Detailed Estimate

Coastal Climate Resilient Infrastructure Project (CCRIP)


Local Government Engineering Department
Scheme Code

: 38665-15-10002

Road Code

: 38665

Financial Year

: 2014-2015

Scheme Preparation Date : 01-Mar-2015


FY && Type of Rate : 2014-2015 (General)
District : SHARIATPUR

Name of the Scheme : Construction of Proposed 15m long RCC Deck Girder Bridge on the Manda Village to Golar Bazar Road at Ch: 1530m, Upazila: Naria, District: Upazila

NARIA

Shariatpur.
SL Item Code

Description of Work

Unit

Making earthen ring/cross bundh of required height and

LS

Location /

Length

Width

Component
1

1. 4.1.02

Height /

Area /

Depth

Volume

No of
10

Total Qty

Unit

of Works

Rate

11

12

Amount
13

1.00

50000

50000.00

1.00

300000

300000.00

1.00

20000

20000.00

width to prevent water from entering in the working area for


any type of foundation with earth arranged and carried by the
contractor including bullah/bamboo palisading and double
tarja mat/drum sheets walling as and where necessary,
maintaining the same throughout the working period, filling
by throwing earth in layers, removal of structure totally on
completion of the bridge, etc. all complete as per
requirement and instruction of the E-I-C.

2. 2.3.04

Providing and maintaining fully equiped semi pucca field


office with necessary furniture, sanitary & electrical/power
facilities, water supply arrangement, office and survey
equipment for the use of Engineer and his stuff, all complete
including removal of structures and cleaning the site on
completion of the work. All materials and equipement shall
be the property of contractor. The contrator shall submit for
the approval of the Engineer the detailed plans and drawings
of the field office building.
Minimum Size: 15 sqm
Maximum Size: 80 sqm

3. 4.1.07

Pumping and bailing out water/de-watering of work site

LS

including supply, operation and maintenance of requisite


number of water pumps. It should be carried out in such a
manner as to preclude possibilities of the movement of water

through or alongside any concrete being placed, etc. all


complete as per direction of E-I-C.

4. 2.3.05

Maintenance and protection of traffic at all times (at all hours

1.00

10000

10000.00

during the day and night) along the existing roads, rivers or
canals throughout the working period by maintaining all
detours, including additional embankment filling, necessary
barricades, warning lights and guide signs as well as other
equipment, removal of all temporary constructions on
completion of the bridge etc. all complete as per requirement
and instruction of E-I-C.

Scheme Code : 38665-15-10002

Page 1

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

5. 4.3.09.1

Construction of 2m wide temporary bamboo diversion bridge

5
m

No of

Total QtyUnit

Depth

Volume

Bamboo Bridge

25.000

Amount

10
25.000

of Works

Rate

11

12
1.00

13

25.000

with 100mm average dia pucca borak bamboo in 4 (four)


lines of posts longitudinally and required lines of posts 2m c/c

25.000

2395.50

59887.50

1.00

5000

5000.00

LS

2.00

15000

1.00

10000

10000.00

transversely with beams and struts and every post with


double bracings and each post driven to at least 0.75m depth
including half split bamboo decking including supplying nuts,
bolts, etc. fitting, fixing and supply, carrying and cost of all
materials & labour, etc. all complete as per direction of the
Engineer.

6. 32.ix

Supplying Firstaid for all employee, workers and officers

LS

those are engagad in construction site as per EIC

7. 4.1.01.01.01

Sub-soil investigation at the actual locations of each abutment

30000.00
and pier positions in accordance with the specifications of
ASTM D 1586 and D 1587. The bore holes shall have a
minimum diameter of 100mm and shall be lined throughout
and shall be minimum 30m to 45m deep or to a depth as
specified in the ASTM/AASHTO or as directed by the E-I-C
from the existing GL and taking all cautions and steps to
collect the disturbed and undisturbed samples and making
the bore holes. The item is inclusive of mobilization &
demobilization, proper method of borings, arrangement of
boat/barge all cost of materials, labourers, field and
laboratory tests including report and records. (The Testing
Party will be selected taking prior approval of Procuring
Entity)

8. 32.111

Providing and maintaining adequate portable water supply LS


and sanitation facilities in labour camps and dust suppression
to the entire satisfaction of the E-I-C. One labour camps for
(iii) dust suppression measures by sprinklling water from wat.

9. 4.1.04

Earth work in excavation in foundation trenches in all sorts of


rocky, gravelly, slushy or organic type, up to a depth of 2m to

cum

Abutment

9.400

6.800

2.500 159.800

2.00

319.600

the lines, grades and elevation as shown on the drawing,

Toe Protection

40.000

0.500

0.775

15.500

1.00

15.500

69.080

1.00

69.080

removing boulders, logs and other objectionable materials,


clearing all loose materials, disposing of all excavated

1/3 of back filling

materials to a safe distance designated by the E-I-C for an


initial lead of 20m, and cut to a firm surface including bailing

404.180

153.61

62086.09

out water, removal of spoils to a safe distance, back filling of


sites of trenches up to original level, shoring if necessary etc.
all complete as per requirement and instruction of the E-I-C.
Back-filled materials shall be compacted to a density
comparable with the adjacent undisturbed material.

