SRAN
- Supervised in Installation and Commissioning HUAWEI GL+U & UL+G(GSM
and LTE combine in one BBU 3900 plus UMTS and UMTS and LTE combine in
one BBU 3900).
4G/LTE
- Supervised in Installation and Commissioning of ERICSSON RBS 6000
families.
- Remote Integration of ERICSSON RBS 6000 through OSS-RC.
- Supervised in Installation and Commissioning of HUAWEI LTE BTS 3900L.
3G/UMTS
- Supervised in Installation and Commissioning of ERICSSON RBS 3000
families.
- Remote Integration of ERICSSON RBS 6000 families through OSS-RC.
- Supervised in Installation, Commissioning, Sector addition and Radio Unit
Expansion of HUAWEI UMTS.
- Remote Integration of HUAWEI Node B through OSS(M2000)
- HUAWEI Node B re-homing to another BSC 6900(RNC).
- Installation of NOKIA UltraSite WCDMA BTS Supreme.
GSM
- Supervised in Installation, Commissioning, Sector addition, TRX Expansion
and Re-configuration of ERICSSON RBS 2000 and RBS 6000 families.
- Supervised in Installation, Commissioning and Testing of LUCENT
TECHNOLOGY BTS 2000.
MICROWAVE TRANSMISSION
- Supervised in Installation and Commissioning of HARRIS FARRINON PDH
Microwave Radio.
- Supervised in Installation, Commissioning, Baseline Software upgrade,
Traffic Routing and Testing of ERICSSON MiniLink E, ERICSSON MiniLink HC
and ERICSSON MiniLink TN.
- Supervised in Installation and commissioning of NERA PDH Microwave
Radio.
- Installation of SIEMENS DRS 155 SDH Microwave Radio and CTR 190 SDH
Microwave radio.
- Supervised in Installation and Commissioning of PCom PDH Microwave
Radio.
TOOLS
- LMT for HUAWEI
- BFFTP
- SFTP
- OMT 54G for ERICSSON GSM Commissioning

- ELEMENT MANAGER for ERICSSON UMTS and LTE commissioning


- MOSHELL
- AMOS
- PUTTY
- HYPERTERMINAL
Experience
TELECOM ENGINEER
ETISALAT UAE
May 2014 Present (1 year 9 months)13 Flr., ETISALAT Building, Umer Bin Al
Khattar road, Deira, DUBAI, UAE
Assigned in ETISALAT as an in-house Telecom Engineer in Engineering
Department- Mobile Access Project Dubai, UAE.
Supervised and ensure the quality as per ETISALAT standard in Installation
of Ericsson GSM RBS 2202, RBS 2206, RBS 2216, RBS 2308, RBS 2302, GSM
RBS 6201 with DUG 20 01 & RUS 02 B3 & B8 and GSM RBS 6601 with DUG
20 01 & RRUS 12 B3, ERICSSON LTE RBS 6201 with DUS 31 01 & RUS 02 B3
& ERICSSON LTE RBS 6601 with DUS 31 01 & RRUS 12 B3.
Supervised and ensure the quality as per ETISALAT standard in installation
of HUAWEI WCDMA BTS 3812E, BTS 3900 & BTS 3900L with 3G WRFUe 2100
band, LTE MRFUd 1800 band, RRU 3804 2100 band & LTE RRU 3939 1800
band, RRU 3929 1800 band, LTE advance RRU 3268 800 band.
Supervised and ensure the quality as per ETISALAT standard in installation
of TRIPLEXER to combine GSM, UMTS and LTE.
Commissioning, TRX expansion, reconfiguration and sector addition of
ERICSSON GSM RBS 2000 and GSM RBS 6000 families as per RF Plan using
OMT version 54G.
Commissioning of ERICSSON LTE RBS 6000 using ELEMENT MANAGER.
Commissioning and sector addition of HUAWEI UMTS BTS 3812E, BTS 3900
and BTS 3900L as per RF plan.
Commissioning and software upgrade for Single RAN version from BTS
3900 V100R008C00SPC260 to BTS 3900 V100R009C00SPC186 using dangle
of HUAWEI LTE and assist HUAWEI Integration Engineer during Integration.
Supervised, ensure the safety, quality and minimized the outage in
swapping ERICSSON GSM RBS 2202 to ERICSSON GSM RBS 2206, ERICSSON
GSM RBS 2206 to ERICSSON GSM RBS 2216, ERICSSON GSM 2206 to
ERICSSON GSM RBS 6201, ERCSSON LTE RBS 6201 to HUAWEI LTE BTS
3900L, HUAWEI UMTS BTS 3900 to HUAWEI UMTS BTS 3900L.

