OBJECTIVE
Steam blowing of MS lines, CRH,HRH,SH,RH,HP & LP bypass pipe lines of
turbine is carried out in order to remove welding slag, loose foreign
materials, iron pieces, rust etc. from the system, generated during
manufacturing, transportation & erection.
1)
2)
3)
4)
5)
6)
7)
PUFFING METHOD
CONTINEOUS BLOWING
METHOD
STAGES
Steam blowing done in stages
Stage-1(a)- SH, MSL, ESV, temporary lines
from ESV to EOTV, EOTV to CRH line, CRH lines
upto boiler end with temporary exhaust pipe.
stage 1a end point will be concluded by
observing the indents on the target plate.
STAGE- 1(a)
STAGE- 1(b)
SH,MSL, HP bypass inter connection, hand
operated valve mounted in place of HP bypass
valve and CRH lines upto Boiler end with
temporary exhaust piping.
In this stage 6 to 8 blows will be given through HP
bypass lines to ensure cleanliness of the limb.
EOTV will be kept closed. Manually Operated
Isolation Valves in HP bypass lines will be kept
opened fully.
STAGE- 1(b)
STAGE-2(a)
1a plus reheater, HRH lines , Interceptor
Valve and temporary pipe.
CRH line along with attemperator shall be
welded with reheater before start of stage 2a.
LP bypass lines shall be blanked during stage
2a. Stage 2a end point will be concluded by
observing the indents on target plates
STAGE- 2(a)
STAGE- 2(b)
2a upto IV + LP bypass lines with temporary
exhaust pipe.
Stage 2b blowing will be parallel blow in the
path 2a & 2b. LP Bypass blanks shall be removed
for stage 2b. 4 blows will be given through L.P.
Bypass line to ensure cleanliness of the limbs
STAGE- 2(b)
TARGET PLATE
Generally Stainless steel panel
Target plate set at the first, sixth, ninth, twelfth purging,
thereafter set target for each purging until purging results
qualified .
Width about 8% of the steam vent tubes inner diameter(ID)
and length equal to ID
Brinell hardness < 90
Steam velocity 258 m/sec
Target plates to be introduced just before steam blowing /
light upto be removed soon after blowing is completed.
ESV
MSV
Martyr V/v
ESV
MSV
HP Bypass
Final SH
MS Line
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Martyr V/v
LPBP V/ v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
ESV
MSV
Martyr V/v
MS Line
ESV
MSV
HP Bypass
CRH Drain
Pot
CRH NRV
IP SV
HRH Line
CRH Line
RH O/L Hdr
Open
Close
Martyr Valve
LP Bypass
Final SH
Final SH
Martyr V/v
THANK
YOU