10. 4.1.09

Single layer brick flat soling with 1st class or picked kiln burnt

sqm

BFS Abutment base

8.400

5.800

3.142

0.090

0.283

48.720

1.00

48.720

bricks in foundation, filling the interstices tightly with sand of


minimum FM 0.50, watering, leveling, dressing, etc. all

Deduction for Pile

30.00 (-)

8.490

complete as per instruction of the E-I-C.


40.230

Scheme Code : 38665-15-10002

335.96

13515.67

Page 2

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

11. 4.1.10.01.1
cum

No of

Total QtyUnit

Depth

Volume

Amount

10

of Works

Rate

11

12

13

6866.65

51005.48

6.630

5331.05

35344.86

82.824

12429.26

1029441.03

Cement concrete work in foundation with Portland cement,


CC work Abutment base

8.400

5.800

0.075

3.654

2.00

7.308

(-) Deduction for Pile

3.142

0.090

0.075

0.021

40.000

0.250

0.075

0.750

sand (minimum FM 1.80) and 1st class/picked brick chips


20mm down graded (LAA value not exceeding 40), including

30.00 (-)

0.630

shuttering, mixing by concrete mixer machine, casting, laying


compacting and curing for the requisite period breaking

Toe protection wall

1.00

0.750

bricks into chips etc. all complete as per direction of the E-IC. Cylinder crushing strength of concrete should not be less

7.428

than 105kg/cm2 at 28 days of curing (Suggested Mix


Proportion 1:3:6). Additional quantity of cement to be added
if required to attain the strength at the contractors own cost.

12. 4.1.24

Labour for breaking head of cast-in-situ bored pile/pre-cast cum Pile head breaking

3.142

0.090

0.750

0.212

30.00

6.360

0.150

0.150

0.200

0.005

54.00

0.270

pile up to required length by any means and removing the


dismantled materials, such as, concrete to a safe distance

Toe Protection Post

including scrapping and removing concrete from steel/MS


rods, preparation and making of platform where necessary,
carrying, all sorts of handling, stacking the same properly
after clearing, leveling and dressing the site and clearing the
river bed, etc. all complete as per direction of the E-I-C.
(Measurement will be given for the actual pile head volume
to be broken).

13. 4.1.10.02.3
cum

Reinforced cement concrete work in well caps, pile caps,


Pile Cap

8.400

5.800

0.850

41.412

2.00

82.824

bearing sheets, abutment base, etc. with ordinary Portland


cement (OPC/CEM-1), sand (minimum FM 2.50) and 20mm
down well graded crushed stone chips (Preferably stone chips
from Madhyapara, Dinajpur), (LAA value not exceeding 30),
including shuttering, mixing by concrete mixer machine
casting, laying, compacting and curing, for 28 days, breaking
stone boulders into chips etc. all complete as per direction of
the E-I-C but excluding cost of reinforcement. Cylinder
crushing strength of concrete should not be less than
250kg/cm2 at 28 days of curing (suggested mix proportion
1:1.5:3, w/c max. 0.4). Additional quantity of cement to be

added if required to attain the strength at the contractor's


own cost.

Scheme Code : 38665-15-10002

Page 3

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

14. 4.2.01.03.01
cum

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

13

Reinforced Cement Concrete work in diaphragm walls, wing

Abutment wall

7.300

0.550

3.112

12.495

2.00

24.990

Abutment Beam

7.300

0.550

0.100

0.402

2.00

0.804

Abutment beam

7.300

0.788

0.600

3.451

2.00

6.902

Ballast Wall

7.300

0.300

1.588

3.478

2.00

6.956

Bearing seat

0.625

0.810

0.175

0.089

6.00

0.534

Face wall

0.625

1.038

0.225

0.146

4.00

0.584

Wing wall

4.000

5.400

0.475

10.260

4.00

41.040

Wing wall

3.000

4.400

0.475

6.270

4.00

25.080

Fillet Abutment

6.100

0.150

0.300

0.275

2.00

0.550

Fillet Wing wall

4.000

0.150

0.300

0.180

4.00

0.720

Fillet Vertical

3.112

0.150

0.300

0.140

4.00

0.560

walls, piers, columns, abutments of bridges and vertical


members of box culverts with 20mm down graded stone chips
(Preferably stone chips from Madhyapara, Dinajpur), (LAA
value not exceeding 30), sand (minimum FM 2.50) and
Ordinary Portland cement (OPC/CEM-1), having minimum 28
days ultimate cylinder crushing strength of 250kg/cm2
(suggested mix proportion 1:1.5:3, w/c max. 0.4). excluding
cost of reinforcement and its fabrication but including cost of
all other materials, shuttering, casting, curing for 28 days and
all incidental charges, etc. complete in all respect as per
design, drawing and direction of the E-I-C
Upto 5m

108.720

15. 4.2.02.1.3.01
cum

12999.41

1413295.86

Reinforced Cement Concrete work (1:1.5:3, w/c max. 0.4) in

Girder

15.000 0.450

0.900

6.075

3.00

18.225

girders,
cross girders, beams, ribs, fillets, etc. in bridge with 20mm X - Girder

1.950

0.300

0.800

0.468

8.00

3.744

graded stone chips (Preferably stone chips from Fillet

15.000

0.150

0.075

0.169

2.00

0.338

Fillet

14.100

0.150

0.075

0.159

4.00

down well

Madhyapara,
Dinajp)(LAA value not exceeding 30), sand (minimum F

0.636

2.5) and Ordinary Portland cement (OPC/CEM-1), having


minimum 28 days ultimate cylinder crushing
403829.38
250kg/cm2 excluding cost of reinforcement and its
fabrication but including cost of all other materials,

strength of

22.943

17601.42

shuttering, propping,

casting, curing for 28 days and all

incidental charges, etc. complete in

all respect as per

design requirement, drawing and direction of the E-I-C.

