hardware and software package (Siemens)
Upgrading of TGM-84 B boiler unit, st. No.10 includ- Kazan CHP-1
ing installation of new AMAKS gas blocks
DCS for the boiler unit based on the hardware and
Tatneft Neftekhimservis
software package (Siemens)
OJSC
Introduction of the frequency-regulated drive
Chelnyvodokanal CJSC
system at water supply pumping units in the southwestern and north-eastern parts (Naberezhnye
Chelny)
Automatic Frequency and Active Power Regulation Zainsk SDPP
System for 11 power units per 200 MW st. no. 2, 3,
4, 5, 6, 7, 8, 9, 10, 11,12 based on Ovation hardware
and software package (Emerson)
www.ker-eng.com
Date
REFERENCE LIST
Projects
DCS for a new power unit at Abakan CHP
2013
2012-2013
2002-2013
2013
2005-2012
2010-2012
2012
2012
2012
2012
2012
2011
2004-2011
77
ELECTRICAL ENGINEERING
Projects
Corporate customer
Date
Yelabuga Electric
Networks
Kazan electrical networks
Nizhnekamsk HPP
2012-2013
78
2012-2013
2012
Zainsk SDPP
2012
Kazan CHP-2
2012
Bugulma electrical
networks
2011
Kazan CHP-1
2010
Kazan electrical
networks
2010
Moscow CHP-23
2010
Sealtek CJSC
2010
Territorial Generating
Company-16 OJSC
2010
Territorial Generating
Company-16 OJSC
2010
Corporate customer
Date
Territorial Generating
Company-6 OJSC
2010
Chistopol electrical
networks
2010
2010
Zainsk SDPP
2010
2010
2010
Kazan electrical
networks
2010
Nizhnekamsk HPP
2009
Nizhnekamsk CHP
2009
2009
500 kV Bugulma
Substation
9 substations of Bugulma
Electrical Networks
Mikulino Substation
2009
www.ker-eng.com
REFERENCE LIST
Projects
2009
2009
2009
79
ENERGOTECHNOLOGICAL AUDIT
EXPERIENCE OF INTERNATIONAL PROJECTS
Projects
Technical survey and development of construction
specications and tender documents
Corporate customer
CHP at the oil renery
plant (Aden,
Republic of Yemen)
Date
2010
Southern Branch of
Gasprom Energo OJSC
2009
2009
2009
80
2009
2009
2008
2008
2008
Corporate customer
Date
2007
2007
2007
2007
2007
2006
2006
2006
2006
-2
2005
2005
2005
2004
2004
2003
2002
.1-16
-1
2001
-3
2001
. 6 ()
,
. 5
-87, -60-130
. 3
www.ker-eng.com
REFERENCE LIST
Projects
/ -47
.3,4
, ,
81
Projects
Date
Minnebayevo Gas
Processing Plant
1998
1997
1996
1994
1992
1991
Primary, repeated surveys (energy audit) of enterprises power utilities. Tatenergo OJSC
82
Corporate customer
www.ker-eng.com
83
www.ker-eng.com
85
!
n
o
i
t
a
r
e
p
o
o
c
Welcome to
www.ker-eng.com
86
KER-ENGINEERING
GROUP OF COMPANIES
KER-ENGINEERING
GROUP OF COMPANIES
KER-ENGINEERING LLC
Yamashev av., 37b, Kazan,
Republic of Tatarstan, Russia, 420080
tel.: +7 (843) 557-62-05,
fax: +7 (843) 557-62-07
kereng@ker-eng.com
www.ker-eng.com
BRANCHES
TATNIPIENERGOPROM
(Kazan)
tel.: +7 (843) 557-62-05,
fax: +7 (843) 557-62-07
tatnipiep@mail.ru
KER-AVTOMATIKA
(Naberezhnye Chelny)
tel.:+7 (8552) 395354,
fax: +7 (8552) 394278
keravt@ker-eng.com
ENGINEERING CENTRE
ENERGOPROGRESS
(Kazan)
tel.: +7 (843) 519-37-59,
fax: +7 (843) 544-17-92
inbox@eprog.tatenergo.ru
KER-NALADKA
(Kazan)
tel.: +7 (843) 299-43-58,
fax: +7 (843) 299-51-17
ker_naladka@mail.ru