Sunteți pe pagina 1din 4

Quick Installation Guide of GDC-600BE

Notice : Install the GDC-600BE in indoor place protected from the environmental
effect such as a surge, very low temperature and etc.

1. General
(1) Check the packing components of the GDC-600BE.
(2) Determine the location of the GDC-600BE. See the quick guide to positioning
th base
the
b
station
t ti explained
l i d iin th
the llast
t page.
(3) Connect a WTI(Wireless Terminal Interface) port to the GDC-600BE by a twisted
cable (at least more than CAT3).
(4) The three LEDs of the front housing of the GDC-600BE provide several pieces of
diagnostic information.
Check the LEDs of the GDC-600BE.

P/N : MMBA9020002

DEC/2013/ISSUE1.2
Printed in Thailand

2. LED functions
Functions
Steady ON
RED
S1

Download mode

Normal operation +
6 channels used

GREEN

Normal operation (idle)

Normal operation +
up to 5 channels used

E1 Sync. NG

AMBER

E1 Loopback mode or
Download mode

GREEN

Sync. OK

RED
S3

Startup or data communication error


between WTIB & base station

AMBER

RED
S2

Blinking

During Sync. process

Errors in FPGA

AMBER

Download mode

GREEN

E1 TX/RX

The software image and the FPGA image of the GDC-600BE can be upgraded via
the serial interface of the WTI board or the Web admin (iPECS-MG).
3. Cabling
(1) Direct cabling between the WTI board and the GDC-600BE

WTI Board

(2) Cabling with the ferrite core and the connection tab

WTI Board

CAT5 cable provided by Ericsson-LG


Enterprise, Twisted Cable (At least
CAT3 cable)

(3) Cabling with MDF (or Patch Panel), SDF, and NTP(or the connection tab)
[Attention]
1) It is not recommended to use many MDFs or Patch Panels to avoid some connection
or contact problem, which can cause the data communication error with the system.
2) The cable installer should check the line condition between MDF and SDF including
the building cable with a cable tester or other tool.
3) The system installer should do the line test using the loop-back test supported from
the WTI board via its serial interface and check the full line condition between
the WTI board and the GDC-600BE before the normal system operation.
Please refer to the loop-back line test procedure explained below.

Building Cable

System
(WTI board)

MDF

SDF

NTP
(CONNECTION TAB)

MDF: Main Distribution Frame


p Distribution Frame
SDF: Sub-loop
NTP: Network Termination Point(=The connection tab supplied from the Ericsson-LG Enterprise factory)

(4) The loop-back line test procedure


1) Set up the serial connection between PC and the WTI board
- The GDC-TRC1 is necessary in case of ipLDK-20 or ipLDK-60.
- The specific serial cable is necessary in case of iPECS-MG.
2) Set the serial speed (baud-rate) according to the system and other set-up conditions
(data: 8bit, parity: none, stop: 1bit, flow control: none).
- ipLDK-20/ipLDK-60 38400
- iPECS
iPECS-LIK/iPECS-MG
LIK/iPECS MG 115200
3) Press CTRL + C to enter the command input mode.
4) Key in goodluck for the password if necessary.
5) Press CTRL + P to make the loop back.
6) Press CTRL + U to start the line test mode.
7) Wait about 5 minutes.
8) Key in ETST to see the result of the loop-back test.
LIU Error cnt1 and cnt2 should be zero. If not, it means there are some problems
related to cable.
The monitoring data example below shows the result of ETST line test.
Ex)
LIU Error cnt1 :
:
LIU Error
E
cnt2
2 :
:

Link0=0000,
Link4=8170,
Li k0 0000
Link0=0000,
Link4=2793,

Link1=6700,
Link5=7475,
Li k1 9475
Link1=9475,
Link5=5563,

Link2=7229,
Link6=0000,
Li
Link2=9646,
k2 9646
Link6=0000,

Link3=8131
Link7=0000
Li
Link3=4363
k3 4363
Link7=0000

[Decision]
The 1st port(Link0), the 7th port(Link6) and the 8th port(Link7) have
no problem. But other ports are not connected to the base stations or
have some cable problem.

Board
Name

Connector

Cable
Plug

Pin
Number

RJ11 type
ipLDK-60
WDIB4/WTIB4

RJ45 type

ipLDK-20 WTIB/WDIB
iPECS-LIK WTIM4/8,
iPECS-MG WTIB4/8

RJ11 type

GDC-400B
GDC-600B
GDC-600BE

Pin Assignment

Function

1,6

Unused

WTI RX(GND)

Receive Data

WTI TX(+30V)

Transmit Data

WTI TX(+30V)

Transmit Data

WTI RX(GND)

Receive Data

1,2,7,8

Unused

WTI RX(GND)

Receive Data

WTI TX(+30V)

Transmit Data

WTI TX(+30V)

Transmit Data

WTI RX(GND)

Receive Data

1,6

Unused

BASE TX(GND)

Transmit Data

BASE RX(+30V)

Receive Data

BASE RX(+30V)

Receive Data

BASE TX(GND)

Transmit Data

Two wires for Tx pair should be twisted each other and two wires for Rx pair should

be also twisted each other(The polarity of Tx pair and Rx pair is not important).
4. Quick guide to positioning the base station(GDC-600BE)
(1) Place the base station to maximize the direct line of sight.
(2) Mount it as high as possible.
(3) Place it to minimize obstructions near the base station.
(4) DDo not
t place
l
it near metal
t l material.
t i l
(5) Situate it in the middle of the area you intend to cover.
(6) Install additional base stations required to meet the estimated call capacity.
(7) In multi-story building, it is desirable to plan coverage for each floor
separately.
(8) Place the base station more than 2 meter above from the floor and more than
0.5 meter below the ceiling.
(9) Overlap between base stations must be established to be able to carry out
handover between base stations (Recommendation
(
overlap is at least 10~15m).
)
(10) Be aware that RF shadows created by parts of the building can cause spots
where no radio signals are at all, find that shadowed area and fine-tune the
position of the base stations.