16. 4.2.04.03.01
cum

Reinforced Cement Concrete work in deck slab (including

Deck Slab

15.000 7.300

0.200

21.900

1.00

21.900

15.000

0.875

0.250

3.281

cantilever), side walk, curb, wheel guard, etc. in bridge with


stone chips (Preferably stone chips from Madhyapara,

Walk way

2.00

6.562

Dinajpur)(LAA value not exceeding 30), sand (minimum FM


2.50) and Ordinary Portland cement (OPC/CEM-1), having

28.462

14727.70

419179.80

minimum 28 days ultimate cylinder crushing strength of


250kg/cm2 (suggested mix proportion 1:1.5:3, w/c max. 0.4)
excluding cost of reinforcement and its fabrication but
including cost of all other materials, shuttering, casting,
curing for 28 days and all incidental charges, etc. complete in
all respect as per design, drawing and direction of the E-I-C.

Scheme Code : 38665-15-10002

Page 4

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

17. 4.2.05.04 Reinforced Cement Concrete work in railing and rail post with

5
cum

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

Rail Post

0.200

0.200

1.050

0.042

46.00

24.150

0.150

0.150

0.543

6.00

3.258

13

1.932

stone chips (Preferably stone chips from Madhyapara,


Dinajpur)(LAA value not exceeding 30), sand (minimum FM

Rail Beam

2.50) and Ordinary Portland cement (OPC/CEM-1), having


minimum 28 days ultimate cylinder crushing strength of

5.190

15971.08

82889.91

10704.87

44157.59

3.09

154067.40

22.80

16416.00

250kg/cm2 (suggested mix proportion 1:1.5:3, w/c max. 0.4)


excluding cost of reinforcement and its fabrication but
including cost of all other materials, shuttering, casting,
curing for 28 days and all incidental charges, etc. complete in
all respect as per design, drawing and direction of the E-I-C.

18. 4.2.09

Providing 50mm average thick wearing course (1:1.5:3) on cum

Wearing Course on Deck

deck slab of bridge with cement, sand (minimum FM 2.50)

Slab

15.000

5.500

0.050

4.125

1.00

4.125

and 6mm down graded boulder chips, mixing concrete, laying


cost of all materials, labour and transportation to the site,

4.125

etc. all complete as per direction of the E-I-C

19. 4.3.21.01 Welding at the splicing point of main reinforcement at 3

each

Welding (Spiral)

49860.000

1.00

49860.000

points (each point being 25mm in length) and each alternate


contact point of spiral binder tie rod with the main vertical

49860.000

reinforcement of the bored piles using electrodes including


the cost of all materials, labours, tools and equipment, the
cost of power, etc. all complete as per drawings,
specifications and directions of the Engineer.
For spiral spot welding,(each alternate contact point of spiral
binder tie rod with the main vertical reinforcement)

20. 4.3.21.02 Welding at the splicing point of main reinforcement at 3

each

Welding (Main rod)

720.000

1.00

720.000

points (each point being 25mm in length) and each alternate


contact point of spiral binder tie rod with the main vertical

720.000

reinforcement of the bored piles using electrodes including


the cost of all materials, labours, tools and equipment, the
cost of power, etc. all complete as per drawings,
specifications and directions of the Engineer.
For lap welding of main reinforcement,3points (each point)

21. 4.1.27.1.2 Conducting static load test as per ASTM D1143 or equivalent

each

Static load test

1.000

1.00

1.000

standard for the cast in situ/ precast pile providing required


scaffolding, bracing, jacks, pressure test gauge, loading

1.000

104067.05

104067.05

unloading, arranging other necessary plants and equipment


including staging, mobilization, demobilization, hire charge,
gunny bags, sand and filling sacs/gunny bags for loading,
record readings and preparation of results in standard forms
and other incidental charges as per standard practice and
procedures including submission of load test report,
furnishing all graph and chart etc. complete in all respects
approved and accepted by the Engineer (Minimum two cyclic
loading). Before commencing load test, Contractor shall
submit method statement for conducting load test to the
Engineer for approval. However, Engineers approval shall
not relieve the Contractor of his responsibilities and
obligations under Contract. (Testing party will be selected
taking prior approval of Procuring Entity)
Using sand filled Gunny Bag/Concrete Block or Equivalent
Above 75 ton and upto 125 ton

Scheme Code : 38665-15-10002

Page 5

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

22. 4.1.27.8.1 Integrity test of cast-in-situ/pre-cast pile by placing a small set

