Documente Academic
Documente Profesional
Documente Cultură
APQP
Advanced
Product
Quality
Planning
Contents
Volvo 3P
2
APQP
Volvo 3P
4
APQP
It is a VOLVO
requirement (incl.
RTS, PAA, PHR) as
specified in SQAM
Pre-requisite: supplier is trained to APQP
according to AIAG reference and its own
development process is in compliance with it
Volvo 3P
5
APQP
Volvo 3P
6
APQP
Volvo 3P
7
APQP
Volvo 3P
8
APQP
Benefits of APQP
QDCF
Supplier involvement
Room for Manoeuvre
IG
VG
CSG
CG
DG
FDCG
IG
PPG
Final
Dvlpt
Detailed
Dvlpt
Concept
Study
Pre-study
FG
LG
RG
Industrialization
EG
Deployment
Costs
Industrial launch
Time
IG
VG
Pre-study
CG
DG
Concept
Study
FG
FDCG
Detailed
Dvlpt
IG
Final
Dvlpt
PPG
LG
Industrialization
CSG
Volvo 3P
9
APQP
RG
EG
Deployment
Volvo 3P
11
APQP
DG
Concept Study
A
Release
SQE coordinates
completion of
VOLVO APQP
activities with the
Project Team
Supplier performs
APQP activities under
its responsibility
Volvo 3P
12
FDCG
Detailed development
APQP
PRODUCT DESIGN
review
Supplier
Product
Design
PPG
Final development
B
Release
Supplier
selected
APQP
KICK-OFF
review
IG
Industrialization
C
Release
Volvo
PPAP
order
APQP
PROCESS DEVELOPMENT
review
Supplier
Process
Design
RG
P
Volvo
PPAP
Release PPAP Approved
amendment
APQP
INDUSTRIALIZATION
review
Supplier
Process
Development
Supplier
Product &
Process
Validation
APQP
APQP
LAUNCH
review
Concept Study
A
Release
SQE coordinates
completion of
VOLVO APQP
activities with the
Project Team
Supplier performs
APQP activities under
its responsibility
Volvo 3P
13
DG
FDCG
Detailed development
B
Release
IG
Final development
Volvo
PPAP
order
APQP
PROCESS DEVELOPMENT
review
Supplier
Process
Design
RG
Industrialization
C
Release
Supplier
selected
APQP
KICK-OFF
review
PPG
P
Volvo
PPAP
Release PPAP Approved
amendment
APQP
INDUSTRIALIZATION
review
Supplier
Process
Development
Supplier
Product &
Process
Validation
APQP
APQP
LAUNCH
review
Project Plan
Projekt milestones
V3P APQP
KO
09w26
P#0
LR
11w27
SoP
11w35
<P-rel>
10w34
P#2
P#3
Process Checkpoints
09w26
PS
W
10w43 10w47
10w25 10w34
09w38
<C-rel>
09w40
Product Milesones
SPR
1 ST
IR
PDR
P#4
10w24
09w38
11w48
Verification PPAP
P-drawing
MRD Blanks 10w28
MRD 10w36
Production 10w38
PSW 10w42
P
S
Allocatition request
Personell BC
Logistic system
Material Handling
Volvo 3P
14
Design
RFQ
Orders
Training
Legend:
KO = APQP Kick-off
PDR = Product Design Review
PDR = Process Design Review
IR = Industrialization Review
1 ST = 1:st part from Serial
SPR = Significant Production Run
LR = Launch Review
Packaging
APQP
CG
B-Sample
OK to...
