Malaysia
Below is a detailed summary of the procedures, time and costs to build a warehouse in Malaysia. This includes obtaining
necessary licenses and permits, completing required notifications and inspections and obtaining utility connections.
This information was collected as part of the Doing Business project, which measures and compares regulations relevant
to the life cycle of a small- to medium-sized domestic business in 189 economies. The most recent round of data
collection was completed in June 2015. Read the methodology.
The indicator set on dealing with construction permits was expanded in Doing Business 2016 to include the building
quality control index that measures good practices in construction regulation and assesses the quality control and safety
mechanisms in place for an economys construction permitting system, as well as the quality of the building regulations.
This new index is a component indicator of the ranking on dealing with construction permits. The details are available
under the "Measure of quality" tab.
ABOUT US
PRESS
STANDARDIZED WAREHOUSE
Estimated value of
warehouse: MYR 1,710,865
City:Kuala Lumpur
More Information
Learn more about this
economy
Read the topic methodology
View the rankings
No.
1
Procedure
Obtain technical conditions from the Water Authority SYABAS
Agency: Water Authority SYABAS
Time to
Complete
Associated
Costs
2 days
no charge
2 days
no charge
30 days
MYR 3,180
BuildCo will visit the Water Authority SYABAS to obtain the technical conditions for the design of the water design plans, so
that they are in compliance with regulations.
*2
http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealingwithconstructionpermits/
1/3
2/18/2016
DealingwithConstructionPermitsinMalaysiaDoingBusinessWorldBankGroup
design approval Fee schedule 2 Part II of the Water Services Industry Act of 2006, Rules of 2006. Development between 11PE
and 150PE)
1 day
MYR 120
1 day
MYR 1,913
1 day
no charge
1 day
no charge
1 day
no charge
12 days
no charge
12 days
MYR 17,109
11 days
no charge
3 days
MYR 1,600
1 day
no charge
12 days
no charge
Under OSC 1Submission, all notifications are submitted via OSC. OSC will then distribute notifications to the relevant agencies
such as:
Building Department (B Form - notification to start building work)
Engineering Department (B Form - notification to start earthwork)
Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)
5
*7
*8
* 10
11
12
13
14
http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealingwithconstructionpermits/
2/3
2/18/2016
DealingwithConstructionPermitsinMalaysiaDoingBusinessWorldBankGroup
Fire and Rescue Department will issue the fire clearance letter to the builder.
15
Builders principal submitting person files the certificate of completion and compliance (CCC)
Agency: Building Department and Board of Architect via OSC
1 day
no charge
BuildCo's Principal Submitting Person (the professional architect or engineer responsible for the project) will issue the
Certificate of Completion and Compliance (Form F), enabling the warehouse to be occupied. Two copies of Form F and Forms
G1-G21 must be submitted to the Building Department and to the Board of Architect via OSC.
* Takes place simultaneously with another procedure.
Home / Data / Malaysia / Dealing with Construction Permits
IBRD
IDA
IFC
Legal
MIGA
Home
ICSID
Contact Us
http://www.doingbusiness.org/data/exploreeconomies/malaysia/dealingwithconstructionpermits/
3/3