Integity Test

No of

Total QtyUnit

Depth

Volume

10

1.000

3.00

Amount
of Works

Rate

11

12

13

3.000

accelerometer on the top of a pile while hitting the pile head


with a small hammer. The shock wave traveling through the

3.000

26035.36

78106.08

255.56

14720.26

14185.55

99298.85

pile propagate with the velocity of sound in concrete which is


3000-3500 m/s approximately or as decided by the Engineer,
as per approved method.
For upto 10 nos. pile of a single bridge

23. 4.3.01.04 Providing rainwater down pipe including placing in position m


and cost of all materials as per drawing and direction of the

75 mm dia PVC Pipe Deck

0.400

0.400

18.00

7.200

0.600

0.600

84.00

50.400

Slab

E-I-C.
Abutment & Wing wall

57.600

24. 4.3.06.1

Supplying, fitting and fixing steel laminated Elastomeric/

set

Bearing Plate

7.000

1.00

7.000

Neoprene bearings (preferably from MagebaSwitzerland/Canada/India or equivalent) in exact positions as


per drawing, specifications conforming to ASTM D4014 and
direction of the E-I-C including cost of all materials, labour,
carrying etc. complete ( The set shall be of 100% virgin
chloroprene Neoprene rubber consisting of one or more
vulcanized elastomeric material pads bonded to rolled mild
steel metal plates to form a sandwich arrangement etc. to
complete the support of a girder at each end). Laboratory test
to be performed from BUET, Dhaka for compression set
value maximum 35% after 22 hr. at 100 0C conforming to
ASTM D-395 method B, Elastomeric content minimum 60%,
Ash content maximum 5%, Shear mudolus 0.80 - 1.2 N/mm2
and Elastometer hardness limits=605 duro conforming to
ASTM D 2240. The type of bearings will be used for bridge
beyond 12.0 m span. Bearing sizes are as follows ( one set
extra for laboratory test). Size =length x breadth x thickness .)
Supplying, fitting and fixing steel laminated Elastomeric/
Neoprene bearings in exact positions as per drawing,
specifications conforming to ASTM D4014 and direction of the

7.000

E-I-C including cost of all materials, labour, carrying etc.


complete ( The set shall be of 100% virgin chloroprene
Neoprene rubber consisting of one or more vulcanized
elastomeric material pads bonded to rolled mild steel metal
plates to form a sandwich arrangement etc. to complete the
support of a girder at each end). Laboratory test to be
performed from BUET, Dhaka for compression set value
maximum 35% after 22 hr. at 100 0C conforming to ASTM D395 method B, Elastomeric content minimum 60%, Ash
content maximum 5%, Shear mudolus 0.80 - 1.2 N/mm2 and
Elastometer hardness limits=605 duro conforming to ASTM
D 2240. The type of bearings will be used for bridge beyond
12.0 m span. Bearing sizes are as follows ( one set extra for
laboratory test). Size =length x breadth x thickness .)
Size : 300mmx350mmX40mm

Scheme Code : 38665-15-10002

Page 6

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

25. 4.3.05

Providing expansion joints between the breast walls

kg

(abutment top wall) and girders or in between the girders

5
Expansion Joint

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

5.700

10.990

62.643

6.00

375.858

5.700

11.715

66.776

2.00

133.552

13

75x75x10mm Angle

with steel sheet and filling the gap with sand and bitumen
(80/100) as per design, drawing and direction of the E-I-C.

12x125mm MS Plate

509.410

26. 5.16.06.01 Painting with acrylic emulsion paint (silky finish) of best

sqm

Painting on Rail Post

0.800

1.050

0.840

46.00

38.640

27.150

0.600

16.290

6.00

97.740

160.55

81785.78

190.01

25913.56

1407.60

2815.20

3000

3000.00

154.58

77290.00

quality and approved colour from authorized manufacturer in


a seal container, to wall and ceiling in two coats over a coat

Painting on Railing

of acrylic sealer Applying one vertical and one horizontal coat


for each coat and successive coat is to be applied after drying

136.380

up of previous coat by brush/roller/spray in/c cleaning the


plinth, floors, doors, windows, portions and ventilators by
washing, rubbing, as necessary and sand papering the
surface and necessary scaffolding, etc. curing for the requisite
period etc. all complete for all floors i/c cost of all materials
as per direction of the E-I-C.

27. 6.13.07

Supplying, fitting and fixing 300mmx300mmx20mm thick each

Name Plate

2.000

1.00

2.000

marble Name plate at left hand wheel guard on each side,


one in English and one in Bengali including cost of materials,

2.000

labour, form work, engraving neatly the approved Sample


given by the engineer etc. complete as per drawings and
direction of the Engineer-in-charge.