FDCG
Tool (CS)
DG
Stand: 08.12.2009
2009
NG17
APQP Plan&Review Status
Training
Design Reviews
RTS
Design & Process Changes & Traceability)
Definition of Packaging
Reduce Variation
APQP Feedback / Lessons Learned
Design phase
Design, FEM Analysis
Tier 2 Management - Preliminary Supplier list
Special characteristics - Preliminary list
DFMA Workshop
Preliminary PVR
APQP Kick-Off Review
B-sample phase
V3P input (Customer input)
Product reliability studies & quality goals
Product Assurance Plan
Investment and capacity plan (BC-Pear update for B-review)
Tier 2 Management - Supplier nomination and APQP launch
Special characteristics - Product list
DFMEA
DFMA Review
Prepare B-sample drawings (Brake assembly)
Engineering & Material Specifications
OK to B-sample Brake Hardware
APQP Product Design Review
B-sample drawings to V3P
B-sample release at V3P
Lead time sample parts
B-sample control plan
Preliminary planning for Process capability study
Create B-sample PVR
Delivery 2 sets B-sample to V3P
Release test for vehicle test and assembly of sample brakes
OK haulage / Delivery 3 sets for VI testing (ST1)
Continue Tests following test plan
Vehicle test WT1
Delivery 5 sets for VI testing (ST1, WT2)
Vehicle test ST1
Vehicle test WT2
Design-Review and adaptation
C-sample phase
V3P input (Customer input)
Update Engineering & Material Specifications
DFMA Review
PFMEA
Investment and capacity plan (BC-Pear update for "Tool"-review)
Tier 2 Management - APQP update
Special characteristics - Product and process list
Plan Measurement system and checking aids
APQP Process Design Review
Prepare C-sample drawings (Brake assembly)
OK to Tool (C-Sample)
Plan PHR (pre-PHR)
C-sample drawings to V3P
C-sample release at V3P
Lead time tooling and sample parts
C-sample control plan
Planning for Process capability study
Create C-sample PVR
Delivery 2 sets B-sample to V3P
Tests following test plan
OK haulage / Delivery 10 sets for VI testing (ST2)
Vehicle test ST2
Update Process Flow Chart
Create method sheets and process instructions
Update PFMEA
Process installation
Update Process Flow Chart
Process Validation
Investment and capacity plan (BC-Pear update for "Process"-review)
Tier 2 Management - PPAP and Run@rate
Special characteristics - Matrix
Finalize engineering drawings and models
Validate measurement system and checking aids
Pre-Launch control plan
OK to process validate
PAA
Run @ rate (50 pcs)
APQP Industrialization Review
Operator Training, Production trials
Packaging Validation
Production Control plan
Perform preliminary process capability study
Production Validation testing
Customer PPAP
Process Audit / PPAP-sample production / Capacity verification Run
PSW sign-off V3P
Investment and capacity plan (BC-Pear update for "Deliver"-review)
OK to Deliver
First assembly axle plant
First assembly series truck
PHR
Update Production Control plan
APQP Launch review
Investment and capacity plan (Monitor BC-PEAR)
SOP supplier / ramp-up
SOP axle plant
SOP truck plant
Volvo 3P
15
IG
2010
PPG
Process
Validation
Process
Design
Kick-Off
2011
LG
SOP
Deliver
Industrialization
2012
Launch
2013
9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12
W
W
W
W
W
W / V3P
W
W
Due Date
w1004
w0947
w0947
w0947
w0949
w0949
w1003
w1005
w1005
w1005
w1005
w1005
w1105
w1004
w1004
w1004
w1006
w1008
w1009
w1012
w1025
w1015
w1015
w1020
w1028
w1042
w1043
w1051
w1108
w1050
w1050
w1050
w1101
w1101
w1101
w1101
w1101
w1101
w1101
w1105
w1106
w1108
w1120
w1123
w1127
w1120
w1120
w1122
w1131
w1207
w1208
W
W
W
W
W
W / V3P
V3P
W
W
W
W
W
W / V3P
W
W
W
W
W / V3P
W
V3P
W
W
W
W
W
W
W / V3P
W
V3P
W
V3P
V3P
W
w1122
w1204
w1204
w1204
w1204
V3P
W
W
W
W
W
W
W
W / V3P
W
W
W / V3P
W
V3P
W
W
W
W
W
W
W / V3P
V3P
W
W
W
W
W
w1208
w1208
w1208
w1208
w1208
w1208
w1209