Wireless Engineer
Huawei Technologies Co., Ltd.
July 2012 July 2013 (1 year 1 month)NCR - National Capital Region,
Philippines
Reporting to the Project Manager for the update of Delivery, create time
plan for the start of Implementation, Integration, rectification, acceptance
Testing, completion of PAT documents, coordinate with documents assistance
for applying PAC (Provisional Acceptance Certificate) and FAC (Final
Acceptance Certificate) for the Node B sites which PAT is done and cleared
punch List, create and send SOW for ASP/Subcon to CEG Department for PO
Reference of our subcon, Coordinate with our ASP/Subcontractor for the
Implementation and coordinate PR Creator for PR request for our
ASP/Subcontractor before start in Implementation of New Node B site for 3G
Phase 4 DMPI roll out Project in the Philippines.
Supervised Subcontractors in Node B (WCDMA DBS 3900) and (APM30)
Rectifiers installation and Testing as per HUAWEI standard, Commissioning,
assist NOC in Integration, troubleshooting and clearing of alarms for 3G
Phase 4 DMPI roll out project in Philippines.
Support HUAWEI SGSN Engineer in IU-Flex trials (SGSN pulling trials),
create MOP, scripts in RNC side and send it to our customer in DMPI 3G
Phase 3 roll out Project in the Philippines.
Support Site Engineer in troubleshooting Node B alarms & RTWP issues and
clearing trouble tickets for DMPI 3G Phase 3 and Phase 4 roll out Project in
the Philippines.
Prepare Node B IP Plan as per CX Homing and RNC Homing and Prepare
Node B Xml Configuration Script for Node B site using CME R011 tools in
DMPI 3G Phase 4 roll out Project in the Philippines.
Completion of new RNC PAT documents files for submission of PAC
(Provisionary Acceptance Certificate) in DMPI 3G Phase 3 and Phase 4 roll out
project in Philippines.
Attend RNC Expansion PAT with Customer representative on site and
support NOC Engineer in executing the MOP for Subrack addition and board
addition in RNC Expansion for DMPI 3G Phase 4 Project in the Philippines
WRAN ENGINEER
HUAWEI TECHNOLOGIES PHILS. INC.
March 2012 June 2012 (4 months)Philippines
Monitoring iManager M2000 OSS, troubleshooting and clearing Node B
existing alarms, Node B Clock Synchronization and RTWP issues for DMPI 3G
Phase 3 and 3G Phase 4 Projects in Philippines.
Coordinates with the Regional Project Manager regarding the Node B Sites
Scheduled for Swapping and remote integration of Phase 3 and Phase 4 DMPI
3G Network Philippines.