28. 6.01.18

Supplying Sign Board at site of 1.5mx1.0m size in plain CI LS

1.00

sheet; painting, writing, erecting & fixing with bamboo


including all complete as per direction of Engineer-in-

29. 2.02.2

Earth filling work with specified soil in any type of

cum

embankment including cutting, carrying, filling by throwing

Earth filling in Approach

500.000

1.00

500.000

& Wing wall portion

earth in layers not more than 150mm in each layer in proper


alignment, grade, camber and side slope in all types of soil
except rocky, gravelly and slushy including benching not more
than 30cm in vertical and 60cm in horizontal steps along the

500.000

sides while widening any embankment, etc. all complete as


per the direction of E-I-C. Earth shall be arranged by the
contractor at his own cost and it will include all necessary
lead & lift. Payment will be made on the basis of compacted
volume.
Note: This item shall be used when the work will be done by
contractor

Scheme Code : 38665-15-10002

Page 7

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

30. 2.03.1

Manual compaction of earth in 150mm thick compacted layers

cum

No of

Total QtyUnit

Depth

Volume

10

Manual Compaction 200.000

Amount
of Works

Rate

11

12
1.00

13

200.000

by breaking clods to a maximum size of 25mm using wooden


drag or ladder and compacting using concrete drop hammer

200.000

33.47

6694.00

120.000

18.61

2233.20

108.000

313.09

33813.72

(Durmus), watering or drying to obtain optimum moisture


content if necessary including supplying of wooden drag,
ladder, bamboo hammer, steel/concrete hammer and other
requisite tools, etc. all complete as per direction of the E-I-C.
85% compaction of the maximum dry density is to be
obtained by the standard compaction test (Rate is for each
layer of 150mm thick)

31. 5.03.10

Providing single layer polythene sheet (0.18mm thick)

sqm

Toe Wall

40.000

0.250

10.000

1.00

10.000

Approach Road Bed

10.000

5.500

55.000

2.00

110.000

weighing one kilogram per 6.5 square meter in floor or any


where in ground floor underneath the cement concrete, etc.
all complete as per specifications and direction of the E-I-C.

32. 4.1.10.04.1

Pre-cast driven of various sizes micro pile with reinforced

m Pre Cast Post

2.000

2.000

54.00

108.000

cement concrete having minimum cylinder crushing strength


of 305kg/cm2 at 28 days (suggested mix proportion
1:1.25:2.5, w/c max. 0.4) with best quality Ordinary Portland
cement (OPC/CEM-1), best quality Sylhet sand (minimum FM
2.5) and best quality 20mm down graded crushed stone chips
(Preferably stone chips from Madhyapara, Dinajpur)(LAA
value not exceeding 30), screening through proper sieves,
cleaning and washing thoroughly, centering and shuttering
with MS sheet and steel form, placing of reinforcement cage
in position, mixing the aggregates with mixer machine,
casting in steel forms, using concrete or similar suitable
chemicals, compacting by mechanical vibrators and tapered
rods and curing for 28 days etc. all complete as per design &
drawing fitting and fixing the pile cap, driving the pile upto
the design depth as per standard practice or specified
method, providing all equipment, labour, materials including
carrying etc. all complete as per design, drawing and

direction of the E-I-C. (Excluding the cost of reinforcement


and its fabrication)

Scheme Code : 38665-15-10002

Page 8

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

33. 4.1.10.04.2

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

13

Pre-cast driven of various sizes micro pile with reinforced

m Post driven 1.700

1.700

54.00

91.800

cement concrete having minimum cylinder crushing strength


of 305kg/cm2 at 28 days (suggested mix proportion

91.800

163.53

15012.05

1:1.25:2.5, w/c max. 0.4) with best quality Ordinary Portland


cement (OPC/CEM-1), best quality Sylhet sand (minimum FM
2.5) and best quality 20mm down graded crushed stone chips
(Preferably stone chips from Madhyapara, Dinajpur)(LAA
value not exceeding 30), screening through proper sieves,
cleaning and washing thoroughly, centering and shuttering
with MS sheet and steel form, placing of reinforcement cage
in position, mixing the aggregates with mixer machine,
casting in steel forms, using concrete or similar suitable
chemicals, compacting by mechanical vibrators and tapered
rods and curing for 28 days etc. all complete as per design &
drawing fitting and fixing the pile cap, driving the pile upto
the design depth as per standard practice or specified
method, providing all equipment, labour, materials including
carrying etc. all complete as per design, drawing and
direction of the E-I-C. (Excluding the cost of reinforcement
and its fabrication)

34. 3.11.11.1 Supplying and laying of a geo-textile filter between CC blocks

sqm

Geo-Textile 200.000

1.00

200.000

and embankment slopes properly with non-woven needle


punched type geo-textile filter of different grades,
specification for effective erosion protection in hydraulic
structures/river training works including local handling
placing in position, providing machine seamed joints (with
100% polypropylene or nylon thread) or 35cm lap in dry
condition or minimum 100cm lap under water including
protecting the geo-textile material; from UV ray and from any
other damages etc. all complete in all respect as per
approved drawing, specification and direction of the
Engineer-in-charge. (Geo-textile delivered at site should be
clearly labeled with brand name and grade printed at
regular intervals across the body of the fabric)

200.000

151.50

30300.00

Grade-I : Specification of which Mass (minimum) =170


gm/m2, Thickness under pressure 2kpa (minimum)=1.5mm,
Strip tensile strength (minimum)=12.0kn/m, Elongation
(minimum) =35%, Grab tensile strength (minimum)=700 N,
CBR puncture resistance (minimum)=2000 N, Effective
opening size (Maximum) = 0.10mm, Permeability vertical
under 2 kpa pressure h is 100mm (minimum)=0.003 m/s and
Permeability horizontal under 2 kpa pressure