w1235
w1222
w1230
w1232
w1238
w1232
w1232
w1238
w1235
w1234
w1238
w1240
w1242
w1307
w1309
w1309
w1320
w1320
w1344
w1327
w1334
w1336
W
W
W
W
W
W
W
W / V3P
W
W / V3P
W
W
W
W
W
W
W / V3P
V3P
W
W
V3P
V3P
W / V3P
W
W / V3P
W
W
V3P
V3P
4
6
10
4
20
APQP
OBJECTIVES
Detects any deviation,
assesses the risks and
assigns actions
Gives visibility of the
progress to Volvo and
supplier teams
Escalate the roadblocks
to project management /
line organization for
decision or action
Volvo 3P
16
ATTENDEES
Expected attendees :
SQE
Development (SIPD
leader, design engineer)
Buyer
Manufacturing, Logistic,
Geometry, Laboratory
Supplier team (project
leader, engineering, quality,
sales, manufacturing,
methods)
APQP
Buyer
Supplier
project team
updates its
APQP plan and
evaluate the
project status:
Timing &
Results
SQE
Design
engineer
Participates in APQP reviews for Key Components
Ensures that all PRODUCT design , verifications & validations activities are integrated/completed: timing and results
Volvo 3P
17
APQP
Volvo 3P
18
APQP
Volvo 3P
19
APQP
APQP plan
not secured
Very limited
corrective
action plan
Supplier's Participant:
XXX
Volvo's Participants:
XXX
Volvo
Brand:
P2685
Model / Program:
20/08/2009
task #
Expectations
4
5
20
Volvo's
Responsible
20/08/2009
issue
Supplier's
Responsible
Open
Date
Due Date
Close
Date
Completion
waiting
20%
40%
60%
80%
90%100%
Risk Level
10
No
100
0
waiting
OK
Yes
G
G
G
Yes
Yes
Yes
To be sent to 3P
To be sent to 3P
To be sent to 3P
Yes
Y
NA
OK
3
0
P.Johansson
P.Johansson
P.Johansson
Tony
Johansson
w927
w927
w927
w929
w929
w929
w927
W935
W934
W934
W934
0
0
0
5
waiting
1
0
NA
Are Interfaces in the full environment given by Volvo ? (First Space Envelope, Packaging Module)
NA
NA
G
NA
Are technical specifications relevant according to the design goals based on supplier know how ?
Does the supplier understand all the applications and intended end uses of the part/ marterial for all
customers? Included Part functionnality ?
Does the supplier have and understand ISO/ TS 16949, FMEA manual, SPC Manual, Measurement
Systems Analysis Manual , PPAP Manual , APQP and Control plan Manual ?
Has the supplier taken acknowledgement of VOLVO APQP instruction, and Toolboxes, has he
understood VOLVO expecatations ?
has the supplier taken acknowledgement of all the necessary VOLVO's corporate standards
Are National and International Core Standards available at Supplier (list to be submitted with the
RTS compliance matrix)
MARKETING STRATEGY
Non Applicable at this stage
BENCHMARK DATA
Has similar products lessons learned been considered to answer to RFQ ?
Has similar processes lessons learned been considered to answer to RFQ (in term of technologies,
best practices in lean, reliability )?
PRODUCT RELIABILITY STUDIES
& QUALITY RELIABILITY GOALS
Yes
Ingemar Dagh
w927
w934
0
0
0
w934
0
0
Yes
SQAM to be commented
Tony
Johansson
T.Larsson
G
NA
NA
G
G
0
OK
waiting
OK
0
0
0
0
0
G
R
Risk
Is quality past experience (customer and internal PPM, field failures,campaigns, process
capabilities) have been taken into account for setting up quality and reliability targets ?
No
50
No
50
No
10
NA
G
G
waiting
6,7
0
0
0
No
Are PPM at VOLVO expected level, and can this level be justified ?
No
Are a Field failure frequency at VOLVO expected result? Can this level be justified ?
PRODUCT ASSURANCE PLAN
G
Y
OK
Is the assistance of the customers quality assurance or product engineering activity needed to
develop or concur to the control plan?
Yes
Has the supplier identified who will assure quality interface with the customer?
Has the supplier identified who will asssure quality interface with tier2 suppliers?
Has the supplier the ability to build the PAP that links its Quality Management System elements and
Volvo APQP documents ?
