Sunteți pe pagina 1din 14

SL

1
1.1
1.2
1.3
1.4
1.5
1.6
1.7

2
2.1
2.2
2.3
2.4
2.5

3.1
3.1.1
3.1.1.1
3.1.1.2
3.1.1.3
3.1.2
3.1.2.1
3.1.2.2
3.1.2.3
3.1.3
3.1.3.1
3.1.3.2
3.2
3.2.1
3.2.2
3.3
3.3.1
3.3.2
3.4
3.5
3.6
3.7

4
4.1
4.2

5.1
5.2
5.3
5.4
5.5
5.6

6
6.1
6.2
6.3
6.4
*
**

Work Description
Befor Mobilzation the IDT on the Plinth
Visual inspection of MT on Trailor
Checking the N2 guage pressure
IR measurment for core and clamp
Visual inspection of accessories & Oil
Safety clreance certificate availability
Civil clreance certificate availability
Verify foundation according to approved foundation drawing

After Mobilzation the IDT on the Plinth


visual inspection
Checking the N2 guage pressure
IR measurment for core and clamp after loading the IDT
Healthiness of Shock recorders & downloading data
SRC recomentation

Accessories Installtion

Bushings
HV BUSHING
Visual inspection
IR measurment
Installation
HVN BUSHING
Visual inspection
IR measurment
Installation
LV BUSHING
Visual inspection
Installation
Cable Boxes
HV cable box /Cable boxe support fixing
LV cable box /Cable boxe support fixing
cooling system
RADIATOR
FANS SUPPORT/FANS
CONSERVATOR
Piping work
Protective devices fixing
Breather

LV cable wiring
Internal cables
Outgoing cables

Oil processing

stoarge tank circulation and Oil sampling


Vacuuming
Vacuum leakage test (1hr.)
Hot Oil filling /HOC
MOLG MT/OLTC alarm check
Rubber bag normalization

AVR
PANEL Visual inspection /SRC
Mobilzation of panel to Control room
Erection of RTCC panel
Field wiring monitoring
Oil quantity and Oil circultion machince capacity
manufacture recommendation & site constrain

TIMING BY HOUR
IDT 1

IDT 2

IDT 3

4
4.5
0.5
0.5
3

1
0.75
3

1
0.75
3

1
0.75
3

0.5
0.5
1

0.5
0.5
1

0.5
0.5
1

1
3

1
3

1
3

5
4

5
4

5
4

8
6
2.5
4
3
1

8
6
2.5
4
3
1

8
6
2.5
4
3
1

6
6

6
6

6
6

1
1

*
**
1
**
3
2

*
**
1
**
3
2
1.5
3
3
3

*
**
1
**
3
2

SL
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7

2
2.1
2.2
2.3
2.4
2.5

3
3.1
3.1.1
3.1.1.1
3.1.1.2
3.1.1.3
3.1.2
3.1.2.1
3.1.2.2
3.1.2.3
3.2
3.3
3.4
3.5
3.6
3.7

4
4.1
4.2

5
5.1
5.2
5.3
5.4
5.5
5.6
*

**

Work Description
Befor Mobilzation the SHX on the Plinth
Visual inspection of MT on Trailor
Checking the N2 guage presure
IR measurment for core and clamp
Visual inspection of accessories & Oil
Safety clreance certificate availability
Civil clreance certificate availability
Verify foundation according to approved foundation drawing

After Mobilzation the SHX on the Plinth


visual inspection
Checking the N2 guage pressure
IR measurment for core and clamp after loading the IDT
Healthiness of Shock recorders & downloading data
SRC recomentation

Accessories Installtion
Bushings
HV BUSHING
Visual inspection
IR measurment
Installation
HVN BUSHING
Visual inspection
IR measurment
Installation
HV cable box /Cable boxe support fixing
CONSERVATOR
Piping work
Protective devices fixing
Breather fixing
RADIATOR

LV cable wiring
Internal cables
Outgoing cables

Oil processing
stoarge tank circulation and Oil sampling
Vacuuming
Vacuum leakage test (1hr.)
Hot Oil filling /HOC
MOLG MT alarm check
Rubber bag normalization
Oil quantity and Oil circultion machince capacity

manufacture recommendation & site constrain

TIMING BY HOUR
SHX
1
2
0.5
0.5
1

1
1
1

1
0.75
3
0.5
0.5
1
4
2.5
4
3
4
2
2
*
**
1
**
1
3

SL
1

Work Description

1.1
1.3
1.4
1.5
1.6

Visual inspection of MT
Visula inspection of accessories
Safety clreance certificate availability
Civil clreance certificate availability
Verify foundation according to approved foundation drawing

Befor Mobilzation the ET on the Plinth

After Mobilzation the ET on the Plinth

2.1
2.2
2.4
2.5

Drilling of Skid plate Bolts


visual inspection
IR measurment for core and clamp after loading the IDT
Healthiness of Shock recorders & downloading data

LV cable wiring

4.1
4.2

Internal cables
Outgoing cables

Oil processing

5.1
5.2
5.3
5.4

stoarge tank circulation and Oil sampling


Vacuuming
Hot Oil filling /HOC
MOLG MT alarm check

*
**

Oil quantity and Oil circultion machince capacity


manufacture recommendation & site constrain

TIMING BY HOUR
ET 1
0.75

0.75
1
0.5
1

ET 2
2
0.75
0.5
0.5
1.5
0.75
1
0.5
1

ET 3
0.75

0.75
1
9.5
1

*
**
**
1