35. 4.12.02

Labour charge for protective works in laying C.C blocks of cum

Labour Charge for CC

different sizes including preparation, watering and ramming

block laying

0.400

0.400

0.100

0.016 1000.00

16.000

of base etc. all complete as per drawing & direction of the


Engineer in charge

Scheme Code : 38665-15-10002

16.000

621.05

9936.80

Page 9

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

36. 3.03.3.4

Providing compacted aggregate sand sub-base course with cum Sand Khoa Mix under Geo
38mm down Crusher run 1st class bricks/picked chips of LAA

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

45.000

5.250

0.075

17.719

4.00

70.876

10.000

5.500

0.150

8.250

2.00

16.500

13

textile

value not exceeding 40 & sand of minimum FM 0.80 mixed in


proportion 1:1 by volume placed in layer(s), mixing properly,

Approach

watering, compacting with 8~10 tonne road roller to give


compaction to 98% of MDD (modified) including supplying of

87.376

2462.42

215156.41

10508.97

12610.76

all materials, labourers, tools and equipment etc. all


complete as per direction of the E-I-C. Minimum CBR
requirement for sub-base course is 32%.

37. 3.11.04.2 Reinforced cement concrete in Protective Works using steel cum Toe Protection Beam

40.000

0.150

0.200

1.200

1.00

1.200

shutter, with picked brick chips and minimum cement content


relates to mix ratio 1:1.5:3 satisfying specified minimum
compressive strength 21Mpa at 28 days on standard cylinders
as per standard practice of code ACI/ASTM & Portland
Cement (OPC)/Portland Composite Cement conforming to BS
-12, ASTM-C 150 (Type ASTM C-595/ EN 197-1), best quality
sand [50% quantity of medium sand (FM. 1.2) and 50%
quantity of coarse sand of equivalent FM = 2.2] and 25mm
down well graded picked brick chips (LAA value not exceeding
40) conforming ASTM C-33 including breaking chips and
screening, making, placing shutter in position and
maintaining true to the alignment, making shutter water-tight
properly, placing reinforcement in position, mixing in
standard mixture machine with hoper fed by standard
measuring boxes, casting in forms, compacting by vibrator
machine and curing for 28 days, removing centeringshuttering after specified time approved, including cost of
water, electricity, additional testing charges of materials and
cylinders required by Engineer, other charges etc. all
complete approved and accepted by the E-I-C. Additional
quantity of cement to be added if required to attain the
strength at the contractors own cost. (Rate is excluding the
cost of reinforcement and its fabrication, placing and binding
etc.)

1.200

38. 3.01.4.1

Earth work in box cutting on road crest up to 450mm depth, sqm Box cutting in approach

10.000

5.500

55.000

2.00

110.000

maintaining proper grade, camber and alignment, super


elevation on curves, removing soil to a safe distance,

110.000

50.06

5506.60

552.31

12150.82

spreading the excavated earth on road flanks and slopes


uniformly including leveling, dressing, watering, compacting
the sub-grade by manual labour, etc. all complete as per
direction of the E-I-C.

39. 3.02.1.1

Sand (FM 0.50) filling on the road bed in the improved sub-cum

Sand Filling on Approach

10.000

5.500

0.200

11.000

2.00

22.000

grade with sand free from dust, earth, other vegetable


growth and foreign materials including supplying all

22.000

materials, spreading, watering, compacting by appropriate


mechanical means to obtain a minimum soaked CBR 8% at
minimum compaction 98% of MDD (Modified), etc. all
complete as per direction of the E-I-C.

Scheme Code : 38665-15-10002

Page 10

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

40. 3.04.3.2

Brick on end edging (125mm across) with 1st class/picked m

Brick on end edging

No of

Total QtyUnit

Depth

Volume

10.000

10.000

10
4.00

Amount
of Works

Rate

11

12

13

40.000

bricks including cutting trenches true to level & grade,


removing earth, re-filling & ramming the sides properly,

40.000

142.67

5706.80

including supplying and filling the gaps with local sand, etc.
all complete as per direction of the E-I-C.

41. 3.08.4.2

Providing Single layer brick flat soling (BFS) with 1st class or

sqm

BFS in Approach

7.500

5.500

41.250

2.00

82.500

picked bricks, true to level, maintaining camber/super


elevation and grade including carrying bricks, filling the

82.500

311.85

25727.63

533.99

44054.18

6293.12

62931.20

37.61

11283.00

interstices tightly with sand of minimum FM 0.80, etc. all


complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge.

42. 3.08.5.2

Providing Brick on edge pavement in single layer of Herring sqm HBB in Approach

7.500

5.500

41.250

2.00

82.500

Bone Bond (HBB) with 1st class or picked bricks true to level,
maintaining camber, super elevation and grade, including

82.500

supplying and laying 25mm thick sand (FM 0.80) cushion over
the BFS, filling the interstices tightly with same type of sand,
etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge.