Volvo 3P
Issues
/
Does recovery
Comm GYR plan secure APQP
ents /
plan ?
Risks
R
Risk
Tony
Johansson
Tony
Johansson
T.Larsson
w927
w935
T.Larsson
w927
w935
50
10
waiting
Pr Johansson w927
0
1
1
G
G
0
0
APQP
XXX
Model / Program:
XXX
XXX
Review Date:
XXX
Supplier's Participant:
XXX
Volvo's Participants:
XXX
task #
1
Expectations
Risk of delay
Due Date
Close
Date
Yes
Yes
F.Paviot
F.Paviot
W917
W917
20%
40%
60%
80%
90%100%
Deviations
Initial Risk
levels
(1,5,10)
10
10
W917
Risk Level
0
0
100%
W917
W917
100%
Yes
Yes
F.Paviot
JD Bonnet
W917
W917
W916
W917
100%
W917
100%
100%
OK
Yes
W916
W916
Yes
G.Gallet
W917
W916
Yes
Schedule to be updated
F.Paviot
W917
W917
Yes
Team Martek
W917
Yes
Y
NA
OK
JD Bonnet
Risk of delay
JD Bonnet
W916
100%
W916
100%
91%
NA
Yes
Yes
W915
1
0
1
0
0
0
0
1
0
0
0
0
0
0
0
100%
JD Bonnet
W916
W916
100%
NA
NA
NA
NA
NA
NA
Last Technical specification to be validated
from Martek
Yes
Yes
Yes
Yes
Development risk
Yes
Development risk
Yes
NA
NA
G
OK
Yes
W916
Yes
W916
OK
Yes
100%
100%
Completion
100%
OK
Yes
21
Open
Date
Volvo 3P
Supplier's
Responsible
100%
Volvo's
Responsible
NA
Are Interfaces in the full environment given by Volvo No 3D = risk of mechanical collision between Converter
? (First Space Envelope, Packaging Module)
and his environment
NA
Does recovery
GYR plan secure APQP
plan ?
G.Gallet
W916
W920
100%
Martek Team
W916
100%
Martek Team
W950
20%
W916
100%
W916
100%
M.Vivert
W916
M.Vivert
W916
100%
100%
OK
0
100%
100%
100%
93%
W916
100%
G
Yes
W916
Yes
W9116
100%
100%
APQP
Volvo 3P
23
APQP
Volvo 3P
25
OBJECTIVES
Make sure the supplier
understands early
enough all the technical
specifications of the
components to be supplied
to Volvo
Supplier agrees on the
feasibility of these
specifications.
ATTENDEES
Expected attendees :
Design engineer
SQE
Buyer
Supplier team
APQP
Temperature
OBJECTIVES
The PAA ensures the
supplier agrees (by written
approval) that the product
he has designed will be
compatible with
environment constraints
when installed and used in
all of the application
environments defined by
Volvo.
ATTENDEES
Expected attendees :
Design engineer
Supplier team
Buyer
Electromagnetic
compatibility
Vibration
Proximity of
other parts
Humidity
Volvo 3P
26
And more...
APQP information for suppliers
APQP
OBJECTIVES
Parts
Delivery
(Inbound
logistic)
Volvo 3P
27
Storage
Tests
Handling
Tooling
Expected attendees :
Volvo Manufacturing team
Supplier team
SQE
Buyer
Rework
Assembly process
Cleanliness
ATTENDEES
And more...
Truck /
Powertrain unit
delivery area
APQP
Volvo 3P
29
APQP
Glossary
APQP: Advanced Product Quality Planning
DFMEA: Design Failure Mode and Effect Analysis
DVP&R: Design Validation Plan and Report
GDP: Global Development Process
GPS: Global Purchasing System
MSA: Measurement System Analysis
PAA: Product Application Agreement
PFMEA: Process Failure Mode and Effect Analysis
PHR: Part Handling review
PPAP: Production Part Approval Process
QDCF: Quality Delivery Cost Features
RFQ: Request For Quotation
RTS Review of Technical Specification
SQE: Supplier Quality Engineer
Volvo 3P
30
APQP