Generating Node B XML Configuration using CME R08 tools for DMPI 3G
Phase 4 Project Philippines.
Uploading Node B License in iManager M2000 for DMPI 3G Network.
Node B WBBPb4 (baseband card) card expansion for CE (Channel Element)
Upgrade.
Node B Software upgrade from DBS3800V100R011C00SPC500 to
DBS3800V200R012C00SPC340 and from DBS3900V100R011C00SPC300 to
DBS3900V200R012C00SPC460 through iManager M2000.
WCDMA/LTE RAN Integration Engineer
Ericsson Mexico Global Services Center (GSC)
August 2011 November 2011 (4 months)Ericsson Global Services Center
Via Dr Gustavo Baz 2160, Tlalnepantla, Mexico
Ericsson RBS 6000 E-Node B remote Integration through OSS-RC (OSS-RC
connection through RSG Access with AMOS Tools),Checking the status IP
contact of E-Node B, check and ensure that the correct software package is
Loaded (R9FE L11A), Checking the status of EUtrancellFDD, Checking the
status of MME (there should be at list one MME is enable), checking from OSS
common explorer if E-Node B is Synchronized, from OSS-RC (PCA) loading
Transport Network and Radio Network parameters, from SMO (Software
Management Organizer) Adjust & Install designated E-Node B LKF, Loading
Baseline parameters to clear alarms and set customer specific attributes,
Checking and ensure that the NTP configuration is enabled, in OSS-RC PCA
Load and Activate Neighbor Relations (except L11B software release because
of its ANR feature) and IRAT Relations, Upgrade software package from
CXP102051/10_R9FE release L11A to CXP102051/12_R17AB release L11B,
Unlocked and Unbarred EutrancellFDD during call testing, Locked and Barred
EutrancellFDD after call testing, verify RET and Antenna Near Unit
Configuration for AT&T U.S.A. LTE Project.
Support RETU Calibration and Definitions with VET Antenna of Ericsson RBS
6000 with software package CXP9016868/1_R3AF/14 and Software release
W11 for DIGICEL ABC Jamaica 3G Networks Projects. Ericsson RBS 6000
WCDMA Remote Integration in RNC 3820, Upgrade Node B Software package
from CXP9016868/1_R3AF11 W10 to CXP9016868/1_R4J02 W10, generating
Node B license from ELIS.Ericsson.net Website and install in Node B through
Moshell tools via OSS-RC, clearing alarms , modifying RET profiles, Updating
Node B site status in Site Handler after Integration done, adding Node B
Element in OSS after Integration done and troubleshooting alarms for RLAM EPCS 3G Subtle and Commercial 900 MHZ ENTEL-CHILE Projects.
Conduct Baby setting/checking KPI after Migration of IUCS from ATM to IP
Migration for RNCBAY1 and RNCBAY2 of CLARO Puerto Rico 3G Networks.

Senior Wireless Network Engineer


Huawei Technologies Co.,Ltd
April 2010 August 2011 (1 year 5 months)Skyrise Bldg., IT Park, Lahug
Cebu City, Cebu, Philippines
Assigned in NOC to Monitor BSC 6900, BSC 6810 RNC DBS 3900 Node B
through iManager M2000 Mobile Element Manager and WEB LMT,
Troubleshooting, clearing alarms, Creates IUR Scripts, IUB Scripts, IUPS
Scripts and run in RNC, Creates Node B XML Configuration Documents using
WRAN CME software, support Node B Integration and Node B Re-homing for
DMPI 3G Phase 3 roll out Project in Philippines.
Coordinates with the Field Engineer regarding the Node B Sites Scheduled for
integration.
Testing, Troubleshooting and Commissioning of HUAWEI DBS 3900 Node B for
3G Phase 3 DMPI Project in Philippines.
Prepare needed documents for re-homing Node B sites to another RNC.
Preparation of needed documents for the HSPA+ Trials in 3G Phase 3 DMPI
Project in Philippines.
RAN/TRAN Field Coordinator
LM Ericsson International AB Vietnam
October 2008 February 2010 (1 year 5 months)10th Flr., E Town 2, 364
Cong Hoa Street, Tan Binh District, Ho Chi Minh City
Assigned in Ericsson Vietnam for Vietnamobile Project.
Coordinating the ASP for the update of the Site Survey Report.
Supervise the ASP in Installation of RBS 2216, RBS 2111 and MiniLink TN Roll
Out project for VietnaMobile, Vietnam.
Monitoring the status & the quality of the production of our ASP.
Commissioning, RBS Software upgrading, Integration Tests, troubleshooting,
clear alarms, simulation of external alarms and Assist BSC during Integration
of Ericsson E-GSM 900 RBS 2216, RBS 2216V2 and RBS 2111.
GSM Transmission Line Sweep Testing using ANRITZU Site Master Model
S331D.
Commissioning, Create Traffic routing, testing, Upgrade baseline software,
troubleshooting and clear the alarms of MiniLink TN using MiniLink Craft 2.2 .
Site Quality Auditing.
BSS/RBS Integrator
Ericsson Congo
November 2007 May 2008 (7 months)Brazzaville, Republic of Congo
Assigned in Ericsson Republic of Congo for RBS 2216 and RBS 2116 Roll Out
Project for MTN-CONGO.
Testing, Commissioning, Troubleshooting, Clear the alarms, Simulation of
External Alarms and Assist BSC during Integration of ERICSSON GSM 900 RBS

2216 and RBS 2116.