43. 4.1.14.01 First class brick works in cement mortar (1:4) in staining of cum B/W in Toe wall

40.000

0.250

1.000

10.000

1.00

10.000

wells with sand (minimum FM 1.50) and cement, cutting


bricks to required sizes, hoisting and keeping in position the

10.000

MS bond rods and finished with flush pointing joints,


watering, etc. complete including cost of all materials but
excluding cost of MS bond rods and bottle nuts, etc. all
complete as per direction of the E-I-C.

44. 2.03.2

Mechanical compaction of earthworks in 150mm thick

cum

Mechanical Compaction

300.000

1.00

300.000

compacted layers by breaking clods to a maximum size of


25mm using wooden drag or ladder and compacting using
mechanical equipment, watering or drying to obtain optimum
moisture content watering if necessary including the
equipment and other tools required to work site, etc. all
complete as per direction of the E-I-C. 98% compaction of
the maximum dry density is to be obtained by the standard

300.000

compaction test (Rate is for each layer of 150mm thick).

45. 4.12.01.1 Manufacturing and supplying CC blocks with cement, sand each CC Block

1000.000

1.00

1000.000

(FM>=1.5)and shingles (40 mm down graded) to attain a


minimum 28 days cylinder strength of 9.00 N/mm2

1000.000

102.63

102630.00

(suggested mix proporation1:3:6), including grading,


washings shingles. Mixing ,laying in forms,
consolidating.curing for at least 21 days, including
preparation of platform, shuttering and stacking in
measurable stacks etc.all complete as per direction of the
Engineer in charge (steel shutter to be used)

Scheme Code : 38665-15-10002

Page 11

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

46. 4.3.14

Back filling of abutment with 50:50 best quality picked brick

5
cum

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

Abutment

6.100

0.450

4.850

13.313

2.00

7.000

0.450

3.850

12.128

4.00

48.512

13

26.626

khoa & sand of min. FM 1.00 of 450mm width, in layers of


150mm thickness free from dust impurities etc. including

Wing wall

compacting using steel or concrete drop hammer (durmus),


watering & dressing and including supply & cost of all

75.138

1575.54

118382.92

546.26

6030.71

1325.43

53017.20

materials, carrying and labour, arranging and supplying of


steel/concrete hammer and other tools required to work site
etc. al complete as per direction of the E-I-C. Payment to be
made for the compacted volume only for a compaction of
90% of the maximum dry density.

47. 4.7.08

Supplying & providing flexible and acrylic type reflectorized sqm Reflectorized Paint for
painting/coating on rail post, rail bars, wheel guard, Pier

0.600

0.800

0.480

23.00

11.040

Post

column etc. including surface preparation, applying paint, all


materials, labour charges, tools, equipments etc. all complete

11.040

as per specification & direction of the Engineer in charge.

48. 3.12.02

Prroviding, fitting and fixing 200mm dia round RCC Guide each

Guide Post

1.000

40.00

40.000

Post 1.70m long as per standard drawing enumerated in


Appendix-7 (type design for Guide Post) with Reinforced
Cement Concrete (1:2:4) with 20mm down well graded brick
chips casting, curing for requisite period, including cost of
providing 4nos.of 12mm dia. Rod of length 1.65m as main
reinforcement and 12 nos. of round shaped 8mm dia rods
used as binders; including two coats of painting with best
quality synthetic enamel paint of approved brand of different
colour and grade to form 6 nos. horizontal alternate bands
in white/yellow and red to 90 cm length standing up above
ground, making hole in ground of 800mm depth and 300m
minimum dia, fixing the guard posts in the same holes and
repacking the earth properly so as to keep the guard posts
standing properly erect in correct position true to line and
length including carriage of RCC Guide Post with due care to
the site including loading into the truck and unloading at site
complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge. Rate is

40.000

inclusive of cost of all materials, labour and all incidental


charges in this connection.

Scheme Code : 38665-15-10002

Page 12

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

49. 4.1.20.1.3(1)
m Pile Boring

No of

Total QtyUnit

Depth

Volume

10

Amount
of Works

Rate

11

12

13

Boring and casting of RCC cast-in-situ piles up to the required

25.900

25.900 30.00

777.000

depth and diameter with temporary steel casing in all types


of soils including 2-chamber slurry tank, drilling with

777.000

1788.67

1389796.59

219.720

10983.24

2413237.49

bentonite circulation (Dry Bentonite powder of liquid limit of


minimum 350 shall be mixed with water @ minimum 4% by
weight to make the fresh drilling fluid of viscosity between 3250 seconds and density less than 1.1gm/cc). Washing bore
hole with bentonite slurry (until the slurry from bore hole
bottom have density less than 1.15gm/cc and sand content is
less than 4%) placing of reinforcement and placing concrete
by tremie pipe with Ordinary Portland cement (OPC/CEM-1),
sand (minimum FM 2.50) and 19mm down graded crushed
stone chips , (LAA value not exceeding 30) to result minimum
ultimate cylinder crushing strength of 250 kg/cm2 at 28 days
(suggested minimum mix proportion 1:1.5:3, w/c ratio
maximum 0.4) with allowable slump of 150mm to 200mm
including cost of all materials, labour, equipment and all
incidental charges but excluding the cost of reinforcement
and its fabrication, etc. all complete as per design, drawing,
specifications and direction of the Engineer. Additional
quantity of cement be added, if required to attain the aforementioned concrete strength, by the contractor at his own
costs.(Boring method shall be selected as set in the drawing).

