Documente Academic
Documente Profesional
Documente Cultură
BILL NO. 1
PRELMINARIES
NO
To collection
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
BILL NO. 2
PILING
NO
DESCRIPTION
UNIT
QTY
Mob.
Boring piles
Rinforcement
Testing
No.
175
No.
12
No.
Demob.
To collection
RATE
AMOUNT
BILL NO. 3
CONCRETE WORK
NO
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
Plain concrete
A.
M3
0.0
M3
0.0
C.
Water Tanks
M3
0.0
D.
Tie Beams
M3
0.0
To collection
BILL NO. 3
CONCRETE WORK
NO
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
cont'd
A.
Column Necks
M3
0.0
B.
Walls
M3
0.0
C.
Walls to Tanks
M3
0.0
D.
M3
0.0
E.
Electrical Trencehes
M3
0.0
M3
0.0
G.
12 mm Flexel Sheet
M2
0.0
H.
Polythene Sheet
M2
0.0
To collection
BILL NO. 4
SUPER-STRUCTURE
NO
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
A.
M3
0.0
B.
Beams
M3
0.0
C.
M3
0.0
D.
800 mm Walls
M3
0.0
E.
700 mm Walls
M3
0.0
F.
600 mm Walls
M3
0.0
G.
500 mm Walls
M3
0.0
H.
400 mm Walls
M3
0.0
I.
300 mm Walls
M3
0.0
J.
200 mm Walls
M3
0.0
K.
Parapet
M3
0.0
L.
Stairs
M3
0.0
M.
Landings
M3
0.0
N.
Counter
M3
0.0
O.
Outdoor Base
M3
0.0
P.
M3
0.0
M3
0.0
Q. Base for TV
To collection
BILL NO. 4
SUPER-STRUCTURE
NO
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
cont'd
A.
M3
0.0
B.
M3
0.0
C.
M3
0.0
D.
M3
0.0
E.
M3
0.0
F.
M3
0.0
G.
Beams to helipad
M3
0.0
To collection
BILL NO. 4
SUPER-STRUCTURE
NO
DESCRIPTION
UNIT
QTY
RATE
AMOUNT
cont'd
Reinforced concrete (30/20)
A
H.
Foam Concrete
Item
0.0
B.
THERMAL BLOCKS
200 mm wall
M2
C.
HOLLOW BLOCKS
100 mm wall
M2
0.0
D.
150 mm wall
M2
0.0
0.0
0.0
SOLID BLOCKS
0.0
E.
200 mm wall
M2
0.0
F.
150 mm wall
M2
G.
100 mm wall
M2
0.0
Foam Concrete
M2
0.0
B.
Bitumin paint
M2
0.0
C.
300 mm Girth
0.0
D.
M2
0.0
E.
300 mm Skirting
0.0
F.
Expansion Joints
0.0
G.
M2
0.0
WET AREAS
0.0
A.
M2
0.0
B.
M2
0.0
C.
Polythene Sheets
M2
0.0
D.
To flower box
0.0
E.
Water Tanks
0.0
F.
LS
0.0
G.
LS
0.0
0.0
A.
1500 mm piles
0.0
B.
1000 mm piles
0.0
C.
700 mm piles
0.0
BITUMINOUS PAINT
0.0
D.
Raft Foundation
M2
0.0
E.
M2
0.0
F.
Columns
M2
0.0
G.
Stairs walls
M2
0.0
H.
Lift Walls
M2
0.0
I.
Tie Beams
M2
0.0
J.
M2
0.0
0.0
K.
100 mm plinth
0.0
L.
200 mm plinth
0.0
A.
INTERNAL FINISHES
Floor Finishes
CEMENT SCREED
Floor of parking/ramp
M2
B.
M2
0.0
C.
TERRAZO TILES
Landings
M2
0.0
D.
Stairs
M2
0.0
E.
M2
0.0
F.
Skirting to Stairs
0.0
G.
0.0
11,907.0
0.0
INTERNAL FINISHES
A.
M2
0.0
B.
EPOXY COATING
To floors of parking & ramps
M2
0.0
A.
M2
0.0
B.
300 mm treads
0.0
C.
300 mm landing
M2
0.0
D.
200 mm riser
0.0
E.
Skirting
0.0
PERLATO MARBLES
0.0
F.
100 mm Thresholds
item
0.0
G.
150 mm Thresholds
item
0.0
H.
200 mm Thresholds
item
0.0
I.
MARBLE SLABS
To floors T17/S15
0.0
CERAMIC FLOORS
0.0
A.
Kitchen
M2
0.0
B.
Bath
M2
0.0
C.
Toliet
M2
0.0
D.
Service floor
M2
0.0
E.
Skirting
0.0
F.
Graniti Ceramics
M2
0.0
G.
Flats
M2
0.0
H.
Shops
M2
0.0
I.
Offices
M2
0.0
J.
Prayer
M2
0.0
K.
Offices
M2
0.0
L.
Video Game
M2
0.0
M.
Bussiness Club
M2
0.0
N.
Banquet Room
M2
0.0
O.
M2
0.0
A.
M2
0.0
B.
Garden Floors
M2
0.0
C.
M2
0.0
D.
Ramp Floors
M2
0.0
E.
M2
0.0
F.
PVC FLOORING
GM rooms
M2
0.0
A.
WALL FINISHES
SAND CEMENT
Walls
M2
0.0
B.
Shaft Walls
M2
0.0
C.
M2
0.0
0.0
D.
M2
0.0
E.
M2
0.0
F.
Pools to Edges
M2
0.0
A.
M2
0.0
B.
CORNER GUARDS
Corner Guards 1-2 m long
no.
0.0
C.
CEILING FINISH
To Ceilings
M2
0.0
SAND CEMENT 15 MM
Sloping soffits & Landings of Stairs
and Balcony
M2
0.0
E.
M2
0.0
F.
M2
0.0
D.
A.
M2
0.0
B.
M2
0.0
C.
M2
0.0
A.
INTERNAL FINISHES
600X600 ALUMINUM COATED
To ceilings
M2
0.0
B.
M2
0.0
C.
200 mm Cornich
0.0
D.
150 mm Cornich
0.0
E.
Item
0.0
A.
M2
0.0
B.
M2
0.0
C.
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0