GSM Transmission Line Sweep Testing using ANRITZU Site Master Model
S331D.
Conducting Pre-Acceptance Test with the client representatives.
Ericsson Mini Link TN PDH Microwave Radio Transmission Commissioning and
Troubleshooting.
RAN Senior Integration Engineer
ERICSSON MOROCCO
February 2007 August 2007 (7 months)Aile Sud de Hay Riad, Bd. Er-RyadAvenue Annakhil, 10000, Rabat, MA
Node B Stand Alone and HUB RBS Configuration, Software package
upgrade, Hardware Testing, Scripts modifications, Onsite Integration by
running IUB using MOSHELL.
Configuration, Commissioning, Integration, Testing, Troubleshooting and
clearing alarms of, Ericsson WCDMA 2100 RBS 3206F, RBS 3206M and RBS
3107 of MEDITEL Telecom 3G roll out projects in Morocco.
Ericsson RXI 820 Configuration and Commissioning.
Ericsson WCDMA RNC 3810 P5 Commissioning, Initial Configuration from
Step 10 to Step 60, Testing, Troubleshooting and clearing alarms and
Software package upgrade from P5 to P6 of MEDITEL Telecom 3G roll out
projects in Morocco.
Node B Pre-Acceptance Testing.
Monitoring the Node B and RNC status, checking and clearing alarms
remotely by using PUTTY release .54 connecting to OSS.
Troubleshooting and tracing traffic routing of Transmission allocated for
Node B.
Making PS/CS calls using Nokia 6680 with FTD software and HSDPA Testing
(upload and download speed test).
Ericsson MiniLink TN PDH Microwave radio commissioning, Upgrade
Baseline Software, Create traffic routing, troubleshooting and clearing
alarms.
Ericsson MiniLink HC SDH Microwave radio commissioning, create Traffic
routing, troubleshooting and clearing alarms.
Coordinating with Project Manager regarding the schedule and daily
activity to meet the deadline as per plan.
RAN Integration Engineer
HAYATT Communications
August 2006 February 2007 (7 months)Life Center Bldg. Shuwaikh, State of
Kuwait

Ericsson WCDMA RNC 3810 P5 Commissioning, Initial Configuration from


Step 10 to Step 60, Testing, Troubleshooting and clearing alarms and
Software package upgrade from P5 to P6 of WATANIYA Telecom 3G/HSDPA roll
out projects.
Supervising Ericsson Node B Indoor Installations as per Ericsson Standard.
Node B Stand Alone Configuration, Software package upgrade,
Reformatting the Flash Disk, Troubleshooting and clear the alarms, Hardware
Testing, Scripts modifications and assist Integration Engineer during
Integration of Ericsson WCDMA 2100 RBS 3206F, RBS 3303, and RBS 3202 of
WATANIYA Telecom 3G/HSDPA roll out projects.
Making Test calls (Video and Voice), MMS and SMS using Sony Ericsson
TEMS Phone model W 900i and Test Data using Sierra Wireless AirCard 800
Series after integration and during acceptance test.
Representative during Procedure Acceptance Test of Ericsson Node B as
per Ericsson Protocol.
Troubleshooting and tracing traffic routing of Transmission allocated for
Node B.
Conducting Feeder cable Sweep Testing prior to the schedule of
acceptance test using ANRITZU Site Master Model 331B.
Doing the task during the schedule of cut over and Integration in swapping
from NOKIA Node B to Ericsson Node B and following the protocols for the
safety of the persons working in site, safety of equipment and minimize
down time.
Coordinating to our project coordinator for the schedule of our daily
activity to meet the deadline as per plan.
Field Engineer
ERICSSON AUSTRALIA
May 2006 August 2006 (4 months)Brisbane, Queensland, Australia
Assigned in Ericsson, Australia as an RBS Engineer for ERICSSON-JERSEY
Project of TELSTRA in Melbourne, Victoria Australia and Brisbane, Queensland
Australia.
Indoor Installation, Filter upgrades, ddTRU EDGE upgrade, Commissioning,
Troubleshooting, Configuration, Create and Install IDB and Assist BSC during
Integration of Ericsson GSM 900 RBS 2206.
GSM Transmission Line Sweep Testing using ANRITZU Site Master Model
332B.
Node B Indoor Installation, Standalone Configuration, Reformatting the Flash
Disk, troubleshooting and assist Integration Engineer during Integration of
Ericsson WCDMA 850 RBS 3206F for TELSTRA-JERSEY Project in Australia.
Doing task during the schedule of Cut over and Integration in swapping from
Ericsson RBS 200 to RBS 2206 and following protocols for the safety of
person working in site, safety of the equipment and minimize down time.