BORING PERCUSSION METHOD


600mm dia (Note: Pile length will be finalized after received

50. 4.1.20.3(11)
cum

Boring and casting of RCC cast-in-situ piles up to the required

Pile Casting

3.142

0.090

25.900

7.324

30.00

219.720

depth and diameter with temporary steel casing in all types


of soils including 2-chamber slurry tank, drilling with
bentonite circulation (Dry Bentonite powder of liquid limit of
minimum 350 shall be mixed with water @ minimum 4% by
weight to make the fresh drilling fluid of viscosity between 3250 seconds and density less than 1.1gm/cc). Washing bore

hole with bentonite slurry (until the slurry from bore hole
bottom have density less than 1.15gm/cc and sand content is
less than 4%) placing of reinforcement and placing concrete
by tremie pipe with Ordinary Portland cement (OPC/CEM-1),
sand (minimum FM 2.50) and 19mm down graded crushed
stone chips , (LAA value not exceeding 30) to result minimum
ultimate cylinder crushing strength of 250 kg/cm2 at 28 days
(suggested minimum mix proportion 1:1.5:3, w/c ratio
maximum 0.4) with allowable slump of 150mm to 200mm
including cost of all materials, labour, equipment and all
incidental charges but excluding the cost of reinforcement
and its fabrication, etc. all complete as per design, drawing,
specifications and direction of the Engineer. Additional
quantity of cement be added, if required to attain the aforementioned concrete strength, by the contractor at his own
costs.(Boring method shall be selected as set in the drawing).

Concreting (Note: Pile length will be finalized after received

Scheme Code : 38665-15-10002

Page 13

SL

Item Code

Description of Work

Unit

Location /

Length

Width

Height / Area /

Component
1

51. 4.2.06.02 Supplying and fabrication of M.S High strength Ribbed

4
kg

(deformed) bar/ Twisted bar reinforcement of required size

No of

Total QtyUnit

Depth

Volume

MS bar as per bar

71729.000

Amount
of Works

Rate

10

11

12

1.00

71729.000

13

Schedule

and length for all types of RCC work in/c straightening the
rod, removing ruts, cleaning, cutting, hooking, bending,

71729.000

88.48

6346581.92

10662.50

234575.00

binding with supply of 22 B.W.G. GI wire, placing in position,


in/c lapping, spacing and securing them in position by
concrete blocks (1:1), metal chairs, etc. complete in/c cost of
all materials, labour, local handling incidentals necessary to
complete the work as per specifications, drawings and
direction of the E-I-C. (Measurement will be based on
standard weight of 490 lbs/ft3. Chairs, laps and separators
will not be measures for payment. The cost of these remains
inclusive in the unit rate)
MS Ribbed Weld able Bar (Deformed Bar) of steel grade RB
400W) with minimum yield stress = 400 MPa & Elongation
14%

52. 3.07.3.2

Providing and laying reinforced, cement concrete pavement cum RCC Road

10.000

5.500

0.200

11.000

2.00

22.000

over a prepared sub-base with crushed stone chips and


minimum cement content relates to mix ratio 1:1.5:3
satisfying specified minimum compressive strength 25.0Mpa
at 28 days on standard cylinders as per standard practice of
code ACI/ASTM & Ordinary Portland Cement (OPC/CEM-l)
conforming to ASTM-C 150, best quality coarse sand of
equivalent FM = 2.5 and 25mm down well graded crushed
stone chips (Preferably stone chips from Madhyapara,
Dinajpur), (LAA value not exceeding 35) conforming ASTM C33 including breaking chips and screening, making, placing
steel shutter in position and maintaining true to the
alignment, making shutter water-tight properly, placing
reinforcement in position, mixing in a batching and mixing
plant as per approved mix design unless other wise approved
by the Engineer, transported to site, laid with a fixed form,
compacting by vibrator machine and finished in a continuous
operation including provision of contraction, expansion and
longitudinal joints, joint filler, joint sealant, debonding strip,

22.000

dowel bar, tie rod, admixtures as approved, curing for 28


days, finishing to lines and grades, removing centeringshuttering after specified time approved, as per drawing
complete, etc. all complete approved and accepted by the EI-C. Additional quantity of cement to be added if required to
attain the specified strength at the contractors own cost. (Rate
is excluding the cost of all reinforcement and its fabrication,
admixtures and joint sealant, etc.)

TOTAL SCHEME AMOUNT:

15,854,482.34

SAY:

15,854,482.00

In Word : Taka (One Crore Fifty-Eight Lac Fifty-Four Thousand Four Hundred Eighty-Two) Only

Scheme Code : 38665-15-10002

Page 14

(.) (..)

(.) () ()

Sub Astt. Engineer

Assistant Engineer

Sr. Assistant Engineer

XEN

Project Director

LGED

LGED

LGED

LGED

LGED

Scheme Code : 38665-15-10002

Page 15