Telecom Engineer
ONYXTEL CONSULTANCY
March 2006 May 2006 (3 months)Talidsay City, Cebu Philippines
Outdoor and Indoor Installation of SIEMENS NEC WCDMA for Globe Telecom
3G Roll out Projects as per SIEMENS Standards.
Handling 3 Technicians/riggers in a team.
Sending daily activity reports for the status of the sites assigned to our
Implementation manager.
GSM Transmission Line Sweep Testing using ANRITZU Site Master Model
331C.
Transmission/RBS Engineer
ALANDICK CORPORATION Phils.
February 2006 March 2006 (2 months)Cebu, Philippines
Assigned in SUN Cellular Phase 5 RBS Expansion Project base; Installation,
Testing, Commissioning, Troubleshooting, Configuration, Create and Install
IDB and Assist BSC during Integration of ERICSSON GSM 1800 RBS 2206.
GSM Transmission Line Sweep Testing using ANRITZU Site Master Model 331C
and ANRITZU CELMASTER Model MT8212A
Team Leader, handling 3 Riggers/Technicians in a Team.
Reporting to our Project Coordinator regarding our daily activity and status of
our sites.
Doing task during the schedule of Cut over and Integration of GSM 1800
ERICSSON RBS 2206 in the sites and following protocols for the safety of
person working in site, safety of the equipment and minimize down Time.
Ericsson Mini Link E Microwave Radio upgrades.
Telecom Engineer
Teledesign Phils. Corp. Inc
October 2005 February 2006 (5 months)Cebu, Philippines
Site survey of existing sites that will be used for Installation Engineering
documents of SUN Cellular Philippines Phase 5 RBS expansion Project.
Installation, Testing, Commissioning, Troubleshooting, Configuration, Create
and Install IDB and Assist BSC during Integration of ERICSSON GSM 1800 RBS
2206 for SUN Cellular Phase 4A Project.
Outdoor and Indoor Installation, Testing, Commissioning and Antenna
Alignment of Ericsson Mini-Link E PDH Microwave radio for SUN Cellular
Phase 4A Projects.
GSM Transmission Line Sweep Testing using Anritsu Site Master Model 332C.
Coordinating to the Project Coordinator regarding our daily activity report,
problem of the project and plan for the next day activity.
Outdoor and Indoor Installation of NOKIA UltraSite WCDMA BTS Supreme
Indoor Cabinet for SMART Philippines 3G roll out project.

Indoor and Outdoor Installation, Testing, and Antenna alignment of CERAGON


SDH Microwave radio of SMART PHILS. Short Haul Project.
Transmission Engineer
ERICSSON KUWAIT
June 2005 October 2005 (5 months)13060 Safat, Kuwait
Assigned in ERICSSON KUWAIT as a CONSULTANT for the ERICSSON MINI-LINK
E PDH Microwave Radio WATANIYA Telecom Change-out Project in Kuwait
from June 23, 2005 to September 30, 2005.
Giving Instructions to each supervisor of the contractor and checking the
quality of their productions as per Ericsson Standards.
Making daily progress report of the project and forwarded to our project
coordinator.
Assisting the contractor in troubleshooting Ericsson MINI-LINK E PDH
Microwave Radio.
Representative of Ericsson during Provisionary Acceptance Test, Final
Acceptance Test and Cut over of ERICSSON MINILINK E PDH Microwave Radio
under WATANIYA Telecom Change-out Project in Kuwait.
Handle the Support and Maintenance of Ericsson MINILINK E PDH Microwave
Radio under WATANIYA Telecom change Out Project in Kuwait before it
handed over to the customer by resolving the trouble tickets at the site.
Coordinating to the contractors for the clearing of Outstanding List Items
before Final Acceptance.
Preparation of Final Acceptance Test Documents of Ericsson MiniLink E PDH
Microwave radio.
Preparing the Material Request of the equipments/materials for each site and
coordinate to the contractor 2 days before the schedule of delivery.
Telecom Engineer
ONYXTEL CONSULTANCY
March 2005 June 2005 (4 months)Talisay City, Cebu Philippines
Site survey and Preparation of materials for the project before
implementation.
Outdoor and Indoor Installation, Testing, Commissioning, Troubleshooting,
Configuration, Create and Install IDB and will assist BSC during Integration of
GSM 900 ERICSSON RBS 2206 for GLOBE Phase 11 Projects.
Outdoor and Indoor Installation, Testing, Commissioning, Troubleshooting,
Configuration, Create and Install IDB and will assist BSC during Integration of
GSM 900 ERICSSON RBS 2207 for GLOBE Phase 11 Projects
Outdoor and Indoor Installation, Testing, and Commissioning of NEC
PASOLINK PDH microwave radio for GLOBE Phase 11 Projects.
Outdoor and Indoor Installation, Testing, and Commissioning of NERA PDH
microwave radio for GLOBE Phase 11 Projects.
Installation of NELTEK 1500-Watts Rectifier for GLOBE Phase 11 Projects.

Sweep Testing of GSM Feeder cable using Anritsu Site Master Model S332C.
Leading a team consists of 3 rigger/technicians.
Sending daily activity reports for the status of the sites assigned to our
Implementation manager.
Telecom Engineer
Teledesign Phils. Corp. Inc
May 2004 March 2005 (11 months)Cebu City, Cebu, Philippines
Site survey and Preparation of materials for the project before
implementation.
Leading a Team that consists of four Technicians/riggers.
On-Call Field Technical Support of SUN CELLULAR Philippines Central Visayas
area, Philippines under EXI Philippines by resolving trouble tickets at the site
and providing overall technical support.
Outdoor and Indoor Installation, Testing, Commissioning, Troubleshooting,
Configuration, Create and Install IDB and will assist BSC during Integration of
GSM 1800 ERICSSON RBS 2206 with TMA for SUN Cellular Phase 4A Projects.
Outdoor and Indoor Installation, Testing, Commissioning and Antenna
Alignment of Ericsson Mini-Link E PDH Microwave radio for SUN Cellular
Phase 4A Projects.
Installation & Commissioning of EMERSON Network 1500 Watts Rectifier for
SUN Cellular Phase 4A Projects.
Performing 24 hours hop stability test using NETTEST BER Test equipment.
Sweep Testing of GSM Feeder cable using Anritsu Site Master Model S332C.
Making daily progress report of the project and forwarded it to our project
coordinator.
Telecom Engineer
Advance Communications and Electronics System
January 2002 January 2004 (2 years 1 month)Riyadh, Kingdom of Saudi
Arabia
Preparation of materials for the project before implementation.
Leading a Team that consists of 4Technicians/riggers.Outdoor and Indoor
Installation, Testing and Commissioning of Harris
FarrinonMicroStarL15GHZPDHMicrowaveRadioinCivilandInstallationPhase1Pro
jectsofSaudiTelecomCompany.OutdoorandIndoorInstallationandCommissionin
gofHarrisFarrinon Micro Star M
7GHZPDHMicrowaveRadioinCivilandInstallationPhase1ProjectsofSaudiTelecom
Company.OutdoorandIndoorInstallation,TestingandCommissioningofHarrisFarr
inonMicroStarM/H15GHZPDHMicrowaveRadio.OutdoorandIndoorInstallation,
Configuration, Testing, Commissioning and Integration of Lucent Technology
GSM 900 BTS 2000withduplexerunderSaudiTelecomCompany
CivilandInstallationPhase1ProjectsK.S.A.OncallFieldTechnical
SupportofalltheSitesthatwehadinstalledalongJeddahJizanroadsideprojectofSau

diTelecomCompanybeforehandedovertoSaudiTelecomCompany.Outdoor and
Indoor Installation, Configuration,
Testing,CommissioningandIntegrationofGSM900NOKIAUltraSiteunderSaudiTel
ecomCompanyRoadandVillagesProjectK.S.A.Handletheresponsibilities during
ProcedureAcceptanceTesting
ofHarrisMicrowaveRadioandLucentTechnologyBTS2000ofSaudiTelecomCompa
nyCivilandInstallationPhase1Project.MicrowaveRadiopathprofilesverificationus
ingGarminIIIPlusGPS.Installatin,TestingandcommissioningofPecom15GHZPDH
MicrowaveRadioinGovernmentIntelligentDepartment(GID)Projects,JeddahK.S.
A.SuperviseinImplementingCivilandElectricalworksforCivilandInstallationPhas
e1ProjectsofSaudiTelecomCompanyalongJeddahJizanroad.OutdoorsandIndoor
sInstallation,TestingandCommissioningofHarrisFarrinonMicroStarM23GHzPDH
MicrowaveRadio for Saudi Telecom Company WLL Expansion Project inJeddah
K.S.A.Sweep Testing of GSM Transmission Line usingAnritsu Site
MasterModelS332C.ImplementingCircuitWireOrder(CWO) and making As Built
drawingfortheroutes.InstallationofASCOM
rectifierequippedwith800watts,1200wattsand3000watts.
Telecom Engineer
NOUR Communications
July 1999 September 1999 (3 months)Malaz, Riyadh, Kingdom of Saudi
Arabia
Assigned to Harris Farrinon based in Riyadh, K.S.A. as a Technical Support for
Harris Farrinon Microwave Radio that was installed in K.S.A.; that has been
contracted by Lucent Technologies International Incorporated Saudi Arabian
Branch.
Trained to troubleshoot Harris Farrinon 23 GHZ PDH Microwave Radio with a
capacity of 16E1 and 4E1.
Troubleshooting the reported faulty Harris Farrinon Microwave Radio with a
frequency of 23 GHZ and a capacity of 16E1 and 4E1 by using the software
to communicate the equipment, which I had received from the Manager of
Customer Services in Canada and verify if it is really faulty. If confirmed
faulty, I will request an RMA (Return Material authorization) number from the
repair center in Canada for repair/replacement.
Responsible of upgrading the software of all the Harris Farrinon Microwave
Radio that was installed in the Kingdom of Saudi Arabia except Makkah and
Madinah.
Sending my weekly report to the Manager of the Customer Services based in
Canada containing my daily activity, progress of the project, problems of the
project and my plans to the solution of the problems and my propose activity
for the next week.
Site survey and Preparation of materials for installation.
Outdoor and Indoor Installation, Testing and Commissioning of Harris Farrinon
PDH Microwave Radio with a frequency of 23 GHZ.
Microwave Radio path profiles verification using Garmin III GPS.

Coordinating to the Maintenance Support Engineer of GSM-Operation and


Maintenance/ TEP6 project and the Supervisor of Operation and Maintenance
of Lucent Technologies regarding the actual fault of Harris Farrinon
Microwave Radio on operation in the site (on-air).
Telecom Engineer
ETSI Tech. Inc
January 1995 June 1999 (4 years 6 months)Metro Bank Bldg., Jones Ave.,
Cebu City Cebu, Philippines
Installation of SIEMENS SMA 1 R2 (STM-1 155 Mbit/s) and SMA 4 R2 (STM-4
622 Mbit/s) in Visayas Region (Synchronous Multiplexer Add-drop) and
termination of the 2 Mb/s 8 pairs cable to the terminal block of the digital
distribution frame.
Installation of SIPAC-S-PLUG for SDH and PDH electrical Interfaces in the
terminal panel of the sub-parts of SMA 1 R2 and SMA 4 R2 and termination of
the terminal block of the digital distribution frame (DDF) rack.
Installation of SIEMENS NK 2000 (Network Node) equipment.
Installation, Testing and assists in Commissioning of SIEMENS CTR 190 SDH
Microwave Radio with a frequency of 7 GHZ for ISLACOM Philippines Projects.
Installation, Testing and assists in Commissioning of SIEMENS DRS 155 SDH
Microwave Radio with a frequency of 4.7 GHZ and 6.8 GHZ with and without
Diversity Receiver.
Installation and Orientation of Microwave Radio parabolic Antenna, drum
type with a diameter of 1.8 meters up to 3.7 meters (Andrew Product).
Site survey and preparation of materials for installation.
Preparation of floor layout and Cabling.
Installation of SIEMENS EWSD (Digital Electronic Switching System) network
node and termination to the terminal block of the main distribution frame.
Installation and testing of SIEMENS GR 40 rectifier power supply.
Modification of RNT-1 power supply and upgrading the unit for Digital
Electronic Cordless Telephone Link (DECT-Link).